CN110424765A - The method that one layer and grade reconstruction underground garage are built in old residential area - Google Patents

The method that one layer and grade reconstruction underground garage are built in old residential area Download PDF

Info

Publication number
CN110424765A
CN110424765A CN201910765003.7A CN201910765003A CN110424765A CN 110424765 A CN110424765 A CN 110424765A CN 201910765003 A CN201910765003 A CN 201910765003A CN 110424765 A CN110424765 A CN 110424765A
Authority
CN
China
Prior art keywords
layer
grade
underground garage
underground
built
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910765003.7A
Other languages
Chinese (zh)
Inventor
潘金龙
殷树芳
楼耀威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GEOTECHNICAL TECHNOLOGY Co Ltd
Original Assignee
GEOTECHNICAL TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GEOTECHNICAL TECHNOLOGY Co Ltd filed Critical GEOTECHNICAL TECHNOLOGY Co Ltd
Priority to CN201910765003.7A priority Critical patent/CN110424765A/en
Publication of CN110424765A publication Critical patent/CN110424765A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H6/00Buildings for parking cars, rolling-stock, aircraft, vessels or like vehicles, e.g. garages

Abstract

The present invention relates to a kind of methods that one layer and grade reconstruction underground garage are built in old residential area, solve the old residential area underground space and fail to utilize, and stop difficult problem.This method carries out reinforcing reconstruction to one layer of old building original ground, raises grade to Stall ceiling position, one layer of original building and former grade is reconstructed as underground garage, the new grade raised is for afforesting and building resident playground.It is the underground parking neatly planned that the present invention, which can change the former ground parking seized every opportunity, improves community parking condition, substantially improves the living environment and quality of resident.The present invention can also increase one layer for the placement to one layer of resident of original building in roof on the basis of original building, while can add the daily demand that outdoor elevators meet resident living;If not having the condition of increasing layer, in addition resident can also be disposed.

Description

The method that one layer and grade reconstruction underground garage are built in old residential area
Technical field
The invention belongs to building engineering fields, are related to a kind of old residential area remodeling method, in particular to a kind of old residential area The method of one layer of building and grade reconstruction underground garage.
Background technique
Urban Underground Space Excavation is using the important component for being City's Construction And Development, when city driving is difficult, parking The contradictions such as difficulty seriously to a certain extent after, it is single to take measures to be difficult to solve from aboveground space, city is handed over using the underground space The logical Organic Renewal that carries out has become the city solution most significant behave of traffic problems effect.Rapid urban instantly, always For old cell since site coverage is big, some houses are of the remote past due to building, and do not develop to the underground space, it is difficult to keep up with The development of modern city.The most important problem of old residential area is exactly that parking is difficult, and old residential area does not have underground parking garage, can only Parking stall is planned using the cell terrace between building, parking position is nervous, occupies subdistrict greening, or even can be to resident living Environment is affected.There are also the cell of some not underground garages, residence ground floors use Stilt layer, stop for resident Vehicle, but this method usable floor area is limited, outdoor ground crowded state is not resolved yet.
Summary of the invention
It is an object of the invention to solve the old residential area underground space to fail to utilize, stop difficult problem, provides a kind of old The method of one layer of old district structure and grade reconstruction underground garage.
The technical solution adopted by the present invention to solve the technical problems is: a kind of old residential area building one layer and grade The method for reconstructing underground garage, it is characterised in that: the following steps are included:
Step 1: carrying out overall structure reinforcing to original building, the hidden danger such as cracking are repaired;
Step 2: meeting underground parking demand to one layer of progress structure of modification of original building;
Step 3: according to design bearing requirements, the piling of former grade or under dig and set cushion cap foundation, then remove former room Outer terrace pours underground garage floor;
Step 4: pouring underground garage exterior wall, and temporary support is carried out, reserves vehicles while passing hole in main road surface road side;
Step 5: reinforcing to one layer of column of original building, the pillar of the new grade of support is created;
Step 6: pouring top plate of underground parking garage in one layer of ceiling height position of original building;
Step 7: carrying out new grade Urban Greening and affiliated facility construction.
This method raises grade to Stall ceiling position by carrying out reinforcing reconstruction to one layer of old building original ground It sets, one layer of original building and former grade is reconstructed as underground garage, the new grade raised is for afforesting and building resident Playground, can change the former ground parking seized every opportunity in this way is the underground parking neatly planned, improves community parking item Part substantially improves the living environment and quality of resident.
Preferably, carrying out increasing layer reinforcing in step 2 or step 6, in original building top layer, lightweight steel construction is then used Build roof increasing layer.In this programme implementation process, need to dispose one layer of resident, can choose on the basis of original building Roof increases one layer, while can add the daily demand that outdoor elevators meet resident living;It, can if not having the condition of increasing layer In addition resident is disposed.
Preferably, to one layer of progress structure of modification of original building, retaining load-carrying members in step 2, removing non-bearing knot Structure.
Preferably, when pouring underground garage floor, reserving outdoor elevators well in step 3;Step 6: getting off with pouring When the top plate of library, outdoor elevators well is reserved;Outdoor elevators construction is carried out after step 6.
Preferably, when pouring underground garage floor, guaranteeing the underground garage room floor projecting road of absolute altitude in step 3 Face height.
Preferably, underground garage exterior wall pours within the scope of original building in step 4.
The present invention reconstructs one layer of original building and former grade for underground garage, and the new grade raised is for afforesting With construction resident playground, can change the former ground parking seized every opportunity in this way is the underground parking neatly planned, is improved Community parking condition substantially improves the living environment and quality of resident;Increase one layer in roof on the basis of original building, is convenient for one The placement of layer resident.
Detailed description of the invention
The present invention will be further described below with reference to the drawings.
Fig. 1 is a kind of structural schematic diagram of the invention.
In figure: 1, original building roof, 2, roof increasing layer, 3, outdoor elevators, 4, new grade, 5, underground garage, 6, original One layer of building, 7, former grade.
Specific embodiment
Below by specific embodiment and in conjunction with attached drawing, the present invention is further described.
Embodiment: a kind of method that one layer and grade reconstruction underground garage are built in old residential area, as shown in Figure 1, packet Include following steps:
Step 1: carrying out overall structure reinforcing to original building, the hidden danger such as cracking are repaired;
Step 2: retaining load-carrying members to one layer of 6 progress structure of modification of original building, non bearing structure is removed, underground parking is met Demand;
Step 3: according to design bearing requirements, the piling of former grade 7 or under dig and set cushion cap foundation, then removal is former Grade 7 pours 5 floor of underground garage, reserves outdoor elevators well;Guarantee the underground garage room floor projecting road surface of absolute altitude Highly;
Step 4: pouring underground garage exterior wall within the scope of original building, and temporary support is carried out, it is reserved in main road surface road side Vehicles while passing hole;
Step 5: reinforcing to one layer of column of original building, the pillar of the new grade of support is created;
Step 6: pouring 5 top plate of underground garage in one layer of ceiling height position of original building, outdoor elevators well is reserved;In original building Top layer carries out increasing layer reinforcing, then builds roof increasing layer 2 using lightweight steel construction;Then outdoor elevators 3 are carried out to build;Such as original building Roof 1 is slope surface roof, first removes slope surface roof before building roof increasing layer 2, rebuilds building after building roof increasing layer 2 Roof;
Step 7: carrying out new grade Urban Greening and affiliated facility construction.
This method raises grade to Stall ceiling position by carrying out reinforcing reconstruction to one layer of old building original ground It sets, one layer of original building and former grade is reconstructed as underground garage, the new grade raised is for afforesting and building resident Playground, can change the former ground parking seized every opportunity in this way is the underground parking neatly planned, improves community parking item Part substantially improves the living environment and quality of resident.In scheme implementation process, needs to dispose one layer of resident, can choose Increase one layer in roof on the basis of original building, while the daily demand that outdoor elevators meet resident living can be added;If no Have the condition of increasing layer, in addition resident can be disposed.

Claims (6)

1. a kind of method that one layer and grade reconstruction underground garage are built in old residential area, it is characterised in that: including following step It is rapid:
Step 1: carrying out overall structure reinforcing to original building, the hidden danger such as cracking are repaired;
Step 2: meeting underground parking demand to one layer of progress structure of modification of original building;
Step 3: according to design bearing requirements, the piling of former grade or under dig and set cushion cap foundation, then remove former room Outer terrace pours underground garage floor,
Step 4: pouring underground garage exterior wall, and temporary support is carried out, reserves vehicles while passing hole in main road surface road side;
Step 5: reinforcing to one layer of column of original building, the pillar of the new grade of support is created;
Step 6: pouring top plate of underground parking garage in one layer of ceiling height position of original building;
Step 7: carrying out new grade Urban Greening and affiliated facility construction.
2. the method that one layer and grade reconstruction underground garage are built in old residential area according to claim 1, feature It is: carries out increasing layer reinforcing in step 2 or step 6, in original building top layer, roof is then built using lightweight steel construction and is increased Layer.
3. the method that one layer and grade reconstruction underground garage are built in old residential area according to claim 1, feature It is: in step 2, to one layer of progress structure of modification of original building, retains load-carrying members, remove non bearing structure.
4. the method that one layer and grade reconstruction underground garage are built in old residential area according to claim 1, feature It is: in step 3, when pouring underground garage floor, reserves outdoor elevators well;Step 6: when pouring top plate of underground parking garage, in advance Stay outdoor elevators well;Outdoor elevators construction is carried out after step 6.
5. the method that one layer and grade reconstruction underground garage are built in old residential area according to claim 1, feature It is: in step 3, when pouring underground garage floor, guarantees the projecting pavement-height of underground garage room floor absolute altitude.
6. the method that one layer and grade reconstruction underground garage are built in old residential area according to claim 1, feature Be: in step 4, underground garage exterior wall pours within the scope of original building.
CN201910765003.7A 2019-08-19 2019-08-19 The method that one layer and grade reconstruction underground garage are built in old residential area Pending CN110424765A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910765003.7A CN110424765A (en) 2019-08-19 2019-08-19 The method that one layer and grade reconstruction underground garage are built in old residential area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910765003.7A CN110424765A (en) 2019-08-19 2019-08-19 The method that one layer and grade reconstruction underground garage are built in old residential area

Publications (1)

Publication Number Publication Date
CN110424765A true CN110424765A (en) 2019-11-08

Family

ID=68416970

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910765003.7A Pending CN110424765A (en) 2019-08-19 2019-08-19 The method that one layer and grade reconstruction underground garage are built in old residential area

Country Status (1)

Country Link
CN (1) CN110424765A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112554592A (en) * 2020-11-26 2021-03-26 中国建筑第八工程局有限公司 Construction method of additionally-built ground parking garage
CN114439267A (en) * 2022-02-16 2022-05-06 浙大城市学院 Road structure transformed from super-huge independent underground garage and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101922134A (en) * 2010-08-02 2010-12-22 郭书韦 Construction scheme for urban traffic and parking
CN102071813A (en) * 2010-11-18 2011-05-25 杭州岩土工程有限公司 Method for constructing underground garage under old building
CN105888281A (en) * 2016-04-21 2016-08-24 武大巨成结构股份有限公司 Method for utilizing jacking storey-adding technique to promote integrated function of community
CN108798149A (en) * 2018-07-11 2018-11-13 合肥市神雕起重机械有限公司 A kind of mechanical parking stall adjustment structure for outdoor parking space

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101922134A (en) * 2010-08-02 2010-12-22 郭书韦 Construction scheme for urban traffic and parking
CN102071813A (en) * 2010-11-18 2011-05-25 杭州岩土工程有限公司 Method for constructing underground garage under old building
CN105888281A (en) * 2016-04-21 2016-08-24 武大巨成结构股份有限公司 Method for utilizing jacking storey-adding technique to promote integrated function of community
CN108798149A (en) * 2018-07-11 2018-11-13 合肥市神雕起重机械有限公司 A kind of mechanical parking stall adjustment structure for outdoor parking space

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112554592A (en) * 2020-11-26 2021-03-26 中国建筑第八工程局有限公司 Construction method of additionally-built ground parking garage
CN114439267A (en) * 2022-02-16 2022-05-06 浙大城市学院 Road structure transformed from super-huge independent underground garage and construction method thereof
CN114439267B (en) * 2022-02-16 2024-03-22 浙大城市学院 Transformation of oversized independent underground garage into road structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN105041349B (en) A kind of excavating construction method that station is digged on the basis of Subway Tunnel shield tunnel
CN107558494B (en) Underground station structure for rail transit and construction method thereof
CN102071813B (en) Method for constructing underground garage under old building
CN100595395C (en) Static pressure pile process for construction of existing building basement
CN110424765A (en) The method that one layer and grade reconstruction underground garage are built in old residential area
CN106869549A (en) Eccentric screw formula sky parking and its underground construction method
CN109026064A (en) A kind of construction method that large span multiple-arch tunnel is hazy
CN105781570A (en) Metro internal-bracing-free track panel shaft and construction method thereof
CN106436755A (en) Four-layer stair-like city underground comprehensive body
CN107326928A (en) A kind of part is related to the construction method in the deeper subsurface garage of basement
CN111139870A (en) Thick plate underpinning cover digging semi-reverse construction method for building subway station under existing basement
CN105888281A (en) Method for utilizing jacking storey-adding technique to promote integrated function of community
CN107489284B (en) Construction method for local newly-added deep underground garage of basement
CN112681376A (en) Construction method of shaft type underground stereo garage
CN205296944U (en) Urban underground space stereo garage
CN204690777U (en) A kind of Novel prefabricated steel pipe pile foundation being applicable to electric power line pole tower
CN207176737U (en) A kind of mechanical underground parking of inclined shaft
CN106545029A (en) A kind of underground space safely and fast construction method
CN109339510A (en) One kind being suitable for major diameter underground shaft type constructed parking garage structure and its construction method
CN207944757U (en) A kind of underground public transport field garage parking
CN106013222A (en) Urban underground complex with three-circle cross section
CN105927252A (en) Method for transforming large-section underground spatial structural systems by means of rectangular jacking pipe excavation
CN108590214A (en) Old residential area comprehensive reformation method
CN214302989U (en) Build assembled garage parking on ground additional
CN215253004U (en) Novel footpath applied to circular cable tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination