CN103032060A - Horizontal well coiled tubing hydraulic sand blasting multi-cluster perforation annular sand adding multi-section fracturing process - Google Patents

Horizontal well coiled tubing hydraulic sand blasting multi-cluster perforation annular sand adding multi-section fracturing process Download PDF

Info

Publication number
CN103032060A
CN103032060A CN2012105176449A CN201210517644A CN103032060A CN 103032060 A CN103032060 A CN 103032060A CN 2012105176449 A CN2012105176449 A CN 2012105176449A CN 201210517644 A CN201210517644 A CN 201210517644A CN 103032060 A CN103032060 A CN 103032060A
Authority
CN
China
Prior art keywords
coiled tubing
fracturing
packer
sand
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012105176449A
Other languages
Chinese (zh)
Inventor
王凤山
王文军
刘崇江
李清忠
徐德奎
李琳
张春辉
张宏岩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Daqing Oilfield Co Ltd
Original Assignee
Petrochina Co Ltd
Daqing Oilfield Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd, Daqing Oilfield Co Ltd filed Critical Petrochina Co Ltd
Priority to CN2012105176449A priority Critical patent/CN103032060A/en
Publication of CN103032060A publication Critical patent/CN103032060A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention relates to the technical field of oil extraction engineering of oil fields, and belongs to a horizontal well continuous oil pipe hydraulic sand blasting multi-cluster perforation annular sand adding multi-section fracturing process for oil fields. The invention effectively solves the problems that the wellhead can not prevent blowout and the construction displacement of the oil pipe is limited in the pipe string tripping process in the prior art. The method comprises the steps of firstly conveying the whole tool string by using a coiled tubing 1, then pressurizing, perforating by using a spray gun 5, after the perforation is finished, continuously injecting fracturing fluid into the coiled tubing 1, simultaneously injecting sand-carrying fluid from a casing 2 to finish the construction of the layer section, after the construction is finished, carrying out backwashing by using a sieve tube 9 and a check valve 8, and then lifting the coiled tubing 1 to carry out the construction of the next target layer. The invention has the advantages of capability of completing perforation and fracturing operation in one trip, large fracturing construction displacement, no limitation on sand adding scale and fracturing segment number, safety, environmental protection, high efficiency and the like.

Description

Many showers of horizontal well coiled tubing hydraulic sand blasting orifice ring sky adds sand multistage fracturing technology
Technical field: the present invention relates to the oil extraction in oil field field of engineering technology, belong to a kind of many showers of horizontal well coiled tubing hydraulic sand blasting orifice ring sky for the oil field and add sand multistage fracturing technology.
Background technology: the large discharge capacity of horizontal well, extensive, multistage volume fracturing can reduce the lower limit that reservoir is effectively employed, and the volume increase transformation of low-permeability oil deposit is had great importance.At present the staged fracturing of horizontal well technology exist operational discharge capacity little, add sand small scale, the pressure break hop count is limited, operating efficiency is low problem, effectively carrying out horizontal well volume fracturing.In order to satisfy horizontal well volume fracturing construction needs, improve scale, intensity and the efficient of fracturing reform, invented many showers of horizontal well coiled tubing hydraulic sand blasting orifice ring sky and added sand multistage fracturing technology, for the volume increase transformation of low-permeability oil deposit provides new technical method.
Summary of the invention: purpose of the present invention is invented a kind of one-trip string exactly just can finish perforation and fracturing work, efficiency of construction is high, cost is low, and can significantly improve the discharge capacity of pressure break and add the sand scale, many showers of the horizontal well coiled tubing hydraulic sand blasting orifice ring sky that satisfies horizontal well volume fracturing construction needs adds sand multistage fracturing technology.
The present invention is by realizing with lower device: coiled tubing, sleeve pipe, safety joint, centralizer, spray gun, packer, hydraulic anchor, ball-and-seat, screen casing and guide shoe.
The present invention realizes by following steps:
A, at first will be connected with from top to bottom the operating tool string that coiled tubing, safety joint, centralizer, spray gun, packer, hydraulic anchor, ball-and-seat, screen casing, guide shoe form in turn and be lowered into the target zone that to construct in the sleeve pipe;
B, then with 1m 3/ min~2m 3The discharge capacity of/min is injected fracturing fluid in coiled tubing, ball-and-seat is closed, and fracturing fluid produces high-velocity fluid by spray gun target zone is carried out abrasive perforating, and concurrent fracturing liquid can make packer setting through the chock pressure difference that spray gun produces;
C, target zone is carried out reducing the injection discharge capacity of coiled tubing, and continuing to inject fracturing fluid to coiled tubing after abrasive perforating finishes, keep packer setting, the annular space to sleeve pipe injects load fluid simultaneously, until this target zone annular space sand fracturing construction finishes;
D, inject fracturing fluid again from sleeve pipe, ball-and-seat is opened, and returns out from coiled tubing, carries out anti-circulation well cleanup, after anti-circulation well cleanup finishes, on carry operating tool string to new target zone and carry out perforation;
E, repeating step c~d until finish perforation and the pressing crack construction of all target zones, propose operating tool string in production casing.
Packer is the pony packer of hydraulic setting.
Compared with the prior art the present invention has following advantage:
The present invention utilizes spray gun to carry out many bunches of abrasive perforatings, effective packing is carried out in the layer position of adopting packer that wish is processed, inject load fluid by casing annulus and carry out pressing crack construction, can realize that one-trip string finishes perforation and fracturing work, and the pressing crack construction discharge capacity is large, add the sand scale and hop count unrestricted, satisfying the needs of multistage, many bunches, extensive, volume fracturing construction, is a kind of fractured horizontal well technology of safe, efficient, environmental protection.
Description of drawings: Fig. 1 is the field schematic diagram of the present invention.
The specific embodiment: below in conjunction with accompanying drawing the present invention is done further auspicious stating: the present invention is by realizing with lower device: coiled tubing 1, sleeve pipe 2, safety joint 3, centralizer 4, spray gun 5, packer 6, hydraulic anchor 7, ball-and-seat 8, screen casing 9 and guide shoe 10; The present invention realizes by following steps:
A, at first will be connected with from top to bottom the operating tool string that coiled tubing 1, safety joint 3, centralizer 4, spray gun 5, packer 6, hydraulic anchor 7, ball-and-seat 8, screen casing 9, guide shoe 10 form in turn and be lowered into the sleeve pipe 2 interior target zones that will construct;
B, then with 2m 3The discharge capacity of/min is to coiled tubing 1 interior injection fracturing fluid, and ball-and-seat 8 is closed, and fracturing fluid produces high-velocity fluid by spray gun 5 target zone is carried out abrasive perforating, and concurrent fracturing liquid can make packer 6 set through the chock pressure difference that spray gun 5 produces;
C, target zone is carried out after abrasive perforating finishes, reduce the injection discharge capacity of coiled tubing 1, and continue to inject fracturing fluid to coiled tubing 1, keep packer 6 to set, annular space to sleeve pipe 2 injects load fluid simultaneously, until this target zone annular space sand fracturing construction finishes;
D, inject fracturing fluid again from sleeve pipe 2, ball-and-seat 8 is opened, and returns out from coiled tubing 1, carries out anti-circulation well cleanup, after anti-circulation well cleanup finishes, on carry operating tool string to new target zone and carry out perforation;
E, repeating step c~d, until finish perforation and the pressing crack construction of four target zones, with operating tool string from production casing 2 interior propositions.
Packer 6 is pony packers of hydraulic setting.

Claims (2)

1. many showers of horizontal well coiled tubing hydraulic sand blasting orifice ring sky adds sand multistage fracturing technology, and above-mentioned technique is by realizing with lower device: coiled tubing (1), sleeve pipe (2), safety joint (3), centralizer (4), spray gun (5), packer (6), hydraulic anchor (7), ball-and-seat (8), screen casing (9) and guide shoe (10); It is characterized in that: above-mentioned technique realizes by following steps:
A, the operating tool string that at first will be connected with from top to bottom coiled tubing (1), safety joint (3), centralizer (4), spray gun (5), packer (6), hydraulic anchor (7), ball-and-seat (8), screen casing (9), guide shoe (10) in turn are lowered into the target zone that will construct in the sleeve pipe (2);
B, then with 1m 3/ min~2m 3The discharge capacity of/min is injected fracturing fluid in coiled tubing (1), ball-and-seat (8) is closed, fracturing fluid produces high-velocity fluid by spray gun (5) target zone is carried out abrasive perforating, and concurrent fracturing liquid can make packer (6) set through the chock pressure difference that spray gun (5) produces;
C, target zone is carried out after abrasive perforating finishes, reduce the injection discharge capacity of coiled tubing (1), and continue to inject fracturing fluid to coiled tubing (1), keep packer (6) to set, annular space to sleeve pipe (2) injects load fluid simultaneously, until this target zone annular space sand fracturing construction finishes;
D, inject fracturing fluid again from sleeve pipe (2), ball-and-seat (8) is opened, and returns out from coiled tubing (1), carries out anti-circulation well cleanup, after anti-circulation well cleanup finishes, on carry operating tool string to new target zone and carry out perforation;
E, repeating step c~d until finish perforation and the pressing crack construction of all target zones, propose operating tool string in production casing (2).
2. many showers of horizontal well coiled tubing hydraulic sand blasting orifice ring sky according to claim 1 adds sand multistage fracturing technology, and it is characterized in that: packer (6) is the pony packer of hydraulic setting.
CN2012105176449A 2012-11-08 2012-11-08 Horizontal well coiled tubing hydraulic sand blasting multi-cluster perforation annular sand adding multi-section fracturing process Pending CN103032060A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012105176449A CN103032060A (en) 2012-11-08 2012-11-08 Horizontal well coiled tubing hydraulic sand blasting multi-cluster perforation annular sand adding multi-section fracturing process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012105176449A CN103032060A (en) 2012-11-08 2012-11-08 Horizontal well coiled tubing hydraulic sand blasting multi-cluster perforation annular sand adding multi-section fracturing process

Publications (1)

Publication Number Publication Date
CN103032060A true CN103032060A (en) 2013-04-10

Family

ID=48019403

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012105176449A Pending CN103032060A (en) 2012-11-08 2012-11-08 Horizontal well coiled tubing hydraulic sand blasting multi-cluster perforation annular sand adding multi-section fracturing process

Country Status (1)

Country Link
CN (1) CN103032060A (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103573241A (en) * 2013-08-06 2014-02-12 中国石油天然气股份有限公司 Horizontal well casing cementing pressure balance sliding sleeve annulus sand-adding multi-section fracturing process
CN103696750A (en) * 2013-12-18 2014-04-02 东北石油大学 Method for determining critical discharge capacity of annular sand fracturing pipe with packer
CN104213890A (en) * 2013-06-03 2014-12-17 中国石油天然气股份有限公司 Coiled tubing fracturing string and fracturing process
CN104373100A (en) * 2013-08-15 2015-02-25 中国石油天然气股份有限公司 Continuous oil pipe dragging hydraulic perforation-annular sand adding layered fracturing process method
CN104564001A (en) * 2014-12-03 2015-04-29 中国石油化工股份有限公司 Horizontal well multi-cluster fracturing method and multi-cluster perforating and fracturing pipe column for implementing method
CN104632172A (en) * 2013-11-15 2015-05-20 中国石油天然气股份有限公司 Method for controlling annulus pressure of gas field horizontal well immovable pipe column hydraulic sand blasting fracturing
CN104863550A (en) * 2014-02-26 2015-08-26 中国海洋石油总公司 Hydraulic sand blasting perforation and APR (annular pressure responsive) testing combined process
CN105986799A (en) * 2015-02-28 2016-10-05 中国石油天然气股份有限公司 Ball seat packing multi-cluster perforation fracturing string and construction method
CN108086964A (en) * 2017-12-04 2018-05-29 中煤科工集团西安研究院有限公司 Coal bed gas horizontal well orients hydrajet tool string and construction method
CN108301818A (en) * 2018-01-31 2018-07-20 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 A kind of no tool packing efficient staged fracturing method of horizontal well
CN111608633A (en) * 2020-06-30 2020-09-01 中国石油天然气股份有限公司 Large-scale fracturing process suitable for horizontal well
CN111622719A (en) * 2019-02-28 2020-09-04 中国石油天然气股份有限公司 Sand blasting perforation fracturing method for perforated production well
CN111852428A (en) * 2020-08-03 2020-10-30 中国石油天然气股份有限公司 Method for fracturing outer packing and coiled tubing in combined operation
CN113530517A (en) * 2021-09-17 2021-10-22 中煤科工集团西安研究院有限公司 Combined segmented fracturing device, asynchronous two-way extraction system and method
CN115324550A (en) * 2022-08-09 2022-11-11 中国石油天然气集团有限公司 Hydraulic coiled tubing dragging fracturing tool and technological method
CN115614007A (en) * 2022-12-19 2023-01-17 龙口市通达油管有限公司 Coiled tubing sandblast perforating device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101059070A (en) * 2006-04-21 2007-10-24 中国石油天然气股份有限公司 Perforation and fracturing integrated method and process pipe column thereof
CN101105121A (en) * 2007-07-27 2008-01-16 大庆油田有限责任公司 Horizontal well machinery staged fracturing tool string
CN101270639A (en) * 2008-04-30 2008-09-24 中国石油天然气股份有限公司 Packer packing multilayer hydraulic sand blasting perforation and fracturing integrated process method
CA2786023A1 (en) * 2009-12-31 2011-07-07 Schlumberger Canada Limited Hydraulic fracturing system
CN102691493A (en) * 2012-06-05 2012-09-26 中国石油化工股份有限公司 Continuous oil pipe sectional sand-blasting perforation casing fracturing pipe column and casing fracturing method
US20120267096A1 (en) * 2007-11-30 2012-10-25 Elena Mikhailovna Pershikova Method of testing the operation of a producing pil well operated using the formation hydrofracturing process

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101059070A (en) * 2006-04-21 2007-10-24 中国石油天然气股份有限公司 Perforation and fracturing integrated method and process pipe column thereof
CN101105121A (en) * 2007-07-27 2008-01-16 大庆油田有限责任公司 Horizontal well machinery staged fracturing tool string
US20120267096A1 (en) * 2007-11-30 2012-10-25 Elena Mikhailovna Pershikova Method of testing the operation of a producing pil well operated using the formation hydrofracturing process
CN101270639A (en) * 2008-04-30 2008-09-24 中国石油天然气股份有限公司 Packer packing multilayer hydraulic sand blasting perforation and fracturing integrated process method
CA2786023A1 (en) * 2009-12-31 2011-07-07 Schlumberger Canada Limited Hydraulic fracturing system
CN102691493A (en) * 2012-06-05 2012-09-26 中国石油化工股份有限公司 Continuous oil pipe sectional sand-blasting perforation casing fracturing pipe column and casing fracturing method

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104213890A (en) * 2013-06-03 2014-12-17 中国石油天然气股份有限公司 Coiled tubing fracturing string and fracturing process
CN104213890B (en) * 2013-06-03 2016-12-28 中国石油天然气股份有限公司 Coiled tubing fracturing process
CN103573241A (en) * 2013-08-06 2014-02-12 中国石油天然气股份有限公司 Horizontal well casing cementing pressure balance sliding sleeve annulus sand-adding multi-section fracturing process
CN104373100A (en) * 2013-08-15 2015-02-25 中国石油天然气股份有限公司 Continuous oil pipe dragging hydraulic perforation-annular sand adding layered fracturing process method
CN104632172A (en) * 2013-11-15 2015-05-20 中国石油天然气股份有限公司 Method for controlling annulus pressure of gas field horizontal well immovable pipe column hydraulic sand blasting fracturing
CN103696750A (en) * 2013-12-18 2014-04-02 东北石油大学 Method for determining critical discharge capacity of annular sand fracturing pipe with packer
CN103696750B (en) * 2013-12-18 2016-08-17 东北石油大学 Method is determined with critical gelation point in the annular space sand fracturing pipe of packer
CN104863550A (en) * 2014-02-26 2015-08-26 中国海洋石油总公司 Hydraulic sand blasting perforation and APR (annular pressure responsive) testing combined process
CN104863550B (en) * 2014-02-26 2019-09-13 中海石油(中国)有限公司上海分公司 Hydraulic jet perforation and APR testing combination operation technique
CN104564001A (en) * 2014-12-03 2015-04-29 中国石油化工股份有限公司 Horizontal well multi-cluster fracturing method and multi-cluster perforating and fracturing pipe column for implementing method
CN105986799B (en) * 2015-02-28 2019-02-15 中国石油天然气股份有限公司 Ball seat packing multi-cluster perforation fracturing string and construction method
CN105986799A (en) * 2015-02-28 2016-10-05 中国石油天然气股份有限公司 Ball seat packing multi-cluster perforation fracturing string and construction method
CN108086964A (en) * 2017-12-04 2018-05-29 中煤科工集团西安研究院有限公司 Coal bed gas horizontal well orients hydrajet tool string and construction method
CN108301818A (en) * 2018-01-31 2018-07-20 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 A kind of no tool packing efficient staged fracturing method of horizontal well
CN111622719A (en) * 2019-02-28 2020-09-04 中国石油天然气股份有限公司 Sand blasting perforation fracturing method for perforated production well
CN111622719B (en) * 2019-02-28 2022-06-03 中国石油天然气股份有限公司 Sand blasting perforation fracturing method for perforated production well
CN111608633A (en) * 2020-06-30 2020-09-01 中国石油天然气股份有限公司 Large-scale fracturing process suitable for horizontal well
CN111852428A (en) * 2020-08-03 2020-10-30 中国石油天然气股份有限公司 Method for fracturing outer packing and coiled tubing in combined operation
CN113530517A (en) * 2021-09-17 2021-10-22 中煤科工集团西安研究院有限公司 Combined segmented fracturing device, asynchronous two-way extraction system and method
CN113530517B (en) * 2021-09-17 2021-12-14 中煤科工集团西安研究院有限公司 Combined segmented fracturing device, asynchronous two-way extraction system and method
CN115324550A (en) * 2022-08-09 2022-11-11 中国石油天然气集团有限公司 Hydraulic coiled tubing dragging fracturing tool and technological method
CN115324550B (en) * 2022-08-09 2024-06-18 中国石油天然气集团有限公司 Hydraulic coiled tubing dragging fracturing tool and technological method
CN115614007A (en) * 2022-12-19 2023-01-17 龙口市通达油管有限公司 Coiled tubing sandblast perforating device

Similar Documents

Publication Publication Date Title
CN103032060A (en) Horizontal well coiled tubing hydraulic sand blasting multi-cluster perforation annular sand adding multi-section fracturing process
CN103573241A (en) Horizontal well casing cementing pressure balance sliding sleeve annulus sand-adding multi-section fracturing process
CN106223922B (en) Shale gas horizontal well proppant intra-seam shielding temporary plugging staged fracturing process
CN101539007B (en) Abrasive jetting device and method for abrasive jetting flow and jetting perforation and multiple fracturing
CN100562645C (en) High pressure water jet-flow deep penetrating perforating and auxiliary crushing method and device thereof
CN109736805A (en) A kind of method of the modified release watershed management bump of thick-layer tight roof
CN102022104B (en) Open-hole packer for open-hole horizontal well and preset connector fracturing well completion method
CN103306660A (en) Shale gas reservoir hydraulic fracturing production increasing method
CN203394493U (en) Soluble bridge plug fracturing technology pipe column
CN105545307A (en) Method for over-pit and under-pit cooperative control of roofs of far and near fields of extra-large stoping space
CN106285601A (en) Cave and fracturing integrated yield-increasing technique method are made in the injection of coal bed gas well abrasive perforating
CN103867177A (en) Horizontal well fracturing method
CN104564003A (en) Drilling plug-free pumping type hydraulic bridge plug staged fracturing method
CN101560877A (en) Horizontal well packer staged fracturing technology tube pillar
CN104213895A (en) Hydraulic sand-blasting perforation fracturing and sand-filling combined process method
CN104213891A (en) Coiled tubing controllable packer process pipe column for old well repeated reconstruction
CN103912257B (en) A kind of dragging multiple fracturing device with pressure
CN103306645B (en) Horizontal well the pressure of the drill splits completion tubular column and technique thereof
CN203961938U (en) Packer staged fracturing technology tube pillar in a kind of horizontal well tube
CN114059980B (en) Shale reservoir fracturing method
CN204782918U (en) Dissolubility bridging plug based on rubber sleeve
CN104563997A (en) Hydraulic jet and bridge plug combined process pipe column and working method thereof
CN104234682B (en) A kind ofly be applicable to separate stratum fracturing of continuous oil pipe method that is many, girdle
CN105221119A (en) A kind of instrument and method setting up Oil/gas Well underground sand-prevention tube particle flow channel
CN205370460U (en) Sandblast perforation allies oneself with with bridging plug makes tubular column that carries out staged fracturing

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130410