CN102071303A - 带钢在硅钢连续退火干燥炉的穿带方法 - Google Patents
带钢在硅钢连续退火干燥炉的穿带方法 Download PDFInfo
- Publication number
- CN102071303A CN102071303A CN 201110032071 CN201110032071A CN102071303A CN 102071303 A CN102071303 A CN 102071303A CN 201110032071 CN201110032071 CN 201110032071 CN 201110032071 A CN201110032071 A CN 201110032071A CN 102071303 A CN102071303 A CN 102071303A
- Authority
- CN
- China
- Prior art keywords
- steel
- continuous annealing
- band
- drying oven
- annealing drying
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Abstract
本发明涉及一种带钢在硅钢连续退火干燥炉的穿带方法。带钢在硅钢连续退火干燥炉的穿带方法,其特征在于它包括如下步骤:1)在硅钢连续退火干燥炉的炉墙内侧壁内沿带钢运动方向设一耐热钢沟槽件;耐热钢丝绳从耐热钢沟槽件的沟槽中穿过;2)穿带:在硅钢连续退火干燥炉的入口处,将普通钢丝绳的一端系在耐热钢丝绳上,将普通钢丝绳的另一端系在带钢端头上;出口卷扬机工作,通过出口卷扬机先将普通钢丝绳的一端从硅钢连续退火干燥炉的入口处拉到硅钢连续退火干燥炉的出口处,然后在硅钢连续退火干燥炉的出口处通过普通钢丝绳将带钢从硅钢连续退火干燥炉内拉出,拉出的带钢端头与另一段带钢焊接,完成穿带。该方法操作简单、安全可靠。
Description
技术领域
本发明涉及一种带钢在硅钢连续退火干燥炉的穿带方法。
背景技术
目前硅钢连续退火干燥炉的穿带是通过如下方式实现的:
干燥炉长度为20多米,截面约为2.5m×2.8m,带钢表面化学涂层后以一定速度通过高温的干燥炉进行烘干,炉内有若干炉辊支撑带钢运行,但在化学涂层烘干之前,带钢不得接触炉辊而是处于悬垂状态。
带钢的穿带通过穿带棒实现,在开始生产或因断带需重新穿带时,先将长约10m的耐热钢制成的穿带棒系在一段钢丝绳上,钢丝绳再系在带钢的端头,同时在干燥炉入口安装若干根穿带用的炉辊(穿带结束带钢处于悬垂状后将这些辊子拆卸),然后将穿带棒放在干燥炉入口的炉辊上,调整位置后通过马达驱动炉辊将穿带棒送入炉内,进而将带钢拉入炉内并最终完成穿带。
然而上述穿带方法有如下局限性:
1、穿带棒长度一般至少为7~8m,这样经常受到干燥炉前后设备距离的影响而不方便穿带;
2、每次穿带前必须先安装临时炉辊(6~7根),穿带结束后再将临时炉辊拆掉,不仅操作困难,而且影响生产率。
发明内容
本发明的目的在于提供一种带钢在硅钢连续退火干燥炉的穿带方法,该方法操作简单、安全可靠。
为了实现上述目的,本发明所采取的技术方案是:带钢在硅钢连续退火干燥炉的穿带方法,其特征在于它包括如下步骤:
1)在硅钢连续退火干燥炉的炉墙内侧壁内沿带钢运动方向设一耐热钢沟槽件9,耐热钢沟槽件9内沿带钢运动方向设沟槽;在硅钢连续退火干燥炉入口的炉墙上固定有入口支撑架,入口支撑架上设有入口卷扬机3、入口滑轮;在硅钢连续退火干燥炉出口的炉墙上固定有出口支撑架5,出口支撑架5上设有出口卷扬机4、出口滑轮6;耐热钢丝绳8从耐热钢沟槽件9的沟槽中穿过,耐热钢丝绳8的一端经过入口滑轮后固定在入口卷扬机3的滚筒上,耐热钢丝绳8的另一端经过出口滑轮6后固定在出口卷扬机4的滚筒上;准备一条普通钢丝绳;
2)穿带:在硅钢连续退火干燥炉的入口处,将普通钢丝绳的一端系在耐热钢丝绳8上,将普通钢丝绳的另一端系在带钢端头上;出口卷扬机4工作,通过出口卷扬机4先将普通钢丝绳的一端从硅钢连续退火干燥炉的入口处拉到硅钢连续退火干燥炉的出口处,然后在硅钢连续退火干燥炉的出口处通过普通钢丝绳将带钢从硅钢连续退火干燥炉内拉出,拉出的带钢端头与另一段带钢焊接,完成穿带。
所述的入口支撑架、出口支撑架5和耐热钢沟槽件9位于炉墙的同一侧壁。
所述的耐热钢沟槽件9的中心线离带钢通过线2的距离为0~500mm(即高于带钢通过线0~500mm,或低于带钢通过线0~500mm)。
