CN105986799A - Ball seat packing multi-cluster perforation fracturing pipe string and construction method - Google Patents

Ball seat packing multi-cluster perforation fracturing pipe string and construction method Download PDF

Info

Publication number
CN105986799A
CN105986799A CN201510090783.1A CN201510090783A CN105986799A CN 105986799 A CN105986799 A CN 105986799A CN 201510090783 A CN201510090783 A CN 201510090783A CN 105986799 A CN105986799 A CN 105986799A
Authority
CN
China
Prior art keywords
ball seat
ball
perforating
pipe string
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510090783.1A
Other languages
Chinese (zh)
Other versions
CN105986799B (en
Inventor
赵粉霞
慕立俊
邵媛
胡相君
任国富
冯长青
冯飞
蒙鑫
薛晓伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Natural Gas Co Ltd
Original Assignee
China Petroleum and Natural Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Natural Gas Co Ltd filed Critical China Petroleum and Natural Gas Co Ltd
Priority to CN201510090783.1A priority Critical patent/CN105986799B/en
Publication of CN105986799A publication Critical patent/CN105986799A/en
Application granted granted Critical
Publication of CN105986799B publication Critical patent/CN105986799B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention provides a ball seat packing multi-cluster perforation fracturing pipe string and a construction method. The ball seat packing multi-cluster perforation fracturing pipe string comprises a completion casing, a perforation pipe string, a ball seat and a dissolution ball. The inner wall of the completion casing is provided with limiting components in the corresponding positions between adjacent modification layers. The perforation pipe string, the ball seat and the dissolution ball are all located in the completion casing. The perforation pipe string is connected with the ball seat and used for controlling and delivering the ball seat. The ball seat is used for containing the dissolution ball. The limiting components are pressed by the ball seat so that the ball seat can be fixed in the completion casing, and thus a blocking layer between the adjacent modification layers is formed. The dissolution ball can be dissolved only after encountering water for a preset period of time. According to the ball seat packing multi-cluster perforation fracturing string and the construction method, an operator does not need to remove the ball seat and the dissolution ball on the blocking layer with a drill bit by drilling, and the situations that a drilling tool is jammed, and the casing is damaged by the drill bit are avoided; and in addition, the construction time is shortened, and the construction cost is reduced.

Description

Ball seat insulates many bunches of perforating and fracturing tubing strings and construction method
Technical field
The present invention relates to oil-gas field fracturing renovation technique, particularly relate to a kind of ball seat and insulate many bunches of perforating and fracturings Tubing string and construction method.
Background technology
At present, the pressure break mode of oil gas field multilamellar mainly has fixed tubular column hydraulic sand blasting pressure break, and bore hole is sealed Every device pressure break, drag the coiled tubing underseal of tubing string, back-up sand pressure break and waterpower pumping drilling bridging plug Pressure break etc..
Wherein, the method for waterpower pumping drilling bridging plug pressure break is: use hydraulic pump by perforating gun and Drilling bridging plug hydraulic pump is delivered in pit shaft, after carrying out setting and insulating pit shaft by drilling bridging plug, then Carrying out perforation, fracturing work, drilling bridging plug brill is removed different oil-gas Layer in realizing pit shaft by the later stage Latus rectum up and down.
Not only expend the time when drilling bridging plug being carried out and boring except operation long, but also card easily occurs Brill, the situation of bit breakage sleeve pipe.
Summary of the invention
The present invention provides a kind of ball seat to insulate many bunches of perforating and fracturing tubing strings and construction method, to overcome existing skill Defect existing for art.
The present invention provides a kind of ball seat to insulate many bunches of perforating and fracturing tubing strings, including: completion casing, perforation pipe String, ball seat and dissolving ball;
Position corresponding between adjacent transformation layer on described completion casing inwall is provided with limiting component;
Described perforation pipe string, described ball seat and described dissolving ball are respectively positioned in described completion casing;
Described perforation pipe string is connected with described ball seat, is used for controlling and deliver described ball seat;
Described ball seat is used for accommodating described dissolving ball, and described ball seat compresses described limiting component to be fixed on Forming the plugged zone between described adjacent transformation layer in described completion casing, wherein, water met by described dissolving ball Reach ability solubilized after Preset Time.
Further, including 2 described limiting components, described 2 limiting components are with described completion casing Setting substantially symmetrical about its central axis.
Further, the cross section of described ball seat is rounded, and cutting from one end of described ball seat to the other end Face area is gradually increased, and one end that wherein area of section is little compresses with described limiting component, and area of section is big One end be provided with arc groove to accommodate described dissolving ball.
Further, described perforation pipe string by cable, torpedo, head harness, magnetic locator, weighted lever, Perforating gun, ball seat hole enlargement tool, ball seat are delivered instrument and are sequentially connected with composition.
Further, described perforating gun is many bunches of perforating guns.
Further, described ball seat is delivered instrument and is connected with described ball seat, is used for delivering described ball seat.
Further, described ball seat hole enlargement tool is connected with described ball seat, is used for controlling described ball seat expanding.
Further, described limiting component is provided with connector, right between described adjacent transformation layer The holding tank of described connector it is provided with on the inwall at described completion casing answered;
Described connector is connected in described holding tank.
Further, described limiting component is provided with bolt, corresponding between described adjacent transformation layer Described completion casing at inwall on be provided with screw;
Described bolt is screwed onto in described screw.
The present invention provides a kind of ball seat to insulate the construction method of many bunches of perforating and fracturing tubing strings, it is adaptable to above-mentioned institute Stating ball seat and insulate many bunches of perforating and fracturing tubing strings, the method includes:
By in completion casing lower going-into-well cylinder, and reinforce described pit shaft, in described pit shaft, have g section to transform layer, Wherein, g is natural number;
Clean described pit shaft;
N-th section of transformation layer is carried out fracturing work, and wherein, n is natural number less than or equal to g, n;
In utilizing ground hydraulic pump group that perforation pipe string and ball seat hydraulic pump are delivered to completion casing described n-th section Before limiting component between transformation layer and (n+1)th section of transformation layer;
Described perforation pipe string control described ball seat expanding, and throw in expanding after ball seat;
Utilize described perforation pipe string that described (n+1)th section of transformation layer is carried out perforation;
Described perforation pipe string is proposed described pit shaft;
Utilize described ground hydraulic pump by dissolve ball be pumped to described expanding after ball seat on, then ball will be dissolved And described expanding after ball seat be together pumped to described n-th section transformation layer and (n+1)th section transformation layer between On described limiting component, form sealing layer, by described n-th section of transformation layer packing;
Repeat above-mentioned operation, until the described g section transformation whole fracturing work of layer completes.
Further, described fracturing work is light casing fracturing operation or hydraulic jetting fracturing operation.
Further, described perforation is many showers hole.
