CN102071813A - Method for constructing underground garage under old building - Google Patents

Method for constructing underground garage under old building Download PDF

Info

Publication number
CN102071813A
CN102071813A CN 201010564141 CN201010564141A CN102071813A CN 102071813 A CN102071813 A CN 102071813A CN 201010564141 CN201010564141 CN 201010564141 CN 201010564141 A CN201010564141 A CN 201010564141A CN 102071813 A CN102071813 A CN 102071813A
Authority
CN
China
Prior art keywords
building
underground
wall
ground
crossbeam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010564141
Other languages
Chinese (zh)
Other versions
CN102071813B (en
Inventor
潘金龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Geotechnical Technology Co ltd
Original Assignee
HANGZHOU GEOTECHNICAL ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANGZHOU GEOTECHNICAL ENGINEERING Co Ltd filed Critical HANGZHOU GEOTECHNICAL ENGINEERING Co Ltd
Priority to CN2010105641418A priority Critical patent/CN102071813B/en
Publication of CN102071813A publication Critical patent/CN102071813A/en
Application granted granted Critical
Publication of CN102071813B publication Critical patent/CN102071813B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a method for constructing an underground garage, which has the characteristics that: structural stability of the original building, high construction speed and low cost are guaranteed. According to a technical scheme, the method for constructing the underground garage under the old building is characterized by comprising the following steps that: a, an underground diaphragm wall or a sheet-pile wall is poured at a position which is at least 1m away from an exterior wall around the building; b, a group of cross beams are poured at the foundation at the bottom of an overhead layer of the building, and the cross beams are integrally connected with foundation soil, the underground diaphragm wall or the sheet-pile wall to support the building; c, underground space is dug below the foundation soil of the building, an entire plate foundation layer is poured at the bottom of the underground space, and the entire plate foundation with underground piles and the underground diaphragm wall or the sheet-pile wall are integrally connected; d, a part of the underground piles are cut off between the foundation soil and the entire plate foundation and the rest underground piles are reinforced; and e, a slope is arranged on the ground and the slope is communicated with the underground space to be served as a passage for entrance and exit of vehicles.

Description

A kind of method of under old building, building underground garage
Technical field
The present invention relates to a kind of job practices, especially under old building, build the method for underground garage.
Background technology
Along with the development of society, people's living standard is also more and more higher; In recent years, the quantity of private car increases year by year, when being convenient for people to go on a journey, has also brought some social concerns.At present, the problem of parking difficulty is increasingly serious in the city, parking space, ground and underground parking space anxiety, and also it is higher to charge, and brings inconvenience for people's work and life.Particularly some ages community resident building and office more of a specified duration, do not build underground garage under the original ground building, the problem of parking difficulty is particularly outstanding, car owners can only be with on the road of vehicle parking in the sub-district, near the perhaps roadside the sub-district, the road of sub-district is become block up, the accident that vehicle scratches takes place easily, cause some unnecessary disputes.
Summary of the invention
Technical problem to be solved by this invention is the deficiency that overcomes the above-mentioned background technology, a kind of method of building underground garage under old building is provided, this method should be able to guarantee the Stability Analysis of Structures of existing building, and has the advantages that construction is quick, construction cost is low, to alleviate the problem of present parking difficulty.
The invention provides following technical scheme:
A kind of method of building underground garage under old building is characterized in that: may further comprise the steps:
A, diaphragm wall or sheet pile wall are built at least 1 meter of exterior wall around the building, and the upper end of described diaphragm wall or sheet pile wall is embedded with the joint bar that protrudes upward;
B, on the ground of building Stilt layer bottom, build one group of crossbeam; This crossbeam and described ground, diaphragm wall or sheet pile wall fuse with support of buildings;
C, excavate out the underground space that is used to park cars below the ground of building, build the whole plate base of one deck afterwards in the bottom of the underground space, described whole plate base links into an integrated entity with underground and diaphragm wall or sheet pile wall;
D, cut off between ground and the whole plate base partly following are beneficial to vehicle parking, and remaining underground stake are reinforced;
E, offer a slope from ground and be communicated with, as the passage of vehicle turnover with the described underground space.
The construction sequence of described crossbeam is: earlier the reinforcing bar at the cage of reinforcement two ends of each crossbeam pre-buried joint bar when building diaphragm wall or sheet pile wall firmly is connected, described ground firmly is being connected with the cage of reinforcement of crossbeam with the intersection of the crossbeam mode by the boring bar planting, and concreting makes crossbeam and ground, diaphragm wall or sheet pile wall fuse with support of buildings afterwards.
The invention has the beneficial effects as follows:
Construction method provided by the invention utilizes the Stilt layer and the underground pilework of old building, build underground garage apace under old building, and construction cost is lower, can alleviate the problem of present parking difficulty greatly, has vast market prospect.In addition, the present invention reinforces the ground of building by crossbeam and diaphragm wall or sheet pile wall, has guaranteed the Stability Analysis of Structures of existing building, makes that also the underground garage safety of building up is higher.
Description of drawings
Fig. 1 is the vertical profile structural representation of old building.
Fig. 2 is that old building is used the vertical profile structural scheme of mechanism behind the construction sequence a among the present invention.
Fig. 3 is that old building is used the vertical profile structural representation behind the construction sequence b among the present invention.
Fig. 4 is that old building is used the vertical profile structural representation behind the construction sequence c among the present invention.
Fig. 5 is that old building is used the vertical profile structural representation behind the construction sequence d among the present invention.
Fig. 6 is the structure for amplifying schematic diagram of A portion among Fig. 3.
The specific embodiment
Below in conjunction with Figure of description, the invention will be further described.
As Fig. 2-shown in Figure 5, a kind of method of building underground garage under old building of the present invention may further comprise the steps:
A, exterior wall is built diaphragm wall or sheet pile wall 4 around the building, and the upper end of described diaphragm wall or sheet pile wall is embedded with the joint bar 7 (conventional job practices) that protrudes upward;
Distance between diaphragm wall or sheet pile wall and the skin is recommended as 1 meter, and the height of diaphragm wall or sheet pile wall and thickness of wall body are determined (as depth of building, area, soil property situation etc.) according to the actual conditions of building;
B, on the ground 1 of building Stilt layer 3 bottoms, build one group of crossbeam 5; Earlier the reinforcing bar at the cage of reinforcement two ends of each crossbeam pre-buried joint bar when building diaphragm wall or sheet pile wall firmly is connected, described ground is connected firmly by the mode of boring bar planting and the cage of reinforcement of crossbeam in the intersection with crossbeam, and concreting makes crossbeam and ground, diaphragm wall or sheet pile wall fuse with support of buildings afterwards;
As Fig. 3, shown in Figure 6, during construction, can be in advance in the boring bar planting (conventional job practices) of the intersection of ground and crossbeam, afterwards the cage of reinforcement of crossbeam and the bar planting 6 of implanting ground are connected firmly (welding or iron wire are tightened), and the pre-buried joint bar 7 of the cage of reinforcement of crossbeam and diaphragm wall or sheet pile wall upper end is connected firmly, last concreting makes building crossbeam and ground fuse, together support of buildings; The radical of described crossbeam and layout type are determined according to the actual conditions of building;
C, excavate out the underground space 8 that is used to park cars below the ground of building, build the whole plate base 9 of one deck level afterwards in the bottom of the underground space, described whole plate base and underground stake and diaphragm wall or sheet pile wall link into an integrated entity;
The height of the described underground space determines that according to actual conditions recommending highly is 3-5m; Vehicle parking is on described whole plate base;
D, cut off between ground and the whole plate base partly following 2 are beneficial to vehicle parking, and remaining underground stake are reinforced to strengthen the support to building;
E, offer a slope from ground and be communicated with, as the passage of vehicle turnover with the described underground space.Conventional job practices is omitted among the figure and is not drawn.
In addition, can also set up ventilation equipment and fire fighting equipment, specifically determine according to actual needs in the bottom of ground.

