CN102121231A - Direct cable weaving and hanging method for cable strand of suspension bridge - Google Patents

Direct cable weaving and hanging method for cable strand of suspension bridge Download PDF

Info

Publication number
CN102121231A
CN102121231A CN2010106171496A CN201010617149A CN102121231A CN 102121231 A CN102121231 A CN 102121231A CN 2010106171496 A CN2010106171496 A CN 2010106171496A CN 201010617149 A CN201010617149 A CN 201010617149A CN 102121231 A CN102121231 A CN 102121231A
Authority
CN
China
Prior art keywords
strand
unit
suspension bridge
traction
unit strand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2010106171496A
Other languages
Chinese (zh)
Other versions
CN102121231B (en
Inventor
张海良
朱金林
顾庆华
俞建群
谢飞
张德刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Pujiang Cable Co Ltd
Original Assignee
Shanghai Pujiang Cable Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Pujiang Cable Co Ltd filed Critical Shanghai Pujiang Cable Co Ltd
Priority to CN201010617149.6A priority Critical patent/CN102121231B/en
Publication of CN102121231A publication Critical patent/CN102121231A/en
Application granted granted Critical
Publication of CN102121231B publication Critical patent/CN102121231B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention relates to the field of cable suspension of bridges, in particular to a direct cable weaving and hanging method for a cable strand of a suspension bridge. A field direct cable weaving and hanging method for the cable strand of the suspension bridge comprises the following steps of: weaving a unit strand; arranging weaving equipment; drawing the unit strand; thermally casting an anchor; cooling an anchor device; arranging a strand anchor device; and linearly adjusting. The method is characterized in that the unit strand is directly drawn after being woven to erect the suspension bridge. The unit strand is woven after the weaving equipment is arranged and before drawing. The method has high working efficiency, and a large quantity of costs is saved.

Description

The direct volume rope of main rope of suspension bridge strand is hung Suo Fangfa
Technical field
The present invention relates to the suspension cable field of bridge, the direct volume rope that is specially a kind of main rope of suspension bridge strand is hung Suo Fangfa.
Background technology
The erection construction of main rope of suspension bridge mainly contains two kinds of methods at present: aerial braided cable method (AS) and prefabricated strand method (PPWS).During the operation of AS method, utilize a rotating disk and trailer system that individual wire is suspended on the bridge, rotating disk shuttles and sets up steel wire in the bridge two ends, because the steel wire quantity that main push-towing rope unit strand includes is very many, can reach hundreds of, rotating disk needs back and forth operation could satisfy the establishment of a main push-towing rope unit strand for hundreds of times like this, and setting up of a main push-towing rope needs tens up to a hundred main push-towing rope unit strands to form, that is to say that the main push-towing rope with a suspension bridge of AS method establishment needs rotating disk tens thousand of back and forth times, often need the time of 1 year even several years, expend a large amount of time and manpower, work difficulty is big during AS method operation simultaneously, it is big influenced by weather etc., the strand precision of establishment is low, and each steel wire unbalance stress in the rope causes indivedual steel wire stress to concentrate, be unfavorable for the efficient high life operation of strand, cause huge waste.During the operation of PPWS method, in factory, steel wire is made into strand in advance, then strand is transported to the bridge construction scene and hangs the rope installation.PPWS method strand is made the precision height, and installation period is short, and is easy for installation, is subjected to weather effect less.But the PPWS method need be considered the transportation of strand, needs to make a large amount of logistics haulage devices; Because the strand tonnage is all bigger, considers transportation problem, the specification of strand can only be reduced to tens to 100 multifibres; Have to set up anchorage when the strand specification reduces to make bridge construction, cause the anchorage pedestal long-pending huge, increased the consumption of goods and materials at the bridge two ends; Because the most of environment in bridge construction building site are abominable, particularly mountain road transportation, the strand transportation of hundreds of ton is difficulty very.
Summary of the invention
In order to overcome the defective of prior art, a kind of strand precision height, long service life, short construction period, the consumption of materials is few, transport difficulty is low suspension bridge suspension cable erection method are provided, and the direct volume rope that the invention discloses a kind of main rope of suspension bridge strand is hung Suo Fangfa.
The present invention reaches goal of the invention by following technical solution:
A kind of on-the-spot rope of directly compiling of main rope of suspension bridge strand is hung Suo Fangfa, comprise the planning unit strand, during the planning unit strand, steel wire is emitted from thread discharge disk, enter wire sub-panel through guide frame, sending into closing device after wire sub-panel divides silk closes up, again after the shaping of shaping wheel by traction unit machine travel unit, after wrapped machine is wrapped, be delivered to transition apparatus, finish the planning unit strand, it is characterized in that: also comprise the establishment equipment that is provided with, the traction unit strand, the hot-cast anchor, the cooling ground tackle, strand ground tackle and linear these 6 steps of adjusting are installed, the planning unit strand finish establishment equipment is set after and carry out before the traction unit strand.When establishment equipment is set, an end of hanging rope job site suspension bridge bridge tower at main push-towing rope is provided with the establishment district, in the establishment district, establishment equipment is set, establishment equipment comprises thread discharge disk, mistake guide frame, wire sub-panel, closing device, shaping wheel, traction unit machine, wrapped machine and the transition apparatus that is arranged in order, transition apparatus is made up of fixed pulley, movable pulley and pillar, fixed pulley is fixed on the pillar, movable pulley is enclosed within on the pillar and along pillar and slides up and down, fixed pulley and movable pulley are staggered, and the unit strand is embedded in the race of fixed pulley and movable pulley successively.During the traction unit strand, the unit strand is drawn to the top of suspension bridge bridge tower by hoist engine, the unit strand is drawn successively by cat head crawler belt and apparatus for shaping, after in stride traction to another suspension bridge bridge tower.During the hot-cast anchor, the suspension bridge bridge tower at two ends is provided with hot-cast anchor platform respectively, and casting chill casting material carries out the hot-cast anchor to strand.During the cooling ground tackle, the chill casting material is solidified strand two ends, the unit cooling of having finished the hot-cast anchor.When the strand ground tackle is installed, the strand ground tackle at strand two ends, unit is separately fixed at the anchorage place at suspension bridge two ends.During linear adjustment, according to linear with the adjustment unit strand of the position of the design parameters adjustment unit strand of suspension bridge, the design parameters of institute's foundation comprises the sag, elevation, design temperature of suspension bridge design etc.
The on-the-spot rope of directly compiling of described main rope of suspension bridge strand is hung Suo Fangfa, it is characterized in that: after establishment equipment is set, planning unit strand and traction unit strand carry out simultaneously, be promptly to begin the traction unit strand after the front end of steel wire is finished the planning unit strand, the planning unit strand is proceeded in the rear end of steel wire, and during the planning unit strand when traction unit speed of steel wire and traction unit strand the traction unit speed of unit strand be consistent.
The invention has the beneficial effects as follows:
1. the unit strand is finished the establishment back and is directly hung rope, and it is good that the cross sectional shape of strand keeps, and precision is higher, need not to consider large-tonnage, the large volume transportation of strand, the strand specification limit is bigger, can dwindle the anchorage quantity of anchorage zone, operating efficiency improves, and saves costs such as a large amount of manpowers and transportation.
2. omit links such as lopping, one-tenth dish, packing, fixing, transportation, saved cost.
3. make anchor at last, during the establishment strand, do not make anchor after Dang Suotou involves, directly rope is hung in traction, after a strand all draws and finishes, again at two system anchor, at this moment, compiles cable system and trailer system and can carry out the establishment and the traction of a back strand simultaneously, to save time.
4. sync pulling, strand establishment system unifies with the speed of trailer system, and when the establishment system started, the draw-gear startup that also links reduced manually-operated workload, also can suitably manually adjust.
Description of drawings
Fig. 1 is the structural representation of the interior establishment equipment in establishment district among the present invention;
Fig. 2 is the structural representation of transition apparatus among the present invention;
Fig. 3 is the schematic diagram of suspension bridge bridge tower on the traction unit strand among the present invention.
The specific embodiment
Below further specify the present invention by specific embodiment.
Embodiment 1
A kind of on-the-spot rope of directly compiling of main rope of suspension bridge strand is hung Suo Fangfa, comprise the establishment equipment that is provided with, planning unit strand, traction unit strand, hot-cast anchor, cooling ground tackle, installation strand ground tackle and linear these 7 steps of adjusting of carrying out successively, concrete steps are as follows:
When establishment equipment is set, as shown in Figure 1, an end of hanging rope job site suspension bridge bridge tower at main push-towing rope is provided with the establishment district, in the establishment district, establishment equipment 1 is set, establishment equipment 1 is by the thread discharge disk 11 that is arranged in order, cross guide frame 12, wire sub-panel 13, closing device 14, shaping wheel 15, traction unit machine 16, wrapped machine 17 and transition apparatus 18 are formed, transition apparatus 18 as shown in Figure 2, by 3 fixed pulleys 181,2 movable pulley 182 and 5 pillars 183 are formed, fixed pulley 181 is fixed on the pillar 183, movable pulley 182 is enclosed within on the pillar 183 and slide up and down along pillar 183, fixed pulley 181 and movable pulley 182 are staggered, and the unit strand is embedded in the race of fixed pulley 181 and movable pulley 182 successively;
During the planning unit strand, steel wire is emitted from thread discharge disk 11, enter wire sub-panel 13 through guide frame 12, sending into closing device 14 in 13 minutes behind the silk at wire sub-panel closes up, again after 15 shapings are taken turns in shaping by traction unit machine 16 traction units, after wrapped machine 17 is wrapped, be delivered to transition apparatus 18, finish the planning unit strand, the planning unit strand finish establishment equipment is set after and carry out before the traction unit strand, wrapped machine 17 is selected reciprocating type full-automatic wrapped machine for use;
During the traction unit strand, as shown in Figure 3, the unit strand is drawn to the top of suspension bridge bridge tower by hoist engine direction shown in arrow among Fig. 3, the unit strand is drawn successively by cat head crawler belt 9 and apparatus for shaping 10, after in stride traction to another suspension bridge bridge tower;
During the hot-cast anchor, the suspension bridge bridge tower at two ends is provided with hot-cast anchor platform respectively, and casting chill casting material carries out the hot-cast anchor to strand;
During the cooling ground tackle, the chill casting material is solidified strand two ends, the unit cooling of having finished the hot-cast anchor;
When the strand ground tackle is installed, the strand ground tackle at strand two ends, unit is separately fixed at the anchorage place at suspension bridge two ends;
During linear adjustment, according to linear with the adjustment unit strand of the position of the design parameters adjustment unit strand of suspension bridge, the design parameters of institute's foundation comprises the sag, elevation, design temperature of suspension bridge design etc.Each root unit strand has just been determined elevation and sag separately in when design, and must monitor when temperature is fit to, so after the strand ground tackle installs, and must do monitoring and do unit strand linear and suitably adjust.
Embodiment 2
A kind of on-the-spot rope of directly compiling of main rope of suspension bridge strand is hung Suo Fangfa, comprise the establishment equipment that is provided with that carries out successively, the planning unit strand, the traction unit strand, the hot-cast anchor, the cooling ground tackle, the strand ground tackle is installed, stretch-draw and linear these 8 steps of adjusting, after establishment equipment is set, planning unit strand and traction unit strand carry out simultaneously, be promptly to begin the traction unit strand after the front end of steel wire is finished the planning unit strand, the planning unit strand is proceeded in the rear end of steel wire, and during the planning unit strand when traction unit speed of steel wire and traction unit strand the traction unit speed of unit strand be consistent.Other steps are all same with embodiment 1.

Claims (2)

1. the on-the-spot rope of directly compiling of a main rope of suspension bridge strand is hung Suo Fangfa, comprise the planning unit strand, during the planning unit strand, steel wire is emitted from thread discharge disk (11), enter wire sub-panel (13) through guide frame (12), sending into closing device (14) after wire sub-panel (13) divides silk closes up, again after (15) shaping of shaping wheel by traction unit machine (16) traction unit, after wrapped machine (17) is wrapped, be delivered to transition apparatus (18), finish the planning unit strand, it is characterized in that: also comprise the establishment equipment that is provided with, the traction unit strand, the hot-cast anchor, the cooling ground tackle, strand ground tackle and linear these 6 steps of adjusting are installed, the planning unit strand finish establishment equipment is set after and carry out before the traction unit strand
When establishment equipment is set, end at the suspension bridge bridge tower is provided with the establishment district, in the establishment district, establishment equipment (1) is set, establishment equipment (1) comprises the thread discharge disk (11) that is arranged in order, cross guide frame (12), wire sub-panel (13), closing device (14), shaping wheel (15), traction unit machine (16), wrapped machine (17) and transition apparatus (18), transition apparatus (18) is by fixed pulley (181), movable pulley (182) and pillar (183) are formed, fixed pulley (181) is fixed on the pillar (183), movable pulley (182) is enclosed within on the pillar (183) and slides up and down along pillar (183), fixed pulley (181) and movable pulley (182) are staggered, and the unit strand is embedded in the race of fixed pulley (181) and movable pulley (182) successively;
During the traction unit strand, the unit strand is drawn to the top of suspension bridge bridge tower by hoist engine, the unit strand is drawn successively by cat head crawler belt (9) and apparatus for shaping (10), after in stride traction to another suspension bridge bridge tower;
During the hot-cast anchor, the suspension bridge bridge tower at two ends is provided with hot-cast anchor platform respectively, and casting chill casting material carries out the hot-cast anchor to strand;
During the cooling ground tackle, the chill casting material is solidified strand two ends, the unit cooling of having finished the hot-cast anchor;
When the strand ground tackle is installed, the strand ground tackle at strand two ends, unit is separately fixed at the anchorage place at suspension bridge two ends;
During linear adjustment, according to linear with the adjustment unit strand of the position of the design parameters adjustment unit strand of suspension bridge.
2. the on-the-spot rope of directly compiling of main rope of suspension bridge strand as claimed in claim 1 is hung Suo Fangfa, it is characterized in that: after establishment equipment is set, the front end of steel wire promptly begins the traction unit strand after finishing the planning unit strand, the planning unit strand is proceeded in the rear end of steel wire, and during the planning unit strand when traction unit speed of steel wire and traction unit strand the traction unit speed of unit strand be consistent.
CN201010617149.6A 2010-12-31 2010-12-31 Direct cable weaving and hanging method for cable strand of suspension bridge Active CN102121231B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010617149.6A CN102121231B (en) 2010-12-31 2010-12-31 Direct cable weaving and hanging method for cable strand of suspension bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010617149.6A CN102121231B (en) 2010-12-31 2010-12-31 Direct cable weaving and hanging method for cable strand of suspension bridge

Publications (2)

Publication Number Publication Date
CN102121231A true CN102121231A (en) 2011-07-13
CN102121231B CN102121231B (en) 2015-05-06

Family

ID=44249882

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010617149.6A Active CN102121231B (en) 2010-12-31 2010-12-31 Direct cable weaving and hanging method for cable strand of suspension bridge

Country Status (1)

Country Link
CN (1) CN102121231B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104746431A (en) * 2013-12-31 2015-07-01 上海浦江缆索股份有限公司 Schedule adjusting mechanism for directly braiding and erecting suspension bridge main cable and application method thereof
CN110424263A (en) * 2019-08-12 2019-11-08 河源迪奇亚工业技术有限公司 A kind of main rope of suspension bridge directly compiles the progress adjustment mechanism and its application method of rope erection
CN110939066A (en) * 2019-12-06 2020-03-31 中铁大桥勘测设计院集团有限公司 Method for determining tension of anchor cross-wire strand
CN112064384A (en) * 2020-08-17 2020-12-11 中铁大桥勘测设计院集团有限公司 Arrangement structure and arrangement method before extrusion and rounding of main cable of suspension bridge

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2077878U (en) * 1990-08-31 1991-05-29 上海市政工程设计院 Big tonnage cable fastening device
CN1253198A (en) * 1998-11-09 2000-05-17 柳州欧维姆建筑机械有限公司 Method for suspending guys of twisted steel cable for cable stayed bridge
CN1253197A (en) * 1998-11-09 2000-05-17 柳州欧维姆建筑机械有限公司 Method and system for suspending oblique guys of cable stayed bridge
JP2008138388A (en) * 2006-11-30 2008-06-19 Ihi Corp Wire reeling equipment and its operation control method
KR20100090160A (en) * 2009-02-05 2010-08-13 한국과학기술원 Wire cable having sensor unit and manufacturing method of the same

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2077878U (en) * 1990-08-31 1991-05-29 上海市政工程设计院 Big tonnage cable fastening device
CN1253198A (en) * 1998-11-09 2000-05-17 柳州欧维姆建筑机械有限公司 Method for suspending guys of twisted steel cable for cable stayed bridge
CN1253197A (en) * 1998-11-09 2000-05-17 柳州欧维姆建筑机械有限公司 Method and system for suspending oblique guys of cable stayed bridge
JP2008138388A (en) * 2006-11-30 2008-06-19 Ihi Corp Wire reeling equipment and its operation control method
KR20100090160A (en) * 2009-02-05 2010-08-13 한국과학기술원 Wire cable having sensor unit and manufacturing method of the same

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104746431A (en) * 2013-12-31 2015-07-01 上海浦江缆索股份有限公司 Schedule adjusting mechanism for directly braiding and erecting suspension bridge main cable and application method thereof
CN110424263A (en) * 2019-08-12 2019-11-08 河源迪奇亚工业技术有限公司 A kind of main rope of suspension bridge directly compiles the progress adjustment mechanism and its application method of rope erection
CN110424263B (en) * 2019-08-12 2021-08-31 河源迪奇亚工业技术有限公司 Progress adjusting mechanism for direct cable braiding and erection of main cable of suspension bridge and using method of progress adjusting mechanism
CN110939066A (en) * 2019-12-06 2020-03-31 中铁大桥勘测设计院集团有限公司 Method for determining tension of anchor cross-wire strand
CN112064384A (en) * 2020-08-17 2020-12-11 中铁大桥勘测设计院集团有限公司 Arrangement structure and arrangement method before extrusion and rounding of main cable of suspension bridge
CN112064384B (en) * 2020-08-17 2021-11-30 中铁大桥勘测设计院集团有限公司 Arrangement structure and arrangement method before extrusion and rounding of main cable of suspension bridge

Also Published As

Publication number Publication date
CN102121231B (en) 2015-05-06

Similar Documents

Publication Publication Date Title
CN202090286U (en) Traction system suitable for self-anchored type double cable plane suspension bridge
CN201494438U (en) Simple fast-assembling cableway for maintenance and emergency repair of mountain pipeline
CN103620213A (en) Method for setting up, maintaining and disassembling a wind turbine
CN103321416B (en) Construction method for prestress of cable-stayed grid structure
CN102121231A (en) Direct cable weaving and hanging method for cable strand of suspension bridge
CN101725111B (en) Totally enclosed cradle and construction method for suspending cast of concrete by using same
CN107792790A (en) Installation and application for the aerial cableway of mountain region construction material transport
CN104278637A (en) No-catwalk cableway erecting method for main cable strands of suspension bridge
CN103465010B (en) Method for integrally replacing bucket type conveying belt of converter
CN102733314A (en) Walking mechanism for moving hanging basket by front clamp type jack and construction method of walking mechanism
CN204316007U (en) A kind of transmission line crossing construction device
CN104060545B (en) Can be used for the suspension trestle waterborne of pumping of concrete and construction method thereof and purposes
CN104631329A (en) Method for adjusting overall line shape of continuous catwalk of suspension bridge
CN106184237A (en) A kind of Light-duty Quick-installation cableway
CN101487234B (en) Construction method for transverse beam hoisting in-position of arch first and beam late tied-arch bridge
CN105586832A (en) Suspension type catwalk surface net mounting system
CN202755314U (en) Simple support T-beam steel stranded wire pulling machine by prefabricated rear rising method
CN102587284A (en) Independent derrick mast and beam plate mounting method
CN102602398B (en) Quick-transporting method and quick-transport device for foldable temporary cableways
CN204418013U (en) Bridge flange plate is constructed self-propelled cantilever hanging basket
CN104948203A (en) Integral construction method for inclined-shaft tunnel linings and asymmetric mid-wall linings
CN106284989B (en) The sliding form bracing system of double track and complete construction method
CN102275218A (en) Die assembling or removing device and method for assembling or removing die by using same
CN208733454U (en) CFST Arch Bridge external prestressing tie-rod system
CN105220911A (en) A kind of power station flood discharge runner inspection platform and erection method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Direct cable weaving and hanging method for the main cable strands of suspension bridges

Effective date of registration: 20231026

Granted publication date: 20150506

Pledgee: Guangzhong Road Sub branch of Bank of Shanghai Co.,Ltd.

Pledgor: SHANGHAI PUJIANG CABLE Co.,Ltd.

Registration number: Y2023310000679