The ball seat of the present invention insulates many bunches of perforating and fracturing tubing strings, by changing adjacent on completion casing inwall Make position corresponding between layer and be respectively arranged with limiting component;Utilize ground hydraulic pump group by perforation pipe string And ball seat hydraulic pump deliver to completion casing in before limiting component between adjacent transformation layer;By ground control The ball seat hole enlargement tool of unit control perforation pipe string, by expanding for current ball seat, controls perforation pipe string the most again Ball seat deliver instrument and the ball seat after the most expanding is thrown in depart from;By terrestrial contr by perforation pipe String proposes the completion casing in pit shaft;Utilize ground hydraulic pump by dissolve ball be pumped into expanding after ball On seat, then by dissolve ball with expanding after ball seat be together pumped on the limiting component between adjacent transformation layer, Form sealing layer, will currently transform layer and insulate.Wherein, the material of ball seat can be with the material dissolving ball Unanimously, after waiting layer to be rebuilt all to transform, ball seat recovers the most molten with dissolving ball with the water temperature in pit shaft Solving, residue returns out ground, downhole well fluid Path Setup with returning discharge opeing.Need not plugged zone with drill bit Upper ball base removes with dissolving round bur, has stopped bit freezing, the situation of bit breakage sleeve pipe.It addition, also save Engineering time and operating expenses.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to reality Execute the required accompanying drawing used in example or description of the prior art to be briefly described, it should be apparent that under, Accompanying drawing during face describes is some embodiments of the present invention, for those of ordinary skill in the art, On the premise of not paying creative work, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 a is the structural representation that ball seat of the present invention insulates many bunches of perforating and fracturing tubing string embodiments;
Fig. 1 b is the another structural representation that ball seat of the present invention insulates many bunches of perforating and fracturing tubing string embodiments;
Fig. 2 is the perforation pipe string structure signal that ball seat of the present invention insulates many bunches of perforating and fracturing tubing string embodiments Figure;
Fig. 3 is the flow chart that ball seat of the present invention insulates the construction method embodiment of many bunches of perforating and fracturing tubing strings.
Description of reference numerals:
11: completion casing;
12: perforation pipe string;
121: cable;
122: torpedo;
123: head harness;
124: magnetic locator;
125: weighted lever;
126: perforating gun;
127: ball seat hole enlargement tool;
128: instrument delivered by ball seat;
13: ball seat;
14: dissolve ball;
15: limiting component;
16: terrestrial contr.
Detailed description of the invention
For making the purpose of the embodiment of the present invention, technical scheme and advantage clearer, below in conjunction with this Accompanying drawing in bright embodiment, is clearly and completely described the technical scheme in the embodiment of the present invention, Obviously, described embodiment is a part of embodiment of the present invention rather than whole embodiments.Based on Embodiment in the present invention, those of ordinary skill in the art are obtained under not making creative work premise The every other embodiment obtained, broadly falls into the scope of protection of the invention.
Fig. 1 a is the structural representation that ball seat of the present invention insulates many bunches of perforating and fracturing tubing string embodiments, Fig. 1 b The another structural representation of many bunches of perforating and fracturing tubing string embodiments is insulated for ball seat of the present invention.Such as Fig. 1 a, figure Shown in 1b, the ball seat of the present embodiment insulate many bunches of perforating and fracturing tubing strings 01 may include that completion casing 11, Perforation pipe string 12, ball seat 13 and dissolving ball 14.On described completion casing 11 inwall adjacent transformation layer it Between corresponding position be provided with limiting component 15;Described perforation pipe string 12, described ball seat 13 and described Dissolve ball 14 to be respectively positioned in described completion casing 11;Described perforation pipe string 12 is connected with described ball seat 13, For controlling and delivering described ball seat 13;Described ball seat 13 is used for accommodating described dissolving ball 14, and described Ball seat 13 compresses described limiting component 15 to form described adjacent transformation in being fixed on described completion casing 11 Plugged zone between Ceng, wherein, described dissolving ball 14 is met water and is reached ability solubilized after Preset Time.
Such as, described dissolving ball 14 in the water less than or equal to 70 DEG C, in 5 hours can voltage stabilizing 70MPa, Meet light casing fracturing or the hydraulic jetting fracturing operation demand to pressure, at the water more than or equal to 70 DEG C In, it is completely dissolved in 15 days.After all having transformed etc. layer to be rebuilt, dissolve ball 14 with the water in pit shaft Temperature is recovered gradually to dissolve, and residue returns out ground with returning discharge opeing.Need exist for explanation, dissolve ball 14 Material can be configured according to actual needs, is not limited at this.
Optionally, described completion casing 11 inwall of corresponding between adjacent transformation layer position sets Being equipped with 2 described limiting components 15, described 2 limiting components 15 are with the center of described completion casing 11 Axial symmetry is arranged, such as limiting component 15 corresponding at 101 or 102 in Fig. 1 a, Fig. 1 b.
Wherein, described limiting component 15 by being welded and fixed, can block with described completion casing 11 inwall Connect fixing, be spirally connected fixing.
Concrete connect and fix for: on described limiting component 15, be provided with connector, with adjacent transformation It is provided with connector holding tank on the inwall at described completion casing 11 corresponding between Ceng.Described limiting section Connector on part 15 is connected to the inwall at described completion casing 11 corresponding between adjacent transformation layer On holding tank in.
Concrete being spirally connected is fixed as: be provided with bolt on described limiting component 15, with adjacent transformation layer Between be provided with screw on inwall at corresponding described completion casing 11.On described limiting component 15 Bolt is screwed onto in the screw on the inwall at described completion casing 11 corresponding between adjacent transformation layer.
The cross section of described ball seat 13 is rounded, and from the face, cross section of one end of described ball seat 13 to the other end Amassing and be gradually increased, one end that wherein area of section is little compresses with described limiting component 15, and area of section is big One end is provided with arc groove to accommodate described dissolving ball 14, as shown in Figure 1 b.It addition, described ball seat The material of 13 can be consistent with the material of described dissolving ball 14, after waiting layer to be rebuilt all to transform, and ball Seat 13 recovers gradually to dissolve with the water temperature in pit shaft with dissolving ball 14, and residue returns out ground with returning discharge opeing.
Fig. 2 is the perforation pipe string structure signal that ball seat of the present invention insulates many bunches of perforating and fracturing tubing string embodiments Figure.As in figure 2 it is shown, perforation pipe string 12 is by cable 121, torpedo 122, head harness 123, magnetic orientation Device 124, weighted lever 125, perforating gun 126, ball seat hole enlargement tool 127, ball seat are delivered instrument 128 and are depended on Secondary connection forms.
Wherein, described ball seat hole enlargement tool 127 is connected with described ball seat 13, is used for controlling described ball seat 13 is expanding;
Ball seat is delivered instrument 128 and is connected with described ball seat 13, is used for being shipped to the ball seat 13 after expanding Appointment position in completion casing 11, this appointment position is controlled magnetic locator 124 by terrestrial contr 16 Determine;
Terrestrial contr 16 controls perforating gun 126 and transformation layer is carried out single cluster perforating job or many showers Hole operation.
The ball seat of the present embodiment insulates many bunches of perforating and fracturing tubing strings, by completion casing inwall adjacent Between transformation layer, corresponding position is respectively arranged with limiting component;Utilize ground hydraulic pump group by perforation pipe String and ball seat hydraulic pump deliver to completion casing in before limiting component between adjacent transformation layer;Controlled by ground The ball seat hole enlargement tool of unit processed control perforation pipe string, by expanding for current ball seat, controls perforation pipe the most again The ball seat of string is delivered instrument and is thrown in by the ball seat after the most expanding and depart from;By terrestrial contr by perforation Pipe string completion casing in pit shaft proposes;Utilize ground hydraulic pump by dissolve ball be pumped into expanding after On ball seat, then by dissolve ball with expanding after ball seat be together pumped into the limiting component between adjacent transformation layer On, form sealing layer, will currently transform layer and insulate.Wherein, the material of ball seat can be with dissolving ball Material is consistent, after waiting layer to be rebuilt all to transform, ball seat with dissolve ball with the water temperature in pit shaft recover by Gradually dissolving, residue returns out ground, downhole well fluid Path Setup with returning discharge opeing.Need not will envelope with drill bit Blocking layer upper ball base removes with dissolving round bur, has stopped bit freezing, the situation of bit breakage sleeve pipe.It addition, also save Engineering time and operating expenses are saved.
Fig. 3 is the flow chart that ball seat of the present invention insulates the construction method embodiment of many bunches of perforating and fracturing tubing strings, As it is shown on figure 3, the ball seat that this method is be applicable to above-described embodiment insulates many bunches of perforating and fracturing tubing strings, bag Include following steps:
Step 301, by completion casing lower going-into-well cylinder, and reinforce described pit shaft, in described pit shaft, have g Section transformation layer, wherein, g is natural number.
Such as, by completion casing lower going-into-well cylinder, and reinforce pit shaft.Wherein it is desired in the pit shaft of transformation Transformation layer be 3 layers.
Step 302, clean described pit shaft.
Step 303, n-th section of transformation layer being carried out fracturing work, wherein, n be oneself less than or equal to g, n So number.
1st section of transformation layer is carried out fracturing work.Wherein, fracturing work can be light casing fracturing operation Or hydraulic jetting fracturing operation.
Step 304, ground hydraulic pump group is utilized perforation pipe string and ball seat hydraulic pump to be delivered in completion casing Before limiting component between described n-th section of transformation layer and (n+1)th section of transformation layer.
Utilize the 1st section of transformation in perforation pipe string and ball seat hydraulic pump are delivered to completion casing by pump group in the surface water Before limiting component between layer and the 2nd section of transformation layer.Wherein, perforation pipe string is by cable, torpedo, horse cage Head, magnetic locator, weighted lever, perforating gun, ball seat hole enlargement tool, ball seat are delivered instrument and are sequentially connected with group Become.
Ball seat hole enlargement tool is connected with ball seat, is used for controlling described ball seat expanding;Ball seat deliver instrument also with Ball seat connects, for the appointment position being shipped in completion casing by the ball seat after expanding, this appointment position Determined by magnetic locator.
Step 305, described perforation pipe string control described ball seat expanding, and throw in expanding after ball seat.
By the ball seat hole enlargement tool of terrestrial contr control perforation pipe string by expanding for current ball seat, make It becomes big.Control the ball seat of perforation pipe string the most again to deliver instrument and thrown in by the ball seat after the most expanding and depart from.
Step 306, utilize described perforation pipe string to described (n+1)th section transformation layer carry out perforation.
The perforating gun being controlled perforation pipe string by terrestrial contr carries out single cluster perforation to the 2nd section of transformation layer Or many showers hole.
Step 307, by described perforation pipe string propose described pit shaft.
Perforation pipe string completion casing in pit shaft will be proposed by terrestrial contr.
Step 308, utilize described ground hydraulic pump by dissolve ball be pumped to described expanding after ball seat on, Again by dissolve ball with described expanding after ball seat be together pumped to described n-th section and transform layer and (n+1)th section and change Make on the described limiting component between layer, form sealing layer, by described n-th section of transformation layer packing.
Utilize ground hydraulic pump by dissolve ball be pumped into expanding after ball seat on, then will dissolve ball with expanding after Ball seat be together pumped into the 1st section transformation layer and the 2nd section transformation layer between limiting component on, formed envelope Interlayer, thus insulates the 1st section of transformation layer.
Step 309, the operation of repetition step 303 to step 308, until described g section transformation layer is whole Fracturing work completes.
2nd section of transformation layer is carried out fracturing work;Utilize in the surface water pump group by perforation pipe string and ball seat water Before the limiting component that power is pumped in completion casing between the 2nd section of transformation layer and the 3rd section of transformation layer;Pass through Terrestrial contr controls the ball seat hole enlargement tool of perforation pipe string by expanding for current ball seat so that it is become big; The perforating gun being controlled perforation pipe string by terrestrial contr carries out perforation to the 3rd section of transformation layer;By ground Face control unit will propose perforation pipe string completion casing in pit shaft;Ground hydraulic pump is utilized to dissolve Ball be pumped into expanding after ball seat on, then by dissolve ball with expanding after ball seat be together pumped into the 2nd section and change Make on the limiting component between layer and the 3rd section of transformation layer, form sealing layer, thus by the 2nd section of transformation Layer insulates;3rd section of transformation layer is carried out fracturing work.Thus by 3 layers of layer to be rebuilt in pit shaft All fracturing work is complete.
After construction terminates, whole dissolving balls and ball seat in pit shaft recover gradually to dissolve with water temperature in well, Residue after dissolving returns discharge ground through open flow, and in completion tubular column, latus rectum is consistent, and pit shaft is completely easy to the later stage Operation.
The ball seat of the present embodiment insulates the construction method of many bunches of perforating and fracturing tubing strings, by completion casing Position corresponding between adjacent transformation layer on wall is respectively arranged with a limiting component;Utilize the surface water Power pump group limiting component between adjacent transformation layer in perforation pipe string and ball seat hydraulic pump are delivered to completion casing Before;The ball seat hole enlargement tool of perforation pipe string is controlled by expanding for current ball seat, so by terrestrial contr After control the ball seat of perforation pipe string again and deliver instrument and the ball seat after the most expanding is thrown in depart from;Utilize perforation Pipe string carries out perforation to next transformation layer;By terrestrial contr by perforation pipe string completion in pit shaft Sleeve pipe proposes;Utilize ground hydraulic pump by dissolve ball be pumped into expanding after ball seat on, then ball will be dissolved Together it is pumped on the limiting component between adjacent transformation layer with the ball seat after expanding, forms sealing layer, will Current transformation layer insulates.Wherein, the material of ball seat can be consistent with the material dissolving ball, waits to be rebuilt After layer has all been transformed, ball seat recovers gradually to dissolve with the water temperature in pit shaft with dissolving ball, and residue is with the row of returning Liquid returns out ground, downhole well fluid Path Setup.Need not plugged zone upper ball base and dissolving ball with drill bit Brill removes, and has stopped bit freezing, the situation of bit breakage sleeve pipe.It addition, also save engineering time and construction Expense.
Last it is noted that various embodiments above is only in order to illustrate technical scheme, rather than right It limits;Although the present invention being described in detail with reference to foregoing embodiments, this area common Skilled artisans appreciate that the technical scheme described in foregoing embodiments still can be modified by it, Or the most some or all of technical characteristic is carried out equivalent;And these amendments or replacement, and The essence not making appropriate technical solution departs from the scope of various embodiments of the present invention technical scheme.

Claims (12)

1. a ball seat insulates many bunches of perforating and fracturing tubing strings, it is characterised in that including: completion casing, penetrate Hole pipe string, ball seat and dissolving ball;
Position corresponding between adjacent transformation layer on described completion casing inwall is provided with limiting component;
Described perforation pipe string, described ball seat and described dissolving ball are respectively positioned in described completion casing;
Described perforation pipe string is connected with described ball seat, is used for controlling and deliver described ball seat;
Described ball seat is used for accommodating described dissolving ball, and described ball seat compresses described limiting component to be fixed on Forming the plugged zone between described adjacent transformation layer in described completion casing, wherein, water met by described dissolving ball Reach ability solubilized after Preset Time.
Ball seat the most according to claim 1 insulates many bunches of perforating and fracturing tubing strings, it is characterised in that bag Including 2 described limiting components, described 2 limiting components are with the setting substantially symmetrical about its central axis of described completion casing.
Ball seat the most according to claim 2 insulates many bunches of perforating and fracturing tubing strings, it is characterised in that institute The cross section stating ball seat is rounded, and the area of section from one end of described ball seat to the other end is gradually increased, One end that wherein area of section is little compresses with described limiting component, and one end that area of section is big is provided with arc Groove is to accommodate described dissolving ball.
Ball seat the most according to claim 1 insulates many bunches of perforating and fracturing tubing strings, it is characterised in that institute State perforation pipe string expanding by cable, torpedo, head harness, magnetic locator, weighted lever, perforating gun, ball seat Instrument, ball seat are delivered instrument and are sequentially connected with composition.
Ball seat the most according to claim 4 insulates many bunches of perforating and fracturing tubing strings, it is characterised in that institute Stating perforating gun is many bunches of perforating guns.
Ball seat the most according to claim 4 insulates many bunches of perforating and fracturing tubing strings, it is characterised in that institute State ball seat delivery instrument to be connected with described ball seat, be used for delivering described ball seat.
Ball seat the most according to claim 4 insulates many bunches of perforating and fracturing tubing strings, it is characterised in that institute State ball seat hole enlargement tool to be connected with described ball seat, be used for controlling described ball seat expanding.
8. insulating many bunches of perforating and fracturing tubing strings according to the arbitrary described ball seat of claim 1-7, its feature exists In, described limiting component is provided with connector, corresponding described complete between described adjacent transformation layer The holding tank of described connector it is provided with on inwall at casing;
Described connector is connected in described holding tank.
9. insulating many bunches of perforating and fracturing tubing strings according to the arbitrary described ball seat of claim 1-7, its feature exists In, described limiting component is provided with bolt, described completion corresponding between described adjacent transformation layer It is provided with screw on inwall at sleeve pipe;
Described bolt is screwed onto in described screw.
10. a ball seat insulates the construction method of many bunches of perforating and fracturing tubing strings, it is adaptable to such as claim 1-9 Arbitrary described ball seat insulates many bunches of perforating and fracturing tubing strings, it is characterised in that including:
By in completion casing lower going-into-well cylinder, and reinforce described pit shaft, in described pit shaft, have g section to transform layer, Wherein, g is natural number;
Clean described pit shaft;
N-th section of transformation layer is carried out fracturing work, and wherein, n is natural number less than or equal to g, n;
In utilizing ground hydraulic pump group that perforation pipe string and ball seat hydraulic pump are delivered to completion casing described n-th section Before limiting component between transformation layer and (n+1)th section of transformation layer;
Described perforation pipe string control described ball seat expanding, and throw in expanding after ball seat;
Utilize described perforation pipe string that described (n+1)th section of transformation layer is carried out perforation;
Described perforation pipe string is proposed described pit shaft;
Utilize described ground hydraulic pump by dissolve ball be pumped to described expanding after ball seat on, then ball will be dissolved And described expanding after ball seat be together pumped to described n-th section transformation layer and (n+1)th section transformation layer between On described limiting component, form sealing layer, by described n-th section of transformation layer packing;
Repeat above-mentioned operation, until the described g section transformation whole fracturing work of layer completes.
11. methods according to claim 10, it is characterised in that described fracturing work is light sleeve pipe Fracturing work or hydraulic jetting fracturing operation.
12. methods according to claim 10, it is characterised in that described perforation is many showers hole.
CN201510090783.1A 2015-02-28 2015-02-28 Ball seat insulates more cluster perforating and fracturing tubing strings and construction method Active CN105986799B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510090783.1A CN105986799B (en) 2015-02-28 2015-02-28 Ball seat insulates more cluster perforating and fracturing tubing strings and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510090783.1A CN105986799B (en) 2015-02-28 2015-02-28 Ball seat insulates more cluster perforating and fracturing tubing strings and construction method

Publications (2)

Publication Number Publication Date
CN105986799A true CN105986799A (en) 2016-10-05
CN105986799B CN105986799B (en) 2019-02-15

Family

ID=57037992

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510090783.1A Active CN105986799B (en) 2015-02-28 2015-02-28 Ball seat insulates more cluster perforating and fracturing tubing strings and construction method

Country Status (1)

Country Link
CN (1) CN105986799B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106593387A (en) * 2016-12-21 2017-04-26 中国石油天然气股份有限公司 Sectional multi-cluster fracturing method of horizontal well
CN106761642A (en) * 2016-12-21 2017-05-31 中国石油天然气股份有限公司 A kind of straight well pinpoints multistage fracturing methods and applications
CN106917610A (en) * 2017-05-11 2017-07-04 中国石油集团川庆钻探工程有限公司 Staged fracturing method is temporarily blocked up in many cluster abrasive perforating filling sandpipe posts and back-up sand

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0427371A1 (en) * 1989-11-08 1991-05-15 Halliburton Company Method of well completion
US6543538B2 (en) * 2000-07-18 2003-04-08 Exxonmobil Upstream Research Company Method for treating multiple wellbore intervals
US20060000610A1 (en) * 2004-03-24 2006-01-05 Halliburton Energy Services, Inc. Methods of fracturing sensitive formations
CN202745794U (en) * 2012-07-04 2013-02-20 中国石油天然气股份有限公司 Multifunctional ball seat with temporary blocking performance for well-completion operation of water injection well
CN103032060A (en) * 2012-11-08 2013-04-10 中国石油天然气股份有限公司 Continuous oil pipe hydraulic sanding blasting multi-cluster perforation annular sanding staged fracturing process for horizontal well
CN103306645A (en) * 2013-06-20 2013-09-18 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Once drilling fracturing completion pipe string of horizontal well and drilling fracturing completion technology
CN203394493U (en) * 2013-07-05 2014-01-15 中国石油天然气股份有限公司 Fracturing process pipe column with soluble bridge plug
CN203515342U (en) * 2013-08-23 2014-04-02 中国石油天然气股份有限公司 Completion pipe string for multi-cluster perforation fracture
US20140158357A1 (en) * 2012-11-02 2014-06-12 Schlumberger Technology Corporation Nozzle selective perforating jet assembly
CN104213891A (en) * 2013-06-05 2014-12-17 中国石油天然气股份有限公司 Coiled tubing controllable packer process tubular column for repeated oil well transformation
CN104278978A (en) * 2013-07-05 2015-01-14 中国石油天然气股份有限公司 Soluble bridge plug fracturing technology pipe string and fracturing method thereof
CN204532320U (en) * 2015-02-28 2015-08-05 中国石油天然气股份有限公司 Ball seat packing many showers hole fracturing string

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0427371A1 (en) * 1989-11-08 1991-05-15 Halliburton Company Method of well completion
US6543538B2 (en) * 2000-07-18 2003-04-08 Exxonmobil Upstream Research Company Method for treating multiple wellbore intervals
US20060000610A1 (en) * 2004-03-24 2006-01-05 Halliburton Energy Services, Inc. Methods of fracturing sensitive formations
CN202745794U (en) * 2012-07-04 2013-02-20 中国石油天然气股份有限公司 Multifunctional ball seat with temporary blocking performance for well-completion operation of water injection well
US20140158357A1 (en) * 2012-11-02 2014-06-12 Schlumberger Technology Corporation Nozzle selective perforating jet assembly
CN103032060A (en) * 2012-11-08 2013-04-10 中国石油天然气股份有限公司 Continuous oil pipe hydraulic sanding blasting multi-cluster perforation annular sanding staged fracturing process for horizontal well
CN104213891A (en) * 2013-06-05 2014-12-17 中国石油天然气股份有限公司 Coiled tubing controllable packer process tubular column for repeated oil well transformation
CN103306645A (en) * 2013-06-20 2013-09-18 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Once drilling fracturing completion pipe string of horizontal well and drilling fracturing completion technology
CN203394493U (en) * 2013-07-05 2014-01-15 中国石油天然气股份有限公司 Fracturing process pipe column with soluble bridge plug
CN104278978A (en) * 2013-07-05 2015-01-14 中国石油天然气股份有限公司 Soluble bridge plug fracturing technology pipe string and fracturing method thereof
CN203515342U (en) * 2013-08-23 2014-04-02 中国石油天然气股份有限公司 Completion pipe string for multi-cluster perforation fracture
CN204532320U (en) * 2015-02-28 2015-08-05 中国石油天然气股份有限公司 Ball seat packing many showers hole fracturing string

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
戴文潮 等: "一球多簇分段压裂滑套工具技术研究", 《石油机械》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106593387A (en) * 2016-12-21 2017-04-26 中国石油天然气股份有限公司 Sectional multi-cluster fracturing method of horizontal well
CN106761642A (en) * 2016-12-21 2017-05-31 中国石油天然气股份有限公司 A kind of straight well pinpoints multistage fracturing methods and applications
CN106761642B (en) * 2016-12-21 2019-08-02 中国石油天然气股份有限公司 A kind of straight well fixed point multistage fracturing methods and applications
CN106593387B (en) * 2016-12-21 2019-11-08 中国石油天然气股份有限公司 A method of realizing the more cluster pressure breaks of horizontal well in segments
CN106917610A (en) * 2017-05-11 2017-07-04 中国石油集团川庆钻探工程有限公司 Staged fracturing method is temporarily blocked up in many cluster abrasive perforating filling sandpipe posts and back-up sand

Also Published As

Publication number Publication date
CN105986799B (en) 2019-02-15

Similar Documents

Publication Publication Date Title
CA2955146C (en) Wellbore plug isolation system and method
CN101539007B (en) Abrasive jetting device and method for abrasive jetting flow and jetting perforation and multiple fracturing
CN204532320U (en) Ball seat packing many showers hole fracturing string
RU2553717C2 (en) Soluble bridge plug
US9033044B2 (en) Method and materials for proppant fracturing with telescoping flow conduit technology
CN104420835B (en) Many cluster perforating and fracturing completion tubular columns and construction method
CN104278978A (en) Soluble bridge plug fracturing technology pipe string and fracturing method thereof
CN107489405B (en) Method for dragging sand-blasting perforation and annular sand-filling staged fracturing by continuous oil pipe
CN104564003A (en) Drilling-plug-free pumping-in hydraulic bridge plug staged fracturing method
CN105986799A (en) Ball seat packing multi-cluster perforation fracturing pipe string and construction method
CN105569619A (en) Abrasive perforating unblocking method and device for coiled tubing
CN104481580A (en) Method and device for repairing downhole coal-bed gas extraction drilled hole
CN107654213B (en) High-energy negative pressure blocking remover
CN103835678A (en) Horizontal well inner-pipe-free drilling-plug-free grading cementing well completion method
CN202882841U (en) Pipe external packer capable of being self-expandable when encountering water or oil
CN105507867B (en) A kind of device and method for generating wellbore crack
CN103089196B (en) Setting method and the device thereof joining work with abrasive perforating of bridging plug is carried out with oil pipe
CN111779466B (en) Method for solving problem of shaft blockage of failed prefabricated restrictor through hydraulic sand blasting perforation process
CN207177850U (en) A kind of rupture disk perforated casing box cupling device
CN101413378A (en) Self-contained system for drilling a drainhole
CN102619496A (en) Method for layering, stage multi-level blasting, hole expanding and crack expanding of oil-gas-bearing rock
CN107476793B (en) Deep shale gas fracturing pipe column and fracturing process method
CN103470208A (en) Recyclable run-in-hole blockage tool for oil and gas field
WO2023097570A1 (en) Fracturing device and fracturing method for preset ball
CN109469463A (en) The more shower holes of straight well coiled tubing and back-up sand connection make fracturing process

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant