CN204186370U - Casing sliding sleeve continuous construction staged fracturing tool pipe column - Google Patents

Casing sliding sleeve continuous construction staged fracturing tool pipe column Download PDF

Info

Publication number
CN204186370U
CN204186370U CN201420608542.2U CN201420608542U CN204186370U CN 204186370 U CN204186370 U CN 204186370U CN 201420608542 U CN201420608542 U CN 201420608542U CN 204186370 U CN204186370 U CN 204186370U
Authority
CN
China
Prior art keywords
sliding sleeve
bushing
casing
staged fracturing
casing sliding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420608542.2U
Other languages
Chinese (zh)
Inventor
唐欣
李斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
CNPC Chuanqing Drilling Engineering Co Ltd
Original Assignee
CNPC Chuanqing Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNPC Chuanqing Drilling Engineering Co Ltd filed Critical CNPC Chuanqing Drilling Engineering Co Ltd
Priority to CN201420608542.2U priority Critical patent/CN204186370U/en
Application granted granted Critical
Publication of CN204186370U publication Critical patent/CN204186370U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a casing sliding sleeve continuous construction staged fracturing tool string, including casing string, casing sliding sleeve I, casing sliding sleeve II, casing sliding sleeve III, casing sliding sleeve IV, casing sliding sleeve V, trigger formula pressure differential sliding sleeve, auto-lock bump seat, float hoop (3), casing shoes and guide shoe connect gradually from top to bottom on the casing string, casing sliding sleeve I, casing sliding sleeve II, casing sliding sleeve III, casing sliding sleeve IV, casing sliding sleeve V and trigger formula pressure differential sliding sleeve set up the staged fracturing horizon at the bore hole well section. The utility model discloses do not need special lower staged fracturing instrument tubular column, do not need packer card layer segmentation, the operation in the middle of the layer construction does not need is changeed, uses the sleeve pipe tubular column to realize large discharge, continuous multistage staged fracturing construction.

Description

Sliding sleeve of bushing sequential production staged fracturing tool tubing string
Technical field
The utility model relates to oil gas well cementing operation and the completion storey increase design technical field of natural petroleum gas field, exactly relates to a kind of sliding sleeve of bushing sequential production staged fracturing tool tubing string.
Background technology
Carrying out in storey increase design operation process to Oil/gas Well, usually using various different tool tubular column according to the feature of reservoir.Along with the development of exploration and development, the characteristic of reservoir becomes more diversified, the exploitation of the tight gas reservoir particularly pushed open gradually in recent years, construction interval is more, operational discharge capacity is large, adopts conventional single interval card layer fracture acidizing tool tubular column or coiled tubing drag fracturing acidizing treatment more and more can not meet the demands.
In recent years, by large quantifier elimination, define multiple staged fracturing tool tubing string, achieved multistage segmentation, huge discharge, fracturing reform construction continuously, achieve good Reservoir Development effect, significant.
Patent publication No. CN102562019A discloses abrasive perforating annular mechanical packing multiple fracturing tool tubular column and reforming technology, and patent publication No. CN202370495U discloses a kind of Oil/gas Well abrasive perforating annular mechanical packing multiple fracturing tool tubular column.In the wellbore casing of this technology after well cementation, under enter this tool tubular column, at the first perforation of construction interval, then set packer carries out card layer pressing crack construction; But after one deck of having constructed, then deblocking packer, carry out the second construction, the like; Generally from bottom to top, multilayer construction can be realized.Need lower tool tubular column separately, tubing string is more complicated; Need unsealing tool when turning layer, occur deblocking difficulty sometimes; Turn the layer time longer, can not sequential production be realized; This tubing string is oil pipe column, and internal diameter is generally less, is not suitable with the construction of huge discharge tight gas reservoir.
Patent publication No. CN101906955A discloses a kind of oil and gas well underground straddle packing layer-by-layer fracture acidizing tool tubular column structure.This technology is also in the wellbore casing after well cementation, first at construction interval perforation, then under enter this tool tubular column and carry out setting card layer, then fracture acidizing construction; But after one deck of having constructed, then deblocking packer, carry out the second construction, the like; Generally from bottom to top, multilayer construction can be realized; This technical parts casing pipe by operation pressure, can not protect upper strata sleeve pipe.Do not need lower tool tubular column during construction, tool tubular column is also more complicated; Need unsealing tool when turning layer, occur deblocking difficulty sometimes; Turn the layer time longer, can not sequential production be realized; This tubing string is oil pipe column, and internal diameter is generally less, is not suitable with the construction of huge discharge tight gas reservoir.
Patent publication No. CN201714364U discloses a kind of tubular column for horizontal well barefoot well completion staged fracturing acidizing tool.This tubing string in bore hole under enter, pitching, sit and hang, set, give up, trip out feeding drilling rod, under enter tieback oil pipe column tieback, then construct, interval of constructing is many, can sequential production.This technology to need separately tool tubular column twice; And tubing string is very complicated, costly; Enter risk under tubing string comparatively large, meet midway blocked portion, the processing time is long, costly.
Utility model content
The utility model is intended to for the defect existing for above-mentioned prior art and deficiency, a kind of sliding sleeve of bushing sequential production staged fracturing tool tubing string is provided, the utility model does not need to descend staged fracturing tool tubing string specially, do not need the segmentation of packer card layer, turn layer construction and do not need middle operation, use sleeve pipe tubing string to achieve huge discharge, the construction of continuous multi-stage staged fracturing.
The utility model realizes by adopting following technical proposals:
A kind of sliding sleeve of bushing sequential production staged fracturing tool tubing string, it is characterized in that: comprise bunch tube, sliding sleeve of bushing I, sliding sleeve of bushing II, sliding sleeve of bushing III, sliding sleeve of bushing IV, sliding sleeve of bushing V, trigger-type pressure reduction sliding sleeve, self-locking impacting seat, float collar, casing shoe and guide shoe, described sliding sleeve of bushing I, sliding sleeve of bushing II, sliding sleeve of bushing III, sliding sleeve of bushing IV, sliding sleeve of bushing V, trigger-type pressure reduction sliding sleeve, self-locking impacting seat, float collar, casing shoe is connected on bunch tube from top to bottom successively with guide shoe, described sliding sleeve of bushing I, sliding sleeve of bushing II, sliding sleeve of bushing III, sliding sleeve of bushing IV, sliding sleeve of bushing V and trigger-type pressure reduction sliding sleeve are arranged on the staged fracturing layer position of barefoot interval.
The ball seat of described sliding sleeve of bushing I, sliding sleeve of bushing II, sliding sleeve of bushing III, sliding sleeve of bushing IV, sliding sleeve of bushing V can bore, and opens ball with sliding sleeve and mate.
Described trigger-type pressure reduction sliding sleeve is arranged on the first paragraph of staged fracturing construction.
Described self-locking impacting seat coordinates with isolation bruising plug.
Compared with prior art, the beneficial effect that reaches of the utility model is as follows:
1, in the utility model, do not descend staged fracturing tool tubing string specially, share one-trip string with well cementing casing pipe string, realize multistage staged fracturing storey increase design by suppressing with pitching (or first paragraph employing perforation), tubing string is simpler.
2, in the utility model, utilize cement paste to realize the packing of sliding sleeve annular space, do not need the segmentation of lower packet card layer.
3, in the utility model, when staged fracturing transformation turns layer, do not need middle operation, can sequential production be realized, save the engineering time.
4, in the utility model, adopt bunch tube to carry out segmentation transformation, casing inner diameter is much bigger relative to oil pipe, and flowing frictional resistance is much smaller, is convenient to realize huge discharge and super large discharge construction.
5, in the utility model, sliding sleeve of bushing ball seat can bore, and after ball seat bores and removes, in sliding sleeve of bushing, latus rectum is consistent with bunch tube, is convenient to carry out later stage workover treatment.
Accompanying drawing explanation
Below in conjunction with specification drawings and specific embodiments, the utility model is described in further detail, wherein:
Fig. 1 is structural representation of the present utility model.
Mark in figure:
1, guide shoe, 2, casing shoe, 3, float collar, 4, self-locking impacting seat, 5, trigger-type pressure reduction sliding sleeve, 6, sliding sleeve of bushing V, 7, sliding sleeve of bushing IV, 8, sliding sleeve of bushing III, 9, sliding sleeve of bushing II, 10, sliding sleeve of bushing I, 11, bunch tube.
Detailed description of the invention
Segmentation progression in the utility model can be 1 ~ 6 grade, and also can be more than 6 grades, for 6 grades, in conjunction with Figure of description, the utility model is described in further detail below.
Embodiment 1
As a better embodiment of the present utility model, as shown in Figure 1, the utility model mainly comprises bunch tube 11, sliding sleeve of bushing I 10, sliding sleeve of bushing II 9, sliding sleeve of bushing III 8, sliding sleeve of bushing IV 7, sliding sleeve of bushing V 6, trigger-type pressure reduction sliding sleeve 5, self-locking impacting seat 4, float collar 3, casing shoe 2, guide shoe 1 etc.Described sliding sleeve of bushing I 10, sliding sleeve of bushing II 9, sliding sleeve of bushing III 8, sliding sleeve of bushing IV 7, sliding sleeve of bushing V 6, trigger-type pressure reduction sliding sleeve 5, self-locking impacting seat 4, float collar 3, casing shoe 2, guide shoe 1 are connected in turn from top to bottom on bunch tube 11.Described sliding sleeve of bushing I 10, sliding sleeve of bushing II 9, sliding sleeve of bushing III 8, sliding sleeve of bushing IV 7, sliding sleeve of bushing V 6 and trigger-type pressure reduction sliding sleeve 5 are arranged on the staged fracturing layer position of barefoot interval.The ball seat of described sliding sleeve of bushing I 10, sliding sleeve of bushing II 9, sliding sleeve of bushing III 8, sliding sleeve of bushing IV 7, sliding sleeve of bushing V 6 can bore, and opens ball with the high intensity low density sliding sleeve of specific dimensions and mate.Described trigger-type pressure reduction sliding sleeve 5 is arranged on the first paragraph of staged fracturing construction.Described self-locking impacting seat 4 coordinates with special isolation bruising plug.
Site operation program, in the sliding sleeve of bushing sequential production staged fracturing tool tubing string lower going-into-well by design, cementing, drops into special rubber plug, the cement paste in the clean bunch tube of isolation, with self-locking impacting seat 4 bruising self-locking, realizes accurately controlling lower cement plug.After cement paste fully solidifies, suppress higher pressure, open trigger-type pressure reduction sliding sleeve 5, carry out first paragraph construction; At the end of first paragraph construction, consider the liquid measure in sleeve pipe, drop into the unlatching ball of sliding sleeve of bushing V 6, open sliding sleeve of bushing V 6 and realize turning layer, carry out second layer construction; By that analogy, carry out the 3rd section, the 4th section ..., finally complete the construction of all staged fracturings.
Embodiment 2
As another embodiment of the present utility model, when the well adopting sliding sleeve of bushing sequential production staged fracturing tool tubing string to carry out storey increase design construction, exploit through the later stage, when needing again to carry out storey increase design, can descend to bore the bored ball seat of decannulation sliding sleeve, make the interior latus rectum of sliding sleeve of bushing and sleeve pipe overall consistent, enter corresponding oil pipe column down as required again, packer card layer fracture acidizing is carried out to specific reservoir, improve the rate of oil and gas recovery, work is convenient, simple, improves the service efficiency of well to greatest extent.

Claims (4)

1. a sliding sleeve of bushing sequential production staged fracturing tool tubing string, it is characterized in that: comprise bunch tube (11), sliding sleeve of bushing I (10), sliding sleeve of bushing II (9), sliding sleeve of bushing III (8), sliding sleeve of bushing IV (7), sliding sleeve of bushing V (6), trigger-type pressure reduction sliding sleeve (5), self-locking impacting seat (4), float collar (3), casing shoe (2) and guide shoe (1), described sliding sleeve of bushing I (10), sliding sleeve of bushing II (9), sliding sleeve of bushing III (8), sliding sleeve of bushing IV (7), sliding sleeve of bushing V (6), trigger-type pressure reduction sliding sleeve (5), self-locking impacting seat (4), float collar (3), casing shoe (2) is connected on bunch tube (11) from top to bottom successively with guide shoe (1), described sliding sleeve of bushing I (10), sliding sleeve of bushing II (9), sliding sleeve of bushing III (8), sliding sleeve of bushing IV (7), sliding sleeve of bushing V (6) and trigger-type pressure reduction sliding sleeve (5) are arranged on the staged fracturing layer position of barefoot interval.
2. sliding sleeve of bushing sequential production staged fracturing tool tubing string according to claim 1, it is characterized in that: the ball seat of described sliding sleeve of bushing I (10), sliding sleeve of bushing II (9), sliding sleeve of bushing III (8), sliding sleeve of bushing IV (7), sliding sleeve of bushing V (6) can bore, and open ball with sliding sleeve and mate.
3. sliding sleeve of bushing sequential production staged fracturing tool tubing string according to claim 1, is characterized in that: described trigger-type pressure reduction sliding sleeve (5) is arranged on the first paragraph of staged fracturing construction.
4. sliding sleeve of bushing sequential production staged fracturing tool tubing string according to claim 1, is characterized in that: described self-locking impacting seat (4) coordinates with isolation bruising plug.
CN201420608542.2U 2014-10-21 2014-10-21 Casing sliding sleeve continuous construction staged fracturing tool pipe column Active CN204186370U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420608542.2U CN204186370U (en) 2014-10-21 2014-10-21 Casing sliding sleeve continuous construction staged fracturing tool pipe column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420608542.2U CN204186370U (en) 2014-10-21 2014-10-21 Casing sliding sleeve continuous construction staged fracturing tool pipe column

Publications (1)

Publication Number Publication Date
CN204186370U true CN204186370U (en) 2015-03-04

Family

ID=52618380

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420608542.2U Active CN204186370U (en) 2014-10-21 2014-10-21 Casing sliding sleeve continuous construction staged fracturing tool pipe column

Country Status (1)

Country Link
CN (1) CN204186370U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106401531A (en) * 2016-12-14 2017-02-15 中国石油集团川庆钻探工程有限公司 Coiled tubing switch sliding sleeve for staged fracturing acidizing transformation and control method thereof
CN110206521A (en) * 2019-05-31 2019-09-06 山东科技大学 A kind of water filling segmentation of coal seam long drilled holes, which is opened, splits device and method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106401531A (en) * 2016-12-14 2017-02-15 中国石油集团川庆钻探工程有限公司 Coiled tubing switch sliding sleeve for staged fracturing acidizing transformation and control method thereof
CN110206521A (en) * 2019-05-31 2019-09-06 山东科技大学 A kind of water filling segmentation of coal seam long drilled holes, which is opened, splits device and method

Similar Documents

Publication Publication Date Title
CN105507865B (en) The method of refracturing for oil gas water well
CN201714364U (en) Staged fracturing acidizing tool string for open hole completion of horizontal well
CN104278978B (en) Soluble bridge plug fracturing process pipe column and fracturing method thereof
CN202108493U (en) Horizontal well hydraulic jet multi-cluster staged fracturing string
CN201902202U (en) Staged fracturing string of oil-gas horizontal well
CN201212387Y (en) Gas injection, gas production and brine discharge integration process pipe column for underground gas storage
CN201593405U (en) Integrated tubular column for horizontal well completion and fracturing production
CN102817603B (en) A kind of method being communicated with ground and underground coal seam gas
CN105484719A (en) Method for improving multi-cluster cracking effectiveness by adopting multi-scale soluble ball to seal seam
CN104420835A (en) Multi-cluster perforation fracturing well completion pipe string and construction method
CN107246254A (en) Coal-based gas U-shaped well drilling and development method
CN104564003A (en) Drilling plug-free pumping type hydraulic bridge plug staged fracturing method
CN201810286U (en) Separate mining mixed pumping pipe column suitable for two-layer mining
CN203321476U (en) Coiled tubing controllable packer process pipe column for old well repeated reconstruction
CN201620853U (en) Multi-layer mining single pump constant pressure gas-proof pipe column
CN105587300B (en) Oil recovery method for horizontal well
CN103075139A (en) Immovable pipe column hydraulic jet process for fracture acidizing and pipe column thereof
CN202215223U (en) Open hole horizontal well unlimited stage staged fracturing downhole string
CN204186371U (en) Staged fracturing tool pipe column with first-section perforated casing sliding sleeve
CN203515342U (en) Multi-cluster perforation fracturing well completion pipe string
CN105443101A (en) Compression type double-sealing and single-clamping subsection fracturing process pipe column and fracturing method thereof
CN204186370U (en) Casing sliding sleeve continuous construction staged fracturing tool pipe column
CN204754881U (en) Double -barrelled gas well flow string parallels
CN204283371U (en) Well completion pipe string
WO2014138301A3 (en) Through tubing perpendicular boring

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200916

Address after: 100007 Beijing, Dongzhimen, North Street, No. 9, No.

Co-patentee after: CNPC Chuanqing Drilling Engineering Co.,Ltd.

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Address before: The 1 section of No. 3 company Chuanqing Drilling Technology Information Office Chenghua District Green Road 610051 Chengdu City, Sichuan Province

Patentee before: CNPC Chuanqing Drilling Engineering Co.,Ltd.