CN201649603U - Bolt-connected steel cantilever scaffold - Google Patents

Bolt-connected steel cantilever scaffold Download PDF

Info

Publication number
CN201649603U
CN201649603U CN2009202415259U CN200920241525U CN201649603U CN 201649603 U CN201649603 U CN 201649603U CN 2009202415259 U CN2009202415259 U CN 2009202415259U CN 200920241525 U CN200920241525 U CN 200920241525U CN 201649603 U CN201649603 U CN 201649603U
Authority
CN
China
Prior art keywords
bolt
shaped steel
scaffold
metal plate
jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009202415259U
Other languages
Chinese (zh)
Inventor
陈宝弟
童万和
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Biaoli Construction Group Co ltd
Jin Fuming
Jin Lijun
Xu Haiyan
Yang Zhihua
Original Assignee
Biaoli Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Biaoli Construction Group Co Ltd filed Critical Biaoli Construction Group Co Ltd
Priority to CN2009202415259U priority Critical patent/CN201649603U/en
Application granted granted Critical
Publication of CN201649603U publication Critical patent/CN201649603U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model belongs to the technical field of scaffold and relates to a bolt-connected steel cantilever scaffold; a scaffold is located on bearing steel frames which are arranged in parallel; and the bearing steel frames are connected a with bearing steel cable; the upper part of the scaffold is connected with a building structure through a wall connector; the upper part of the bearing steel cable is connected with a locating hook which can be pre-buried in the bearing beam of the building; the bearing steel frame is as follows: one end of profile steel is connected with hanging metal plates; the upper part of the hanging metal plates and the upper surface of the profile steel are connected with stiffening plates; the hanging metal plates at the two sides of the stiffening plates are respectively provided with a bolt mounting hole; bolts are connected with the bolt mounting holes; the upper surface of the profile steel is provided with a locating post and a steel cable hanging hook locating the scaffold; the wall connector is as follows: a metal tube is connected with one metal plate in a centralized position; the periphery of the metal plate is provided with the bolt mounting holes; and the mounting holes are connected with the bolts. The bolt-connected steel cantilever scaffold is convenient for construction, can prevent leakage of outer walls, saves the construction cost, and is suitable to be used on high-rise buildings.

Description

Bolt connects the shaped steel builder's jack
Technical field
The utility model belongs to the scaffold technical field of builing industry, refers in particular to a kind of bolt and connects the shaped steel builder's jack.
Background technology
Along with development high-rise and super highrise building, highrise building external scaffolding construction technology more and more is subjected to paying attention to widely and studying.Overhanging scaffold is one of builing industry ten big new technologies of Ministry of Construction's popularization, since have a less investment (saving a large amount of circulation materials), applied widely, be not subjected to floor height and place to limit, help characteristics such as on-the-spot civilized construction management, in high-building construction, use increasingly extensive, its weak point is: the one, and the section bar of encorbelmenting of overhanging scaffold need extend in the spandrel girder of building about 1.5 meters, so not only needs the steel that once drop into many; And after build finishing to withdraw from the section bar of encorbelmenting, although the hole that is reserved in the construction wall is repaired, unavoidably seepage can appear; The 2nd, in process of construction, the interior section bar of encorbelmenting of spandrel girder that extend into building directly influences the interior decoration construction of building.
Summary of the invention
The bolt that the purpose of this utility model provides a kind of facility of constructing, exterior wall antiseepage, construction cost saving connects the shaped steel builder's jack.
The purpose of this utility model is achieved in that
Bolt connects the shaped steel builder's jack, be on the load steelframe that is arranged side by side, to be positioned with scaffold and to be connected with messenger cable, the top of scaffold is connected with fabric structure by wall attaching parts, and the top of the messenger cable location hook interior with being embedded into the building spandrel girder is connected; Described load steelframe is: the end at shaped steel is connected with the hanging metal plate, the top of hanging metal plate and the upper surface of shaped steel are connected with stiffener, be respectively arranged with bolt mounting holes on the hanging metal plate of stiffener both sides, be connected with bolt on the installing hole, be provided with the reference column and the cable wire hanged hook of location scaffold at the upper surface of shaped steel; Described wall attaching parts is: be connected with metal tube between two parties on a metal sheet, be provided with bolt mounting holes around the metal sheet, be connected with bolt on the installing hole.
Above-mentioned shaped steel is i iron, the length of i iron=1~2 meter.
Above-mentioned shaped steel is i iron, the length of i iron=1.5 meter.
Above-mentioned bolt is for can partly being embedded into the L type in the building spandrel girder or the bolt of T type.
Being connected of above-mentioned shaped steel and hanging metal plate, stiffener and hanging metal plate and shaped steel be connected and wall attaching parts on metal sheet be welding with being connected of metal tube.
The outside of above-mentioned scaffold is connected with protective screening.
The outstanding compared to existing technology advantage of the utility model is:
1, the utility model can be saved shaped steel material, the mounting or dismounting convenience of half, and all material is all reusable, saves great amount of cost;
2, the body of wall of the utility model construction hole of not boxing out does not influence the masonry construction, helps the exterior wall antiseepage;
3, because the utility model is fixed on the concrete wall beam outside, do not influence the interior decoration construction substantially, the exterior wall finishing construction also to a certain degree improves, for ensuring the quality of products and the duration has been created condition;
4, the utility model is based on common builder's jack, with the shaped steel partial cancellation of stretching in the floor, is fixed on the outside that structural frames is set a roof beam in place with the bolt shaped steel of will encorbelmenting, and makes characteristics such as of the present utility modelly set up flexibly, size is unrestricted, compliance is strong;
5, the utility model uses fixedly scaffold of wall attaching parts, and energy reliable delivery scaffold horizontal loading makes scaffold and agent structure form reliable the connection, strengthens the support body resistance to overturning;
6, the utility model is applicable to that two aspects at building begin to encorbelment, and can build the high scaffold of six floors on one group of shaped steel of encorbelmenting.
Description of drawings
Fig. 1 is mounted in the structural representation of the present utility model on the building;
Fig. 2 is the front view of wall attaching parts of the present utility model;
Fig. 3 is the right view of wall attaching parts of the present utility model;
Fig. 4 is the front view of load steelframe of the present utility model;
Fig. 5 is the right view of load steelframe of the present utility model.
The specific embodiment
With specific embodiment the utility model is further described below, referring to Fig. 1-5:
Bolt connects the shaped steel builder's jack, be on the load steelframe 10 that is arranged side by side, to be positioned with scaffold 20 and to be connected with messenger cable 30, the top of scaffold 20 is connected with fabric structure by wall attaching parts 40, and the top of messenger cable 30 location hook 50 interior with being embedded into building spandrel girder 70 is connected; Described load steelframe 10 is: the end at shaped steel 101 is connected with hanging metal plate 102, the upper surface of the top of hanging metal plate 102 and shaped steel 101 is connected with stiffener 103, be respectively arranged with bolt mounting holes 104 on the hanging metal plate 102 of stiffener 103 both sides, be connected with bolt 105 on the installing hole 104, be provided with the reference column 106 and the cable wire hanged hook 107 of location scaffold 20 at the upper surface of shaped steel 101; Described wall attaching parts 40 is: be connected with metal tube 402 between two parties on a metal sheet 401, be provided with four bolt mounting holes 403 around the metal sheet 401, be connected with bolt 404 on the installing hole 403.
Above-mentioned shaped steel 101 is No. 16 i iron, and the length of i iron is 1.5 meters, and certainly, the length of above-mentioned i iron can be chosen in 1~2 meter.
Above-mentioned bolt 105,404 is for can partly being embedded into the L type in the building spandrel girder or the bolt of T type, and the exposed parts of bolt 105,404 is provided with screw thread, and tightens with nut.
Being connected of above-mentioned shaped steel 101 and hanging metal plate 102, stiffener 103 and hanging metal plate 102 and shaped steel 101 be connected and wall attaching parts 40 on metal sheet 401 be welding with being connected of metal tube 402.
All be connected between the metal tube between metal tube 402 on the wall attaching parts 40 and the scaffold 20, on the scaffold 20 by hasp 80.
The outside of above-mentioned scaffold 20 is connected with protective screening 60.
The foregoing description only is one of preferred embodiment of the present utility model; be not to limit protection domain of the present utility model according to this; so: all equivalences of doing according to structure of the present utility model, shape, principle change, and all should be covered by within the protection domain of the present utility model.

Claims (6)

1. bolt connects the shaped steel builder's jack, it is characterized in that: be on the load steelframe that is arranged side by side, to be positioned with scaffold and to be connected with messenger cable, the top of scaffold is connected with fabric structure by wall attaching parts, and the top of the messenger cable location hook interior with being embedded into the building spandrel girder is connected; Described load steelframe is: the end at shaped steel is connected with the hanging metal plate, the top of hanging metal plate and the upper surface of shaped steel are connected with stiffener, be respectively arranged with bolt mounting holes on the hanging metal plate of stiffener both sides, be connected with bolt on the installing hole, be provided with the reference column and the cable wire hanged hook of location scaffold at the upper surface of shaped steel; Described wall attaching parts is: be connected with metal tube between two parties on a metal sheet, be provided with bolt mounting holes around the metal sheet, be connected with bolt on the installing hole.
2. bolt according to claim 1 connects the shaped steel builder's jack, and it is characterized in that: described shaped steel is i iron, the length of i iron=1~2 meter.
3. bolt according to claim 1 connects the shaped steel builder's jack, and it is characterized in that: described shaped steel is i iron, the length of i iron=1.5 meter.
4. bolt according to claim 1 connects the shaped steel builder's jack, it is characterized in that: described bolt is for can partly being embedded into the L type in the building spandrel girder or the bolt of T type.
5. bolt according to claim 1 connects the shaped steel builder's jack, it is characterized in that: being connected of described shaped steel and hanging metal plate, stiffener and hanging metal plate and shaped steel be connected and wall attaching parts on metal sheet be welding with being connected of metal tube.
6. bolt according to claim 1 connects the shaped steel builder's jack, and it is characterized in that: the outside of described scaffold is connected with protective screening.
CN2009202415259U 2009-11-24 2009-11-24 Bolt-connected steel cantilever scaffold Expired - Lifetime CN201649603U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009202415259U CN201649603U (en) 2009-11-24 2009-11-24 Bolt-connected steel cantilever scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009202415259U CN201649603U (en) 2009-11-24 2009-11-24 Bolt-connected steel cantilever scaffold

Publications (1)

Publication Number Publication Date
CN201649603U true CN201649603U (en) 2010-11-24

Family

ID=43114832

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009202415259U Expired - Lifetime CN201649603U (en) 2009-11-24 2009-11-24 Bolt-connected steel cantilever scaffold

Country Status (1)

Country Link
CN (1) CN201649603U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102003070A (en) * 2010-12-28 2011-04-06 山东万鑫建设有限公司 Construction method of suspending scaffold
CN103510694A (en) * 2012-06-29 2014-01-15 姚磊 Externally-hung protective frame
CN105672645A (en) * 2016-03-29 2016-06-15 台州建筑安装工程公司 Cantilever beam anchoring structure of projecting scaffold and cantilever beam anchoring construction method of cantilever beam anchoring structure
CN106013755A (en) * 2016-06-29 2016-10-12 浙江省建工集团有限责任公司 Cantilever frame for existing building and construction method
WO2018148977A1 (en) * 2017-02-20 2018-08-23 卢兴明 Anti-overturning load-bearing scaffold

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102003070A (en) * 2010-12-28 2011-04-06 山东万鑫建设有限公司 Construction method of suspending scaffold
CN103510694A (en) * 2012-06-29 2014-01-15 姚磊 Externally-hung protective frame
CN105672645A (en) * 2016-03-29 2016-06-15 台州建筑安装工程公司 Cantilever beam anchoring structure of projecting scaffold and cantilever beam anchoring construction method of cantilever beam anchoring structure
CN106013755A (en) * 2016-06-29 2016-10-12 浙江省建工集团有限责任公司 Cantilever frame for existing building and construction method
WO2018148977A1 (en) * 2017-02-20 2018-08-23 卢兴明 Anti-overturning load-bearing scaffold

Similar Documents

Publication Publication Date Title
CN101736893B (en) Overhanging type scaffold supporting system
CN107100358B (en) Cantilever bracket and bracket body special for unloading-free industrialized safety protection and construction method of cantilever bracket and bracket body
CN101368444B (en) Novel profiled bar and wood combination type door, window shaping template and its installation method
CN201649603U (en) Bolt-connected steel cantilever scaffold
CN101265748B (en) Tools type section steel fastener steel tube outer scaffold
CN201546435U (en) Bolted stayed cantilever scaffold
CN210482710U (en) Assembled template truss strutting arrangement
CN201598820U (en) Single point suspension external hanging bracket
CN213329955U (en) Flower basket diagonal rod type overhanging scaffold
CN201420385Y (en) Overhanging type unloading platform for building construction
CN206581577U (en) Using housing construction builder's jack
CN204001650U (en) Overhanging scaffold for building
CN105507573A (en) Method for mounting external cantilever scaffolds made of shape steel
CN106351245A (en) Tower crane foundation base and construction method thereof
CN201190408Y (en) Tool type exterior scaffolding of section steel fastening tube
CN212336672U (en) I-steel overhanging bearing frame of basket pull rod for constructional engineering
CN107587711A (en) A kind of regularization assembled overhanging protection canopy and its assembly method
CN203640257U (en) Support of overhanging type scaffold
CN110552495A (en) assembled building combined tool type outer protective frame system and construction method thereof
CN103669817B (en) Building structure overhanging scaffold external corner assembling type frame body device
CN208749071U (en) A kind of reinforcing heightening type hanging basket connection system
CN214462401U (en) Double-layer protection frame with novel structure
CN212743447U (en) Reinforced structure that building structure is firm anti collapsing
CN211597650U (en) Overhanging type scaffold
CN205369874U (en) Elevartor shaft outer wall cantilever frame

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: JIN LIJUN

Free format text: FORMER OWNER: BIAOLI CONSTRUCTION GROUP CO., LTD.

Effective date: 20110909

Owner name: BIAOLI CONSTRUCTION GROUP CO., LTD.

Free format text: FORMER OWNER: JIN FUMING

Effective date: 20110909

Owner name: XU HAIYAN

Free format text: FORMER OWNER: JIN LIJUN

Effective date: 20110909

Owner name: JIN FUMING

Free format text: FORMER OWNER: YANG ZHIHUA

Effective date: 20110909

Owner name: YANG ZHIHUA

Free format text: FORMER OWNER: XU HAIYAN

Effective date: 20110909

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20110909

Address after: 318020, No. 398 Bridge Road, North City Street, Huangyan District, Zhejiang, Taizhou

Patentee after: BIAOLI CONSTRUCTION GROUP Co.,Ltd.

Address before: 318020, No. 2-4 West Pu village, North City Street, Huangyan District, Zhejiang, Taizhou

Patentee before: Jin Fuming

Effective date of registration: 20110909

Address after: 318020, No. 117, Lane nine, 201 Peak Road, Dongcheng Street, Huangyan District, Zhejiang, Taizhou

Patentee after: Jin Lijun

Address before: 318020 No. 398 Bridge Road, Huangyan District, Zhejiang, Taizhou

Patentee before: BIAOLI CONSTRUCTION GROUP Co.,Ltd.

Effective date of registration: 20110909

Address after: 602, room 146, unit 37, Begonia new village, Dongcheng Street, Huangyan District, Taizhou, Zhejiang, 318020

Patentee after: Xu Haiyan

Address before: 318020, No. 117, Lane nine, 201 Peak Road, Dongcheng Street, Huangyan District, Zhejiang, Taizhou

Patentee before: Jin Lijun

Effective date of registration: 20110909

Address after: 318020, No. 2-4 West Pu village, North City Street, Huangyan District, Zhejiang, Taizhou

Patentee after: Jin Fuming

Address before: 318020, room 1, unit 107, Lane nine, 501 Feng Road, Dongcheng Street, Huangyan District, Zhejiang, Taizhou

Patentee before: Yang Zhihua

Effective date of registration: 20110909

Address after: 318020, room 1, unit 107, Lane nine, 501 Feng Road, Dongcheng Street, Huangyan District, Zhejiang, Taizhou

Patentee after: Yang Zhihua

Address before: 602, room 146, unit 37, Begonia new village, Dongcheng Street, Huangyan District, Taizhou, Zhejiang, 318020

Patentee before: Xu Haiyan

CX01 Expiry of patent term

Granted publication date: 20101124

CX01 Expiry of patent term