CN102003070A CN 201010608391 CN201010608391A CN102003070A CN 102003070 A CN102003070 A CN 102003070A CN 201010608391 CN201010608391 CN 201010608391 CN 201010608391 A CN201010608391 A CN 201010608391A CN 102003070 A CN102003070 A CN 102003070A
Authority
CN
China
Prior art keywords
steel plate
steel
shear wall
plastic bushing
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201010608391
Other languages
Chinese (zh)
Inventor
宗可锋
李永峰
张秀峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG WANXIN CONSTRUCTION CO Ltd
Original Assignee
SHANDONG WANXIN CONSTRUCTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG WANXIN CONSTRUCTION CO Ltd filed Critical SHANDONG WANXIN CONSTRUCTION CO Ltd
Priority to CN 201010608391 priority Critical patent/CN102003070A/en
Publication of CN102003070A publication Critical patent/CN102003070A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The invention belongs to the technical field of scaffolds and particularly relates to a construction method of a suspending scaffold. The construction method is characterized by comprising the following steps of: when a shear wall is constructed, preserving a plastic bushing; preparing a steel plate I, a steel plate II and I-shaped steel, respectively arranging a hole which is matched with the preserved bushing on the steel plate I and the steel plate II, and fully welding the steel plate I and the I-shaped steel to form a suspending steel girder; and respectively placing the suspending steel girder and the steel plate II at two sides of the shear wall and connecting through the preserved bushing by bolts, and screwing by using double nuts. The construction method of the invention can effectively avoid the artificial defects caused by the major structure of a building in the construction by using the traditional scaffold, is free of hidden leakage danger and low cost, is convenient for installation and brings great convenient for the construction.

Description

The builder's jack job practices
Technical field
The invention belongs to the scaffold technical field, be specifically related to a kind of builder's jack job practices, be used for the construction of elevator shaft, stair well and inspection-pit shear wall position builder's jack.
Background technology
Along with the development of highrise building, the builder's jack construction technology has obtained widely using as ten new technologies of national builing industry, and this technology has to take advantage such as tears conveniently, the material turnaround speed is fast, reduce investment outlay open.It is not enough that but the construction of present builder's jack also exists, especially shear wall position builder's jack constructions such as elevator shaft, stair well and inspection-pit, the job practices of these position routines is for staying 100 * 200mm hole to be provided at installation cantilever steel girder position, wear steel I-beam then, set up scaffold at last, the problem that this method exists is: first: the shear wall position punches influences the globality of structure; Second: owing to steel I-beam must pass through hoistway, the length that needs is longer, and generally greater than 6m, the weight of i iron is heavier, is not easy construction, and passes through the hoistway position because steel I-beam is arranged, and influences about the constructor and discrepancy; The 3rd: after scaffold was removed, the expansive concrete shutoff need be used in this position, easily stays hidden leakage defect.
Summary of the invention
The object of the present invention is to provide a kind of job practices of builder's jack, overcome the deficiencies in the prior art, the artificial defect that causes to constructure body structure in the time of effectively avoiding the construction of traditional scaffold and bring great convenience to construction.
The job practices of shear wall of the present invention position builder's jack is characterized in that comprising the steps:
A. when shear wall construction, reserve plastic bushing;
B. prepare steel plate I, steel plate II, i iron, have on steel plate I, the steel plate II and the bolt hole of reserving the plastic bushing coupling, steel plate I and i iron full weld are made cantilever steel girder together;
C. cantilever steel girder and steel plate II are placed the shear wall both sides respectively, link together by reserving plastic bushing, tighten with double nut with bolt.
Described reservation plastic bushing has four, and the bolt hole of steel plate I, steel plate II is opened on four jiaos, and bolt hole is corresponding with the reservation sleeve pipe.
With 2 angle steel I and 2 angle steel II to the top and the bottom of the junction of steel plate I and i iron, about portion carry out repair welding.
Compared with prior art, beneficial effect of the present invention is as follows:
The artificial defect that causes to constructure body structure when the present invention can effectively avoid traditional scaffold to construct, do not stay hidden leakage defect, easy for installation, cost is low, bring great convenience to construction, be mainly used in the construction of shear wall position builder's jacks such as elevator shaft, stair well and inspection-pit.
Description of drawings
Fig. 1 is a shear wall of the present invention position builder's jack structural representation.
Fig. 2 is the enlarged drawing of cantilever steel girder left hand view of the present invention.
Among the figure: 1, steel plate I; 2, steel plate II; 3, bolt hole; 4, i iron; 5, angle steel I; 6, angle steel II; 7, shear wall; 8, bolt; 9, nut.
The specific embodiment
Below in conjunction with embodiment the present invention is further described.
The job practices of shear wall of the present invention position builder's jack comprises the steps:
A. when shear wall 7 constructions, reserve plastic bushing;
B. prepare steel plate 1, steel plate 2, i iron 4, have on steel plate 1, the steel plate 2 and the bolt hole of reserving the plastic bushing coupling, steel plate I and i iron full weld are made cantilever steel girder together;
C. cantilever steel girder and steel plate 2 are placed the shear wall both sides respectively, link together by reserving plastic bushing, tighten with double nut 9 with bolt 8.
Reserving plastic bushing has four, adopts PVC, and diameter is Ф 18mm.The bolt hole of steel plate 1, steel plate 2 is opened on four jiaos, and bolt hole is corresponding with the reservation sleeve pipe.
With the top and the bottom of 2 angle steel 5 and 6 pairs of steel plates of 2 angle steel 1 and the junction of i iron 4, about portion carry out repair welding.
Steel plate 1, steel plate 2 are of a size of: grow * wide * the thick 250mm * 250mm * 10mm of being.
I iron 4 is the long 16# i iron of 1500mm.
Angle steel 5 is the long L50 * 50 * 5mm of 80mm, and angle steel 6 is the long L50 * 50 * 5mm of 120mm.
Bolt 8 diameters are identical with the reservation plastic bushing.

Claims (3)

1. the job practices of a shear wall position builder's jack is characterized in that comprising the steps:
A. when shear wall (7) is constructed, reserve plastic bushing;
B. prepare steel plate I (1), steel plate II (2), i iron (4), have on steel plate I (1), the steel plate II (2) and the bolt hole of reserving the plastic bushing coupling, steel plate I (1) is made cantilever steel girder with i iron (4) full weld together;
C. cantilever steel girder and steel plate II (2) are placed the shear wall both sides respectively, link together by reserving plastic bushing, tighten with double nut (9) with bolt (8).
2. the job practices of shear wall according to claim 1 position builder's jack, it is characterized in that reserving plastic bushing has four, and the bolt hole of steel plate I (1), steel plate II (2) is opened on four jiaos, and bolt hole is corresponding with the reservation sleeve pipe.
3. the job practices of shear wall according to claim 1 and 2 position builder's jack, it is characterized in that with 2 angle steel I (5) and 2 angle steel II (6) to the top and the bottom of steel plate I (1) and the junction of i iron (4), about portion carry out repair welding.
CN 201010608391 2010-12-28 2010-12-28 Construction method of suspending scaffold Pending CN102003070A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010608391 CN102003070A (en) 2010-12-28 2010-12-28 Construction method of suspending scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010608391 CN102003070A (en) 2010-12-28 2010-12-28 Construction method of suspending scaffold

Publications (1)

Publication Number Publication Date
CN102003070A true CN102003070A (en) 2011-04-06

Family

ID=43810745

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010608391 Pending CN102003070A (en) 2010-12-28 2010-12-28 Construction method of suspending scaffold

Country Status (1)

Country Link
CN (1) CN102003070A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103072906A (en) * 2013-01-16 2013-05-01 广州建筑股份有限公司 Connecting device of inner climbing type tower crane and building structure and construction method utilizing same
CN103993738A (en) * 2014-05-16 2014-08-20 江苏省华建建设股份有限公司 Floor penetrating and anchoring type overhanging unloading steel platform
CN106639333A (en) * 2017-02-24 2017-05-10 中国电建集团河南工程公司 Installation method of rigid scaffold during spiral water wall installation process

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6202788B1 (en) * 1997-05-07 2001-03-20 Plettac Ag Latch for scaffold
CN101555728A (en) * 2009-04-14 2009-10-14 江苏省华建建设股份有限公司 High-rise building construction assembled overhanging safe guarding shed and construction method thereof
CN201339313Y (en) * 2008-12-31 2009-11-04 内蒙古巨华集团大华建筑安装有限公司 Scaffold wall connecting piece
CN201362956Y (en) * 2009-01-19 2009-12-16 中天建设集团有限公司 Novel wall connector
CN201649603U (en) * 2009-11-24 2010-11-24 标力建设集团有限公司 Bolt-connected steel cantilever scaffold
CN101906870A (en) * 2010-07-29 2010-12-08 正太集团有限公司 Suspended scaffolding

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6202788B1 (en) * 1997-05-07 2001-03-20 Plettac Ag Latch for scaffold
CN201339313Y (en) * 2008-12-31 2009-11-04 内蒙古巨华集团大华建筑安装有限公司 Scaffold wall connecting piece
CN201362956Y (en) * 2009-01-19 2009-12-16 中天建设集团有限公司 Novel wall connector
CN101555728A (en) * 2009-04-14 2009-10-14 江苏省华建建设股份有限公司 High-rise building construction assembled overhanging safe guarding shed and construction method thereof
CN201649603U (en) * 2009-11-24 2010-11-24 标力建设集团有限公司 Bolt-connected steel cantilever scaffold
CN101906870A (en) * 2010-07-29 2010-12-08 正太集团有限公司 Suspended scaffolding

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103072906A (en) * 2013-01-16 2013-05-01 广州建筑股份有限公司 Connecting device of inner climbing type tower crane and building structure and construction method utilizing same
CN103993738A (en) * 2014-05-16 2014-08-20 江苏省华建建设股份有限公司 Floor penetrating and anchoring type overhanging unloading steel platform
CN106639333A (en) * 2017-02-24 2017-05-10 中国电建集团河南工程公司 Installation method of rigid scaffold during spiral water wall installation process

Similar Documents

Publication Publication Date Title
CN207268073U (en) Novel flexible formwork bearing frame
CN203878965U (en) Device for construction of elevator shaft
CN103572703A (en) Construction method of outer wrapped concrete obliquely pulling and buckling and ring and section dividing combination method
CN206289945U (en) A kind of assembled Portable safety crosshead
CN102003070A (en) Construction method of suspending scaffold
CN203319564U (en) Portal crane for shipbuilding
CN203795311U (en) Multi-leg high pier and slip form construction device
CN102661035A (en) Tool type wall connecting piece for exterior wall scaffold
CN109667228B (en) Straight beam type hanging basket and continuous beam cantilever pouring construction method
CN202611223U (en) Recyclable bolt type scaffold wall connection piece
CN202433253U (en) Auxiliary device for pull-out test of hooked anchors
CN102926330B (en) Installation method of hanging basket suitable for bridge construction
CN208440996U (en) A kind of novel inlet pipe
CN203924656U (en) A kind of high-altitude overlength cable-stayed type shaped steel job platform structure
CN203361605U (en) Anchor ring assembly
CN103362315B (en) Hanging bracket for hoisting pipeline integrally and construction method of hanging bracket
CN103046743A (en) High-rise conversion layer type steel concrete girder hanging type template supporting system and construction method
CN206233115U (en) A kind of supporting bracket of bridge construction
CN201339320Y (en) High-altitude overhanging hanging reinforced concrete hanging bracket
CN210288145U (en) Straight beam type hanging basket
CN204112226U (en) A kind of holes connects does section assembling bridge manufacturing machine
CN209721363U (en) A kind of lifting pipeline auxiliary device
CN203361596U (en) Auxiliary support of integrated lifting operation platform
CN207377096U (en) Overlength large girder scaffold building structure
CN203222981U (en) Suspended platform for steel reinforced concrete cantilever structure construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110406