CN102022104A - Open-hole packer for open-hole horizontal well and preset connector fracturing well completion method - Google Patents

Open-hole packer for open-hole horizontal well and preset connector fracturing well completion method Download PDF

Info

Publication number
CN102022104A
CN102022104A CN2010105341894A CN201010534189A CN102022104A CN 102022104 A CN102022104 A CN 102022104A CN 2010105341894 A CN2010105341894 A CN 2010105341894A CN 201010534189 A CN201010534189 A CN 201010534189A CN 102022104 A CN102022104 A CN 102022104A
Authority
CN
China
Prior art keywords
packer
fracturing
open
open hole
hole packer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2010105341894A
Other languages
Chinese (zh)
Other versions
CN102022104B (en
Inventor
王凤山
张书进
王金友
刘崇江
谢建华
李清忠
徐德奎
吴恩成
毛庆波
李琳
仲福惟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Daqing Oilfield Co Ltd
Original Assignee
Daqing Oilfield Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daqing Oilfield Co Ltd filed Critical Daqing Oilfield Co Ltd
Priority to CN 201010534189 priority Critical patent/CN102022104B/en
Publication of CN102022104A publication Critical patent/CN102022104A/en
Application granted granted Critical
Publication of CN102022104B publication Critical patent/CN102022104B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to the technical field of oilfield production engineering, belongs to an oilfield open-hole packer horizontal well fracturing well completion method, and aims to solve the problem that: in the conventional common sliding sleeve type staged fracturing well completion process, a sliding sleeve is difficult to open due to the influence of stratigraphic back pressure sometimes. The oilfield open-hole packer horizontal well fracturing well completion method mainly comprises the following steps of: delivering a well completion pipe string to a preset position through a deliver pipe column; delivering a setting pipe column and gradually setting the open-hole packer 4; and when fracturing is needed, delivering a fracturing pipe column to complete all interval fracturing. The oilfield open-hole packer horizontal well fracturing well completion method has the advantages that: the internal drift diameter of well completion is large, the number of treated segments is large, fracturing after delivery can be firstly obtained, and fracturing, acidification, water plugging measures can be performed on any interval and the like.

Description

Open-hole horizontal well open hole packer and preset linker pressure break completion method
Technical field: the present invention relates to the oil field technical field of oil production engineering, belong to a kind of oil field open hole packer fractured horizontal well completion method.
Background technology: at present external bore hole pressure break completion adopts the bore hole external packer of pipe to separate the stratum more, and the mode of sliding sleeve pressure break is opened in pitching, but exist sliding sleeve to open difficulty, needs brill mills ball seat and could guarantee the run through casing size shortcoming.Therefore developed open hole packer horizontal well perforated pipe pressure break completion tubular column, it can realize horizontal well bore hole staged fracturing completion, greatly reduces construction cost, has avoided sliding sleeve to open construction risks such as difficulty simultaneously.Need not bore behind the pressing crack construction of the present invention and mill the interior latus rectum that just can guarantee the pipe string, be convenient to the production and the shutoff adjustment of interval.
Summary of the invention: the objective of the invention is to develop and a kind ofly can separate the stratum, can guarantee run through casing size again, be convenient to the open-hole horizontal well open hole packer of follow-up pressure break, water blockoff, water filling job execution and preset linker pressure break completion method at horizontal well.
The present invention is by realizing with lower device: this device by deliver tubing string, set tubing string, three times tubing strings of fracturing string are realized, wherein deliver tubing string by drilling rod, hanging packer, sleeve pipe, open hole packer, preset linker, float shoe is formed; Set tubing string by oil pipe, K344 packer, restriction choke, dead stifled etc. the composition; Fracturing string is made up of oil pipe, safety joint, centralizer, hydraulic anchor, K344 packer, pilot sandblaster, dead the blocking up of guiding; Above-mentioned technology realizes by following steps:
A, at first will deliver tubing string drilling rod, hanging packer, sleeve pipe, open hole packer, preset linker, float shoe connects successively, down to the horizontal well precalculated position;
B, secondly be lowered to successively oil pipe, K344 packer, restriction choke, the dead stifled tubing string that sets that connects, and restriction choke aimed at open hole packer and hanging packer, ground fluid injection then, restriction choke produces chock pressure difference, make left and right sides K344 packer setting, separate open hole packer, liquid comes out to enter in open hole packer and the hanging packer through the hole of restriction choke, open hole packer and hanging packer are set, put forward mode on utilizing at last and set open hole packer and hanging packer step by step, trip out after setting and set tubing string;
C, be lowered to successively the dead stifled fracturing string of the oil pipe, safety joint, centralizer, hydraulic anchor, K344 packer, pilot sandblaster, the guiding that connect then, after oil pipe carries and arrives the interior precalculated position of sleeve pipe under this fracturing string, sit well head, ground fluid injection then, the pilot sandblaster produces chock pressure difference and makes left and right sides K344 packer setting, separated oil layer section, liquid comes out to through the side opening of pilot sandblaster and presets linker and enter into the stratum, press off the stratum, upper lifting pipe post behind the intact interval of pressure break is finished the pressing crack construction of all intervals piecemeal.
Compared with the prior art the present invention has following advantage:
1) completion mode is simple, after open hole packer sets sealing, can be divided into several sections to the stratum.
2) latus rectum is big in the tubing string inner sleeve, and hop count is many, can carry out measure to certain interval arbitrarily, can significantly reduce cost.
Description of drawings: Fig. 1 is for delivering the tubular column structure sketch; Fig. 2 is a setting pipe rod structure sketch; Fig. 3 is the fracturing string structure diagram.
The specific embodiment: the invention will be further described below in conjunction with accompanying drawing: the present invention is by realizing with lower device: this device by deliver tubing string, set tubing string, three times tubing strings of fracturing string are realized, wherein deliver tubing string by drilling rod 1, hanging packer 2, sleeve pipe 3, open hole packer 4, preset linker 5, float shoe 6 is formed; Set tubing string by oil pipe 7, K344 packer 8, restriction choke 9, extremely stifled 10 etc. form; Fracturing string is made up of oil pipe 11, safety joint 12, centralizer 13, hydraulic anchor 14, K344 packer 15, pilot sandblaster 16, guiding dead stifled 17; Above-mentioned technology realizes by following steps:
A, at first will deliver tubing string drilling rod 1, hanging packer 2, sleeve pipe 3, open hole packer 4, preset linker 5, float shoe 6 and connect successively, down to the horizontal well precalculated position; According to geologic requirements, with open hole packer 4 horizontal segment is divided into six well sections, there are six intervals to need following six of pressure break to preset linker, after putting in place under the tubing string, after giving up, hanging packer trips out drilling rod 1.
B, secondly be lowered to successively the oil pipe 7, K344 packer 8, the restriction choke 9 that connect, extremely stifled 10 set tubing string, and with restriction choke 9 aligning open hole packer 4 and hanging packers 2, ground fluid injection then, restriction choke 9 produces chock pressure difference, left and right sides K344 packer 8 is set, separate open hole packer 4, liquid is in open hole packer 4 and hanging packer 2 are come out to enter in the hole of restriction choke 9, open hole packer 4 and hanging packer 2 are set, put forward mode on utilizing at last and set open hole packer 4 and hanging packer 2 step by step, trip out after setting and set tubing string;
C, be lowered to the oil pipe 11 that connects successively then, safety joint 12, centralizer 13, hydraulic anchor 14, K344 packer 15, pilot sandblaster 16, dead stifled 17 fracturing strings of guiding, after oil pipe 11 carries and arrives sleeve pipe 3 interior precalculated positions under this fracturing string, sit well head, ground fluid injection then, pilot sandblaster 16 produces chock pressure difference sets left and right sides K344 packer 15, separated oil layer section, liquid comes out to through the side opening of pilot sandblaster 16 and presets linker 5 and enter into the stratum, press off the stratum, upper lifting pipe post behind the intact interval of pressure break, make this tool string advance to another interval and carry out pressure break, one-trip string just can be finished six sections pressure breaks like this.

Claims (1)

1. open-hole horizontal well open hole packer and preset linker pressure break completion method, it is characterized in that: it is by realizing with lower device: this device by deliver tubing string, set tubing string, three times tubing strings of fracturing string are realized, wherein deliver tubing string by drilling rod (1), hanging packer (2), sleeve pipe (3), open hole packer (4), preset linker (5), float shoe (6) is formed; Setting tubing string is made up of oil pipe (7), K344 packer (8), restriction choke (9), dead stifled (10) etc.; Fracturing string is made up of oil pipe (11), safety joint (12), centralizer (13), hydraulic anchor (14), K344 packer (15), pilot sandblaster (16), guiding dead stifled (17); Above-mentioned technology realizes by following steps:
A, at first will deliver tubing string drilling rod (1), hanging packer (2), sleeve pipe (3), open hole packer (4), preset linker (5), float shoe (6) connects successively, down to the horizontal well precalculated position;
B, next is lowered to the oil pipe (7) that connects successively, K344 packer (8), restriction choke (9), dead stifled (10) set tubing string, and with restriction choke (9) aligning open hole packer (4) and hanging packer (2), ground fluid injection then, restriction choke (9) produces chock pressure difference, left and right sides K344 packer (8) is set, separate open hole packer (4), liquid is in open hole packer (4) and hanging packer (2) are come out to enter in the hole of restriction choke (9), open hole packer (4) and hanging packer (2) are set, put forward mode on utilizing at last and set open hole packer (4) and hanging packer (2) step by step, trip out after setting and set tubing string;
C, be lowered to the oil pipe (11) that connects successively then, safety joint (12), centralizer (13), hydraulic anchor (14), K344 packer (15), pilot sandblaster (16), dead stifled (17) fracturing string of guiding, after oil pipe (11) carries and arrives the interior precalculated position of sleeve pipe (13) under this fracturing string, set well head, ground fluid injection then, pilot sandblaster (16) produces chock pressure difference sets left and right sides K344 packer (15), separated oil layer section, liquid comes out to through the side opening of pilot sandblaster (16) and presets linker (5) and enter into the stratum, press off the stratum, upper lifting pipe post behind the intact interval of pressure break is finished the pressing crack construction of all intervals piecemeal.
CN 201010534189 2010-11-06 2010-11-06 Open-hole packer for open-hole horizontal well and preset connector fracturing well completion method Active CN102022104B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010534189 CN102022104B (en) 2010-11-06 2010-11-06 Open-hole packer for open-hole horizontal well and preset connector fracturing well completion method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010534189 CN102022104B (en) 2010-11-06 2010-11-06 Open-hole packer for open-hole horizontal well and preset connector fracturing well completion method

Publications (2)

Publication Number Publication Date
CN102022104A true CN102022104A (en) 2011-04-20
CN102022104B CN102022104B (en) 2013-08-14

Family

ID=43863836

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010534189 Active CN102022104B (en) 2010-11-06 2010-11-06 Open-hole packer for open-hole horizontal well and preset connector fracturing well completion method

Country Status (1)

Country Link
CN (1) CN102022104B (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103132970A (en) * 2011-12-05 2013-06-05 中国石油化工股份有限公司 Staged fracturing oil tube system and application method thereof
CN103132967A (en) * 2011-12-01 2013-06-05 阜新驰宇石油机械有限公司 Multilateral well fracturing hanging well completion process device
CN103306636A (en) * 2012-03-15 2013-09-18 中国石油化工股份有限公司 Well completion tube string and cementing method
CN103573241A (en) * 2013-08-06 2014-02-12 中国石油天然气股份有限公司 Casing cementing pressure balancing sliding sleeve annulus staged sand fracturing process for horizontal well
CN103835691A (en) * 2014-04-03 2014-06-04 北京捷贝通石油技术有限公司 Natural selection sweet heart temporary plugging volume fracturing method
CN104727796A (en) * 2015-03-02 2015-06-24 中国石油化工股份有限公司江汉油田分公司采油工艺研究院 Construction method of horizontal well core-withdrawable sliding sleeve multistage fracturing completion pipe string
CN106050222A (en) * 2016-07-22 2016-10-26 中国石油天然气股份有限公司 Water searching and blocking tubular column of open-hole horizontal well
CN106639968A (en) * 2015-10-30 2017-05-10 中石化石油工程技术服务有限公司 Multi-cluster infinite-order well cementation segmentation fracturing string and fracturing method
CN106939784A (en) * 2017-01-13 2017-07-11 上海全泽能源科技有限公司 The positioning acidizing device of stratified injection well
CN109707358A (en) * 2017-10-25 2019-05-03 中海石油(中国)有限公司上海分公司 Fracturing string and its fracturing process
CN110017133A (en) * 2019-05-23 2019-07-16 广州海洋地质调查局 A kind of test of horizontal well production profile and shutoff method and device
CN111236909A (en) * 2020-03-03 2020-06-05 深圳市百勤石油技术有限公司 Full-bore infinite staged fracturing tool and using method thereof
CN111608633A (en) * 2020-06-30 2020-09-01 中国石油天然气股份有限公司 Large-scale fracturing process suitable for horizontal well
CN111648754A (en) * 2020-05-19 2020-09-11 中国石油天然气股份有限公司 Coiled tubing fracturing and downhole throttling production integrated process pipe column and method thereof
CN115045635A (en) * 2022-06-07 2022-09-13 西南石油大学 Tool and method suitable for downhole pressurized well completion of gas and liquid drilling

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030121663A1 (en) * 2001-12-31 2003-07-03 Xiaowei Weng Method and apparatus for placement of multiple fractures in open hole wells
CN2654838Y (en) * 2003-10-17 2004-11-10 中国石化胜利油田有限公司采油工艺研究院 Replacing of pipe column under three layer oil extraction without moving pipe column
US7059407B2 (en) * 2000-02-15 2006-06-13 Exxonmobil Upstream Research Company Method and apparatus for stimulation of multiple formation intervals
CN1818328A (en) * 2006-03-24 2006-08-16 中国石油天然气股份有限公司 Cracking four-linking technology
CN201165866Y (en) * 2008-03-04 2008-12-17 北京华油油气技术开发有限公司 Horizontal well division and combination extracting pipe column
CN101864921A (en) * 2010-06-11 2010-10-20 大港油田集团有限责任公司 Well completion and oil production string of horizontal well and well completion and oil production processes thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7059407B2 (en) * 2000-02-15 2006-06-13 Exxonmobil Upstream Research Company Method and apparatus for stimulation of multiple formation intervals
US20030121663A1 (en) * 2001-12-31 2003-07-03 Xiaowei Weng Method and apparatus for placement of multiple fractures in open hole wells
CN2654838Y (en) * 2003-10-17 2004-11-10 中国石化胜利油田有限公司采油工艺研究院 Replacing of pipe column under three layer oil extraction without moving pipe column
CN1818328A (en) * 2006-03-24 2006-08-16 中国石油天然气股份有限公司 Cracking four-linking technology
CN201165866Y (en) * 2008-03-04 2008-12-17 北京华油油气技术开发有限公司 Horizontal well division and combination extracting pipe column
CN101864921A (en) * 2010-06-11 2010-10-20 大港油田集团有限责任公司 Well completion and oil production string of horizontal well and well completion and oil production processes thereof

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103132967A (en) * 2011-12-01 2013-06-05 阜新驰宇石油机械有限公司 Multilateral well fracturing hanging well completion process device
CN103132970A (en) * 2011-12-05 2013-06-05 中国石油化工股份有限公司 Staged fracturing oil tube system and application method thereof
CN103132970B (en) * 2011-12-05 2016-01-06 中国石油化工股份有限公司 Staged fracturing tubing system and using method thereof
CN103306636A (en) * 2012-03-15 2013-09-18 中国石油化工股份有限公司 Well completion tube string and cementing method
CN103306636B (en) * 2012-03-15 2015-12-09 中国石油化工股份有限公司 A kind of completion tubular string and cemented method
CN103573241A (en) * 2013-08-06 2014-02-12 中国石油天然气股份有限公司 Casing cementing pressure balancing sliding sleeve annulus staged sand fracturing process for horizontal well
CN103835691A (en) * 2014-04-03 2014-06-04 北京捷贝通石油技术有限公司 Natural selection sweet heart temporary plugging volume fracturing method
CN103835691B (en) * 2014-04-03 2017-03-08 北京捷贝通石油技术有限公司 A kind of natural selection dessert temporarily blocks up volume fracturing method
CN104727796A (en) * 2015-03-02 2015-06-24 中国石油化工股份有限公司江汉油田分公司采油工艺研究院 Construction method of horizontal well core-withdrawable sliding sleeve multistage fracturing completion pipe string
CN104727796B (en) * 2015-03-02 2017-08-29 中国石油化工股份有限公司江汉油田分公司采油工艺研究院 A kind of horizontal well can coring sliding sleeve multistage fracturing completion tubular column construction method
CN106639968A (en) * 2015-10-30 2017-05-10 中石化石油工程技术服务有限公司 Multi-cluster infinite-order well cementation segmentation fracturing string and fracturing method
CN106050222A (en) * 2016-07-22 2016-10-26 中国石油天然气股份有限公司 Water searching and blocking tubular column of open-hole horizontal well
CN106939784A (en) * 2017-01-13 2017-07-11 上海全泽能源科技有限公司 The positioning acidizing device of stratified injection well
CN109707358A (en) * 2017-10-25 2019-05-03 中海石油(中国)有限公司上海分公司 Fracturing string and its fracturing process
CN109707358B (en) * 2017-10-25 2023-09-05 中海石油(中国)有限公司上海分公司 Fracturing string and fracturing method thereof
CN110017133A (en) * 2019-05-23 2019-07-16 广州海洋地质调查局 A kind of test of horizontal well production profile and shutoff method and device
CN111236909A (en) * 2020-03-03 2020-06-05 深圳市百勤石油技术有限公司 Full-bore infinite staged fracturing tool and using method thereof
CN111648754A (en) * 2020-05-19 2020-09-11 中国石油天然气股份有限公司 Coiled tubing fracturing and downhole throttling production integrated process pipe column and method thereof
CN111608633A (en) * 2020-06-30 2020-09-01 中国石油天然气股份有限公司 Large-scale fracturing process suitable for horizontal well
CN115045635A (en) * 2022-06-07 2022-09-13 西南石油大学 Tool and method suitable for downhole pressurized well completion of gas and liquid drilling

Also Published As

Publication number Publication date
CN102022104B (en) 2013-08-14

Similar Documents

Publication Publication Date Title
CN102022104B (en) Open-hole packer for open-hole horizontal well and preset connector fracturing well completion method
CN103277079B (en) A kind of tubing string of horizontal well fracturing completion and pressing crack construction method thereof
WO2020113870A1 (en) Method for cooperatively draining roof separation water and mining coal-measure gas
CN201902202U (en) Staged fracturing string of oil-gas horizontal well
CN103883293B (en) Hydraulic jet radial drilling and fracturing integrating method
CN111535791B (en) Efficient gas extraction method for broken soft low-permeability coal seam well upper and lower combined fracturing area
CN103195468A (en) System process for conducting efficient strengthened extraction in surrounding rock
CN104405283A (en) Technique for extracting gas from L-shaped ground drilling well in mining area
CN103470242B (en) A kind of oilfield horizontal well volume fracturing method
CN205063929U (en) Colliery is sealed in pit and is pressed integration segmentation hydraulic fracturing device
CN105507865A (en) Re-fracturing method for oil, gas and water wells
CN104632172A (en) Immovable string hydraulic sandblasting fracture annulus pressure control method for gas field horizontal well
CN104564001A (en) Horizontal well multi-cluster fracturing method and multi-cluster perforating and fracturing pipe column for implementing method
CN203961938U (en) Packer staged fracturing technology tube pillar in a kind of horizontal well tube
CN105888639A (en) Feeding-controlling full-bore sliding sleeve sectional fracturing tube column
CN103821489A (en) Horizontal well mechanical layering and hydraulic jet fracture acidizing compound technique pipe
CN105443098A (en) Coal mine underground borehole segmented fixed hydraulic fracturing fixation hole device and method
CN112211601A (en) Coiled tubing and packer combined staged fracturing string for slim-hole well and method
CN104196492B (en) A kind of dragging down-hole plugging valve with pressure
CN101105121A (en) Horizontal well machinery staged fracturing tool string
CN203394492U (en) Coiled tubing perforation and mechanical packing fracturing pipe column
CN201031679Y (en) Deep layer gas well multiple fracturing tools string
CN209892171U (en) Horizontal well section staggered displacement and imbibition displacement injection-production string
CN204041042U (en) A kind of coiled tubing drag fracturing tubing string
CN103541679B (en) Method for sealing underground hydraulic fracture drilled hole of coal mine in combined manner

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220106

Address after: 163453 Heilongjiang Province, Daqing City Ranghulu District No. 233 South Central Avenue

Patentee after: Daqing Oilfield Co.,Ltd.

Patentee after: PetroChina Co Ltd

Address before: 163453 Heilongjiang Province, Daqing City Ranghulu District No. 233 South Central Avenue

Patentee before: Daqing Oilfield Co.,Ltd.