CN208440996U - A kind of novel inlet pipe - Google Patents

A kind of novel inlet pipe Download PDF

Info

Publication number
CN208440996U
CN208440996U CN201821081033.3U CN201821081033U CN208440996U CN 208440996 U CN208440996 U CN 208440996U CN 201821081033 U CN201821081033 U CN 201821081033U CN 208440996 U CN208440996 U CN 208440996U
Authority
CN
China
Prior art keywords
anchor plate
steel pipe
seamless steel
jack
strand wires
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821081033.3U
Other languages
Chinese (zh)
Inventor
郭春强
李波
李君燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Linyi Municipal Group Co Ltd
Original Assignee
Linyi Municipal Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Linyi Municipal Group Co Ltd filed Critical Linyi Municipal Group Co Ltd
Priority to CN201821081033.3U priority Critical patent/CN208440996U/en
Application granted granted Critical
Publication of CN208440996U publication Critical patent/CN208440996U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of novel inlet pipes, it includes seamless steel pipe;The bottom of seamless steel pipe is equipped with and inlet pipe;Inlet pipe is equipped with the wired hose being secured to;The top of seamless steel pipe is equipped with anchor plate;The center point of anchor plate is equipped with jack, and the outer diameter grafting of the internal diameter of jack and seamless steel pipe;Anchor plate is equipped with grout outlet, and grout outlet is connected to the jack of anchor plate the center point;Anchor plate fixes connection by the limit shelves being equipped at the top of seamless steel pipe;The internal diameter of seamless steel pipe is equipped with the steel strand wires of several and its interspersed connection;The both ends of seamless steel pipe are stretched out at the both ends of steel strand wires, and the both ends of steel strand wires are fixedly connected by bolt with anchor slab.The utility model production is simple at low cost, and operating process is convenient.Bearing capacity is strong, can bear larger pressure and accelerate mud jacking process.Limiter can position anchor plate base opening coordinate and to guarantee anchor plate center line consistent with box girder web Impact direction, and guarantee that anchor plate will not slip.

Description

A kind of novel inlet pipe
Technical field
The utility model belongs to municipal construction technical field of tools, and in particular to one kind is applied for large-span concrete box beam The novel inlet pipe of work.
Background technique
Currently, it is existing that the biggish concrete box girder of span has constantly discovered cracking in webs in recent years in bridge construction process As often will appear a plurality of vertical or oblique shear crack while the weak part in web occur, some even extends to box beam Top plate and bottom plate, the integrally-built anti-torsion of bridge, shearing resistance, span ability or even structural bearing can be made by box girder web crackle occur Power is declined, and the safety of bridge is seriously endangered.
The reason of box girder web cracks is extremely complex, from the point of view of Web cracks, shows on oblique section anti-principal tensile stress not It is enough.Therefore more and more large-span concrete box beams arrange vertical prestressing into slurry fairlead in web.
Traditional low retraction vertical prestressing into slurry fairlead using will into slurry steel pipe be embedded in box beam underplate concrete Bottom, fairlead are drawn by vertical duct base opening, are not easy to reinforce in this way;When casting concrete into slurry steel pipe easily occurs slip thus Slurry-feeding hole is caused to block.Traditional vertical prestressing is into slurry fairlead, and loss of prestress can reach 30% after tensioning, to box girder web Cracking can play a certain protective role, but effect is not ideal enough.
Summary of the invention
The purpose of this utility model is that the technology of vertical prestressing supporting rib protective effect difference built in the above-mentioned box beam of solution is asked Topic, provides a kind of novel inlet pipe, with overcome the deficiencies in the prior art.
In order to achieve the above object, the technical solution adopted in the utility model is:
A kind of novel inlet pipe, it includes seamless steel pipe;
The bottom of the seamless steel pipe is equipped with the inlet pipe being connected to its mutual right angle welding;The inlet pipe be equipped with Its wired hose being mutually sleeved and fixed;
The top of the seamless steel pipe is equipped with anchor plate;The center point of the anchor plate is equipped with jack, and the internal diameter of jack It is corresponding with the outer diameter of seamless steel pipe and be mutually inserted;The anchor plate is equipped with grout outlet, and grout outlet and anchor plate the center point Jack be interconnected;The anchor plate fixes connection by the limit shelves being equipped at the top of seamless steel pipe;
The internal diameter of the seamless steel pipe is equipped with the steel strand wires of several and its mutually interspersed connection;The both ends of the steel strand wires The both ends of seamless steel pipe are stretched out, and the both ends of steel strand wires are mutually permanently connected by bolt and anchor slab.
The beneficial effects of the utility model are:
1, production is simple at low cost, and operating process is convenient.
2, bearing capacity is strong, can bear larger pressure and accelerate mud jacking process.
3, when anchor plate and vertical duct connect, limiter can position anchor plate base opening coordinate and guarantee anchor plate Center line is consistent with box girder web Impact direction, and guarantees that anchor plate will not slip.
Detailed description of the invention
Attached drawing 1 is the structural schematic diagram of the utility model.
Attached drawing 2 is the using state structure diagram of the utility model.
1- grout outlet 2- steel strand wires 3- anchor plate 4- limits shelves 5- inlet pipe 6- wired hose 7- anchor slab 8- in figure Bolt 9- seamless steel pipe.
Specific embodiment
The technical solution of the utility model is clearly and completely described below in conjunction with attached drawing 1 and attached drawing 2, it is clear that The embodiments are a part of the embodiments of the present invention rather than all of the embodiments.Based in the utility model Embodiment, every other embodiment obtained by those of ordinary skill in the art without making creative efforts, all Belong to the range of the utility model protection.
Referring to attached drawing 1 and attached drawing 2, the utility model it include seamless steel pipe 9;
The bottom of the seamless steel pipe 9 is equipped with the inlet pipe 5 being connected to its mutual right angle welding;It is set on the inlet pipe 5 There is the wired hose 6 being mutually sleeved and fixed with it;
The top of the seamless steel pipe 9 is equipped with anchor plate 3;The center point of the anchor plate 3 is equipped with jack, and jack is interior Diameter is corresponding with the outer diameter of seamless steel pipe 9 and is mutually inserted;The anchor plate 3 is equipped with grout outlet 1, and grout outlet 1 and anchor plate 3 The jack of the center point is interconnected;The anchor plate 3 passes through 4 company of fixing of limit shelves being equipped at the top of seamless steel pipe 9 It connects;
The internal diameter of the seamless steel pipe 9 is equipped with the steel strand wires 2 of several and its mutually interspersed connection;The steel strand wires 2 The both ends of seamless steel pipe 9 are stretched out at both ends, and the both ends of steel strand wires 2 are mutually permanently connected by bolt 8 with anchor slab 7.
Traditional fairlead bearing capacity is poor, and duct pressure reaches as high as 1.20MPa when hole path pressure grouting, and traditional fairlead is held Scarce capacity is pressed, it is unobstructed full to influence mud jacking.The utility model uses wired hose, and wired hose internal diameter of the pipeline can be with inlet pipe Accomplish seamless interfacing, burst pressure 1.4MPa.Solid and reliable after clamping, it is various unfavorable to bear to generate in work progress Factor, when mud jacking, can bear larger pressure and accelerate mud jacking process.
Limit shelves in the utility model play the role of limiting anchor plate position, if anchor plate center line and box beam abdomen Plate Impact direction is inconsistent, will lead to after tensioning that presstressed reinforcing steel perpetuity stress and stress direction needed for web are inconsistent, there is effect Power reduces.When anchor plate is connect with vertical duct, limit shelves can position anchor plate base opening coordinate and be guaranteed in anchor plate Heart line is consistent with box girder web Impact direction, and guarantees that anchor plate will not slip.
The utility model using two times tensioning vertical prestressing can significantly reduce in short beam presstressed reinforcing steel put loss, The shearing resistance degree of safety of vertical prestressing structure is improved, and vertical practical perpetuity stress can stably reach design requirement, it can be effective Ground controls construction quality.Low retraction vertical prestressing tensioning mud jacking construction technology research is whole in advance by Pipe installing and lashing Forming, continuous productive process accelerate the construction and installation period, effectively improve presstressed reinforcing steel positional accuracy;It is anti-using three way type inlet pipe Only mud jacking line clogging;Guarantee that anchor plate installation site is accurate using top opening limit shelves, it is strong to the protective effect of box beam.
Above description is only a specific implementation of the present invention, but the protection scope of the utility model is not limited to In this, anyone skilled in the art within the technical scope disclosed by the utility model, the change that can be readily occurred in Change or replace, should be covered within the scope of the utility model.

Claims (1)

1. a kind of novel inlet pipe, it includes seamless steel pipe (9);It is characterized in that:
The bottom of the seamless steel pipe (9) is equipped with the inlet pipe (5) being connected to its mutual right angle welding;On the inlet pipe (5) Equipped with the wired hose (6) being mutually sleeved and fixed with it;
The top of the seamless steel pipe (9) is equipped with anchor plate (3);The center point of the anchor plate (3) is equipped with jack, and jack Internal diameter is corresponding with the outer diameter of seamless steel pipe (9) and is mutually inserted;The anchor plate (3) is equipped with grout outlet (1), and grout outlet (1) it is interconnected with the jack of anchor plate (3) the center point;The limit that the anchor plate (3) is equipped with by seamless steel pipe (9) top Shelves (4) fix connection;
The internal diameter of the seamless steel pipe (9) is equipped with the steel strand wires (2) of several and its mutually interspersed connection;The steel strand wires (2) Both ends stretch out the both ends of seamless steel pipe (9), and the both ends of steel strand wires (2) pass through bolt (8) and anchor slab (7) company of being fixed to each other It connects.
CN201821081033.3U 2018-07-09 2018-07-09 A kind of novel inlet pipe Active CN208440996U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821081033.3U CN208440996U (en) 2018-07-09 2018-07-09 A kind of novel inlet pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821081033.3U CN208440996U (en) 2018-07-09 2018-07-09 A kind of novel inlet pipe

Publications (1)

Publication Number Publication Date
CN208440996U true CN208440996U (en) 2019-01-29

Family

ID=65088437

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821081033.3U Active CN208440996U (en) 2018-07-09 2018-07-09 A kind of novel inlet pipe

Country Status (1)

Country Link
CN (1) CN208440996U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110863421A (en) * 2019-12-05 2020-03-06 四川石油天然气建设工程有限责任公司 Large oil-gas pipeline crossing anchorage prestress system integrated protection system and process
CN111021249A (en) * 2019-03-28 2020-04-17 临沂市政集团有限公司 Construction device and construction method for prestressed steel bundles

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111021249A (en) * 2019-03-28 2020-04-17 临沂市政集团有限公司 Construction device and construction method for prestressed steel bundles
CN110863421A (en) * 2019-12-05 2020-03-06 四川石油天然气建设工程有限责任公司 Large oil-gas pipeline crossing anchorage prestress system integrated protection system and process

Similar Documents

Publication Publication Date Title
CN203393848U (en) Connection node structure of reinforced concrete column and steel I-beam
CN102912972B (en) Multifunctional lifting steel platform switching jig and construction method
CN204163196U (en) A kind of embedded concrete-filled steel square tubular column in T-steel top flange and steel beam connecting joint
CN201546436U (en) Platform for construction of high-altitude suspension structures
CN209855047U (en) Full-bolt-connection high-strength steel plate assembled beam-concrete slab combined beam
CN208440996U (en) A kind of novel inlet pipe
CN108867341B (en) GFRP pipe-concrete-profile steel combined column base joint and construction method thereof
CN111472530A (en) Flower basket pull rod I-shaped steel cantilever bearing frame for constructional engineering and mounting method thereof
CN103216103A (en) Pre-deformation construction method for mounting oblique-arc-shaped combined steel-structured column of annular roof
CN113152898A (en) Novel indoor concreting face of perpendicular pump line is consolidated device
CN209837314U (en) Prefabricated assembled wallboard node quick connect structure
CN204098241U (en) Trapezoidal steel plate interpolation type rectangular steel-tube concrete column and steel beam connecting joint
CN203514528U (en) Composite connection structure of concrete filled steel tubular column and thin steel plate shear wall
CN112922237A (en) Take telescopic assembled reinforced concrete post and girder steel connected node
CN205153145U (en) Adopt precast concrete coincide floor of bolt and connection structure of H shaped steel roof beam
CN202913677U (en) Multifunctional conversion scaffold capable of lifting steel platform
CN207905104U (en) A kind of assembled architecture truss structure
CN216586226U (en) Large-scale concrete drainage box culvert roof suspension type template support
CN204898508U (en) Circular steel tube pier of bucking power consumption structure is prevented in root setting
CN113944309A (en) Cold-formed steel support beam framework and construction method thereof
CN203238971U (en) Combination and adjustment device of truss end portions
CN203361431U (en) Steel bar connection structure for prefabricated parapet wall
CN2385010Y (en) External mounted square steel tube concrete beam and column connecting node
CN111254827A (en) Stay cable and bridge tower anchoring structure and manufacturing method
CN104499644A (en) Crossbeam with lapping bars and triangular rib plates

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant