CN1253197A - Method and system for suspending oblique guys of cable stayed bridge - Google Patents

Method and system for suspending oblique guys of cable stayed bridge Download PDF

Info

Publication number
CN1253197A
CN1253197A CN 98121418 CN98121418A CN1253197A CN 1253197 A CN1253197 A CN 1253197A CN 98121418 CN98121418 CN 98121418 CN 98121418 A CN98121418 A CN 98121418A CN 1253197 A CN1253197 A CN 1253197A
Authority
CN
China
Prior art keywords
cable
suspension
suspension cable
mentioned
haulage gear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 98121418
Other languages
Chinese (zh)
Other versions
CN1122742C (en
Inventor
梁来
穆成君
唐明翰
李义
刘璇
秦立方
方中予
黄芳玮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
OUWEIMU ARCHITECTURAL MACHINERY CO Ltd LIUZHOU
Original Assignee
OUWEIMU ARCHITECTURAL MACHINERY CO Ltd LIUZHOU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by OUWEIMU ARCHITECTURAL MACHINERY CO Ltd LIUZHOU filed Critical OUWEIMU ARCHITECTURAL MACHINERY CO Ltd LIUZHOU
Priority to CN 98121418 priority Critical patent/CN1122742C/en
Publication of CN1253197A publication Critical patent/CN1253197A/en
Application granted granted Critical
Publication of CN1122742C publication Critical patent/CN1122742C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

A method and system for suspending oblique stay cables of the cable-stayed bridge includes such steps as installing guide rope; installing the slide element able to slide along guide rope, suspending the front end of oblique stay cable by the first drawing mechanism composed of lifting cable, fixed pulley block and lifter, suspending said slide element by the second drawing mechanism consisting of drawing cable, fixed pulley block pair and manually or mechanically drawer, fixing the oblique stay cable to said slide element, and suspending said oblique stay cable to the specified position by the first and the second drawing mechanisms. Said method can solve the problems of the deflection of stay cable due to too great a weight and the difficulty for suspending it.

Description

A kind of cable stayed bridge hanging method and suspension of suspension cable
The present invention relates to hanging method and the device of a kind of cable stayed bridge with suspension cable.
In the installation of in the past guy of twisted steel cable for cable stayed bridge, generally be with a drag cable, tie steel strand one end for one of this drag cable, the other end of drag cable is connected with hoist engine by two fixed pulleys, starts hoist engine the steel strand traction enhancement is put in place.Oversize as more than 1000 meters the time when drag-line length, guy of twisted steel cable weight reaches more than 1 ton, and the big sag of its weight is also very big, and except that requiring bigger tractive force, steel strand are sagging, with the ground friction, easily scratch steel strand surface, and drag-line is installed difficulty.
The object of the present invention is to provide a kind of cable stayed bridge hanging method and the suspension with guy of twisted steel cable, this hanging method has solved longer guy of twisted steel cable, and to hang in the rope construction steel strand overweight sagging, scratches and hang the problem of rope difficulty with ground friction.
For reaching above-mentioned purpose, the present invention's cable stayed bridge adopts the installation guide rope, the sliding part that can slide thereon is installed on this guide rope with the hanging method of suspension cable, by the front end of first haulage gear suspention suspension cable, hang the method and system of above-mentioned sliding part and movable and fixed pulley and usefulness by second haulage gear.
Its hanging method step comprises:
1) guide rope is installed, the one end is connected with the beam body, the other end makes guide rope be oblique upper to being connected with body of the tower top;
2) sliding part that can slide is installed thereon on this guide rope;
3) pass through the front end that first haulage gear suspends suspension cable in midair;
4) hang above-mentioned sliding part by second haulage gear;
5) suspension cable is fixed on the above-mentioned sliding part, the point of suspension of the front end of this fixed point and above-mentioned first haulage gear and suspension cable keeps suitable distance, so that this suspension cable can be suspended from specified altitude;
6) drive above-mentioned first and second haulage gears, above-mentioned suspension cable is suspended from assigned position;
The present invention's method and system has the following advantages:
1, adopt two haulage gears to act synergistically simultaneously, alleviated construction labour intensity, accelerating construction progress has reduced construction cost;
2, hook suspension cable with one to a plurality of sliding parts, upwards slide, overcome long overweight steel strand sagging problem along guide line, the one, avoided guy of twisted steel cable and ground friction by the surface of scratch steel strand, the 2nd, laborsaving.
Below in conjunction with drawings and Examples the present invention's cable stayed bridge hanging method and the suspension with suspension cable is described further.
Accompanying drawing is the suspension structure signal of cable stayed bridge of the present invention with suspension cable.
Embodiment
As shown in the figure, cable stayed bridge of the present invention comprises with the suspension of suspension cable:
Guide rope 2, the one end is connected with beam body 10, the other end along oblique upper to being connected with body of the tower 8 tops;
Sliding part 6, it slidably is arranged on the above-mentioned guide rope 2;
First haulage gear comprises lift cable 1, fixed pulley pair 7 1, lifting appliance 4, lift cable 1 one ends and suspension cable 3 front end M points are fixing, the other end is walked around fixed pulley pair 7 1, link to each other with lifting appliance 4;
Second haulage gear comprises drag cable 5, fixed pulley pair 7 2, artificial or mechanical traction device 11, drag cable 5 one ends are fixedly linked with the movable pulley pair 6 of band hook, the other end is walked around fixed pulley pair 7 2, link to each other with artificial or mechanical traction device 11;
Suspension cable 3 can be fixed on the above-mentioned sliding part 6, and this fixed point and above-mentioned lift cable and suspension cable front end M fixed point keep suitable distance, so that can suspension cable 3 be suspended from specified altitude by above-mentioned first haulage gear and second haulage gear.
The step of its hanging method comprises:
1) guide rope 2 is installed, the one end is connected with beam body 10, the other end makes guide rope 2 be oblique upper to being connected with body of the tower 8 tops;
2) the movable pulley pair 6 that can slide is installed thereon on this guide rope 2;
3) lift cable 1 one ends are fixed with being raised guy of twisted steel cable 3 front end M points, the other end is walked around fixed pulley pair 7 1, link to each other with lifting appliance 4.
4) be fixedly linked with the movable pulley pair 6 of drag cable 5 one ends with the band hook, the other end is walked around fixed pulley pair 7 2, link to each other with artificial or mechanical traction device 11.
5) steel strand 3 are buckled in the hook of movable pulley pair 6;
6) start hoist engine 4 and pull steel strand 3 risings by lift cable 1, when 3 one of steel strand rise to 9 aperture following times of anchor hole, constructor on working platform 12 drives secondary 6 hooks of movable pulley with artificial or mechanical traction device 11 tractive drag cables 5 and steel strand 3 risings, and steel strand 3 are penetrated in the anchor hole 9 smoothly.

Claims (5)

1, a kind of cable stayed bridge hanging method of suspension cable, its step comprises:
1) guide rope (2) is installed, the one end is connected with beam body (10), the other end makes guide rope (2) be oblique upper to being connected with body of the tower (8) top;
2) go up the sliding part (6) that installation can be slided thereon at this guide rope (2);
3) pass through the front end that first haulage gear suspends suspension cable (3) in midair;
4) hang above-mentioned sliding part (6) by second haulage gear;
5) suspension cable (3) is fixed on the above-mentioned sliding part (6), the point of suspension of the front end of this fixed point and above-mentioned first haulage gear and suspension cable (3) keeps suitable distance, so that this suspension cable (3) can be suspended from specified altitude;
6) drive above-mentioned first and second haulage gears, above-mentioned suspension cable (3) is suspended from assigned position;
2, realize the suspension of the described method of claim 1, comprising:
Guide rope (2): the one end is connected with beam body (10), the other end along oblique upper to being connected with body of the tower (8) top;
Sliding part (6): it slidably is arranged on the above-mentioned guide rope (2);
First haulage gear: it comprises lift cable (1), and an end of this rope and suspension cable (3) front end M point are fixing;
Second haulage gear: it comprises drag cable (5), and an end of this rope is connected with above-mentioned sliding part (6);
Suspension cable (3) can be fixed on the above-mentioned sliding part (6), this fixed point and above-mentioned lift cable (1) keep suitable distance with suspension cable (3) front end M fixed point, so that can suspension cable (3) be suspended from specified altitude by above-mentioned first haulage gear and second haulage gear.
3, the cable stayed bridge as claimed in claim 1 or 2 hanging method or the system of suspension cable, it is characterized in that: described sliding part (6) is one or more movable pulley pairs, and hook is arranged on it, suspension cable (3) can firmly be buckled on the hook.
4, the cable stayed bridge as claimed in claim 1 or 2 hanging method or the system of suspension cable, it is characterized in that: described first haulage gear comprises lift cable (1), fixed pulley pair (7 1), lifting appliance (4), lift cable (1) one end and suspension cable (3) front end M point be fixing, the other end is walked around fixed pulley pair (7 1), link to each other with lifting appliance (4).
5, the cable stayed bridge as claimed in claim 1 or 2 hanging method or the system of suspension cable, it is characterized in that: described second haulage gear comprises drag cable (5), fixed pulley pair (7 2), artificial or mechanical traction device (11), drag cable (5) one ends are fixedly linked with the movable pulley pair (6) of band hook, the other end is walked around fixed pulley pair (7 2), link to each other with artificial or mechanical traction device (11).
CN 98121418 1998-11-09 1998-11-09 Method and system for suspending oblique guys of cable stayed bridge Expired - Fee Related CN1122742C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 98121418 CN1122742C (en) 1998-11-09 1998-11-09 Method and system for suspending oblique guys of cable stayed bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 98121418 CN1122742C (en) 1998-11-09 1998-11-09 Method and system for suspending oblique guys of cable stayed bridge

Publications (2)

Publication Number Publication Date
CN1253197A true CN1253197A (en) 2000-05-17
CN1122742C CN1122742C (en) 2003-10-01

Family

ID=5227088

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 98121418 Expired - Fee Related CN1122742C (en) 1998-11-09 1998-11-09 Method and system for suspending oblique guys of cable stayed bridge

Country Status (1)

Country Link
CN (1) CN1122742C (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101725114B (en) * 2009-12-08 2011-06-29 中铁大桥(郑州)缆索有限公司 Method for hoisting hawser of long-span cable-stayed bridge and equipment thereof
CN102121231A (en) * 2010-12-31 2011-07-13 上海浦江缆索股份有限公司 Direct cable weaving and hanging method for cable strand of suspension bridge
CN103147404A (en) * 2013-04-02 2013-06-12 中铁大桥局股份有限公司 System and method for hanging stay cable at tower end of height limiting cable-stayed bridge
CN104452594A (en) * 2014-11-05 2015-03-25 武汉二航路桥特种工程有限责任公司 Multi-support cable guide method cable replacement device
CN105155426A (en) * 2015-09-30 2015-12-16 中铁港航局集团有限公司 Method for combining cable-stayed bridge deck cable unreeling manner and air cable unreeling manner under condition of limited space
CN105401523A (en) * 2015-09-30 2016-03-16 中铁港航局集团有限公司 Hanging mounting method of long heavy stay cable under space limited condition
CN105442458A (en) * 2016-01-29 2016-03-30 中铁大桥(郑州)缆索有限公司 Method for hanging and installing stay cable of cable-stayed bridge special-shaped tower pillar
CN105672138A (en) * 2016-03-31 2016-06-15 中铁四局集团第一工程有限公司 Through type stayed cable installation circulation system and cable threading construction method thereof
CN108149928A (en) * 2017-12-21 2018-06-12 中交路桥华南工程有限公司 The tower end installation method of suspension cable
CN111636313A (en) * 2020-06-08 2020-09-08 柳州欧维姆结构检测技术有限公司 Installation and maintenance system for bridge inhaul cable brightening engineering and construction method thereof
CN113481868A (en) * 2021-07-30 2021-10-08 中国建筑第八工程局有限公司 Cableway positioning device and method with anchor point adjusting structure for cable-stayed bridge
CN114525739A (en) * 2022-03-10 2022-05-24 中铁十二局集团有限公司 Long and heavy cable hanging installation method for multipoint hanging of cable extending under bridge

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101177931B (en) * 2007-12-05 2011-08-10 中铁大桥局股份有限公司 Erection of gantry type small-cycle traction system on large-span suspension bridge main cable
CN101967796B (en) * 2010-09-19 2011-11-23 湖南路桥建设集团公司 Method for arranging parallel steel wire stay cable

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101725114B (en) * 2009-12-08 2011-06-29 中铁大桥(郑州)缆索有限公司 Method for hoisting hawser of long-span cable-stayed bridge and equipment thereof
CN102121231A (en) * 2010-12-31 2011-07-13 上海浦江缆索股份有限公司 Direct cable weaving and hanging method for cable strand of suspension bridge
CN102121231B (en) * 2010-12-31 2015-05-06 上海浦江缆索股份有限公司 Direct cable weaving and hanging method for cable strand of suspension bridge
CN103147404A (en) * 2013-04-02 2013-06-12 中铁大桥局股份有限公司 System and method for hanging stay cable at tower end of height limiting cable-stayed bridge
CN104452594A (en) * 2014-11-05 2015-03-25 武汉二航路桥特种工程有限责任公司 Multi-support cable guide method cable replacement device
CN105155426A (en) * 2015-09-30 2015-12-16 中铁港航局集团有限公司 Method for combining cable-stayed bridge deck cable unreeling manner and air cable unreeling manner under condition of limited space
CN105401523A (en) * 2015-09-30 2016-03-16 中铁港航局集团有限公司 Hanging mounting method of long heavy stay cable under space limited condition
CN105442458B (en) * 2016-01-29 2017-01-11 中铁大桥(郑州)缆索有限公司 Method for hanging and installing stay cable of cable-stayed bridge special-shaped tower pillar
CN105442458A (en) * 2016-01-29 2016-03-30 中铁大桥(郑州)缆索有限公司 Method for hanging and installing stay cable of cable-stayed bridge special-shaped tower pillar
CN105672138A (en) * 2016-03-31 2016-06-15 中铁四局集团第一工程有限公司 Through type stayed cable installation circulation system and cable threading construction method thereof
CN108149928A (en) * 2017-12-21 2018-06-12 中交路桥华南工程有限公司 The tower end installation method of suspension cable
CN108149928B (en) * 2017-12-21 2020-05-19 中交路桥华南工程有限公司 Tower end installation method of stay cable
CN111636313A (en) * 2020-06-08 2020-09-08 柳州欧维姆结构检测技术有限公司 Installation and maintenance system for bridge inhaul cable brightening engineering and construction method thereof
CN111636313B (en) * 2020-06-08 2021-10-15 柳州欧维姆结构检测技术有限公司 Installation and maintenance system for bridge inhaul cable brightening engineering and construction method thereof
CN113481868A (en) * 2021-07-30 2021-10-08 中国建筑第八工程局有限公司 Cableway positioning device and method with anchor point adjusting structure for cable-stayed bridge
CN113481868B (en) * 2021-07-30 2022-07-26 中国建筑第八工程局有限公司 Cableway positioning device and method with anchor point adjusting structure for cable-stayed bridge
CN114525739A (en) * 2022-03-10 2022-05-24 中铁十二局集团有限公司 Long and heavy cable hanging installation method for multipoint hanging of cable extending under bridge
CN114525739B (en) * 2022-03-10 2023-10-13 中铁十二局集团有限公司 Long heavy cable hanging installation method for multi-point hanging of under-bridge span cables

Also Published As

Publication number Publication date
CN1122742C (en) 2003-10-01

Similar Documents

Publication Publication Date Title
CN1122742C (en) Method and system for suspending oblique guys of cable stayed bridge
CN1046919C (en) Arrangement for fixing elevator rope
CN102444086B (en) Cable hanging system for inclined stay cable of bridge and cable hanging method for inclined stay cable of bridge
CN107476195A (en) A kind of suspension bridge transports the fortune beam tackle system of stiff girder
EP3572366A1 (en) Elevator system
KR20060117941A (en) Elevator and arrangement
CN2308670Y (en) Self-lifing gate type construction elevator
CN109853393A (en) A kind of the hanging cable construction system and its construction method of king-tower vertical transfer cable-stayed bridge
CN1257821A (en) Flat elevator machine having vertical rotating shaft
CN1204034C (en) Method and apparatus for assembling elevator parts
CN2491429Y (en) Safety device of spirally supporting brake type material hoister
CN213356618U (en) Construction elevator
CN112575691A (en) Cable hanging system and method for single-column type cable tower cable-stayed bridge
CN105438958B (en) Rotating lifting steel-fastening structure component boom hoisting
CN112744665A (en) Method for winding rope of elevator
CN2209143Y (en) Sliding lifter
CN2179844Y (en) Inspection trolley for ropes
CN219708874U (en) Steel case roof beam antiskid hoist device
CN2626964Y (en) Rope bearing equipment
CN101062744A (en) Elevator equipment
US3993287A (en) Method and device of reblocking to an increased or reduced number of rope parts at a hoisting gear
CN220766374U (en) Portable lifting mechanism for space lifting
CN212127323U (en) Cableway with hoisting function
CN210598088U (en) Climbing frame lifting structure
CN114475967B (en) Installation method of balancing weight and anchor chain

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee