CN104213891B - Old well repeats transformation coiled tubing controllable confining process pipe string - Google Patents

Old well repeats transformation coiled tubing controllable confining process pipe string Download PDF

Info

Publication number
CN104213891B
CN104213891B CN201310219568.8A CN201310219568A CN104213891B CN 104213891 B CN104213891 B CN 104213891B CN 201310219568 A CN201310219568 A CN 201310219568A CN 104213891 B CN104213891 B CN 104213891B
Authority
CN
China
Prior art keywords
coiled tubing
pipe string
controllable confining
process pipe
end connection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310219568.8A
Other languages
Chinese (zh)
Other versions
CN104213891A (en
Inventor
姜勇
慕立俊
李宪文
桂捷
王在强
任国富
邵媛
蒙鑫
刘汉斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Natural Gas Co Ltd
Original Assignee
China Petroleum and Natural Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Natural Gas Co Ltd filed Critical China Petroleum and Natural Gas Co Ltd
Priority to CN201310219568.8A priority Critical patent/CN104213891B/en
Publication of CN104213891A publication Critical patent/CN104213891A/en
Application granted granted Critical
Publication of CN104213891B publication Critical patent/CN104213891B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

Transformation coiled tubing controllable confining process pipe string is repeated the invention discloses a kind of old well, is designed to carry out the larger old well layering refracturing rebuilding construction of well control risk.The coiled tubing of this process pipe string be sequentially connected downwards shearing give up, mechanical casing collar locator, controllable confining, injector, lower packet, sleeve base and guiding check valve, in coiled tubing abrasive perforating, annular space liquid outlet channel is unimpeded, can ensure that perforating effect.In pressure break, upper and lower transformation layer can be reliably insulated, it is ensured that fracturing effect.This process pipe string can complete multistage perforation by the way that coiled tubing dragging with pressure is disposable, insulate mode from coiled tubing sand fracturing using double envelope single deck tape-recorders, be sequentially completed layering section transformation, realize perforating and fracturing integration, improve the efficiency of construction of old well refracturing.

Description

Old well repeats transformation coiled tubing controllable confining process pipe string
Technical field
Transformation coiled tubing controllable confining process pipe string is repeated the present invention relates to a kind of old well, belongs to oil-gas field fracturing Technical field.
Background technology
Low-permeability oil gas well pressure break completion was produced after a period of time, and fracture condudtiviy is gradually reduced.In order to improve individual well Production capacity, excavates Oil/gas Well productive potentialities, often to re-start pressure break.It is different from new well pressure break, to many old wells again pressure break For, after acting original production tubing string, there is well control risk with being bored under conventional oil pipe, need tripping in fracturing reform drilling tool with pressure, because This, solves using coiled tubing dragging with pressure.In addition, during old well refracturing, because upper strata crack has been opened, institute To consider upper and lower layer packing simultaneously.
The content of the invention
Transformation coiled tubing controllable confining process pipe string is repeated it is an object of the invention to provide a kind of old well, to enter The old well layering refracturing transformation of the larger straight well of row well control risk, directional well and horizontal well.
The particular technique content of the present invention is as follows:
The coiled tubing of this process pipe string connects shearing by connector and given up, and shears lower end connection mechanical casing of giving up Collar locator, mechanical casing collar locator lower end connection controllable confining, controllable confining lower end connection injector, spray Emitter lower end connects lower packet, lower packet lower end connection sleeve base, sleeve base lower end connection guiding check valve.
This process pipe string is in coiled tubing abrasive perforating, and annular space liquid outlet channel is unimpeded, can ensure that perforating effect.In pressure break When, it can reliably insulate upper and lower transformation layer, it is ensured that fracturing effect.This process pipe string can be disposable by coiled tubing dragging with pressure Multistage perforation is completed, mode is insulated from coiled tubing sand fracturing using double envelope single deck tape-recorders, layering section transformation is sequentially completed, realization is penetrated Hole is fracturing integrated, improves the efficiency of construction of old well refracturing.
Brief description of the drawings
Fig. 1 is that old well repeats transformation coiled tubing controllable confining process pipe string schematic diagram.
Fig. 2 is operating diagram when old well repeats transformation coiled tubing controllable confining process pipe string perforation.
Fig. 3 is that old well repeats transformation coiled tubing controllable confining process pipe string unset state schematic diagram.
Fig. 4 is that the repetition transformation of old well sets view with coiled tubing controllable confining process pipe string.
Embodiment
Embodiment:
Further illustrated referring to figs. 1 to 4 pairs of embodiments of the invention:
The coiled tubing 1 of this process pipe string connects shearing by connector 2 and gives up 3, and shearing 3 lower ends connection of giving up is mechanical Casing collar locator (CCL) 4, the lower end of mechanical casing collar locator 4 connection controllable confining 5, the connection of the lower end of controllable confining 5 Injector 7, the lower end of injector 7 connection lower packet 8, the lower end of lower packet 8 connection sleeve base 9, the lower end of sleeve base 9 connection is oriented to Ball-and-seat 10.
The fracturing process of this process pipe string is as follows:
1) rise after flow string, lower coiled tubing leads to Flushing tubular column, complete through wash well operations.
2) this process pipe string of tripping in, is positioned by casing collar locator (CCL) 4, and injector 7 is aligned into first paragraph design improvement Position, perforating fluid is injected from coiled tubing 1.When perforating fluid is away from nozzle 200m, discharge capacity is improved, first paragraph hydraulic sand blasting is carried out and penetrates Hole.During perforation, lower packet 8 is in and sets state, and the inlet opening of controllable confining 5 is blocked by sliding sleeve 6, all the time in deblocking shape State, perforating fluid is returned out from oil jacket annular space.
3) coiled tubing 1 is above carried, the hydraulic jet perforation of remaining interval is completed one by one.
4) lower coiled tubing 1 after perforation is finished, φ 19.05mm are thrown in alignment first paragraph design improvement position from coiled tubing 1 Steel ball.Treat that steel ball falls on sliding sleeve 6, the liquid feeding pressure of coiled tubing 1, the connecting pin between shearing controllable confining 5 and sliding sleeve 6 Nail, sliding sleeve 6 is together dropped down onto on sleeve base 9 with steel ball, and now, controllable confining 5 can normally be set.Liquid, which is crossed, when nozzle produces section After drift angle, controllable confining 5, all in the state that sets, insulates upper and lower layer with lower packet 8.Then, to the note of coiled tubing 1 Enter fracturing fluid, complete first paragraph pressing crack construction.
5) coiled tubing 1 is above carried, the pressing crack construction of remaining interval is completed one by one.
6) rise and this process pipe string, lower flow string, completion.

Claims (1)

1. a kind of old well repeats transformation coiled tubing controllable confining process pipe string, it is characterised in that:
The coiled tubing (1) of this process pipe string connects shearing by connector (2) and given up (3), shears (3) lower end connection machine of giving up Tool formula casing collar locator (CCL) (4), mechanical casing collar locator (4) lower end connection controllable confining (5), controllable confining (5) lower end connection injector (7), injector (7) lower end connection lower packet (8), lower packet (8) lower end connection sleeve base (9), sleeve base (9) lower end connection guiding check valve (10), wherein, when carrying out abrasive perforating, injector alignment first paragraph design Position is transformed, perforating fluid is injected from coiled tubing, lower packet is in and sets state, and the inlet opening of controllable confining is sealed by sliding sleeve Stifled, controllable confining is in unset state all the time, and perforating fluid is returned out from oil jacket annular space;Perforation lower coiled tubing (1) after finishing, it is right Quasi- first paragraph design improvement position, throws from coiled tubing (1)Steel ball, treat that the steel ball falls in sliding sleeve (6) On, coiled tubing (1) liquid feeding pressure, the connecting pin that shearing can be between the control packer (5) and sliding sleeve (6), the sliding sleeve (6) Together dropped down onto on sleeve base (9) with the steel ball, the controllable confining (5) can normally set, crossing liquid when nozzle produces section After drift angle, controllable confining (5) is in setting state with lower packet (8), can insulate upper and lower layer;Then to continuous Oil pipe (1) injects fracturing fluid, completes first paragraph pressing crack construction.
CN201310219568.8A 2013-06-05 2013-06-05 Old well repeats transformation coiled tubing controllable confining process pipe string Active CN104213891B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310219568.8A CN104213891B (en) 2013-06-05 2013-06-05 Old well repeats transformation coiled tubing controllable confining process pipe string

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310219568.8A CN104213891B (en) 2013-06-05 2013-06-05 Old well repeats transformation coiled tubing controllable confining process pipe string

Publications (2)

Publication Number Publication Date
CN104213891A CN104213891A (en) 2014-12-17
CN104213891B true CN104213891B (en) 2017-11-07

Family

ID=52095760

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310219568.8A Active CN104213891B (en) 2013-06-05 2013-06-05 Old well repeats transformation coiled tubing controllable confining process pipe string

Country Status (1)

Country Link
CN (1) CN104213891B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105986799B (en) * 2015-02-28 2019-02-15 中国石油天然气股份有限公司 Ball seat insulates more cluster perforating and fracturing tubing strings and construction method
CN105484721B (en) * 2016-01-14 2018-03-13 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 A kind of efficient pressing crack construction process pipe string of horizontal well and pressing crack construction technique
CN106939784A (en) * 2017-01-13 2017-07-11 上海全泽能源科技有限公司 The positioning acidizing device of stratified injection well
CN109707362B (en) * 2019-01-24 2021-01-01 中国石油天然气股份有限公司 Fixed-point fracturing method for residual oil in longitudinal single sand body of mining and submerging old well reservoir
CN109973067B (en) * 2019-03-04 2021-06-01 中国石油天然气股份有限公司 Horizontal well crack plugging wellbore reconstruction repeated fracturing method
CN110206505A (en) * 2019-05-16 2019-09-06 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 A kind of set subsidy blocks the old well reform method of coiled tubing drag fracturing
CN111648754A (en) * 2020-05-19 2020-09-11 中国石油天然气股份有限公司 Coiled tubing fracturing and downhole throttling production integrated process pipe column and method thereof
CN112324416B (en) * 2020-11-05 2022-08-30 中国石油天然气股份有限公司 Multi-packer process pipe column and method for selective and repeated reconstruction of old well
CN113107418B (en) * 2021-03-25 2023-05-05 中煤科工集团西安研究院有限公司 Segmented pressure-maintaining grouting device and method for horizontal drilling of water-bearing layer of coal seam floor

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201090188Y (en) * 2007-09-18 2008-07-23 中国石油天然气股份有限公司 Fixedly tubular pile delamination hydraulic jet perforating and compression fracture integration tubular pile
CN101270639A (en) * 2008-04-30 2008-09-24 中国石油天然气股份有限公司 Packer packing multi-layer hydropower abrasive perforating and fracturing integrated technique
CN102691493A (en) * 2012-06-05 2012-09-26 中国石油化工股份有限公司 Continuous oil pipe sectional sand-blasting perforation casing fracturing pipe column and casing fracturing method

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101105121A (en) * 2007-07-27 2008-01-16 大庆油田有限责任公司 Horizontal well machinery staged fracturing tool string
CN201396131Y (en) * 2009-05-15 2010-02-03 中国石油天然气股份有限公司 Staged fracturing string of horizontal well
US8210257B2 (en) * 2010-03-01 2012-07-03 Halliburton Energy Services Inc. Fracturing a stress-altered subterranean formation
CN101906955B (en) * 2010-07-30 2014-01-01 中国石油集团川庆钻探工程有限公司井下作业公司 Oil and gas well underground straddle packing layer-by-layer fracture acidizing tool tubular column structure
CN102140900B (en) * 2011-05-17 2014-02-12 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Design method of expanding type anti-sticking packer
CN202250015U (en) * 2011-10-08 2012-05-30 华鼎鸿基石油工程技术(北京)有限公司 Segmented fracturing device of slide sleeve packer
CN202745846U (en) * 2012-07-12 2013-02-20 中国石油天然气股份有限公司 Perforating, fracturing and sand washing integrated string for coiled tubing
CN202900060U (en) * 2012-11-12 2013-04-24 中国石油天然气股份有限公司 Process string for coiled tubing perforation, casing fracturing and bridge plug packing
CN203321476U (en) * 2013-06-05 2013-12-04 中国石油天然气股份有限公司 Coiled tubing controllable packer technique pipe for repeated reconstruction of old wells

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201090188Y (en) * 2007-09-18 2008-07-23 中国石油天然气股份有限公司 Fixedly tubular pile delamination hydraulic jet perforating and compression fracture integration tubular pile
CN101270639A (en) * 2008-04-30 2008-09-24 中国石油天然气股份有限公司 Packer packing multi-layer hydropower abrasive perforating and fracturing integrated technique
CN102691493A (en) * 2012-06-05 2012-09-26 中国石油化工股份有限公司 Continuous oil pipe sectional sand-blasting perforation casing fracturing pipe column and casing fracturing method

Also Published As

Publication number Publication date
CN104213891A (en) 2014-12-17

Similar Documents

Publication Publication Date Title
CN104213891B (en) Old well repeats transformation coiled tubing controllable confining process pipe string
CN203321476U (en) Coiled tubing controllable packer technique pipe for repeated reconstruction of old wells
CN202108493U (en) Water jetting multi-cluster subsection fracturing strings of horizontal well
CN102022104B (en) Open-hole packer for open-hole horizontal well and preset connector fracturing well completion method
CN108952655B (en) Normal-pressure shale gas screen pipe well completion hydraulic jet volume fracturing method
CN106285601A (en) Cave and fracturing integrated yield-increasing technique method are made in the injection of coal bed gas well abrasive perforating
CN105484719A (en) Method for improving multi-cluster crack initiation effectiveness by blocking seams through multi-scale soluble balls
CN201367892Y (en) Pipe string structure of downhole hydraulic-jetting fracturing and acidizing tool of oil-gas well
CN101942986A (en) Abrasive jet injection multiple fracturing device
CN102536186A (en) Method for fracturing composite pipe column through hydraulic jetting in segmented mode
CN106337673A (en) Multilayer-section fracturing technique pipe column and construction method thereof
CN103821489B (en) Horizontal well machinery layering is acidified combination process tubing string with hydraulic jetting fracturing
CN104213895A (en) Hydraulic sand jet perforation, fracture and sand filling integrated technological method
CN104695923A (en) Method for realizing sectional multi-cluster fracture of horizontal well by adopting soluble balls
CN203321474U (en) Gas field horizontal well immovable string hydraulic power sand blast clustering multistage fracturing string
CN102953719A (en) Drag type packer-less hydraulic jet pulsating acid fracturing device and method
CN104278979A (en) Coiled tubing perforation bridge plug sealing, separating and fracturing method
CN104563997A (en) Water-jet and bridge plug combined process tubing string and work thereof
CN104213893B (en) Oilfield old well selectivity repeats to transform perforating and fracturing integrated pipe column and method of work thereof
CN104213894A (en) Selective re-fracturing technology for old well of oil field
CN102877824A (en) Horizontal well staged and multi-cluster fracturing method by hydraulic jetting
CN203394492U (en) Coiled tubing perforation and mechanical packing fracturing pipe column
CN101105121A (en) Horizontal well machinery staged fracturing tool string
CN102619494A (en) Multi-section sliding sleeve type sand jet perforating and fracturing tool
CN202000977U (en) Sandblast perforating fracturing machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant