CN101864921A - Well completion and oil production string of horizontal well and well completion and oil production processes thereof - Google Patents
Well completion and oil production string of horizontal well and well completion and oil production processes thereof Download PDFInfo
- Publication number
- CN101864921A CN101864921A CN 201010198082 CN201010198082A CN101864921A CN 101864921 A CN101864921 A CN 101864921A CN 201010198082 CN201010198082 CN 201010198082 CN 201010198082 A CN201010198082 A CN 201010198082A CN 101864921 A CN101864921 A CN 101864921A
- Authority
- CN
- China
- Prior art keywords
- sealing
- intubate
- layering
- iii
- tubular column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 25
- 238000007789 sealing Methods 0.000 claims abstract description 336
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 30
- 238000005516 engineering process Methods 0.000 claims abstract description 20
- 238000000034 method Methods 0.000 claims abstract description 5
- 238000005406 washing Methods 0.000 claims abstract description 5
- 238000005554 pickling Methods 0.000 claims description 43
- 238000011010 flushing procedure Methods 0.000 claims description 23
- 210000002445 nipple Anatomy 0.000 claims description 10
- 239000004576 sand Substances 0.000 claims description 8
- 235000021110 pickles Nutrition 0.000 claims description 6
- 238000004513 sizing Methods 0.000 claims description 4
- 230000000694 effects Effects 0.000 abstract description 5
- 230000001788 irregular Effects 0.000 abstract description 3
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000010276 construction Methods 0.000 abstract description 2
- 238000012216 screening Methods 0.000 abstract 4
- 239000002253 acid Substances 0.000 abstract 1
- 230000007547 defect Effects 0.000 abstract 1
- 230000003111 delayed effect Effects 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 5
- 230000018109 developmental process Effects 0.000 description 3
- 239000003129 oil well Substances 0.000 description 3
- 238000012856 packing Methods 0.000 description 3
- 238000011084 recovery Methods 0.000 description 2
- 240000007817 Olea europaea Species 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000003208 petroleum Substances 0.000 description 1
- 230000011218 segmentation Effects 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
Images
Landscapes
- Treatment Of Liquids With Adsorbents In General (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201010198082 CN101864921B (en) | 2010-06-11 | 2010-06-11 | Well completion and oil production string of horizontal well and well completion and oil production processes thereof |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201010198082 CN101864921B (en) | 2010-06-11 | 2010-06-11 | Well completion and oil production string of horizontal well and well completion and oil production processes thereof |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN101864921A true CN101864921A (en) | 2010-10-20 |
| CN101864921B CN101864921B (en) | 2013-05-01 |
Family
ID=42956828
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 201010198082 Active CN101864921B (en) | 2010-06-11 | 2010-06-11 | Well completion and oil production string of horizontal well and well completion and oil production processes thereof |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN101864921B (en) |
Cited By (32)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102022104A (en) * | 2010-11-06 | 2011-04-20 | 大庆油田有限责任公司 | Open-hole packer for open-hole horizontal well and preset connector fracturing well completion method |
| CN102454381A (en) * | 2010-10-22 | 2012-05-16 | 中国石油化工股份有限公司 | Oil and gas reservoir open hole well cementing and completion method and device |
| CN102536172A (en) * | 2012-02-23 | 2012-07-04 | 石云夫 | Sectional production tubular pile for horizontal well |
| CN103573226A (en) * | 2012-07-24 | 2014-02-12 | 思达斯易能源技术(集团)有限公司 | Well completion sand prevention process and sand prevention strings thereof |
| CN103573229A (en) * | 2012-07-24 | 2014-02-12 | 中国海洋石油总公司 | Open hole oil production technology and separated pipe string |
| CN103775021A (en) * | 2014-01-09 | 2014-05-07 | 中国石油天然气股份有限公司 | A water plugging pipe string and water plugging method suitable for bottom plugging wells with small interlayers |
| CN104213846A (en) * | 2013-06-05 | 2014-12-17 | 中国石油天然气股份有限公司 | Selective Production String and Working Method of Multi-Stage Fracturing Horizontal Well Completion with Casing |
| CN104358519A (en) * | 2014-09-12 | 2015-02-18 | 中国石油集团长城钻探工程有限公司 | Segment-type well completion method |
| CN104420834A (en) * | 2013-08-23 | 2015-03-18 | 天津大港油田钻采技术开发公司 | Separate-layer sand blocking simultaneous production pipe string |
| CN105089571A (en) * | 2014-05-24 | 2015-11-25 | 天津大港油田钻采技术开发公司 | Water injection string without surface flow and water injection technological method of water injection string |
| CN105221136A (en) * | 2015-10-10 | 2016-01-06 | 中国石油天然气股份有限公司 | Integrated well completion tool for screen pre-stage water control and channel monitoring and inspection |
| CN105298431A (en) * | 2015-10-13 | 2016-02-03 | 中国石油天然气股份有限公司 | A horizontal well trigger isolation segmental completion process string |
| CN105358792A (en) * | 2013-07-04 | 2016-02-24 | Ior加拿大有限公司 | Method for producing oil from induced fractures using a single wellbore and multiple-channel tubing |
| CN105625978A (en) * | 2014-11-06 | 2016-06-01 | 中国石油天然气股份有限公司 | Central control liquid control string for horizontal wells and liquid control string technology for horizontal wells |
| CN105927165A (en) * | 2016-05-11 | 2016-09-07 | 四川行之智汇知识产权运营有限公司 | Completion pipe string of viscous oil horizontal well |
| CN105927164A (en) * | 2016-05-11 | 2016-09-07 | 四川行之智汇知识产权运营有限公司 | Completion pipe string of shallow viscous crude oil reservoir |
| CN105952388A (en) * | 2016-05-11 | 2016-09-21 | 四川行之智汇知识产权运营有限公司 | Heavy oil horizontal well completion pipe string realizing subsection mining |
| CN106089161A (en) * | 2016-08-21 | 2016-11-09 | 中国石油化工股份有限公司 | A kind of layering section sand control production integration control valve and completion tubular column |
| CN107218003A (en) * | 2017-07-18 | 2017-09-29 | 中国石油集团渤海钻探工程有限公司 | Coal bed gas continuous punching sandpipe string and its sand washing method |
| CN108086954A (en) * | 2017-12-07 | 2018-05-29 | 中国石油化工股份有限公司华北油气分公司石油工程技术研究院 | Horizontal well is classified pickling acidization tool |
| CN108240200A (en) * | 2016-12-27 | 2018-07-03 | 中国石油天然气股份有限公司 | Oil pumping method |
| CN105822252B (en) * | 2015-01-04 | 2018-09-04 | 中国石油天然气股份有限公司 | Cementing String Combination and Cementing Method |
| CN108798539A (en) * | 2017-05-05 | 2018-11-13 | 中国石油化工股份有限公司 | Horizontal well sand control commingled column |
| CN110273652A (en) * | 2018-03-14 | 2019-09-24 | 中国石油天然气股份有限公司 | Oil production well pickling string structure and oil production well pickling method |
| CN112096338A (en) * | 2020-10-09 | 2020-12-18 | 东营市瑞丰石油技术发展有限责任公司 | Annular packing valve and well completion pipe string |
| CN112824641A (en) * | 2019-11-21 | 2021-05-21 | 中国石油天然气股份有限公司 | Integrated oil production process pipe column |
| CN112943183A (en) * | 2021-01-12 | 2021-06-11 | 中国石油天然气股份有限公司 | Layered gas injection process pipe column and using method thereof |
| CN114086920A (en) * | 2021-12-28 | 2022-02-25 | 成都北方石油勘探开发技术有限公司 | Integrated self-filling sand-preventing wax-preventing oil forced-production tool and method |
| CN114482912A (en) * | 2020-10-26 | 2022-05-13 | 中国石油化工股份有限公司 | Horizontal well water shutoff agent injection process control method |
| CN114991711A (en) * | 2022-06-30 | 2022-09-02 | 大庆辰平钻井技术服务有限公司 | Completion process for deflecting section of horizontal well with ultra-short radius |
| CN115135849A (en) * | 2021-07-20 | 2022-09-30 | 北京合力奇点科技有限公司 | Flow-regulating water-controlling acidizing well completion device for oil-gas well and use method |
| CN115992652A (en) * | 2021-10-19 | 2023-04-21 | 中国石油化工股份有限公司 | Open hole horizontal well cement packing sectional water control sand prevention completion string and method |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5343965A (en) * | 1992-10-19 | 1994-09-06 | Talley Robert R | Apparatus and methods for horizontal completion of a water well |
| US20040154798A1 (en) * | 2000-03-30 | 2004-08-12 | Baker Hughes Incorporated | Zero drill completion and production system |
| CN201057017Y (en) * | 2007-06-26 | 2008-05-07 | 大港油田集团有限责任公司 | Multilevel packing well completion technique tubular pile |
| CN201363112Y (en) * | 2009-02-23 | 2009-12-16 | 中国石化集团胜利石油管理局钻井工艺研究院 | Well cleaning and inflating integrated device used for screen tube sublevel well completion |
| RU2376460C1 (en) * | 2008-07-25 | 2009-12-20 | Махир Зафар оглы Шарифов | Equipment for multiple production of multilayer field wells |
| CN201705276U (en) * | 2010-06-11 | 2011-01-12 | 大港油田集团有限责任公司 | Well completion and flow string of horizontal well |
-
2010
- 2010-06-11 CN CN 201010198082 patent/CN101864921B/en active Active
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5343965A (en) * | 1992-10-19 | 1994-09-06 | Talley Robert R | Apparatus and methods for horizontal completion of a water well |
| US20040154798A1 (en) * | 2000-03-30 | 2004-08-12 | Baker Hughes Incorporated | Zero drill completion and production system |
| CN201057017Y (en) * | 2007-06-26 | 2008-05-07 | 大港油田集团有限责任公司 | Multilevel packing well completion technique tubular pile |
| RU2376460C1 (en) * | 2008-07-25 | 2009-12-20 | Махир Зафар оглы Шарифов | Equipment for multiple production of multilayer field wells |
| CN201363112Y (en) * | 2009-02-23 | 2009-12-16 | 中国石化集团胜利石油管理局钻井工艺研究院 | Well cleaning and inflating integrated device used for screen tube sublevel well completion |
| CN201705276U (en) * | 2010-06-11 | 2011-01-12 | 大港油田集团有限责任公司 | Well completion and flow string of horizontal well |
Cited By (48)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102454381A (en) * | 2010-10-22 | 2012-05-16 | 中国石油化工股份有限公司 | Oil and gas reservoir open hole well cementing and completion method and device |
| CN102454381B (en) * | 2010-10-22 | 2014-09-17 | 中国石油化工股份有限公司 | Oil-gas reservoir barefoot well cementing and completion method and device |
| CN102022104B (en) * | 2010-11-06 | 2013-08-14 | 大庆油田有限责任公司 | Open-hole packer for open-hole horizontal well and preset connector fracturing well completion method |
| CN102022104A (en) * | 2010-11-06 | 2011-04-20 | 大庆油田有限责任公司 | Open-hole packer for open-hole horizontal well and preset connector fracturing well completion method |
| CN102536172A (en) * | 2012-02-23 | 2012-07-04 | 石云夫 | Sectional production tubular pile for horizontal well |
| CN103573226B (en) * | 2012-07-24 | 2016-03-02 | 思达斯易能源技术(集团)有限公司 | A kind of completion and sand control technique and sand control pipe thereof |
| CN103573226A (en) * | 2012-07-24 | 2014-02-12 | 思达斯易能源技术(集团)有限公司 | Well completion sand prevention process and sand prevention strings thereof |
| CN103573229A (en) * | 2012-07-24 | 2014-02-12 | 中国海洋石油总公司 | Open hole oil production technology and separated pipe string |
| CN103573229B (en) * | 2012-07-24 | 2016-12-21 | 中国海洋石油总公司 | A kind of bore hole DP technology and separation tubing string thereof |
| CN104213846A (en) * | 2013-06-05 | 2014-12-17 | 中国石油天然气股份有限公司 | Selective Production String and Working Method of Multi-Stage Fracturing Horizontal Well Completion with Casing |
| CN104213846B (en) * | 2013-06-05 | 2016-07-13 | 中国石油天然气股份有限公司 | Selective Production String and Working Method of Multi-Stage Fracturing Horizontal Well Completion with Casing |
| CN105358792A (en) * | 2013-07-04 | 2016-02-24 | Ior加拿大有限公司 | Method for producing oil from induced fractures using a single wellbore and multiple-channel tubing |
| CN104420834A (en) * | 2013-08-23 | 2015-03-18 | 天津大港油田钻采技术开发公司 | Separate-layer sand blocking simultaneous production pipe string |
| CN104420834B (en) * | 2013-08-23 | 2017-03-29 | 天津大港油田钻采技术开发公司 | Layering sand block is same to adopt tubing string |
| CN103775021A (en) * | 2014-01-09 | 2014-05-07 | 中国石油天然气股份有限公司 | A water plugging pipe string and water plugging method suitable for bottom plugging wells with small interlayers |
| CN105089571A (en) * | 2014-05-24 | 2015-11-25 | 天津大港油田钻采技术开发公司 | Water injection string without surface flow and water injection technological method of water injection string |
| CN104358519A (en) * | 2014-09-12 | 2015-02-18 | 中国石油集团长城钻探工程有限公司 | Segment-type well completion method |
| CN105625978B (en) * | 2014-11-06 | 2018-04-03 | 中国石油天然气股份有限公司 | Central control liquid control string for horizontal wells and liquid control string technology for horizontal wells |
| CN105625978A (en) * | 2014-11-06 | 2016-06-01 | 中国石油天然气股份有限公司 | Central control liquid control string for horizontal wells and liquid control string technology for horizontal wells |
| CN105822252B (en) * | 2015-01-04 | 2018-09-04 | 中国石油天然气股份有限公司 | Cementing String Combination and Cementing Method |
| CN105221136B (en) * | 2015-10-10 | 2018-04-03 | 中国石油天然气股份有限公司 | Integrated well completion tool for screen pre-stage water control and channel monitoring and inspection |
| CN105221136A (en) * | 2015-10-10 | 2016-01-06 | 中国石油天然气股份有限公司 | Integrated well completion tool for screen pre-stage water control and channel monitoring and inspection |
| CN105298431A (en) * | 2015-10-13 | 2016-02-03 | 中国石油天然气股份有限公司 | A horizontal well trigger isolation segmental completion process string |
| CN105952388A (en) * | 2016-05-11 | 2016-09-21 | 四川行之智汇知识产权运营有限公司 | Heavy oil horizontal well completion pipe string realizing subsection mining |
| WO2017193504A1 (en) * | 2016-05-11 | 2017-11-16 | 四川行之智汇知识产权运营有限公司 | Thickened oil horizontal well completion string capable of achieving subsection extraction |
| CN105927164A (en) * | 2016-05-11 | 2016-09-07 | 四川行之智汇知识产权运营有限公司 | Completion pipe string of shallow viscous crude oil reservoir |
| CN105927165A (en) * | 2016-05-11 | 2016-09-07 | 四川行之智汇知识产权运营有限公司 | Completion pipe string of viscous oil horizontal well |
| CN106089161A (en) * | 2016-08-21 | 2016-11-09 | 中国石油化工股份有限公司 | A kind of layering section sand control production integration control valve and completion tubular column |
| CN106089161B (en) * | 2016-08-21 | 2018-10-16 | 中国石油化工股份有限公司 | A kind of layering section sand control production integration control valve and completion tubular column |
| CN108240200B (en) * | 2016-12-27 | 2020-06-09 | 中国石油天然气股份有限公司 | Oil pumping method |
| CN108240200A (en) * | 2016-12-27 | 2018-07-03 | 中国石油天然气股份有限公司 | Oil pumping method |
| CN108798539B (en) * | 2017-05-05 | 2024-05-24 | 中国石油化工股份有限公司 | Sand-proof combined production string for horizontal well |
| CN108798539A (en) * | 2017-05-05 | 2018-11-13 | 中国石油化工股份有限公司 | Horizontal well sand control commingled column |
| CN107218003A (en) * | 2017-07-18 | 2017-09-29 | 中国石油集团渤海钻探工程有限公司 | Coal bed gas continuous punching sandpipe string and its sand washing method |
| CN108086954B (en) * | 2017-12-07 | 2020-07-28 | 中国石油化工股份有限公司华北油气分公司石油工程技术研究院 | Horizontal well grading acid pickling acidification method |
| CN108086954A (en) * | 2017-12-07 | 2018-05-29 | 中国石油化工股份有限公司华北油气分公司石油工程技术研究院 | Horizontal well is classified pickling acidization tool |
| CN110273652A (en) * | 2018-03-14 | 2019-09-24 | 中国石油天然气股份有限公司 | Oil production well pickling string structure and oil production well pickling method |
| CN112824641B (en) * | 2019-11-21 | 2023-02-07 | 中国石油天然气股份有限公司 | Integrated oil recovery process string |
| CN112824641A (en) * | 2019-11-21 | 2021-05-21 | 中国石油天然气股份有限公司 | Integrated oil production process pipe column |
| CN112096338A (en) * | 2020-10-09 | 2020-12-18 | 东营市瑞丰石油技术发展有限责任公司 | Annular packing valve and well completion pipe string |
| CN114482912A (en) * | 2020-10-26 | 2022-05-13 | 中国石油化工股份有限公司 | Horizontal well water shutoff agent injection process control method |
| CN114482912B (en) * | 2020-10-26 | 2024-05-24 | 中国石油化工股份有限公司 | Control method for water shutoff agent injection process of horizontal well |
| CN112943183A (en) * | 2021-01-12 | 2021-06-11 | 中国石油天然气股份有限公司 | Layered gas injection process pipe column and using method thereof |
| CN115135849A (en) * | 2021-07-20 | 2022-09-30 | 北京合力奇点科技有限公司 | Flow-regulating water-controlling acidizing well completion device for oil-gas well and use method |
| CN115992652A (en) * | 2021-10-19 | 2023-04-21 | 中国石油化工股份有限公司 | Open hole horizontal well cement packing sectional water control sand prevention completion string and method |
| CN114086920A (en) * | 2021-12-28 | 2022-02-25 | 成都北方石油勘探开发技术有限公司 | Integrated self-filling sand-preventing wax-preventing oil forced-production tool and method |
| CN114086920B (en) * | 2021-12-28 | 2024-10-08 | 成都北方石油勘探开发技术有限公司 | Integrated self-filling sand-prevention wax-prevention petroleum forced-extraction tool and method |
| CN114991711A (en) * | 2022-06-30 | 2022-09-02 | 大庆辰平钻井技术服务有限公司 | Completion process for deflecting section of horizontal well with ultra-short radius |
Also Published As
| Publication number | Publication date |
|---|---|
| CN101864921B (en) | 2013-05-01 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101864921B (en) | Well completion and oil production string of horizontal well and well completion and oil production processes thereof | |
| CN201705276U (en) | Well completion and flow string of horizontal well | |
| CN201165866Y (en) | Horizontal well separate mining and combined mining pipe column | |
| CN109653707B (en) | A method for reducing water and increasing oil by filling packing particles in oil and gas wells in fractured oil and gas reservoirs | |
| CN104806217B (en) | Combined separated layer fracturing, grouping and layer-combining mining method for coal bed well group | |
| CN104153753B (en) | Horizontal well volume fracturing tubular column and method based on conventional oil tube pressure dragging | |
| CN103470242B (en) | A kind of oilfield horizontal well volume fracturing method | |
| CN202578589U (en) | Multi-functional pipe string with well cleaning, testing and layered water injection | |
| CN205225215U (en) | A mining device for layered mining of two sets of oil layers | |
| CN103643931A (en) | Completion and fracture integrated pipe column of offshore openhole horizontal well and construction method of pipe column | |
| CN104420835A (en) | Multi-cluster perforation fracturing completion string and construction method | |
| CN108361001A (en) | A kind of deep trona drilling well exploitation cementing stage technique | |
| CN103452531B (en) | Oil pipe under underbalance, no killing well gaslift, turn the method for taking out, examining pump and maintenance oil pipe | |
| CN112127802A (en) | Infinite grade full-bore staged fracturing sand control pipe column and production method thereof | |
| CN103615226A (en) | Hydraulic jet drilling and fracturing method | |
| CN201810292U (en) | Separated layer water injection process tubular column | |
| CN105587300B (en) | Oil recovery method for horizontal well | |
| CN112360345A (en) | Method and system for reinforcing grouting of gas extraction hole under extremely soft coal seam and application | |
| CN103470221B (en) | Method made by the connection that pump was taken out and examined to oil pipe under underbalance, no killing well gaslift, axle | |
| CN203939477U (en) | An integrated pipe string for oil testing and well completion operations | |
| CN1456785A (en) | Selective multi-stage inner pipe cementing process and cemented tubular column there from | |
| CN205135571U (en) | a well completion string | |
| CN204283383U (en) | Layered Water Injection String for Thin Interbeds | |
| CN108643871A (en) | Controlled gas recovery device and method | |
| US20120103626A1 (en) | A well completion method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20101020 Assignee: Tianjin China Petroleum Ruisi Technology Development Co., Ltd. Assignor: Dagang Oil Field Group Co., Ltd. Contract record no.: 2014120000009 Denomination of invention: Well completion and oil production string of horizontal well and well completion and oil production processes thereof Granted publication date: 20130501 License type: Exclusive License Record date: 20140317 |
|
| LICC | Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20201117 Address after: 300000 No. three, Dagang Oilfield, Binhai New Area, Tianjin Patentee after: DAGANG OILFIELD GROUP Co.,Ltd. Patentee after: CHINA NATIONAL PETROLEUM Corp. Address before: Three Dagang oil field, Tianjin, Grand Port, No. 300280 Patentee before: DAGANG OILFIELD GROUP Co.,Ltd. |
|
| TR01 | Transfer of patent right |