CN103993738A - Floor penetrating and anchoring type overhanging unloading steel platform - Google Patents

Floor penetrating and anchoring type overhanging unloading steel platform Download PDF

Info

Publication number
CN103993738A
CN103993738A CN201410206281.6A CN201410206281A CN103993738A CN 103993738 A CN103993738 A CN 103993738A CN 201410206281 A CN201410206281 A CN 201410206281A CN 103993738 A CN103993738 A CN 103993738A
Authority
CN
China
Prior art keywords
floor
steel
bolts
load
steel plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410206281.6A
Other languages
Chinese (zh)
Inventor
石伟国
邵正俊
潘文浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Huajian Construction Co Ltd
Original Assignee
Jiangsu Huajian Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Huajian Construction Co Ltd filed Critical Jiangsu Huajian Construction Co Ltd
Priority to CN201410206281.6A priority Critical patent/CN103993738A/en
Publication of CN103993738A publication Critical patent/CN103993738A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention provides a floor penetrating and anchoring type overhanging unloading steel platform and relates to a floor anchoring technology. Operation platforms are laid on two bearing steel beams of the outer side of a floor. Two rows of straight casing pipes are respectively and vertically embedded in the floor. A bolt is arranged in each casing pipe in a penetrating mode. The two bolts in each set of casing pipes above the floor are arranged on the same steel plate in a penetrating mode. The two bolts on the steel plate are connected with nuts respectively. The two bolts in each set of the casing pipes of the back of the floor are arranged on the same steel plate in a penetrating mode. The two bolts on the steel plate are connected with the nuts respectively. The bearing steel beams are arranged in the space formed by the two bolts in each corresponding row of casing pipes, the floor and a first steel plate in a penetrating mode. The four nuts of the tightening bolts have the tightening effects, and therefore potential safety hazards due to looseness are eradicated; moreover, the bolts are back-arranged fastening parts, and therefore laitance pollution generated in the concrete pouring process can be eradicated; the bolts arranged on the floor in the penetrating mode are convenient to anchor and disassemble, and therefore circulation use can be achieved.

Description

A kind of through-flooring anchoring type cantilever steel platform for material unloading
Technical field
The present invention relates to the technical field that a kind of cantilever steel platform for material unloading through-flooring carries out anchoring.
Background technology
In building engineering construction, generally can adopt cantilever steel platform for material unloading as the middle amboceptor of picking material and transhipment material, to improve the efficiency of construction.Cantilever steel platform for material unloading be generally by i iron end and floor be fixed, thereby i iron head end and wire rope carry out stretch-draw and form the stressed girder steel of encorbelmenting, and finally on girder steel, lays the operating platform system that steel plate forms.What in engineering, the i iron end of cantilever steel platform for material unloading and floor were fixed employing at present is the method for pre-buried round steel clip (or round steel bolt) in cast-in-situ concrete.Use this fixing means to exist following shortcoming:
1, before floor concrete casting, after using round steel clip to be connected with floor bar as built-in fitting, prop up immediately, the vibration producing when concreting is easy to cause the clip inclination that misplaces on horizontal plane and vertical plane, finally cannot use.In addition, in the time that clip produces horizontal plane absolute altitude error, cannot naturally tighten up flexibly fixingly with i iron while connection, can only clog timber wedge and carry out fasteningly, but timber wedge easily becomes flexible and makes potential safety hazard larger.
2, before floor concrete casting; in the time using pre-buried round steel bolt as built-in fitting; although comparing the follow-up problem of tightening up of pre-buried clip is resolved; but still the shortcoming that exists dislocation to tilt; and the laitance that the screw thread of bolt produces while being easy to by concreting pollutes, so the protection of screw thread has also been become to a large difficult point.
3, adopt the method for pre-buried round steel clip (or round steel bolt) cannot recycle after discharging platform is removed, in the cost control of engineering, caused very large waste.
In sum, the i iron end of cantilever steel platform for material unloading and floor adopt the method for pre-buried round steel clip (or round steel bolt) to exist many hidden danger, are unfavorable for engineering safety, quality, progress and cost control.
Summary of the invention
The present invention seeks to as addressing the above problem, propose a kind of through-flooring anchoring type cantilever steel platform for material unloading.
The present invention includes that two one end are arranged in floor top, the other end stretches out the load-bearing girder steel in floor outside, on two load-bearing girder steels in floor outside, lay operating platform, it is characterized in that vertical pre-buried two arranging straight shape sleeve pipe respectively on floor, every bar casing tube has two groups at least, every group is two, spacing between described two sleeve pipes of every group of sleeve pipe is greater than the width of load-bearing girder steel, and the described two load-bearing girder steels above floor are corresponding respectively to be arranged with two bar casing tubes; In each sleeve pipe, place respectively a bolt, two bolts in each group sleeve pipe of floor top are also set on same the first steel plate, difference attaching nut on two bolts on the first steel plate; Two bolts in each group sleeve pipe at floor back are also set on same the second steel plate, difference attaching nut on two bolts on the second steel plate; Each root load-bearing girder steel is set in the space that two bolts, floor and the first steel plate in each group sleeve pipe of a corresponding bar casing tube surround simultaneously.
The present invention adopts cantilever steel platform for material unloading through-flooring to carry out the method for anchoring, when construction pre-buried sleeve pipe due to from heavy and light, thereby vibrating load that body is little to be produced while being subject to concreting hardly affects, verticality and the levelness in the built-in pipe hole of formation are guaranteed; Because four nuts for tightening bolt all can play the effect of tightening up, so can make load-bearing girder steel lean on mutually with floor tightly completely by the degree of tightness of adjusting nut, stopped the security hidden trouble existing because of degree of tightness, and bolt is that the laitance that rearmounted securing member can produce while having stopped concreting pollutes; Due to this bolt anchoring convenient disassembly that is set in floor, the bolt ironware of use can repeat turnover and use, and has really accomplished engineering cost saving.
In addition, the present invention is also at parallel welding one block plate of a side of load-bearing girder steel, between load-bearing girder steel and described steel plate, jack is set, the vertical rigidity latch of planting in described jack, the lower end of described rigidity latch stretches out in the lower end of load-bearing girder steel, and the lower end of described rigidity latch contacts at the outside end face of floor.The present invention is owing to being provided with latch, and the inside horizontal force of floor platform better, has stopped the security hidden trouble existing because of degree of tightness.Adopt the method for this kind of anti-inside slippage can conscientiously ensure that anti-skidding firmware and cantilever steel girder are in same horizontal plane, the cantilever steel girder finished product of making is put and is transported more for convenience.
Brief description of the drawings
Fig. 1 is a kind of structural representation of the present invention.
Fig. 2 is that the A-A of Fig. 1 is to view.
Fig. 3 is the side direction enlarged drawing of I portion in Fig. 1.
Fig. 4 be in Fig. 2 B-B to profile.
Detailed description of the invention
As shown in Figure 1, 2, 3, the present invention is provided with that two one end are arranged in lower floor 1 top, the other end stretches out the load-bearing girder steel 2,3 in lower floor 1 outside simultaneously, on two load-bearing girder steels 2,3 in lower floor 1 outside, lay operating platform 4, can also on operating platform 4, arrange to protect and block etc. to improve safety.
On lower floor 1, vertical pre-buried two arrange straight shape sleeve pipe 5 respectively, every bar casing tube 5 has three groups, every group is two, and the spacing between the sleeve pipe 5 of every group of sleeve pipe is slightly larger than the width of load-bearing girder steel 2 or 3, and the two load-bearing girder steels 2,3 above lower floor 1 are corresponding respectively to be arranged with two bar casing tubes.
Place respectively a bolt 6 each sleeve pipe 5 is interior, two bolts 6 in each group sleeve pipe 5 of lower floor 1 top are also set on same the first steel plate 7, attaching nut 8 respectively on two bolts 6 on the first steel plate 7.Two bolts 6 in each group sleeve pipe 5 at lower floor 1 back are also set on same the second steel plate 9, difference attaching nut 10 on two bolts 6 on the second steel plate 9.Each root load-bearing girder steel 2 or 3 is set in the space that two bolts 6, lower floor 1 and the first steel plate 7 in each group sleeve pipe 5 of a corresponding bar casing tube surround simultaneously.
Also can on upper floor 11, be arranged to right hook 12, in hook 12 with stretch out between the load-bearing girder steel 2,3 in lower floor 1 outside and connect respectively lifting rope 13, to strengthen the safety of suspention.
Weld the steel plate (as the short girder steel of load-bearing girder steel) 14 parallel with load-bearing girder steel 2 at load-bearing girder steel 2 towards the side of load-bearing girder steel 3, between load-bearing girder steel 2 and steel plate 14, be provided with jack, the vertical rigidity latch 15 of planting in jack, the lower end of rigidity latch 15 stretches out in the lower end of load-bearing girder steel 2, and contacts at the outside end face of floor 1.
Welding steel 16 on load-bearing girder steel 3 equally, the vertical rigidity latch 17 of planting in the jack between load-bearing girder steel 3 and steel plate 16, the lower end of rigidity latch 17 stretches out in the lower end of load-bearing girder steel 3, and contacts at the outside end face of floor 1.

Claims (3)

1. a through-flooring anchoring type cantilever steel platform for material unloading, comprise that two one end are arranged in floor top, the other end stretches out the load-bearing girder steel in floor outside, on two load-bearing girder steels in floor outside, lay operating platform, it is characterized in that vertical pre-buried two arranging straight shape sleeve pipe respectively on floor, every bar casing tube has two groups at least, every group is two, spacing between described two sleeve pipes of every group of sleeve pipe is greater than the width of load-bearing girder steel, and the described two load-bearing girder steels above floor are corresponding respectively to be arranged with two bar casing tubes; In each sleeve pipe, place respectively a bolt, two bolts in each group sleeve pipe of floor top are also set on same the first steel plate, difference attaching nut on two bolts on the first steel plate; Two bolts in each group sleeve pipe at floor back are also set on same the second steel plate, difference attaching nut on two bolts on the second steel plate; Each root load-bearing girder steel is set in the space that two bolts, floor and the first steel plate in each group sleeve pipe of a corresponding bar casing tube surround simultaneously.
2. through-flooring anchoring type cantilever steel platform for material unloading according to claim 1, it is characterized in that parallel welding one block plate of a side at load-bearing girder steel, between load-bearing girder steel and described steel plate, jack is set, the vertical rigidity latch of planting in described jack, the lower end of described rigidity latch stretches out in the lower end of load-bearing girder steel, and the lower end of described rigidity latch contacts at the outside end face of floor.
3. through-flooring anchoring type cantilever steel platform for material unloading according to claim 2, is characterized in that on the relative face of two load-bearing girder steels welding steel respectively, the rigidity latch of planting respectively in the jack between corresponding load-bearing girder steel and steel plate.
CN201410206281.6A 2014-05-16 2014-05-16 Floor penetrating and anchoring type overhanging unloading steel platform Pending CN103993738A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410206281.6A CN103993738A (en) 2014-05-16 2014-05-16 Floor penetrating and anchoring type overhanging unloading steel platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410206281.6A CN103993738A (en) 2014-05-16 2014-05-16 Floor penetrating and anchoring type overhanging unloading steel platform

Publications (1)

Publication Number Publication Date
CN103993738A true CN103993738A (en) 2014-08-20

Family

ID=51308051

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410206281.6A Pending CN103993738A (en) 2014-05-16 2014-05-16 Floor penetrating and anchoring type overhanging unloading steel platform

Country Status (1)

Country Link
CN (1) CN103993738A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107893540A (en) * 2017-09-28 2018-04-10 新疆北方建设集团有限公司 Build discharging platform
CN109162464A (en) * 2018-09-04 2019-01-08 江苏兴厦建设工程集团有限公司 A kind of skyscraper discharging platform soap-free emulsion polymeization detachable built-in fitting and its building technology
CN112411740A (en) * 2020-11-23 2021-02-26 赵俊杰 Balcony pouring safety guarantee technical scheme based on automatic control technology
CN112942780A (en) * 2021-04-15 2021-06-11 山西省工业设备安装集团有限公司 Shaped steel encorbelments fast ann quick detach stagnant water built-in fitting

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE29605761U1 (en) * 1996-03-28 1996-08-08 Thalhammer, Franz, 82065 Baierbrunn Suspended scaffolding for balconies & platforms
GB2382614A (en) * 2001-08-04 2003-06-04 Bernard Crawford Robert Blain Scaffold system mountable on window sill or ledge
CN201756787U (en) * 2010-05-31 2011-03-09 中建钢构有限公司 Adjustable hanger platform
CN102003070A (en) * 2010-12-28 2011-04-06 山东万鑫建设有限公司 Construction method of suspending scaffold
CN202745354U (en) * 2012-07-11 2013-02-20 龙元建设集团股份有限公司 Toolized discharging steel platform
CN203080934U (en) * 2012-12-19 2013-07-24 中建三局第一建设工程有限责任公司 Overhanging type discharging platform
CN203160659U (en) * 2013-03-15 2013-08-28 中城建第六工程局集团有限公司 Assembled cantilever discharging platform for building
CA2877179A1 (en) * 2012-06-26 2014-01-03 Wasyl Rosati The improved frame for climbing screen
CN203879008U (en) * 2014-05-16 2014-10-15 江苏省华建建设股份有限公司 Floor penetrating anchoring type overhang unloading steel platform

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE29605761U1 (en) * 1996-03-28 1996-08-08 Thalhammer, Franz, 82065 Baierbrunn Suspended scaffolding for balconies & platforms
GB2382614A (en) * 2001-08-04 2003-06-04 Bernard Crawford Robert Blain Scaffold system mountable on window sill or ledge
CN201756787U (en) * 2010-05-31 2011-03-09 中建钢构有限公司 Adjustable hanger platform
CN102003070A (en) * 2010-12-28 2011-04-06 山东万鑫建设有限公司 Construction method of suspending scaffold
CA2877179A1 (en) * 2012-06-26 2014-01-03 Wasyl Rosati The improved frame for climbing screen
CN202745354U (en) * 2012-07-11 2013-02-20 龙元建设集团股份有限公司 Toolized discharging steel platform
CN203080934U (en) * 2012-12-19 2013-07-24 中建三局第一建设工程有限责任公司 Overhanging type discharging platform
CN203160659U (en) * 2013-03-15 2013-08-28 中城建第六工程局集团有限公司 Assembled cantilever discharging platform for building
CN203879008U (en) * 2014-05-16 2014-10-15 江苏省华建建设股份有限公司 Floor penetrating anchoring type overhang unloading steel platform

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107893540A (en) * 2017-09-28 2018-04-10 新疆北方建设集团有限公司 Build discharging platform
CN109162464A (en) * 2018-09-04 2019-01-08 江苏兴厦建设工程集团有限公司 A kind of skyscraper discharging platform soap-free emulsion polymeization detachable built-in fitting and its building technology
CN112411740A (en) * 2020-11-23 2021-02-26 赵俊杰 Balcony pouring safety guarantee technical scheme based on automatic control technology
CN112942780A (en) * 2021-04-15 2021-06-11 山西省工业设备安装集团有限公司 Shaped steel encorbelments fast ann quick detach stagnant water built-in fitting

Similar Documents

Publication Publication Date Title
US9861190B2 (en) Wood gang form and method for constructing concrete building using same
CN204098463U (en) Builder's jack
CN203768811U (en) Embedded steel anchor beam combined pylon anchoring structure
KR101487139B1 (en) Pre-fabricated column with reinforcing bar
CN106638588B (en) Steel pipe pile cap bottom hanging device and installation method thereof
CN103993738A (en) Floor penetrating and anchoring type overhanging unloading steel platform
JP3181041U (en) Mounting member for scaffolding for bridge
CN204001746U (en) A kind of wall, column template supporting adn fixing device
CN105507573A (en) Method for mounting external cantilever scaffolds made of shape steel
CN105298107A (en) High supporting frame of high-altitude large cantilever structure
CN213804905U (en) Bailey beam suspension structure
CN103993739B (en) The construction method of granulation tower spraying layer stiff beam
CN203879008U (en) Floor penetrating anchoring type overhang unloading steel platform
CN209780193U (en) Suspension type scaffold
CN103469736A (en) Template supporting device of diaphragm plate of T-shaped bridge surface and template supporting and removing method
CN105442840A (en) Construction method of cantilever formwork supporting frame
CN108824955A (en) A kind of steel railing connection structure
CN103485524A (en) Bracket type overhanging scaffold and construction method thereof at erection time
CN205153504U (en) Detachable cantilever frame body base
JP2019108701A (en) Fence for safety measures of reinforced soil wall construction
CN103981807A (en) Steel anchor beam without corbels
KR101586376B1 (en) Structure lifting method using steel pipe member with lifting jack
CN102605964B (en) Separately mounted grille on elevator shaft opening and construction method of separately mounted grille
CN114439253A (en) Hanging construction method for wrapping concrete on peripheral part of steel beam
CN204530479U (en) The interim counter-force bracing or strutting arrangement of a kind of bridge jacking

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140820