所述的耐热钢丝绳8的长度大于M,M=2倍的硅钢连续退火干燥炉的炉长+入口支撑架的长度+出口支撑架的长度。
所述的入口卷扬机3、出口卷扬机4均为手摇式卷扬机。
本发明的特点:
1)从根本上改变了传统的利用穿带棒穿带的方式,而是通过位于耐热钢沟槽件(嵌在炉墙内)的沟槽内的可自由滑动的耐热钢丝绳实现穿带。
2)炉墙内的耐热钢丝绳不是直接与带钢连接将带钢拉动,而是先将另一根系在带钢上的临时钢丝绳(即普通钢丝绳)从干燥炉一端送出另一端,然后再通过临时钢丝绳将带钢拉动完成穿带。
3)耐热钢丝绳是长期嵌在炉墙内的,通过耐热钢沟槽件,可保证耐热钢丝绳长期置于高温的干燥炉内仍能正常使用,这种设计实现了干燥炉在高温状态下也可方便快捷地进行穿带的功能。
4)本发明无需再使用原来传统穿带方法必需的临时炉辊及驱动马达,大大降低了设备投资,同时穿带时也无需再安装若干根临时托辊,这样节约了大量的操作维护时间。
5)炉内耐热钢丝绳的滑动是通过干燥炉两端的卷扬机及滑轮实现的,操作简单,安全可靠。
应用拓展:使用带钢在硅钢连续退火干燥炉的穿带方法,也可广泛适用于其它无托辊高温炉内的水平穿带。
本发明的有益效果是:操作简单、安全可靠。可以方便地实现带钢在冷态及热态下的干燥炉内的穿带,本发明不仅大大降低干燥炉穿带难度,而且很大程度上提高了机组生产率。
附图说明
图1是硅钢连续退火干燥炉的立面图;
图2是图1中Y部的俯视图(放大);
图3是硅钢连续退火干燥炉的断面图;
图4是图3中X部的放大图;
图中:1-炉墙,2-带钢通过线,3-入口卷扬机,4-出口卷扬机,5-出口支撑架,6-出口滑轮,7-钢丝绳夹,8-耐热钢丝绳,9-耐热钢沟槽件(或称耐热钢沟槽板),10-炉膛(炉腔)。
具体实施方式
如图1、图2、图3、图4所示,带钢在硅钢连续退火干燥炉的穿带方法,它包括如下步骤:
1)在硅钢连续退火干燥炉的炉墙内侧壁内沿带钢运动方向设一耐热钢沟槽件9,耐热钢沟槽件9的中心线离带钢通过线2的距离为0~500mm(即高于带钢通过线0~500mm,或低于带钢通过线0~500mm),耐热钢沟槽件9内沿带钢运动方向设内凹的沟槽;在硅钢连续退火干燥炉入口的炉墙上固定有入口支撑架(即入口支撑架位于炉墙处的入口端),入口支撑架上设有入口卷扬机3、入口滑轮;在硅钢连续退火干燥炉出口的炉墙上固定有出口支撑架5(即出口支撑架位于炉墙处的出口端),出口支撑架5上设有出口卷扬机4、出口滑轮6;入口支撑架、出口支撑架5和耐热钢沟槽件9位于炉墙的同一侧壁(只是耐热钢沟槽件9位于炉墙内,入口支撑架、出口支撑架5位于炉墙外的入口、出口处);耐热钢丝绳(或称耐热不锈钢钢丝绳)8从耐热钢沟槽件9的沟槽中穿过(耐热钢丝绳嵌在沟槽中,耐热钢丝绳在沟槽内可以自由滑动,耐热钢丝绳受沟槽保护不致脱落,沟槽也一定程度上降低了炉内高温气体对耐热钢丝绳的辐射),耐热钢丝绳8的一端经过入口滑轮后固定在入口卷扬机3的滚筒上(滑轮改变方向,滚筒收放钢丝绳),耐热钢丝绳8的另一端经过出口滑轮6后固定在出口卷扬机4的滚筒上,耐热钢丝绳8的长度大于M,M=2倍的硅钢连续退火干燥炉的炉长+入口支撑架的长度+出口支撑架的长度[即位于出口处的耐热钢丝绳一端的一个点(如钢丝绳夹7)可移动到入口处;通过卷扬机可将耐热钢丝绳一端的一个点从干燥炉一端拉到干燥炉另一端];准备一条普通钢丝绳;
2)穿带:在硅钢连续退火干燥炉的入口处,将普通钢丝绳的一端系在耐热钢丝绳8上(即普通钢丝绳可随耐热钢丝绳移动),将普通钢丝绳的另一端系在带钢端头上(即带钢可随普通钢丝绳移动,也就是耐热钢丝绳8可带动带钢移动);出口卷扬机4工作,通过出口卷扬机4先将普通钢丝绳的一端从硅钢连续退火干燥炉的入口处拉到硅钢连续退火干燥炉的出口处,然后在硅钢连续退火干燥炉的出口处通过普通钢丝绳将带钢从硅钢连续退火干燥炉内拉出,拉出的带钢端头与另一段带钢焊接,完成穿带。
所述的入口卷扬机3、出口卷扬机4均为手摇式卷扬机。
Claims (5)
1.带钢在硅钢连续退火干燥炉的穿带方法,其特征在于它包括如下步骤:
1)在硅钢连续退火干燥炉的炉墙内侧壁内沿带钢运动方向设一耐热钢沟槽件(9),耐热钢沟槽件(9)内沿带钢运动方向设沟槽;在硅钢连续退火干燥炉入口的炉墙上固定有入口支撑架,入口支撑架上设有入口卷扬机(3)、入口滑轮;在硅钢连续退火干燥炉出口的炉墙上固定有出口支撑架(5),出口支撑架(5)上设有出口卷扬机(4)、出口滑轮(6);耐热钢丝绳(8)从耐热钢沟槽件(9)的沟槽中穿过,耐热钢丝绳(8)的一端经过入口滑轮后固定在入口卷扬机(3)的滚筒上,耐热钢丝绳(8)的另一端经过出口滑轮(6)后固定在出口卷扬机(4)的滚筒上;准备一条普通钢丝绳;
2)穿带:在硅钢连续退火干燥炉的入口处,将普通钢丝绳的一端系在耐热钢丝绳(8)上,将普通钢丝绳的另一端系在带钢端头上;出口卷扬机(4)工作,通过出口卷扬机(4)先将普通钢丝绳的一端从硅钢连续退火干燥炉的入口处拉到硅钢连续退火干燥炉的出口处,然后在硅钢连续退火干燥炉的出口处通过普通钢丝绳将带钢从硅钢连续退火干燥炉内拉出,拉出的带钢端头与另一段带钢焊接,完成穿带。
2.根据权利要求1所述的带钢在硅钢连续退火干燥炉的穿带方法,其特征在于:所述的入口支撑架、出口支撑架(5)和耐热钢沟槽件(9)位于炉墙的同一侧壁。
3.根据权利要求1所述的带钢在硅钢连续退火干燥炉的穿带方法,其特征在于:所述的耐热钢沟槽件(9)的中心线离带钢通过线(2)的距离为0~500mm。
4.根据权利要求1所述的带钢在硅钢连续退火干燥炉的穿带方法,其特征在于:所述的耐热钢丝绳(8)的长度大于M,M=2倍的硅钢连续退火干燥炉的炉长+入口支撑架的长度+出口支撑架的长度。
5.根据权利要求1所述的带钢在硅钢连续退火干燥炉的穿带方法,其特征在于:所述的入口卷扬机(3)、出口卷扬机(4)均为手摇式卷扬机。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011100320716A CN102071303B (zh) | 2011-01-30 | 2011-01-30 | 带钢在硅钢连续退火干燥炉的穿带方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011100320716A CN102071303B (zh) | 2011-01-30 | 2011-01-30 | 带钢在硅钢连续退火干燥炉的穿带方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102071303A true CN102071303A (zh) | 2011-05-25 |
CN102071303B CN102071303B (zh) | 2012-11-21 |
Family
ID=44030060
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011100320716A Expired - Fee Related CN102071303B (zh) | 2011-01-30 | 2011-01-30 | 带钢在硅钢连续退火干燥炉的穿带方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102071303B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103276190A (zh) * | 2013-06-07 | 2013-09-04 | 鞍钢股份有限公司 | 一种连退炉节能操作方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0732413A1 (fr) * | 1995-03-14 | 1996-09-18 | USINOR SACILOR Société Anonyme | Procédé de fabrication d'une tÔle d'acier électrique à grains orientés notamment pour transformateurs |
JPH08319520A (ja) * | 1995-03-23 | 1996-12-03 | Nippon Steel Corp | 連続焼鈍炉 |
CN2915880Y (zh) * | 2006-05-31 | 2007-06-27 | 福建方明钢铁有限公司 | 一种带钢连续热镀锌生产线的节能型连续退火炉 |
CN201433232Y (zh) * | 2009-05-31 | 2010-03-31 | 中冶南方(武汉)威仕工业炉有限公司 | 卧式炉内带钢穿送装置 |
-
2011
- 2011-01-30 CN CN2011100320716A patent/CN102071303B/zh not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0732413A1 (fr) * | 1995-03-14 | 1996-09-18 | USINOR SACILOR Société Anonyme | Procédé de fabrication d'une tÔle d'acier électrique à grains orientés notamment pour transformateurs |
JPH08319520A (ja) * | 1995-03-23 | 1996-12-03 | Nippon Steel Corp | 連続焼鈍炉 |
CN2915880Y (zh) * | 2006-05-31 | 2007-06-27 | 福建方明钢铁有限公司 | 一种带钢连续热镀锌生产线的节能型连续退火炉 |
CN201433232Y (zh) * | 2009-05-31 | 2010-03-31 | 中冶南方(武汉)威仕工业炉有限公司 | 卧式炉内带钢穿送装置 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103276190A (zh) * | 2013-06-07 | 2013-09-04 | 鞍钢股份有限公司 | 一种连退炉节能操作方法 |
CN103276190B (zh) * | 2013-06-07 | 2016-11-16 | 鞍钢股份有限公司 | 一种连退炉节能操作方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102071303B (zh) | 2012-11-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105436204A (zh) | 一种高硅钢的轧制装置及其方法 | |
CN102310118A (zh) | 一种高强度扁线的生产工艺及设备 | |
CN101935750A (zh) | 高性能钢板热处理机组生产工艺 | |
CN107413850A (zh) | 用于直接轧制方矩形钢坯的输送过程铸轧衔接方法 | |
CN102071303B (zh) | 带钢在硅钢连续退火干燥炉的穿带方法 | |
CN102560071A (zh) | 一种连退机组在线磨炉底辊的方法 | |
CN101164721B (zh) | 一种连铸输送辊道的全程保温罩 | |
CN201971875U (zh) | 用于带钢在硅钢连续退火干燥炉穿带的装置 | |
CN205187498U (zh) | 钢绞线输送装置 | |
CN204058549U (zh) | 一种热轧带钢退火炉旁通装置 | |
CN203400926U (zh) | 棒线材连铸直轧生产设备 | |
CN101407856B (zh) | 连续退火装置 | |
CN102527605B (zh) | 卧式干燥炉穿带装置 | |
CN212174108U (zh) | 一种移动式收卷装置 | |
CN103693577B (zh) | 换辊辊子吊挂装置 | |
CN201889318U (zh) | 一种黄铜冷凝管连续感应退火和拉伸设备 | |
CN211225189U (zh) | 隧道炉用牵引小车 | |
CN205802821U (zh) | 一种对加热炉水梁进行吊装倒运的装置 | |
CN211100773U (zh) | 一种自动化带钢牵头设备 | |
CN201793667U (zh) | 一种干燥炉带钢断带引带连接装置 | |
CN202621416U (zh) | 卧式干燥炉穿带装置 | |
CN205763004U (zh) | 一种改进放线装置的拉丝机 | |
CN204980889U (zh) | 手机膜钢化炉用航吊车装置 | |
CN107894162A (zh) | 一种用于推钢式加热炉检修炉时清理钢坯的方法 | |
CN214920314U (zh) | 一种浇铸机用金属锭提升装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20121121 Termination date: 20150130 |
|
EXPY | Termination of patent right or utility model |