CN203879008U - Floor penetrating anchoring type overhang unloading steel platform - Google Patents

Floor penetrating anchoring type overhang unloading steel platform Download PDF

Info

Publication number
CN203879008U
CN203879008U CN201420249699.0U CN201420249699U CN203879008U CN 203879008 U CN203879008 U CN 203879008U CN 201420249699 U CN201420249699 U CN 201420249699U CN 203879008 U CN203879008 U CN 203879008U
Authority
CN
China
Prior art keywords
floor
bolts
steel
load
steel plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420249699.0U
Other languages
Chinese (zh)
Inventor
石伟国
邵正俊
潘文浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Huajian Construction Co Ltd
Original Assignee
Jiangsu Huajian Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Huajian Construction Co Ltd filed Critical Jiangsu Huajian Construction Co Ltd
Priority to CN201420249699.0U priority Critical patent/CN203879008U/en
Application granted granted Critical
Publication of CN203879008U publication Critical patent/CN203879008U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a floor penetrating anchoring type overhang unloading steel platform, and relates to the floor anchoring technology. An operation platform is laid on two bearing steel beams outside a floor, two rows of straight sleeves are vertically embedded in the floor, a bolt is arranged in each sleeve in a penetrating mode, the two bolts in each set of sleeves on the floor are arranged on the same steel plate in a penetrating mode, and the two bolts in each steel plate are respectively connected with nuts; the two bolts in each set of sleeves on the back of the floor are arranged on the same steel plate in a penetrating mode, and the two bolts in each steel plate are respectively connected with nuts; each bearing steel beam is arranged in the space in a penetrating mode, wherein the space is defined by the bolts in all sets of sleeves of the corresponding row of sleeves, the floor and the first steel plates. The fastening effect can be achieved by fastening the four nuts of the bolts in each set of sleeves, and therefore potential safety hazards caused by looseness are eliminated; the bolts are fasteners arranged in the later period, and therefore laitance contamination caused during concrete pouring is eliminated; the bolts arranged on the floor in the penetrating mode can be conveniently anchored and detached, and can be repeatedly used.

Description

A kind of through-flooring anchoring type cantilever steel platform for material unloading
Technical field
The utility model relates to the technical field that a kind of cantilever steel platform for material unloading through-flooring carries out anchoring.
Background technology
In building engineering construction, generally can adopt cantilever steel platform for material unloading as the middle amboceptor of picking material and transhipment material, to improve the efficiency of construction.Cantilever steel platform for material unloading be generally by i iron end and floor be fixed, thereby i iron head end and wire rope carry out stretch-draw and form the stressed girder steel of encorbelmenting, and finally on girder steel, lays the operating platform system that steel plate forms.What in engineering, the i iron end of cantilever steel platform for material unloading and floor were fixed employing at present is the method for pre-buried round steel clip (or round steel bolt) in cast-in-situ concrete.Use this fixing means to exist following shortcoming:
1, before floor concrete casting, after using round steel clip to be connected with floor bar as built-in fitting, prop up immediately, the vibration producing during concreting is easy to cause the clip inclination that misplaces on horizontal plane and vertical plane, finally cannot use.In addition, when clip produces horizontal plane absolute altitude error, cannot naturally tighten up flexibly fixingly while being connected with i iron, can only clog timber wedge and carry out fasteningly, but timber wedge easily becomes flexible and makes potential safety hazard larger.
2, before floor concrete casting; when using pre-buried round steel bolt as built-in fitting; although comparing the follow-up problem of tightening up of pre-buried clip is resolved; but still the shortcoming that exists dislocation to tilt; and the laitance that the screw thread of bolt produces while being easy to by concreting pollutes, so the protection of screw thread has also been become to a large difficult point.
3, adopt the method for pre-buried round steel clip (or round steel bolt) cannot recycle after discharging platform is removed, in the cost control of engineering, caused very large waste.
In sum, the i iron end of cantilever steel platform for material unloading and floor adopt the method for pre-buried round steel clip (or round steel bolt) to exist many hidden danger, are unfavorable for engineering safety, quality, progress and cost control.
Utility model content
The utility model object is for addressing the above problem, and proposes a kind of through-flooring anchoring type cantilever steel platform for material unloading.
The utility model comprises that two one end are arranged in floor top, the other end stretches out the load-bearing girder steel in floor outside, on two load-bearing girder steels in floor outside, lay operating platform, it is characterized in that vertical pre-buried two arranging straight shape sleeve pipe respectively on floor, every bar casing tube has two groups at least, every group is two, spacing between described two sleeve pipes of every group of sleeve pipe is greater than the width of load-bearing girder steel, and the described two load-bearing girder steels above floor are corresponding respectively to be arranged with two bar casing tubes; In each sleeve pipe, place respectively a bolt, two bolts in each group sleeve pipe of floor top are also set on same the first steel plate, difference attaching nut on two bolts on the first steel plate; Two bolts in each group sleeve pipe at floor back are also set on same the second steel plate, difference attaching nut on two bolts on the second steel plate; Each root load-bearing girder steel is set in the space that two bolts, floor and the first steel plate in each group sleeve pipe of a corresponding bar casing tube surround simultaneously.
The method that the utility model adopts cantilever steel platform for material unloading through-flooring to carry out anchoring, when construction pre-buried sleeve pipe due to from heavy and light, thereby vibrating load that body is little to be produced while being subject to concreting hardly affects, verticality and the levelness in the built-in pipe hole of formation are guaranteed; Because four nuts for tightening bolt all can play the effect of tightening up, so the degree of tightness by adjusting nut can make load-bearing girder steel lean on mutually with floor tightly completely, stopped the security hidden trouble existing because of degree of tightness, and bolt is that the laitance that rearmounted securing member can produce while having stopped concreting pollutes; Because this is set in the bolt anchoring convenient disassembly of floor, the bolt ironware of use can repeat turnover and use, and has really accomplished engineering cost saving.
In addition, the utility model is also at parallel welding one block plate of a side of load-bearing girder steel, between load-bearing girder steel and described steel plate, jack is set, the vertical rigidity latch of planting in described jack, the lower end of described rigidity latch stretches out in the lower end of load-bearing girder steel, and the lower end of described rigidity latch contacts at the outside end face of floor.The utility model is owing to being provided with latch, and the inside horizontal force of floor platform, has stopped the security hidden trouble existing because of degree of tightness better.Adopt the method for this kind of anti-inside slippage can conscientiously guarantee that anti-skidding firmware and cantilever steel girder are in same horizontal plane, the cantilever steel girder finished product of making is put and is transported more for convenience.
Accompanying drawing explanation
Fig. 1 is a kind of structural representation of the present utility model.
Fig. 2 is that the A-A of Fig. 1 is to view.
Fig. 3 is the side direction enlarged drawing of I portion in Fig. 1.
Fig. 4 be in Fig. 2 B-B to profile.
The specific embodiment
As shown in Figure 1, 2, 3, the utility model is provided with that two one end are arranged in lower floor 1 top, the other end stretches out the load-bearing girder steel 2,3 in lower floor 1 outside simultaneously, on two load-bearing girder steels 2,3 in lower floor 1 outside, lay operating platform 4, can also on operating platform 4, arrange to protect and block etc. to improve safety.
On lower floor 1, vertical pre-buried two arrange straight shape sleeve pipe 5 respectively, every bar casing tube 5 has three groups, every group is two, and the spacing between the sleeve pipe 5 of every group of sleeve pipe is slightly larger than the width of load-bearing girder steel 2 or 3, and the two load-bearing girder steels 2,3 above lower floor 1 are corresponding respectively to be arranged with two bar casing tubes.
Place respectively a bolt 6 each sleeve pipe 5 is interior, two bolts 6 in each group sleeve pipe 5 of lower floor 1 top are also set on same the first steel plate 7, attaching nut 8 respectively on two bolts 6 on the first steel plate 7.Two bolts 6 in each group sleeve pipe 5 at lower floor 1 back are also set on same the second steel plate 9, difference attaching nut 10 on two bolts 6 on the second steel plate 9.Each root load-bearing girder steel 2 or 3 is set in the space that two bolts 6, lower floor 1 and the first steel plate 7 in each group sleeve pipe 5 of a corresponding bar casing tube surround simultaneously.
Also can on upper floor 11, be arranged to right hook 12, in hook 12 with stretch out between the load-bearing girder steel 2,3 in lower floor 1 outside and connect respectively lifting rope 13, to strengthen the safety of suspention.
At load-bearing girder steel 2, towards the side of load-bearing girder steel 3, weld the steel plate (as the short girder steel of load-bearing girder steel) 14 parallel with load-bearing girder steel 2, between load-bearing girder steel 2 and steel plate 14, be provided with jack, the vertical rigidity latch 15 of planting in jack, the lower end of rigidity latch 15 stretches out in the lower end of load-bearing girder steel 2, and contacts at the outside end face of floor 1.
Welding steel 16 on load-bearing girder steel 3 equally, the vertical rigidity latch 17 of planting in the jack between load-bearing girder steel 3 and steel plate 16, the lower end of rigidity latch 17 stretches out in the lower end of load-bearing girder steel 3, and contacts at the outside end face of floor 1.

Claims (2)

1. a through-flooring anchoring type cantilever steel platform for material unloading, comprise that two one end are arranged in floor top, the other end stretches out the load-bearing girder steel in floor outside, on two load-bearing girder steels in floor outside, lay operating platform, it is characterized in that vertical pre-buried two arranging straight shape sleeve pipe respectively on floor, every bar casing tube has two groups at least, every group is two, spacing between described two sleeve pipes of every group of sleeve pipe is greater than the width of load-bearing girder steel, and the described two load-bearing girder steels above floor correspond respectively to two bar casing tubes and arrange; In each sleeve pipe, place respectively a bolt, two bolts in each group sleeve pipe of floor top are also set on same the first steel plate, difference attaching nut on two bolts on the first steel plate; Two bolts in each group sleeve pipe at floor back are also set on same the second steel plate, difference attaching nut on two bolts on the second steel plate; Each root load-bearing girder steel is set in the space that two bolts, floor and the first steel plate in each group sleeve pipe of a corresponding bar casing tube surround simultaneously.
2. through-flooring anchoring type cantilever steel platform for material unloading according to claim 1, it is characterized in that parallel welding one block plate of a side at load-bearing girder steel, between load-bearing girder steel and described steel plate, jack is set, the vertical rigidity latch of planting in described jack, the lower end of described rigidity latch stretches out in the lower end of load-bearing girder steel, and the lower end of described rigidity latch contacts at the outside end face of floor.
CN201420249699.0U 2014-05-16 2014-05-16 Floor penetrating anchoring type overhang unloading steel platform Active CN203879008U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420249699.0U CN203879008U (en) 2014-05-16 2014-05-16 Floor penetrating anchoring type overhang unloading steel platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420249699.0U CN203879008U (en) 2014-05-16 2014-05-16 Floor penetrating anchoring type overhang unloading steel platform

Publications (1)

Publication Number Publication Date
CN203879008U true CN203879008U (en) 2014-10-15

Family

ID=51679523

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420249699.0U Active CN203879008U (en) 2014-05-16 2014-05-16 Floor penetrating anchoring type overhang unloading steel platform

Country Status (1)

Country Link
CN (1) CN203879008U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103993738A (en) * 2014-05-16 2014-08-20 江苏省华建建设股份有限公司 Floor penetrating and anchoring type overhanging unloading steel platform

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103993738A (en) * 2014-05-16 2014-08-20 江苏省华建建设股份有限公司 Floor penetrating and anchoring type overhanging unloading steel platform

Similar Documents

Publication Publication Date Title
CN204040446U (en) The shaped steel suspension scaffolding structure
CN106638588B (en) Steel pipe pile cap bottom hanging device and installation method thereof
CN202937005U (en) Cast-in-situ concrete beam lateral template reinforcement device
CN105525569A (en) Bridge flange plate wet joint suspended formwork construction method
CN202766972U (en) Circular pier column hoop
CN204001746U (en) A kind of wall, column template supporting adn fixing device
CN103993738A (en) Floor penetrating and anchoring type overhanging unloading steel platform
CN209799317U (en) Can have enough to meet need use pre-buried ring of scaffold frame of encorbelmenting
CN105507573A (en) Method for mounting external cantilever scaffolds made of shape steel
CN202945798U (en) Overhanging type scaffold corner device
CN204825652U (en) Bridge pier stud bent cap formwork support device
CN103993739B (en) The construction method of granulation tower spraying layer stiff beam
CN203879008U (en) Floor penetrating anchoring type overhang unloading steel platform
CN110939261B (en) Double outer scaffold of dish knot formula structure of encorbelmenting
CN103469736B (en) Template supporting device of diaphragm plate of T-shaped bridge surface and template supporting and removing method
CN209798774U (en) Anchor sealing concrete template for rock-soil high slope anchor cable support
CN209780193U (en) Suspension type scaffold
CN204370797U (en) A kind of concrete floor slab construction plate device and supporting component thereof
CN105442840A (en) Construction method of cantilever formwork supporting frame
CN205153504U (en) Detachable cantilever frame body base
CN102418417B (en) Long-slab-span cast-in-situ beam ribbed floor early-dismantling template formwork system
CN102605964B (en) Separately mounted grille on elevator shaft opening and construction method of separately mounted grille
CN204960324U (en) Suspension type floor formwork support device
CN103437292A (en) Lifting combination device for bidirectional inclined A-shaped main tower cable-stayed bridge template
CN104110100A (en) Steel bar clip pre-stress tensioning anchor block

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant