Oil well horizontal well oil jacket is with note formula two envelope single deck tape-recorder volume fracturing tubing string and fracturing process
Technical field
The invention belongs to oil gas field stimulation technology field, is one of fracturing technology tubing string conventional in the operation of oil gas field reservoir reconstruction, is specifically related to a kind of oil well horizontal well oil jacket with note formula two envelope single deck tape-recorder volume fracturing tubing string and fracturing process.
Background technology
Be accompanied by the further exploitation in oil field, horizontal well volume fracturing process as a kind of efficient reforming mode using the main reforming mode as ultra-low penetration oil reservoir, two envelope single deck tape-recorder staged fracturing technique is the effective technological measure of one of staged fracturing of horizontal well transformation, and this technology is widely used in the old well of each block oil well horizontal well and repeats to transform in operation.
Be accompanied by the further exploitation in oil field, " volume fracturing " as a kind of efficient reforming mode using the main reforming mode as ultra-low penetration oil reservoir.Current two envelope single deck tape-recorder staged fracturing technology tube pillars are made up of instruments such as safety joint, inflatable packer, pressure-guiding sand blower, guiding plugs, it is only applicable to oil pipe and injects pressing crack construction, fluid frictional resistance is large, and operational discharge capacity is difficult to improve, and cannot meet the construction demand of " volume fracturing ".
Summary of the invention
The object of the invention is to overcome existing general two envelope single deck tape-recorder staged fracturing techniques and be only applicable to oil pipe injection pressing crack construction, fluid frictional resistance is large, and operational discharge capacity is difficult to the problem improving.
For this reason, the invention provides a kind of oil well horizontal well oil jacket with the two envelope of note formula single deck tape-recorder volume fracturing tubing string, comprise oil pipe, the end of oil pipe is connected with packer, ball-and-seat, eye pipe and righting-oriented device in turn, is connected with pilot ejector between packer and oil pipe;
On oil pipe, be serially connected with the second packer, the 3rd packer and annular space injection valve, described the second packer is positioned at pilot ejector top, the 3rd packer is positioned at the second packer top, and annular space injection valve is positioned at the 3rd packer top and adjacent the 3rd packer is serially connected on oil pipe.
Distance between described the 3rd packer and packer is greater than the length that needs fractured interval.
Described packer and the second packer are inflatable packer, and the 3rd packer is mechanical packer.
As a fracturing process for above-mentioned volume fracturing tubing string, comprise the steps,
1) connect tubing string and lower brill: need the length of the interval of pressure break to connect tubing string according to Oil/gas Well, make the distance between the 3rd packer and packer be greater than the length that needs fractured interval, then lower boring, packer is positioned at need to need below of the construction layer of pressure break, between packer and the second packer, is target zone;
2) set: set the 3rd packer;
3) pressing crack construction: all simultaneously inject fracturing fluid in rail and annular space, fracturing fluid is through flowing out in pilot ejector, produce throttling official post simultaneously and obtain packer and the second packer setting, now fracturing fluid is by the interface channel of construction interval and sleeve pipe, and the bottom entering between packer and the second packer carries out pressing crack construction;
4) drag tubing string: after pressing crack construction completes, drag tubing string and go upward to the preceding paragraph target zone;
5) repeating step 2), 3), 4) until complete all pressing crack constructions.
Above-mentioned steps 3) in the interface channel of construction interval and sleeve pipe, before step 1), to keep passage to open, when construction well is while being new well, need to adopt the mode of conventional tubing transmission that perforating gun is sent into design attitude, disposable all intervals of this well are carried out to perforating job.
Beneficial effect of the present invention: this oil well horizontal well oil jacket of the present invention is with note formula two envelope single deck tape-recorder volume fracturing tubing string and fracturing process, the interval of unlatching on target zone with the 3rd packer and the second packer packing, the liquid stream that annular space injects enters in oil pipe near construction section position in down-hole, mixed liquid stream flows in the shorter oil pipe in down-hole, enter construction interval through pressure-guiding sand blower, realize the volume fracturing construction to target zone, this repetition volume fracturing rebuilding construction, can realize the oil well horizontal well successively layering volume fracturing construction from bottom to top of having constructed.
Below with reference to accompanying drawing, the present invention is described in further details.
Brief description of the drawings
Fig. 1 is that tubing string of the present invention is at net horizontal section operation structure schematic diagram.
Description of reference numerals: 1, annular space injection valve; 2, the 3rd packer; 3, the second packer; 4, pilot ejector; 5, packer; 6, ball-and-seat; 7, eye pipe; 8, righting-oriented device; 9, oil pipe.
Detailed description of the invention
Embodiment 1:
Inject pressing crack construction in order to make two envelope single deck tape-recorder staged fracturing technique not be only applicable to oil pipe, and can adapt to oil pipe annular space and inject pressure break simultaneously, the invention provides a kind of oil well horizontal well oil jacket with the two envelope of note formula single deck tape-recorder volume fracturing tubing string, as shown in Figure 1, comprise oil pipe 9, the end of oil pipe 9 is connected with packer 5, ball-and-seat 6, eye pipe 7 and righting-oriented device 8 in turn, between packer 5 and oil pipe 9, is connected with pilot ejector 4; Described packer 5 and the second packer 3 are inflatable packer, and the 3rd packer 2 is mechanical packer.
On oil pipe 9, be serially connected with the second packer 3, the 3rd packer 2 and annular space injection valve 1, described the second packer 3 is positioned at pilot ejector 4 tops, the 3rd packer 2 is positioned at the second packer 3 tops, annular space injection valve 1 is positioned at the 3rd packer 2 tops and adjacent the 3rd packer 2 is serially connected on oil pipe 9, here so-called " top " all directions (direction while connecting tubing string) when the vertical state with tubing string, figure meta is set to operating position.Distance between the 3rd packer 2 and packer 5 is greater than the length that needs fractured interval.
This tubing string string of the present embodiment, the second packer 3 and between device 5 corresponding bottom be pressure break target zone, fracturing fluid can spray from annular space injection valve 1, then enters bottom by the interface channel of sleeve pipe and carries out fracturing work; After completing, overall pipe string moves on carrying out, and continues the pressure break of next position, constantly repeated work process, the from bottom to top different stratum of staged fracturing.
Embodiment 2:
On the basis of above-described embodiment, the present invention proposes a kind of fracturing process, comprise the steps,
First check the wellbore conditions before construction, this fracturing process that the present invention proposes, is applied to the oil well horizontal well of having constructed, and the interface channel of all construction intervals and sleeve pipe is opened; If construction well is new well, need to carry out perforating job, can adopt the mode of conventional tubing transmission that perforating gun is sent into design attitude, disposable all intervals of this well are carried out to perforating job.
Next carry out operation according to the following step:
1) connect tubing string and lower brill: carry out the connection of tubing string according to the structure in above-described embodiment, need the length of the interval of pressure break to determine the position of each packer according to Oil/gas Well, make the distance between the 3rd packer 2 and packer 5 be greater than the length that needs fractured interval, then lower boring, packer 5 is positioned at need to need below of the construction layer of pressure break, between packer 5 and the second packer 3, is target zone;
2) set: the 3rd packer 2 is generally mechanical packer, adopt the mechanical systems such as rotation drilling tool that the 3rd packer 2 is set;
3) pressing crack construction: all simultaneously inject fracturing fluid in rail 9 and annular space, the fracturing fluid that oil jacket annular space injects is entered in oil pipe 9 by annular space injection valve 1 near construction section position in down-hole, interior the flowing of oil pipe 9 that mixed fracturing fluid is shorter in down-hole, fracturing fluid is through flowing out in pilot ejector 4, produce that throttling official post obtains packer 5 and the second packer 3 sets simultaneously, now fracturing fluid is by the interface channel of construction interval and sleeve pipe, and the bottom entering between packer 5 and the second packer (3) carries out pressing crack construction;
4) drag tubing string: after previous step pressing crack construction completes, drag tubing string up, leave the interval of pressure break, go upward to the not interval of pressure break of top;
5) repeating step 2), 3), 4), make that tubing string constantly rises, pressure break, from bottom to top, segmentation completes the pressure break of each construction section.
By above fracturing process, when having realized oil pipe and sleeve pipe, inject fracturing fluid, operational discharge capacity is high, can realize top-down successively volume fracturing construction.
Each assembly in the tubing string relating in embodiment is existing structure, in market, all can obtain by purchase, does not specify at this.
More than exemplifying is only to illustrate of the present invention, does not form the restriction to protection scope of the present invention, within the every and same or analogous design of the present invention all belongs to protection scope of the present invention.