CN104196512B - Oil well horizontal well oil jacket is the same as the double envelope single deck tape-recorder volume fracturing tubing strings of note formula and fracturing process - Google Patents

Oil well horizontal well oil jacket is the same as the double envelope single deck tape-recorder volume fracturing tubing strings of note formula and fracturing process Download PDF

Info

Publication number
CN104196512B
CN104196512B CN201410423439.5A CN201410423439A CN104196512B CN 104196512 B CN104196512 B CN 104196512B CN 201410423439 A CN201410423439 A CN 201410423439A CN 104196512 B CN104196512 B CN 104196512B
Authority
CN
China
Prior art keywords
packer
oil
fracturing
oil pipe
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410423439.5A
Other languages
Chinese (zh)
Other versions
CN104196512A (en
Inventor
周丰
陆红军
孙虎
王祖文
苏敏文
邓小强
张文
李尊团
田文超
隆世明
宁治军
王伟
张波
柳瑞军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
CNPC Chuanqing Drilling Engineering Co Ltd
Original Assignee
Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd filed Critical Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd
Priority to CN201410423439.5A priority Critical patent/CN104196512B/en
Publication of CN104196512A publication Critical patent/CN104196512A/en
Application granted granted Critical
Publication of CN104196512B publication Critical patent/CN104196512B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention belongs to oil gas field stimulation technology field, more particularly to a kind of oil well horizontal well oil jacket with the double envelope single deck tape-recorder volume fracturing tubing strings of note formula and fracturing process, including oil pipe, the end of oil pipe is connected with packer, ball-and-seat, eye pipe and righting-oriented device in turn, and pilot injector is connected between packer and oil pipe;The second packer, the 3rd packer and annular space injection valve are serially connected with oil pipe, second packer is located above pilot injector, 3rd packer is located above the second packer, annular space injection valve is located above the 3rd packer and adjacent 3rd packer is serially connected on oil pipe, the double envelope single deck tape-recorder staged fracturing techniques of existing in general are overcome to be only applicable to oil pipe injection pressing crack construction, fluid frictional resistance is big, the problem of operational discharge capacity is difficult to improve, oil pipe and sleeve pipe inject liquid stream simultaneously, realize that oil well horizontal well is successively layered volume fracturing construction from bottom to top.

Description

Oil well horizontal well oil jacket is the same as the double envelope single deck tape-recorder volume fracturing tubing strings of note formula and fracturing process
Technical field
The invention belongs to oil gas field stimulation technology field, is the fracturing technology commonly used in oil gas field reservoir reconstruction operation One of tubing string, and in particular to a kind of oil well horizontal well oil jacket is the same as the double envelope single deck tape-recorder volume fracturing tubing strings of note formula and fracturing process.
Background technology
Along with the further exploitation in oil field, horizontal well volume fracturing process will as a kind of efficient reforming mode As the major alterations mode of extra-low-permeability reservoir, double envelope single deck tape-recorder staged fracturing techniques are one kind of staged fracturing of horizontal well transformation Effective technological measure, the technology are widely used in the old well of each block oil well horizontal well and repeated in transformation operation.
Along with the further exploitation in oil field, " volume fracturing " will be used as ultra-low penetration as a kind of efficient reforming mode The major alterations mode of oil reservoir.Current double envelope single deck tape-recorder staged fracturing technology tube pillars are by safety joint, inflatable packer, pilot Sanding machine, the instruments such as plug composition is oriented to, it is only applicable to oil pipe injection pressing crack construction, and fluid frictional resistance is big, and operational discharge capacity is difficult to Improve, the construction demand of " volume fracturing " can not be met.
The content of the invention
The purpose of the present invention is to overcome the double envelope single deck tape-recorder staged fracturing techniques of existing in general to be only applicable to oil pipe injection pressure break The problem of construction, fluid frictional resistance is big, and operational discharge capacity is difficult to improve.
Therefore, the invention provides a kind of oil well horizontal well oil jacket with the double envelope single deck tape-recorder volume fracturing tubing strings of note formula, including oil Pipe, the end of oil pipe is connected with packer, ball-and-seat, eye pipe and righting-oriented device in turn, is connected between packer and oil pipe Pilot injector;
The second packer, the 3rd packer and annular space injection valve are serially connected with oil pipe, second packer is located at pilot Above injector, the 3rd packer be located above the second packer, and annular space injection valve is located at the 3rd packer top and adjacent the Three packers are serially connected on oil pipe.
The distance between described 3rd packer and packer are more than the length for needing fractured interval.
The packer and the second packer are inflatable packer, and the 3rd packer is mechanical packer.
A kind of fracturing process of such as above-mentioned volume fracturing tubing string, comprises the following steps,
1)Connect tubing string and lower brill:The length of the interval of pressure break is needed to connect tubing string according to Oil/gas Well so that the 3rd envelope Being more than every the distance between device and packer needs the length of fractured interval, then lower to bore so that packer, which is located at, to be needed The construction layer bottom of pressure break, then it is target zone between packer and the second packer;
2)Set:Set the 3rd packer;
3)Pressing crack construction:Fracturing fluid is all injected in rail and annular space simultaneously, fracturing fluid, which passes through in pilot injector, to flow out, Throttling official post is produced simultaneously and obtains packer and the second packer setting, and now fracturing fluid is led to by the connection of construct interval and sleeve pipe Road, pressing crack construction is carried out into the bottom between packer and the second packer;
4)Drag tubing string:After the completion of pressing crack construction, dragging tubing string goes upward to the preceding paragraph target zone;
5)Repeat step 2)、3)、4)Until complete all pressing crack constructions.
Above-mentioned steps 3)The interface channel of middle construction interval and sleeve pipe, in step 1)Passage is kept to have turned on before, when , it is necessary to perforating gun is sent into design attitude by the way of conventional tubing transmission, disposably to the well institute when well of constructing is new well There is interval to carry out perforating job.
Beneficial effects of the present invention:This oil well horizontal well oil jacket of the present invention is the same as the double envelope single deck tape-recorder volume fracturing tubing strings of note formula And fracturing process, have turned on interval, the liquid stream of annular space injection on target zone with the 3rd packer and the second packer packing Enter in underground close to construction fragment position in oil pipe, mixed liquid stream is in the shorter oily Bottomhole pressure in underground, through pilot sandblasting Device enters construction interval, realizes the volume fracturing construction to target zone, this to repeat volume fracturing rebuilding construction, it is possible to achieve The oil well horizontal well of construction is successively layered volume fracturing construction from bottom to top.
The present invention is described in further details below with reference to accompanying drawing.
Brief description of the drawings
Fig. 1 is tubing string of the present invention in net horizontal section operation structure schematic diagram.
Description of reference numerals:1st, annular space injection valve;2nd, the 3rd packer;3rd, the second packer;4th, pilot injector;5th, seal Every device;6th, ball-and-seat;7th, eye pipe;8th, righting-oriented device;9th, oil pipe.
Embodiment
Embodiment 1:
In order to make double envelope single deck tape-recorder staged fracturing techniques be applicable not only to oil pipe injection pressing crack construction, and adapt to oil pipe Annular space injects pressure break simultaneously, seals single deck tape-recorder volume fracturing tubing strings with note formula pair the invention provides a kind of oil well horizontal well oil jacket, such as Shown in Fig. 1, including oil pipe 9, the end of oil pipe 9 are connected with packer 5, ball-and-seat 6, eye pipe 7 and righting-oriented device 8 in turn, envelope Pilot injector 4 is connected between device 5 and oil pipe 9;The packer 3 of packer 5 and second is inflatable packer, the 3rd Packer 2 is mechanical packer.
The second packer 3, the 3rd packer 2 and annular space injection valve 1 are serially connected with oil pipe 9, second packer 3 is located at The top of pilot injector 4, the 3rd packer 2 are located at the top of the second packer 3, and annular space injection valve 1 is located at the top of the 3rd packer 2 And adjacent 3rd packer 2 is serially connected on oil pipe 9, the direction of so-called here " top " with tubing string in vertical state(I.e. Connect direction during tubing string), figure middle position is set to operating position.The distance between 3rd packer 2 and packer 5, which are more than, to be needed to press The length of parting section.
This tubing string string of the present embodiment, the second packer 3 and corresponding bottom is pressure break target zone between device 5, Fracturing fluid can spray from annular space injection valve 1, and then entering bottom by the interface channel of sleeve pipe carries out fracturing work;After the completion of it is whole Body pipe string is moved up, and continues the pressure break of next position, continuous repeated work process, staged fracturing is different from bottom to top Stratum.
Embodiment 2:
On the basis of above-described embodiment, the present invention proposes a kind of fracturing process, comprises the following steps,
First look at the wellbore conditions before construction, this fracturing process proposed by the present invention, applied to the oil well constructed Horizontal well, i.e., the interface channel of all construction intervals and sleeve pipe have turned on;If well of constructing is new well, it is necessary to carry out perforation work Industry, perforating gun can be sent into design attitude by the way of conventional tubing transmission, perforation disposably is carried out to all intervals of the well Operation.
Next operation is carried out according to the following steps:
1)Connect tubing string and lower brill:The connection of tubing string is carried out according to the structure in above-described embodiment, according to Oil/gas Well needs The length of the interval of pressure break determines the position of each packer so that the distance between the 3rd packer 2 and packer 5, which are more than, to be needed The length of fractured interval is wanted, it is then lower to bore so that packer 5 is located at the construction layer bottom for needing pressure break, then packer 5 It is target zone between the second packer 3;
2)Set:3rd packer 2 is generally mechanical packer, causes the 3rd envelope using mechanical systems such as rotary tools Set every device 2;
3)Pressing crack construction:Fracturing fluid is all injected in rail 9 and annular space simultaneously, the fracturing fluid of oil jacket annular space injection is in underground Being entered close to construction fragment position by annular space injection valve 1 in oil pipe 9, mixed fracturing fluid flows in the shorter oil pipe 9 in underground, Fracturing fluid, which passes through in pilot injector 4, to flow out, while produces throttling official post and obtain the packer 3 of packer 5 and second and set, and now presses Interface channel of the liquid by construct interval and sleeve pipe is split, into the packer of packer 5 and second(3)Between bottom carry out pressure break Construction;
4)Drag tubing string:After the completion of previous step pressing crack construction, dragging tubing string is up, leaves the interval of pressure break, on Go to the interval of the non-pressure break in top;
5)Repeat step 2)、3)、4)So that tubing string constantly rises, pressure break, and from bottom to top, each construction is completed in segmentation The pressure break of section.
Fracturing process more than, fracturing fluid is injected while realizing oil pipe and sleeve pipe, operational discharge capacity is high, can realize Top-down successively volume fracturing construction.
Each component in the tubing string being related in embodiment is existing structure, can be obtained in the market by buying, Do not illustrate herein.
It is exemplified as above be only to the present invention for example, do not form the limitation to protection scope of the present invention, it is all It is to be belonged to the same or analogous design of the present invention within protection scope of the present invention.

Claims (1)

  1. A kind of 1. fracturing process of volume fracturing tubing string, it is characterised in that:Comprise the following steps,
    1)Connect tubing string and lower brill:The length of the interval of pressure break is needed to connect tubing string according to Oil/gas Well so that the 3rd packer (2)With packer(5)The distance between be more than and need the length of fractured interval, it is then lower to bore so that packer(5)Positioned at needs The construction layer bottom of pressure break, then packer(5)With the second packer(3)Between be target zone;
    2)Set:Set the 3rd packer(2);
    3)Pressing crack construction:Rail(9)With in annular space all simultaneously inject fracturing fluid, fracturing fluid passes through pilot injector(4)Middle stream Go out, while produce throttling official post and obtain packer(5)With the second packer(3)Set, now fracturing fluid passes through interval and the set of constructing The interface channel of pipe, into packer(5)With the second packer(3)Between bottom carry out pressing crack construction;
    4)Drag tubing string:After the completion of pressing crack construction, dragging tubing string goes upward to the preceding paragraph target zone;
    5)Repeat step 2)、3)、4)Until complete all pressing crack constructions;
    A kind of oil well horizontal well oil jacket is the same as the double envelope single deck tape-recorder volume fracturing tubing strings of note formula, including oil pipe used by this method(9), oil Pipe(9)End be connected with packer in turn(5), ball-and-seat(6), eye pipe(7)With righting-oriented device(8), it is characterised in that:Envelope Every device(5)With oil pipe(9)Between be connected with pilot injector(4);Oil pipe(9)On be serially connected with the second packer(3), the 3rd packing Device(2)With annular space injection valve(1), second packer(3)Positioned at pilot injector(4)Top, the 3rd packer(2)It is located at Second packer(3)Top, annular space injection valve(1)Positioned at the 3rd packer(2)Top and adjacent 3rd packer(2)It is serially connected in Oil pipe(9)On;3rd packer(2)With packer(5)The distance between be more than and need the length of fractured interval;The envelope Every device(5)With the second packer(3)For inflatable packer, the 3rd packer(2)For mechanical packer;
    This oil well horizontal well oil jacket is with the double envelope single deck tape-recorder volume fracturing tubing strings of note formula and fracturing process, with the 3rd packer and second Packer packing has turned on interval on target zone, and the liquid stream of annular space injection enters oil pipe in underground close to construction fragment position Interior, mixed liquid stream enters construction interval in the shorter oily Bottomhole pressure in underground, through pressure-guiding sand blower, realizes to target zone Volume fracturing is constructed, this to repeat volume fracturing rebuilding construction, it is possible to achieve the oil well horizontal well constructed is from bottom to top successively It is layered volume fracturing construction.
CN201410423439.5A 2014-08-26 2014-08-26 Oil well horizontal well oil jacket is the same as the double envelope single deck tape-recorder volume fracturing tubing strings of note formula and fracturing process Active CN104196512B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410423439.5A CN104196512B (en) 2014-08-26 2014-08-26 Oil well horizontal well oil jacket is the same as the double envelope single deck tape-recorder volume fracturing tubing strings of note formula and fracturing process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410423439.5A CN104196512B (en) 2014-08-26 2014-08-26 Oil well horizontal well oil jacket is the same as the double envelope single deck tape-recorder volume fracturing tubing strings of note formula and fracturing process

Publications (2)

Publication Number Publication Date
CN104196512A CN104196512A (en) 2014-12-10
CN104196512B true CN104196512B (en) 2017-12-26

Family

ID=52081861

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410423439.5A Active CN104196512B (en) 2014-08-26 2014-08-26 Oil well horizontal well oil jacket is the same as the double envelope single deck tape-recorder volume fracturing tubing strings of note formula and fracturing process

Country Status (1)

Country Link
CN (1) CN104196512B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110671058A (en) * 2019-09-10 2020-01-10 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Double-sealing single-clamping process pipe column of old horizontal well and method for realizing large-discharge transformation
CN112267864A (en) * 2020-09-21 2021-01-26 中国石油天然气股份有限公司 Repeated fracturing device and method for large-displacement horizontal well
CN115324550B (en) * 2022-08-09 2024-06-18 中国石油天然气集团有限公司 Hydraulic coiled tubing dragging fracturing tool and technological method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202300357U (en) * 2011-09-30 2012-07-04 中国石油化工股份有限公司 Well cementing staged fracturing well completion pipe column with controllable valves and hydraulic control switch pipe column
CN203321476U (en) * 2013-06-05 2013-12-04 中国石油天然气股份有限公司 Coiled tubing controllable packer process pipe column for old well repeated reconstruction
CN103470242A (en) * 2013-09-14 2013-12-25 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Oilfield horizontal well volume fracturing method
CN203394491U (en) * 2013-06-05 2014-01-15 中国石油天然气股份有限公司 Perforation and fracturing integrated tubular column for selectively and repeatedly reforming old well of oil field
CN204082116U (en) * 2014-08-26 2015-01-07 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Oil well horizontal well oil jacket is with note formula two envelope single deck tape-recorder volume fracturing tubing string

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7096954B2 (en) * 2001-12-31 2006-08-29 Schlumberger Technology Corporation Method and apparatus for placement of multiple fractures in open hole wells

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202300357U (en) * 2011-09-30 2012-07-04 中国石油化工股份有限公司 Well cementing staged fracturing well completion pipe column with controllable valves and hydraulic control switch pipe column
CN203321476U (en) * 2013-06-05 2013-12-04 中国石油天然气股份有限公司 Coiled tubing controllable packer process pipe column for old well repeated reconstruction
CN203394491U (en) * 2013-06-05 2014-01-15 中国石油天然气股份有限公司 Perforation and fracturing integrated tubular column for selectively and repeatedly reforming old well of oil field
CN103470242A (en) * 2013-09-14 2013-12-25 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Oilfield horizontal well volume fracturing method
CN204082116U (en) * 2014-08-26 2015-01-07 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Oil well horizontal well oil jacket is with note formula two envelope single deck tape-recorder volume fracturing tubing string

Also Published As

Publication number Publication date
CN104196512A (en) 2014-12-10

Similar Documents

Publication Publication Date Title
CN101864921B (en) Well completion and oil production string of horizontal well and well completion and oil production processes thereof
CN104314546B (en) Staged fracturing well completion pipe string in horizontal well casing and staged fracturing process
CN106194131B (en) It is spaced CO between multistage fracturing horizontal well seam2Oil flooding method
CN102022104B (en) Open-hole packer for open-hole horizontal well and preset connector fracturing well completion method
CA2907623C (en) Increasing hydrocarbon recovery from reservoirs
CN104153753B (en) Horizontal well volume fracturing tubular column and method based on conventional oil tube pressure dragging
CN104981584A (en) Fluid injection in light tight oil reservoirs
CN103470242B (en) A kind of oilfield horizontal well volume fracturing method
CN109267983B (en) Horizontal well repeated fracturing device and method based on open hole preset pipe string well completion
CN104632172A (en) Method for controlling annulus pressure of gas field horizontal well immovable pipe column hydraulic sand blasting fracturing
CN105822276A (en) Inter-crack space synchronous water injection-oil extraction method of multistage fracturing horizontal well
CN103912257B (en) A kind of dragging multiple fracturing device with pressure
CN104196512B (en) Oil well horizontal well oil jacket is the same as the double envelope single deck tape-recorder volume fracturing tubing strings of note formula and fracturing process
CN204082116U (en) Oil well horizontal well oil jacket is with note formula two envelope single deck tape-recorder volume fracturing tubing string
CN105221094A (en) Horizontal well double-sealing single-clamp blowout prevention process
CN105587300B (en) Oil recovery method for horizontal well
CN107269255A (en) A kind of method and device that fine and close oil is exploited by the displacement of reservoir oil between cluster
CN103821489B (en) Horizontal well machinery layering is acidified combination process tubing string with hydraulic jetting fracturing
CN104196492B (en) A kind of dragging down-hole plugging valve with pressure
CN106014370A (en) Oil-pipe under-pressure dragging fracturing device and technology
CN103061724B (en) Towards the layering pressure control associating mining device easily telling powder and telling the two coal seam of sand
CN105545272B (en) Oil extraction method for ultra-low permeability water-sensitive reservoir/compact reservoir
CN108005629A (en) A kind of underground fracture sliding sleeve of electric control hydraulic driving
CN209892171U (en) Horizontal well section staggered displacement and imbibition displacement injection-production string
CN202325277U (en) Sectional uniform acidifying tubular column in sand control tubular column of oil-water well

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211021

Address after: 100007 Oil Mansion, 9 North Avenue, Dongcheng District, Beijing, Dongzhimen

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Patentee after: CNPC CHUANQING DRILLING ENGINEERING Co.,Ltd.

Address before: 710018 room 1207, Changqing building, Changqing Xing Long Yuan District, Xi'an, Shaanxi

Patentee before: CHINA NATIONAL PETROLEUM CORPORATION CHUANQING DRILLING ENGINEERING COMPANY LIMITED CHANGQING DOWNHOLE TECHNOLOGY Co.