CN103573241A - Casing cementing pressure balancing sliding sleeve annulus staged sand fracturing process for horizontal well - Google Patents

Casing cementing pressure balancing sliding sleeve annulus staged sand fracturing process for horizontal well Download PDF

Info

Publication number
CN103573241A
CN103573241A CN201310348881.1A CN201310348881A CN103573241A CN 103573241 A CN103573241 A CN 103573241A CN 201310348881 A CN201310348881 A CN 201310348881A CN 103573241 A CN103573241 A CN 103573241A
Authority
CN
China
Prior art keywords
sliding sleeve
fracturing
packer
coiled tubing
pressure balance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310348881.1A
Other languages
Chinese (zh)
Inventor
王凤山
李清忠
王金友
徐德奎
马强
张宏岩
李琳
许国文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daqing Oilfield Co Ltd
China Petroleum and Natural Gas Co Ltd
Original Assignee
Daqing Oilfield Co Ltd
China Petroleum and Natural Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daqing Oilfield Co Ltd, China Petroleum and Natural Gas Co Ltd filed Critical Daqing Oilfield Co Ltd
Priority to CN201310348881.1A priority Critical patent/CN103573241A/en
Publication of CN103573241A publication Critical patent/CN103573241A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention relates to the technical field of oil production engineering in oilfields, and belongs to a casing cementing pressure balancing sliding sleeve annulus staged sand fracturing process for a horizontal well in an oilfield. The problems of low construction displacement, requirements on perforation before fracturing and incapability of effectively implementing volume fracturing on the horizontal well by a conventional process are effectively solved. The process comprises the following steps of running a pressure balancing sliding sleeve 1 along with a casing 3 for cementing, conveying the whole tool string by using a continuous oil pipe 2, injecting sand-carrying liquid for annulus fracturing, simultaneously supplementing the liquid through a throttling device 6 by using the continuous oil pipe, and keeping the setting of a packer; after an interval is constructed, backwashing the interval by using a screen pipe 11 and a check valve 9, lifting the continuous oil pipe 2, and constructing the next target interval. The process has the advantages that the sliding sleeve is run along with a well completion pipe column for cementing, and perforation is avoided; the process is high in fracturing construction displacement, safe, environment-friendly, high in efficiency and the like.

Description

Horizontal well casing pipe well cementation pressure balance sliding sleeve annular space adds sand multistage fracturing technology
Technical field: the present invention relates to oil extraction in oil field field of engineering technology, belong to a kind of well cementation of the horizontal well casing pipe for oil field pressure balance sliding sleeve annular space and add sand multistage fracturing technology.
Background technology: the large discharge capacity of horizontal well, extensive, multistage volume fracturing can reduce the lower limit that reservoir is effectively employed, and the volume increase transformation of the fine and close oil-gas reservoir of hyposmosis is had great importance.Conventional levels well staged fracturing technology exist operational discharge capacity little, add sand small scale, pressure break hop count is limited, operating efficiency is low problem, and before pressure break, need effectively carrying out horizontal well volume fracturing of first perforation.In order to meet horizontal well volume fracturing construction needs, improve scale, intensity and the efficiency of fracturing reform, invented horizontal well casing pipe well cementation pressure balance sliding sleeve annular space and added sand multistage fracturing technology, for the volume increase of the fine and close oil-gas reservoir of hyposmosis, transformed new technical method is provided.
Summary of the invention: object of the present invention invent exactly a kind of with well cementation completion combine, without perforation, just can complete fracturing work, efficiency of construction is high, cost is low, and can significantly improve the discharge capacity of pressure break and add sand scale, the horizontal well casing pipe well cementation pressure balance sliding sleeve annular space that meets horizontal well volume fracturing construction needs adds sand multistage fracturing technology.
The present invention is by realizing with lower device: pressure balance sliding sleeve, coiled tubing, sleeve pipe, safety joint, centralizer, restriction choke, packer, hydraulic anchor, ball-and-seat, screen casing and guide shoe.The present invention realizes by following steps:
A, first by pressure balance sliding sleeve with in sleeve pipe lower going-into-well and well cementation completion;
B, then will be connected with in turn from top to bottom in the operating tool string lower going-into-well of coiled tubing, safety joint, centralizer, restriction choke, packer, hydraulic anchor, ball-and-seat, collar locator, screen casing and guide shoe, by collar locator, locate, packer is lowered into the pressure balance sliding sleeve centre position of pre-fractured interval;
C, with 1m 3/ min~2m 3the discharge capacity of/min is injected fracturing fluid in coiled tubing, and ball-and-seat is closed, and by restriction choke, makes packer setting, and the annular space injection fracturing fluid by coiled tubing and sleeve pipe, improves pressure, opens pressure balance sliding sleeve, and sand jet outlet is exposed;
D, continue to inject fracturing fluid to coiled tubing, keep packer setting, from the annular space of coiled tubing and sleeve pipe, inject fracturing fluid and carry proppant target zone is carried out to pressure break, until this target zone annular space sand fracturing construction finishes;
After e, this target zone pressing crack construction finish, then from sleeve pipe, inject fracturing fluid, ball-and-seat is opened, and from coiled tubing, returns out, carries out anti-circulation well cleanup, after anti-circulation well cleanup finishes, on the operating tool string that coiled tubing is connected, carries to new target zone;
F, repeating step c~e until complete the pressing crack construction of all target zones, propose operating tool string in production casing.
Pressure balance sliding sleeve designs for full-bore, and packer is the pony packer of hydraulic setting.
The present invention compared with the prior art tool has the following advantages:
The present invention utilizes the pressure balance sliding sleeve completion of cementing the well that is connected with sleeve pipe, without perforation, adopt packer to carry out packing in the pressure balance sliding sleeve centre position of the layer position of wish processing, break pressure balance open sliding sleeve, by casing annulus, inject load fluid and carry out pressing crack construction, and pressing crack construction discharge capacity is large, add sand scale and hop count unrestricted, meet the needs of multistage, extensive, volume fracturing construction, be a kind of horizontal well volume fracturing technology of safe, efficient, environmental protection.Simultaneously sliding sleeve can repeat switch, is beneficial to the later stage selectively to close while producing.
Accompanying drawing explanation: Fig. 1 is on-the-spot application schematic diagram of the present invention.
The specific embodiment: below in conjunction with accompanying drawing, the present invention is done to further auspicious stating: the present invention is by realizing with lower device: pressure balance sliding sleeve 1, coiled tubing 2, sleeve pipe 3, safety joint 4, centralizer 5, restriction choke 6, packer 7, hydraulic anchor 8, ball-and-seat 9, collar locator 10, screen casing 11 and guide shoe 12.The present invention realizes by following steps:
A, first by pressure balance sliding sleeve 1 with in sleeve pipe 3 lower going-into-wells and well cementation completion;
B, then will be connected with in turn from top to bottom in the operating tool string lower going-into-well of coiled tubing 2, safety joint 4, centralizer 5, restriction choke 6, packer 7, hydraulic anchor 8, ball-and-seat 9, collar locator 10, screen casing 11 and guide shoe 12, by collar locator 10, locate, packer 7 is lowered into pressure balance sliding sleeve 1 centre position of pre-fractured interval;
C, with 2m 3the discharge capacity of/min is to the interior injection fracturing fluid of coiled tubing 2, and ball-and-seat 9 is closed, and by restriction choke 6, packer 7 is set, and the annular space injection fracturing fluid by coiled tubing 2 and sleeve pipe 3, improves pressure, opens pressure balance sliding sleeve 1, and sand jet outlet is exposed;
D, continue to inject fracturing fluids to coiled tubing 2, keep packer 7 to set, from the annular space of coiled tubing 2 and sleeve pipe 3, inject fracturing fluid and carry proppant target zone is carried out to pressure break, until this target zone annular space sand fracturing construction finishes;
After e, this target zone pressing crack construction finish, then inject fracturing fluid from sleeve pipe 3, ball-and-seat 9 is opened, and from coiled tubing 2, returns out, carries out anti-circulation well cleanup, after anti-circulation well cleanup finishes, on the operating tool string that coiled tubing 2 is connected, carries to new target zone;
F, repeating step c~e, until complete the pressing crack constructions of three above target zones, by operating tool string from the interior proposition of production casing 3.
Pressure balance sliding sleeve 1 is for full-bore designs, and packer 6 is pony packers of hydraulic setting.

Claims (2)

1. horizontal well casing pipe well cementation pressure balance sliding sleeve annular space adds sand multistage fracturing technology, and above-mentioned technique is by realizing with lower device: pressure balance sliding sleeve (1), coiled tubing (2), sleeve pipe (3), safety joint (4), centralizer (5), restriction choke (6), packer (7), hydraulic anchor (8), ball-and-seat (9), collar locator (10), screen casing (11) and guide shoe (12); It is characterized in that: above-mentioned technique realizes by following steps:
A, first by pressure balance sliding sleeve (1) with in sleeve pipe (3) lower going-into-well and well cementation completion;
B, then will be connected with in turn from top to bottom in the operating tool string lower going-into-well of coiled tubing (2), safety joint (4), centralizer (5), restriction choke (6), packer (7), hydraulic anchor (8), ball-and-seat (9), collar locator (10), screen casing (11) and guide shoe (12), by collar locator (10) location, packer (7) is lowered into pressure balance sliding sleeve (1) centre position of pre-fractured interval;
C, with 1m 3/ min~2m 3the discharge capacity of/min is injected fracturing fluid in coiled tubing (2), ball-and-seat (9) is closed, by restriction choke (6), packer (7) is set, annular space by coiled tubing (2) and sleeve pipe (3) injects fracturing fluid, improve pressure, open pressure balance sliding sleeve (1), sand jet outlet is exposed;
D, continuation are injected fracturing fluid to coiled tubing (2), keep packer (7) to set, from the annular space of coiled tubing (2) and sleeve pipe (3), inject fracturing fluid and carry proppant target zone is carried out to pressure break, until this target zone annular space sand fracturing construction finishes;
After e, this target zone pressing crack construction finish, from sleeve pipe (3), inject again fracturing fluid, ball-and-seat (9) is opened, from coiled tubing (2), return out, carry out anti-circulation well cleanup, after anti-circulation well cleanup finishes, on the operating tool string that coiled tubing (2) is connected, carry to new target zone;
F, repeating step c~e until complete the pressing crack construction of all target zones, propose operating tool string in production casing (3).
2. horizontal well casing pipe well cementation pressure balance sliding sleeve annular space according to claim 1 adds sand multistage fracturing technology, it is characterized in that: pressure balance sliding sleeve (1) is for full-bore designs, and packer (6) is the pony packer of hydraulic setting.
CN201310348881.1A 2013-08-06 2013-08-06 Casing cementing pressure balancing sliding sleeve annulus staged sand fracturing process for horizontal well Pending CN103573241A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310348881.1A CN103573241A (en) 2013-08-06 2013-08-06 Casing cementing pressure balancing sliding sleeve annulus staged sand fracturing process for horizontal well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310348881.1A CN103573241A (en) 2013-08-06 2013-08-06 Casing cementing pressure balancing sliding sleeve annulus staged sand fracturing process for horizontal well

Publications (1)

Publication Number Publication Date
CN103573241A true CN103573241A (en) 2014-02-12

Family

ID=50045883

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310348881.1A Pending CN103573241A (en) 2013-08-06 2013-08-06 Casing cementing pressure balancing sliding sleeve annulus staged sand fracturing process for horizontal well

Country Status (1)

Country Link
CN (1) CN103573241A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103939076A (en) * 2014-04-23 2014-07-23 西安威盛电子仪器有限公司 Pressure and flow regulator in fracturing construction
CN104790951A (en) * 2015-03-12 2015-07-22 大同煤矿集团有限责任公司 Method for weakening high hard roof having distance of 100-350m to coal seam, and apparatus thereof
CN104912535A (en) * 2015-05-29 2015-09-16 中国石油天然气股份有限公司 In-section multi-cluster fracturing slide sleeve
CN105178934A (en) * 2015-09-24 2015-12-23 中国石油天然气股份有限公司 Horizontal well no-throttle straddle-type double-sealing single-grip fracturing process
CN105822252A (en) * 2015-01-04 2016-08-03 中国石油天然气股份有限公司 Well cementation pipe column combination and well cementation method
CN105986802A (en) * 2015-02-13 2016-10-05 中国石油天然气股份有限公司 Downhole fracturing method
CN106223898A (en) * 2016-09-27 2016-12-14 中国石油集团川庆钻探工程有限公司 The solid completion integral tubular column unit of a kind of two boiled water horizontal wells
CN106337667A (en) * 2016-09-27 2017-01-18 中国石油集团川庆钻探工程有限公司 Dual-opening horizontal well cementation and completion construction method
CN106351605A (en) * 2016-09-27 2017-01-25 中国石油集团川庆钻探工程有限公司 Drilling method of second-spudding horizontal well
CN111472738A (en) * 2020-03-12 2020-07-31 中国石油天然气股份有限公司 Switchable well cementation sliding sleeve water control fracturing method for horizontal well

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5865252A (en) * 1997-02-03 1999-02-02 Halliburton Energy Services, Inc. One-trip well perforation/proppant fracturing apparatus and methods
GB2365889A (en) * 2000-08-17 2002-02-27 Abb Offshore Systems Ltd Flow control device
GB2398585A (en) * 2003-02-19 2004-08-25 Schlumberger Holdings A fracturing tool for treating a formation
CN200940470Y (en) * 2006-05-15 2007-08-29 新疆石油管理局钻井工艺研究院 Under balance underground sleeve valve capable of measuring bottom hole pressure
CN101270639A (en) * 2008-04-30 2008-09-24 中国石油天然气股份有限公司 Packer packing multi-layer hydropower abrasive perforating and fracturing integrated technique
CN102022104A (en) * 2010-11-06 2011-04-20 大庆油田有限责任公司 Open-hole packer for open-hole horizontal well and preset connector fracturing well completion method
CN202300216U (en) * 2011-10-19 2012-07-04 中国石油化工股份有限公司 Connecting device for deblocking down-hole string
CN202431261U (en) * 2011-10-03 2012-09-12 克拉玛依特隆油田技术服务有限责任公司 Oil field horizontal well multi-section press cracking slide sleeve and opening tool
CN102691493A (en) * 2012-06-05 2012-09-26 中国石油化工股份有限公司 Continuous oil pipe sectional sand-blasting perforation casing fracturing pipe column and casing fracturing method
CN102720471A (en) * 2012-06-05 2012-10-10 中国海洋石油总公司 Safety valve of pressure control water injection well
CN202531037U (en) * 2012-03-09 2012-11-14 中国石油天然气股份有限公司 Segregated completion tubular column of bottom water tight gas reservoir horizontal well
CN103032060A (en) * 2012-11-08 2013-04-10 中国石油天然气股份有限公司 Continuous oil pipe hydraulic sanding blasting multi-cluster perforation annular sanding staged fracturing process for horizontal well
CN103122760A (en) * 2013-03-01 2013-05-29 中国海洋石油总公司 Completion pipe string for suspending bottom water coning
CN202970668U (en) * 2012-12-11 2013-06-05 华鼎鸿基石油工程技术(北京)有限公司 Casing pressure balance slide sleeve staged fracturing tool

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5865252A (en) * 1997-02-03 1999-02-02 Halliburton Energy Services, Inc. One-trip well perforation/proppant fracturing apparatus and methods
GB2365889A (en) * 2000-08-17 2002-02-27 Abb Offshore Systems Ltd Flow control device
GB2398585A (en) * 2003-02-19 2004-08-25 Schlumberger Holdings A fracturing tool for treating a formation
CN200940470Y (en) * 2006-05-15 2007-08-29 新疆石油管理局钻井工艺研究院 Under balance underground sleeve valve capable of measuring bottom hole pressure
CN101270639A (en) * 2008-04-30 2008-09-24 中国石油天然气股份有限公司 Packer packing multi-layer hydropower abrasive perforating and fracturing integrated technique
CN102022104A (en) * 2010-11-06 2011-04-20 大庆油田有限责任公司 Open-hole packer for open-hole horizontal well and preset connector fracturing well completion method
CN202431261U (en) * 2011-10-03 2012-09-12 克拉玛依特隆油田技术服务有限责任公司 Oil field horizontal well multi-section press cracking slide sleeve and opening tool
CN202300216U (en) * 2011-10-19 2012-07-04 中国石油化工股份有限公司 Connecting device for deblocking down-hole string
CN202531037U (en) * 2012-03-09 2012-11-14 中国石油天然气股份有限公司 Segregated completion tubular column of bottom water tight gas reservoir horizontal well
CN102691493A (en) * 2012-06-05 2012-09-26 中国石油化工股份有限公司 Continuous oil pipe sectional sand-blasting perforation casing fracturing pipe column and casing fracturing method
CN102720471A (en) * 2012-06-05 2012-10-10 中国海洋石油总公司 Safety valve of pressure control water injection well
CN103032060A (en) * 2012-11-08 2013-04-10 中国石油天然气股份有限公司 Continuous oil pipe hydraulic sanding blasting multi-cluster perforation annular sanding staged fracturing process for horizontal well
CN202970668U (en) * 2012-12-11 2013-06-05 华鼎鸿基石油工程技术(北京)有限公司 Casing pressure balance slide sleeve staged fracturing tool
CN103122760A (en) * 2013-03-01 2013-05-29 中国海洋石油总公司 Completion pipe string for suspending bottom water coning

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103939076A (en) * 2014-04-23 2014-07-23 西安威盛电子仪器有限公司 Pressure and flow regulator in fracturing construction
CN103939076B (en) * 2014-04-23 2016-05-18 西安威盛电子科技股份有限公司 Pressure flow adjuster in a kind of pressing crack construction
CN105822252A (en) * 2015-01-04 2016-08-03 中国石油天然气股份有限公司 Well cementation pipe column combination and well cementation method
CN105822252B (en) * 2015-01-04 2018-09-04 中国石油天然气股份有限公司 Pipe string combination of cementing the well and cementing method
CN105986802A (en) * 2015-02-13 2016-10-05 中国石油天然气股份有限公司 Downhole fracturing method
CN105986802B (en) * 2015-02-13 2018-12-25 中国石油天然气股份有限公司 The method of underground fracture
CN104790951A (en) * 2015-03-12 2015-07-22 大同煤矿集团有限责任公司 Method for weakening high hard roof having distance of 100-350m to coal seam, and apparatus thereof
CN104912535B (en) * 2015-05-29 2017-09-01 中国石油天然气股份有限公司 Many cluster fracturing sliding bushs in a kind of section
CN104912535A (en) * 2015-05-29 2015-09-16 中国石油天然气股份有限公司 In-section multi-cluster fracturing slide sleeve
CN105178934A (en) * 2015-09-24 2015-12-23 中国石油天然气股份有限公司 Horizontal well no-throttle straddle-type double-sealing single-grip fracturing process
CN106351605A (en) * 2016-09-27 2017-01-25 中国石油集团川庆钻探工程有限公司 Drilling method of second-spudding horizontal well
CN106337667A (en) * 2016-09-27 2017-01-18 中国石油集团川庆钻探工程有限公司 Dual-opening horizontal well cementation and completion construction method
CN106223898A (en) * 2016-09-27 2016-12-14 中国石油集团川庆钻探工程有限公司 The solid completion integral tubular column unit of a kind of two boiled water horizontal wells
CN106223898B (en) * 2016-09-27 2020-04-10 中国石油集团川庆钻探工程有限公司 Two horizontal well cementing and completion integrated pipe column devices that open
CN111472738A (en) * 2020-03-12 2020-07-31 中国石油天然气股份有限公司 Switchable well cementation sliding sleeve water control fracturing method for horizontal well

Similar Documents

Publication Publication Date Title
CN103573241A (en) Casing cementing pressure balancing sliding sleeve annulus staged sand fracturing process for horizontal well
CN103032060A (en) Continuous oil pipe hydraulic sanding blasting multi-cluster perforation annular sanding staged fracturing process for horizontal well
US11781409B2 (en) Fracturing system and method therefor
US10024148B2 (en) Hydrocarbon recovery process exploiting multiple induced fractures
CN106223922B (en) Shale gas horizontal well proppant intra-seam shielding temporary plugging staged fracturing process
US10018025B2 (en) Hydraulic fracturing system and method
CN102733789B (en) Staged fracturing construction yield increment method for waterpower in deep thickened oil deposit thick-bedded sandstone storage layer
CN103306660A (en) Shale gas reservoir hydraulic fracturing production increasing method
CN103470242B (en) A kind of oilfield horizontal well volume fracturing method
CN104632172A (en) Immovable string hydraulic sandblasting fracture annulus pressure control method for gas field horizontal well
CN103867177A (en) Horizontal well fracturing method
CN107620581B (en) Construction method of one-well dual-purpose coal mine shaft inspection hole
CN109025940B (en) CO for tight oil reservoir2Fracturing oil displacement integrated oil extraction method
CN103912257B (en) A kind of dragging multiple fracturing device with pressure
CN111911127A (en) Fracturing sand adding method
CN104563997A (en) Water-jet and bridge plug combined process tubing string and work thereof
CN202500541U (en) Tubular column of gas well plumb shaft multi-level layering fracturing technology
CN204082116U (en) Oil well horizontal well oil jacket is with note formula two envelope single deck tape-recorder volume fracturing tubing string
RU2456441C1 (en) Production method of high-viscous oil by means of simultaneous pumping of steam and extraction of liquid from single horizontal well
CN110608027B (en) Large-scale hydraulic fracturing permeability-increasing pre-gas-pumping treatment process for directional ultra-long drilling of roadway
CN204041042U (en) A kind of coiled tubing drag fracturing tubing string
CN104196512B (en) Oil well horizontal well oil jacket is the same as the double envelope single deck tape-recorder volume fracturing tubing strings of note formula and fracturing process
CN201416429Y (en) Sand blasting choke with sliding sleeve
CN110578507B (en) Reusable sand blower for fracturing stratum of oil field
CN204186370U (en) Sliding sleeve of bushing sequential production staged fracturing tool tubing string

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140212