Claims (2)

1. method of building underground garage under old building is characterized in that: may further comprise the steps:
A, diaphragm wall or sheet pile wall (4) are built at least 1 meter of exterior wall around the building, and the upper end of described diaphragm wall or sheet pile wall is embedded with the joint bar (7) that protrudes upward;
B, on the ground (1) of building Stilt layer (3) bottom, build one group of crossbeam (5); This crossbeam and described ground, diaphragm wall or sheet pile wall fuse with support of buildings;
C, excavate out the underground space (8) that is used to park cars below the ground of building, build the whole plate base (9) of one deck afterwards in the bottom of the underground space, described whole plate base links into an integrated entity with underground and diaphragm wall or sheet pile wall;
D, partly following (2) of cutting off between ground and the whole plate base are beneficial to vehicle parking, and remaining underground stake is reinforced;
E, offer a slope from ground and be communicated with, as the passage of vehicle turnover with the described underground space.
2. a kind of method of under old building, building underground garage according to claim 1, it is characterized in that: the construction sequence of described crossbeam is: earlier the reinforcing bar at the cage of reinforcement two ends of each crossbeam pre-buried joint bar when building diaphragm wall or sheet pile wall firmly is connected, described ground firmly is being connected with the cage of reinforcement of crossbeam with the intersection of the crossbeam mode by the boring bar planting, and concreting makes crossbeam and ground, diaphragm wall or sheet pile wall fuse with support of buildings afterwards.
CN2010105641418A 2010-11-18 2010-11-18 Method for constructing underground garage under old building Active CN102071813B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105641418A CN102071813B (en) 2010-11-18 2010-11-18 Method for constructing underground garage under old building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105641418A CN102071813B (en) 2010-11-18 2010-11-18 Method for constructing underground garage under old building

Publications (2)

Publication Number Publication Date
CN102071813A true CN102071813A (en) 2011-05-25
CN102071813B CN102071813B (en) 2012-04-25

Family

ID=44030553

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105641418A Active CN102071813B (en) 2010-11-18 2010-11-18 Method for constructing underground garage under old building

Country Status (1)

Country Link
CN (1) CN102071813B (en)

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102900100A (en) * 2012-10-26 2013-01-30 杭州岩土工程有限公司 Method for building underground room under old building by using pipe sheds
CN102913000A (en) * 2012-10-23 2013-02-06 山东建筑大学 Method for development and utilization of underground space by building moving
CN103790180A (en) * 2014-01-24 2014-05-14 刘献刚 Underground space building pile body construction method of and underground space building structure
CN103912134A (en) * 2014-03-21 2014-07-09 上海建工四建集团有限公司 Construction in-situ underground space structure and construction method
CN104120738A (en) * 2014-08-19 2014-10-29 广东南方电信规划咨询设计院有限公司 Non-migration-type supporting and protecting system and method of communication man/hand hole
CN104878776A (en) * 2015-05-27 2015-09-02 中建地下空间有限公司 Full-automatic parking garage body structure at shallow underground layer
CN105089071A (en) * 2014-03-21 2015-11-25 刘献刚 Construction method for building pile of underground space
CN106088650A (en) * 2016-07-19 2016-11-09 山东建筑大学 A kind of building with brick-concrete structure underground that is applicable to increases method and the building of layer
CN106245927A (en) * 2016-07-19 2016-12-21 山东建筑大学 A kind of frame structure building underground that is applicable to increases method and the building of layer
CN106480976A (en) * 2016-10-14 2017-03-08 岩土科技股份有限公司 A kind of basis of the building well-sinking with underground garage
CN110306820A (en) * 2019-06-12 2019-10-08 上海市建筑装饰工程集团有限公司 A kind of reinforcement means of historical building blocking partition wall
CN110424765A (en) * 2019-08-19 2019-11-08 岩土科技股份有限公司 The method that one layer and grade reconstruction underground garage are built in old residential area
CN110616739A (en) * 2019-09-12 2019-12-27 上海建工集团股份有限公司 Vertical construction method for underground space of existing building
CN111321762A (en) * 2020-03-02 2020-06-23 广州市胜特建筑科技开发有限公司 Accurate basement building method
CN111335670A (en) * 2020-03-18 2020-06-26 同济大学建筑设计研究院(集团)有限公司 Method for constructing foundation pit and newly adding underground structure in situ under existing reserved building
CN113356290A (en) * 2021-06-25 2021-09-07 中铁二院华东勘察设计有限责任公司 Longitudinal wall beam type pile foundation underpinning construction method for underground passage construction
CN113914392A (en) * 2021-10-13 2022-01-11 浙江高专建筑设计研究院有限公司 Existing building transformation method
CN115354650A (en) * 2022-08-29 2022-11-18 中国土木工程集团有限公司 Building foundation reinforcing method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05202631A (en) * 1992-01-28 1993-08-10 Kumagai Gumi Co Ltd Underground parking garage
CN2929069Y (en) * 2006-07-26 2007-08-01 邓海燕 Garage structure for old residence reforming and rebuilding
DE202007010092U1 (en) * 2007-07-18 2007-10-04 Jürgens, Bu-Ja Device for overbuilding open parking decks
CN201095770Y (en) * 2007-09-06 2008-08-06 长业建设集团有限公司 Embedded single-layer basement wooden pile composite brad wall structure
CN101614019A (en) * 2008-11-11 2009-12-30 中铁四局集团建筑工程有限公司 The multilayer underground structure next to existing building self-supporting construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05202631A (en) * 1992-01-28 1993-08-10 Kumagai Gumi Co Ltd Underground parking garage
CN2929069Y (en) * 2006-07-26 2007-08-01 邓海燕 Garage structure for old residence reforming and rebuilding
DE202007010092U1 (en) * 2007-07-18 2007-10-04 Jürgens, Bu-Ja Device for overbuilding open parking decks
CN201095770Y (en) * 2007-09-06 2008-08-06 长业建设集团有限公司 Embedded single-layer basement wooden pile composite brad wall structure
CN101614019A (en) * 2008-11-11 2009-12-30 中铁四局集团建筑工程有限公司 The multilayer underground structure next to existing building self-supporting construction method

Cited By (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102913000A (en) * 2012-10-23 2013-02-06 山东建筑大学 Method for development and utilization of underground space by building moving
CN102913000B (en) * 2012-10-23 2014-08-06 山东建筑大学 Method for development and utilization of underground space by building moving
CN102900100A (en) * 2012-10-26 2013-01-30 杭州岩土工程有限公司 Method for building underground room under old building by using pipe sheds
CN102900100B (en) * 2012-10-26 2014-10-22 岩土科技股份有限公司 Method for building underground room under old building by using pipe sheds
CN103790180A (en) * 2014-01-24 2014-05-14 刘献刚 Underground space building pile body construction method of and underground space building structure
CN103790180B (en) * 2014-01-24 2015-11-25 刘献刚 The building pile body construction method of the underground space and underground space building structure
CN103912134A (en) * 2014-03-21 2014-07-09 上海建工四建集团有限公司 Construction in-situ underground space structure and construction method
CN105089071A (en) * 2014-03-21 2015-11-25 刘献刚 Construction method for building pile of underground space
CN105155533A (en) * 2014-03-21 2015-12-16 刘献刚 Construction method of underground space building pile
CN104120738A (en) * 2014-08-19 2014-10-29 广东南方电信规划咨询设计院有限公司 Non-migration-type supporting and protecting system and method of communication man/hand hole
CN104878776A (en) * 2015-05-27 2015-09-02 中建地下空间有限公司 Full-automatic parking garage body structure at shallow underground layer
CN106245927A (en) * 2016-07-19 2016-12-21 山东建筑大学 A kind of frame structure building underground that is applicable to increases method and the building of layer
CN106245927B (en) * 2016-07-19 2018-06-01 山东建筑大学 A kind of method and building suitable for frame structure building underground increasing layer
CN106088650A (en) * 2016-07-19 2016-11-09 山东建筑大学 A kind of building with brick-concrete structure underground that is applicable to increases method and the building of layer
CN106480976A (en) * 2016-10-14 2017-03-08 岩土科技股份有限公司 A kind of basis of the building well-sinking with underground garage
CN110306820A (en) * 2019-06-12 2019-10-08 上海市建筑装饰工程集团有限公司 A kind of reinforcement means of historical building blocking partition wall
CN110424765A (en) * 2019-08-19 2019-11-08 岩土科技股份有限公司 The method that one layer and grade reconstruction underground garage are built in old residential area
CN110616739B (en) * 2019-09-12 2021-08-31 上海建工集团股份有限公司 Vertical construction method for underground space of existing building
CN110616739A (en) * 2019-09-12 2019-12-27 上海建工集团股份有限公司 Vertical construction method for underground space of existing building
CN111321762A (en) * 2020-03-02 2020-06-23 广州市胜特建筑科技开发有限公司 Accurate basement building method
CN111335670A (en) * 2020-03-18 2020-06-26 同济大学建筑设计研究院(集团)有限公司 Method for constructing foundation pit and newly adding underground structure in situ under existing reserved building
CN113356290A (en) * 2021-06-25 2021-09-07 中铁二院华东勘察设计有限责任公司 Longitudinal wall beam type pile foundation underpinning construction method for underground passage construction
CN113356290B (en) * 2021-06-25 2023-03-10 中铁二院华东勘察设计有限责任公司 Longitudinal wall beam type pile foundation underpinning construction method for underground passage construction
CN113914392A (en) * 2021-10-13 2022-01-11 浙江高专建筑设计研究院有限公司 Existing building transformation method
CN115354650A (en) * 2022-08-29 2022-11-18 中国土木工程集团有限公司 Building foundation reinforcing method

Also Published As

Publication number Publication date
CN102071813B (en) 2012-04-25

Similar Documents

Publication Publication Date Title
CN102071813B (en) Method for constructing underground garage under old building
CN105064397B (en) Open excavation construction method for expanding excavation of station on metro interzone shield tunnel foundation
CN109235499A (en) A kind of open cut hypogee Standard formula construction method
CN110578339B (en) Construction method of shaft type underground stereo garage
CN105926669A (en) Construction method of subway station
CN107059667A (en) Door shape assembled armored concrete box culvert and its construction method
CN203939288U (en) Anti-wind net structure
CN104878776B (en) A kind of underground shallow layer automatic parking garage the library structure
CN105089670B (en) Construction method for enlarging and excavating subway station on basis of parallel interval shield tunnel
CN111021771B (en) Construction method for replacing original building structure with steel structure
CN105133493B (en) Embedded track structure suitable for middle-span and small-span bridge and construction method
CN105064711B (en) Method for constructing underground garage between residential buildings
CN206495233U (en) Door shape assembled armored concrete box culvert
CN110820471A (en) Crossing plate, level crossing structure and laying method
CN110397148A (en) A kind of prefabricated assembled catch pit structure and construction method
CN113073540A (en) Pile-beam integrated fully-prefabricated assembled bridge substructure, bridge and construction method thereof
CN112681376A (en) Construction method of shaft type underground stereo garage
CN111501782A (en) Foundation pit supporting and construction road integrated structure and construction method
CN214302989U (en) Build assembled garage parking on ground additional
CN207633357U (en) Charge station assembling type base
CN107313454B (en) Construction method of underground garage
CN215906845U (en) Large-span vestibule mounting structure in foundation pit
CN105133645B (en) The shaft main body structure of built-in lattice column and inverse make formula construction method
CN107059918A (en) Get down the highway to Double Multi-Arch, pipe gallery and sponge City complex
CN207295774U (en) A kind of Underground Station structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: GEOTECHNICAL TECHNOLOGY CO., LTD.

Free format text: FORMER NAME: HANGZHOU GEOTECHNICAL ENGINEERING CO., LTD.

CP03 Change of name, title or address

Address after: 310024, Hangzhou, Zhejiang province Xihu District transferred to the streets of Liuzhou Wu Long Industrial Park

Patentee after: GEOTECHNICAL TECHNOLOGY Co.,Ltd.

Address before: City of Chao Wang Road 310014 Hangzhou city of Zhejiang province No. 59-1 East Verde writer Pavilion 2C

Patentee before: HANGZHOU GEOTECHNICAL ENGINEERING Co.,Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A method of constructing underground garage under old buildings

Effective date of registration: 20220704

Granted publication date: 20120425

Pledgee: China Construction Bank Co.,Ltd. Fuyang Branch of Hangzhou

Pledgor: GEOTECHNICAL TECHNOLOGY Co.,Ltd.

Registration number: Y2022980009767

PE01 Entry into force of the registration of the contract for pledge of patent right