CN102011354B - 宽轨枕到发线轨排组装平台 - Google Patents
宽轨枕到发线轨排组装平台 Download PDFInfo
- Publication number
- CN102011354B CN102011354B CN2010105512991A CN201010551299A CN102011354B CN 102011354 B CN102011354 B CN 102011354B CN 2010105512991 A CN2010105512991 A CN 2010105512991A CN 201010551299 A CN201010551299 A CN 201010551299A CN 102011354 B CN102011354 B CN 102011354B
- Authority
- CN
- China
- Prior art keywords
- joist
- broad
- fixed
- bolt
- rotating shaft
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Machines For Laying And Maintaining Railways (AREA)
Abstract
本发明具体为一种宽轨枕到发线轨排组装平台,解决现在没有一种宽轨枕到发线轨枕的铺设辅助设备的问题。包括两根平行放置的左托梁和右托梁,左托梁和右托梁的前端固定有高度高于两者的挡板,且左托梁左方设有与其固定且高度高于左托梁的定位板,右托梁的前后方向上拧有若干头部位于右托梁右侧的螺栓,右托梁右侧的螺栓上套有滑动于螺栓上的拨块。本发明填补了目前没有一种铺设辅助设备的空白,克服了人工铺设轨排时存在劳动强度大、施工质量失控、后续调整工作量大、施工周期长的问题,可较好的控制宽轨枕的中心线、间距等尺寸,减少后期整道工作量,降低了施工成本,减少工人用量60%左右,工效提高3倍以上。
Description
技术领域
本发明涉及轨排组装平台,具体为一种宽轨枕到发线轨排组装平台。
背景技术
高速铁路到发线常采用宽轨枕有碴线路,目前,宽轨枕到发线轨排的铺设是通过人工进行,铺设时,将宽轨枕摆放在已压实的道碴面上,然后在宽轨枕上安装钢轨,存在施工人员踩踏道碴面影响宽轨枕底道碴标高、轨枕间距不匀及线路中线精度误差超标的现象;同时铺设宽轨枕线路时,宽轨枕之间的间距仅为10mm,一旦线路成型后,再想调整线路的高低、方向等十分困难。
鉴于人工铺设宽轨枕到发线线路时存在劳动强度大、施工质量失控、后续调整工作量大、施工周期长的问题,目前没有一种用于解决上述问题的铺设辅助设备。
发明内容
本发明为了解决现在没有一种宽轨枕到发线轨排的铺设辅助设备而通过人工铺设时存在劳动强度大、施工质量失控、后续调整工作量大、施工周期长的问题,提供了一种宽轨枕到发线轨排组装平台。
本发明是采用如下技术方案实现的:宽轨枕到发线轨排组装平台,包括两根平行放置的左托梁和右托梁,左托梁和右托梁的前端固定有高度高于两者的挡板,且左托梁左方设有与其固定且高于其高度的定位板,右托梁的前后方向上拧有若干头部位于其右侧的螺栓,右托梁右侧的螺栓上套有滑动于螺栓上的L型拨块,且L型拨块短边内侧贴靠在宽轨枕上。工作时,叉车上放置有宽轨枕,然后沿左托梁和右托梁后部中间向前行驶至前端,将宽轨枕放置在左托梁和右托梁上,且紧靠挡板,这时将与该宽轨枕位置对应的螺栓拧紧,此时在螺栓头部的作用下带动其上的L型拨块向左移动,从而推动该宽轨枕顶住定位板,接着通过叉车将下一块宽轨枕运送至左、右托梁上,用轨枕间距塞尺控制两块宽轨枕的间距为10mm,再按上述步骤将宽轨枕向左顶推至顶紧定位板;依次类推,即可实现左、右托梁上所有宽轨枕的精确对位;安装钢轨后通过吊具将轨排吊起、平移、平稳置于宽轨枕到发线的道碴面上,连接钢轨即完成铺设施工,克服了人工铺设线路时存在劳动强度大、施工质量失控、后续调整工作量大、施工周期长的问题。
左托梁右侧和右托梁左侧的前后方向上均固定有若干对左右方向对应的钢管,且在每对左右方向对应的钢管内穿有拉杆,当在左、右托梁上不断的放置宽轨枕时,将拉杆插入放置好的宽轨枕下方周围的钢管内,起到控制左、右托梁间距的作用,且提高了宽轨枕到发线轨排组装平台的整体刚度。
左托梁左侧和右托梁右侧均固定有加强钢板,每块加强钢板的前后两侧均穿有转轴,左右两侧的转轴内侧均固定有位于其后方的轮轴,轮轴上穿有滚轮,左右两侧加强钢板外侧的转轴上固定有位于转轴前方且前后方向放置的手柄杆,左右两侧加强钢板外侧均固定有支撑手柄杆的第一限位螺栓和位于转轴后侧上方的第二限位螺栓,当铺设完一段宽轨枕到发线轨排时,手柄杆向上旋转至支撑在第二限位螺栓上,这时滚轮以转轴为中心向下旋转,从而将左、右托梁撑起,省时省力的实现宽轨枕到发线轨排组装平台的向前移动。
本发明填补了目前没有一种铺设辅助设备的空白,克服了人工铺设轨排时存在劳动强度大、施工质量失控、后续调整工作量大、施工周期长的问题,可较好的控制宽轨枕的中心线、间距等尺寸,减少后期整道工作量,降低了施工成本,减少工人用量60%左右,工效提高3倍以上。
附图说明
图1为本发明的结构示意及使用状态图;
图2为图1滚轮处的俯视结构示意图。
图中:1-左托梁,2-右托梁,3-定位板,4-螺栓,5-第二限位螺栓,6-L型拨块,7-钢管,8-拉杆,9-加强钢板,10-转轴,11-轮轴,12-滚轮,13-第一限位螺栓,14-手柄杆。
具体实施方式
宽轨枕到发线轨排组装平台,包括两根平行放置的左托梁1和右托梁2,左托梁1和右托梁2的前端固定有高度高于两者的挡板,且左托梁1左方设有与其固定且高于其高度的定位板3,右托梁2的前后方向上拧有若干头部位于其右侧的螺栓4,右托梁2右侧的螺栓4上套有滑动于螺栓4上的L型拨块6,且L型拨块6短边内侧贴靠在宽轨枕上。左托梁1右侧和右托梁2左侧的前后方向上均固定有若干对左右方向对应的钢管7,且在每对左右方向对应的钢管7内穿有拉杆8;左托梁1左侧和右托梁2右侧均固定有加强钢板9,每块加强钢板9的前后两侧均穿有转轴10,左右两侧的转轴10内侧均固定有位于其后方的轮轴11,轮轴11上穿有滚轮12,左右两侧加强钢板9外侧的转轴10上固定有位于转轴10前方且前后方向放置的手柄杆14,左右两侧加强钢板9外侧均固定有支撑手柄杆14的第一限位螺栓13和位于转轴10后侧上方的第二限位螺栓5。
Claims (3)
1.一种宽轨枕到发线轨排组装平台,其特征在于:包括两根平行放置的左托梁(1)和右托梁(2),左托梁(1)和右托梁(2)的前端固定有高度高于两者的挡板,且左托梁(1)左方设有与其固定且高于其高度的定位板(3),右托梁(2)的前后方向上拧有若干头部位于其右侧的螺栓(4),右托梁(2)右侧的螺栓(4)上套有滑动于螺栓(4)上的L型拨块(6),且L型拨块(6)短边内侧贴靠在宽轨枕上。
2.根据权利要求1所述的宽轨枕到发线轨排组装平台,其特征在于:左托梁(1)右侧和右托梁(2)左侧的前后方向上均固定有若干对左右方向对应的钢管(7),且在每对左右方向对应的钢管(7)内穿有拉杆(8)。
3.根据权利要求1或2所述的宽轨枕到发线轨排组装平台,其特征在于:左托梁(1)左侧和右托梁(2)右侧均固定有加强钢板(9),每块加强钢板(9)的前后两侧均穿有转轴(10),左右两侧的转轴(10)内侧均固定有位于其后方的轮轴(11),轮轴(11)上穿有滚轮(12),左右两侧加强钢板(9)外侧的转轴(10)上固定有位于转轴(10)前方且前后方向放置的手柄杆(14),左右两侧加强钢板(9)外侧均固定有支撑手柄杆(14)的第一限位螺栓(13)和位于转轴(10)后侧上方的第二限位螺栓(5)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010105512991A CN102011354B (zh) | 2010-11-19 | 2010-11-19 | 宽轨枕到发线轨排组装平台 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010105512991A CN102011354B (zh) | 2010-11-19 | 2010-11-19 | 宽轨枕到发线轨排组装平台 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102011354A CN102011354A (zh) | 2011-04-13 |
CN102011354B true CN102011354B (zh) | 2012-01-11 |
Family
ID=43841668
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010105512991A Expired - Fee Related CN102011354B (zh) | 2010-11-19 | 2010-11-19 | 宽轨枕到发线轨排组装平台 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102011354B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106192624B (zh) * | 2016-08-24 | 2017-11-28 | 中铁十七局集团有限公司铺架分公司 | 铁路架桥机单线作业非标轨排就近存放装置及方法 |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0683370A (ja) * | 1992-09-02 | 1994-03-25 | Tokyu Constr Co Ltd | 鋼製桁の制振装置 |
JP2853016B2 (ja) * | 1995-05-19 | 1999-02-03 | 東京フアブリック工業株式会社 | 防振まくらぎ軌道の施工方法 |
CN200940243Y (zh) * | 2006-08-23 | 2007-08-29 | 中铁八局集团有限公司 | 道岔原位铺设平台 |
CN101173492B (zh) * | 2007-11-26 | 2011-03-30 | 中铁四局集团有限公司 | 有砟轨道客运专线道岔原位铺设方法 |
CN201151857Y (zh) * | 2007-12-29 | 2008-11-19 | 南车洛阳机车有限公司 | 双块式无碴轨道施工设备之手动调整横梁 |
CN201180243Y (zh) * | 2007-12-29 | 2009-01-14 | 南车洛阳机车有限公司 | 双块式无碴轨道施工用横梁 |
CN100594273C (zh) * | 2008-05-22 | 2010-03-17 | 北京铁五院工程机械科技开发有限公司 | 双块式无砟轨道的施工装备及施工工艺 |
CN201224852Y (zh) * | 2008-06-30 | 2009-04-22 | 北京铁五院工程机械科技开发有限公司 | 用于无砟轨道铺设的组合式轨道排架 |
CN201850479U (zh) * | 2010-11-19 | 2011-06-01 | 中铁十七局集团有限公司铺架分公司 | 宽轨枕到发线轨排组装平台 |
-
2010
- 2010-11-19 CN CN2010105512991A patent/CN102011354B/zh not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN102011354A (zh) | 2011-04-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102174790B (zh) | 盾构施工用装配式轨枕及其施工方法 | |
CN201850479U (zh) | 宽轨枕到发线轨排组装平台 | |
CN102011354B (zh) | 宽轨枕到发线轨排组装平台 | |
CN204662270U (zh) | 一种箱梁转运系统 | |
CN201826857U (zh) | 隧道衬砌台车 | |
CN102561117B (zh) | 双线隧道内无碴轨道施工的物流传送方法 | |
CN107574727B (zh) | 一种便装式盾构台车组合轨枕及其使用方法 | |
CN110258771B (zh) | 一种连廊 | |
CN204530347U (zh) | 双块式无砟轨道轨枕精调装置 | |
CN207878190U (zh) | 橡胶与金属复合的道床板以及包含该道床板的组件 | |
CN201023435Y (zh) | 双向行驶无碴轨道运输车 | |
CN203100878U (zh) | 一种汽车衡用框架 | |
CN203382408U (zh) | 一种桥梁板面铺设用门式起重机 | |
CN102304882A (zh) | 城市轨道交通工程中线路轨道4.5号对称道岔 | |
CN204567663U (zh) | 城市轨道交通工程带停车线的地下车站结构 | |
CN208121485U (zh) | 一种小半径盾构用预制轨道板 | |
CN205276138U (zh) | 新型自行轮胎式u型梁运梁车 | |
CN104929045A (zh) | 一种箱梁转运平台以及喂梁、取梁方法 | |
CN201512733U (zh) | 钢弹簧浮置板道床钢筋笼轨排组装用调轨架 | |
CN210561507U (zh) | 一种有砟道床整形装置 | |
CN207277104U (zh) | 一种便装式盾构台车组合轨枕 | |
CN202450402U (zh) | 无砟轨道板铺板施工用侧移限位装置 | |
CN202492787U (zh) | 一种斜向预应力水泥混凝土路面施工模板装置 | |
CN202705827U (zh) | 板式无砟轨道施工用移动式砂浆灌注平台 | |
CN220643671U (zh) | 一种铁路拼接式施工便梁 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120111 Termination date: 20191119 |
|
CF01 | Termination of patent right due to non-payment of annual fee |