CN209721363U - A kind of lifting pipeline auxiliary device - Google Patents
A kind of lifting pipeline auxiliary device Download PDFInfo
- Publication number
- CN209721363U CN209721363U CN201920415040.0U CN201920415040U CN209721363U CN 209721363 U CN209721363 U CN 209721363U CN 201920415040 U CN201920415040 U CN 201920415040U CN 209721363 U CN209721363 U CN 209721363U
- Authority
- CN
- China
- Prior art keywords
- crossbar
- auxiliary device
- vertical bar
- fixed
- lifting pipeline
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
It needs frequently to bundle to solve the prior art in pipe laying, the problem of unbundlings, the utility model provides a kind of lifting pipeline auxiliary device, it is characterized in that, it mainly include the first crossbar and second crossbar of upper and lower parallelly distribute on, it is fixedly connected on the vertical bar that between the first crossbar and the same side end of second crossbar and vertical direction is distributed, the first crossbar is equipped with two for overlapping the fixation pillar of fixed hanging belt far from the end front-rear direction of vertical bar one end, the fixed pillar is perpendicular to first crossbar axis direction horizontal distribution, furthermore, the second crossbar is greater than the length of first crossbar far from the length of vertical bar one end, structure used by this programme, without frequently bundling, unbundlings, speed of application is fast, greatly improve working efficiency.
Description
Technical field
The utility model relates to pipe installation technology field, in particular to a kind of lifting pipeline auxiliary device.
Background technique
Currently, Pipe installing needs to be lifted using truck crane in construction work, it is also necessary to which site operation personnel make
Pipeline is bundled with hanging belt, when pipeline is seated to designated position, it is also necessary to which construction personnel unbinds hanging belt.
This pipeline construction mode not only needs several construction personnel to cooperate, but also in the construction process, hanging belt can be such that two pipelines connect
It meets place there are gaps and waste the construction time so as to cause the next step constructional difficulties, also reduce whole aesthetics;
Meanwhile the liftings such as truck crane large machines is unable to operate normally in the narrow place of some roads, can not play advantage, therefore need
A kind of auxiliary tool of Portable power saving is designed, construction personnel is helped to complete Pipe installing.
Summary of the invention
To solve the above-mentioned problems, the utility model provides a kind of lifting pipeline auxiliary device, the technical solution of use
It is as follows:
A kind of lifting pipeline auxiliary device, which is characterized in that mainly include the first crossbar and second of upper and lower parallelly distribute on
Cross bar is fixedly connected on the vertical bar that between the first crossbar and the same side end of second crossbar and vertical direction is distributed, institute
It states first crossbar and is equipped with two for overlapping the fixation pillar of fixed hanging belt, institute far from the end front-rear direction of vertical bar one end
Fixed pillar is stated perpendicular to first crossbar axis direction horizontal distribution, in addition, big in the length far from vertical bar side second crossbar
In the length of first crossbar.
Preferably, the first crossbar, second crossbar and vertical bar length are adjustable.
Preferably, the first crossbar, second crossbar and vertical bar are made of fixed link and motion bar, the motion bar
It can be slidably connected to fixed link along fixed link axis direction, position phase on circumferencial direction is equipped in the fixed link and motion bar
Corresponding fixation hole, fixed link and motion bar pass through fixation hole by bolt and are fixed by nut.
Preferably, the second crossbar outer surface is equipped with one layer of anti-slip layer.
Preferably, the anti-slip layer is rubber layer.
The utility model has the beneficial effects that:
1, structure is simple, is lifted by crane by the way that long end steel pipe to be inserted into pipeline, avoids construction personnel from frequently bundling, unbinds and hang
Band is filled, manipulation strength and personnel's investment is reduced, improves integral construction speed and quality;
2, first crossbar, second crossbar and vertical bar are stretching structure, and length and position are adjustable, and basis is facilitated not sympathize with
Condition is adjusted, applied widely.
Detailed description of the invention
Fig. 1 is lifting pipeline assistant apparatus structure schematic diagram
Fig. 2 lifting pipeline auxiliary device main view
Wherein, 1- first crossbar, 2- second crossbar, 3- vertical bar, the fixed pillar of 4-, 5- hanging belt, 6- fixation hole, 7- are solid
Determine bolt, 8- fixed link, 9- motion bar.
Specific embodiment
1-2 and specific embodiment are described in further detail the utility model with reference to the accompanying drawing.
Lifting pipeline auxiliary device as shown in Figs. 1-2, mainly includes first crossbar 1, second crossbar 2 and vertical bar 3, and the
One cross bar 1 is located at the surface of second crossbar 2, first crossbar 1 and the distribution of 2 horizontal cross of second crossbar and the two left end
Alignment, 3 vertical direction of vertical bar is distributed and is fixedly connected between 2 left end of first crossbar 1 and second crossbar, in first crossbar
1 right part is equipped with two fixed pillars 4 being distributed perpendicular to 1 axis front-rear direction of first crossbar, and the fixed pillar 4 is using tool
There is the connection reinforcing bar of some strength, wherein first crossbar 1, second crossbar 2 and 3 three of vertical bar are by fixed link 8 and motion bar 9
Composition, motion bar 9 are slidably coupled to inside fixed link 8, carry out the adjusting in length with this, and 9 surface of motion bar is equipped with
Several fixation holes 6 being in axial direction distributed, 8 surface of fixed link are equipped with one with the fixation hole 6 on motion bar 9 in circumference side
The corresponding fixation hole 6 in upward position, after regulating corresponding relationship between fixed link 8 and motion bar 9, passes through 7 He of fixing bolt
Fixation hole 6 is fixed, in addition, being also enclosed with one layer on the outer surface of second crossbar 2 for increasing the rubber layer of frictional force.
In actual work progress, first crossbar 1, second crossbar 2 and vertical bar 3 can choose the side left unused in engineering
Steel pipe or round steel pipe, the left end with first crossbar 1 and second crossbar 2 is respectively welded in 3 upper and lower ends of vertical bar, firstly, according to pipe
The length of road length adjustment first crossbar 1 and second crossbar 2, and be fixed by fixing bolt 7, then by 5 liang of hanging belt
End is respectively fixedly connected on two fixed pillars 4, and then lifting machine slings hanging belt 5 by drop hanger, then by second crossbar 2
Movable end protrude into inside pipeline, hoisting machinery is sling be put into pipeline groove vertically, adjust good position after, by second crossbar 2
Level pulls out and lifts, and continues the lifting of next length of tubing.
By the utilization of the present apparatus, staff's institute's wave in the circulation process that binding, unbundlings bundle again is greatly reduced
The time taken, improve construction efficiency and quality.
The above is only the preferred embodiment of the utility model, it should be pointed out that: for the common skill of the art
For art personnel, without departing from the principle of this utility model, several improvement can also be made, these improvement also should be regarded as
The protection scope of the utility model.
Claims (5)
1. a kind of lifting pipeline auxiliary device, which is characterized in that the mainly first crossbar including upper and lower parallelly distribute on and the second cross
Bar is fixedly connected on the vertical bar that between the first crossbar and the same side end of second crossbar and vertical direction is distributed, described
First crossbar is equipped with two fixation pillars for being used to overlap fixed hanging belt far from the end front-rear direction of vertical bar one end, described
Fixed pillar is perpendicular to first crossbar axis direction horizontal distribution, in addition, being greater than in the length far from vertical bar side second crossbar
The length of first crossbar.
2. lifting pipeline auxiliary device according to claim 1, which is characterized in that the first crossbar, second crossbar with
And vertical bar length is adjustable.
3. lifting pipeline auxiliary device according to claim 2, which is characterized in that the first crossbar, second crossbar with
And vertical bar is made of fixed link and motion bar, the motion bar can be slidably connected to fixed link, institute along fixed link axis direction
It states and is equipped with the corresponding fixation hole in position on circumferencial direction on fixed link and motion bar, fixed link and motion bar pass through fixed spiral shell
Bolt passes through fixation hole and is fixed by nut.
4. lifting pipeline auxiliary device according to claim 1 or 3, which is characterized in that on the second crossbar outer surface
Equipped with one layer of anti-slip layer.
5. lifting pipeline auxiliary device according to claim 4, which is characterized in that the anti-slip layer is rubber layer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920415040.0U CN209721363U (en) | 2019-03-29 | 2019-03-29 | A kind of lifting pipeline auxiliary device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920415040.0U CN209721363U (en) | 2019-03-29 | 2019-03-29 | A kind of lifting pipeline auxiliary device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209721363U true CN209721363U (en) | 2019-12-03 |
Family
ID=68689323
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920415040.0U Active CN209721363U (en) | 2019-03-29 | 2019-03-29 | A kind of lifting pipeline auxiliary device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209721363U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111874796A (en) * | 2020-09-14 | 2020-11-03 | 中冶南方城市建设工程技术有限公司 | Multifunctional pipeline hoisting and positioning auxiliary device |
-
2019
- 2019-03-29 CN CN201920415040.0U patent/CN209721363U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111874796A (en) * | 2020-09-14 | 2020-11-03 | 中冶南方城市建设工程技术有限公司 | Multifunctional pipeline hoisting and positioning auxiliary device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205689895U (en) | Heavy caliber compound pipeline complex pipeline boil on the nape opposite the mouth adjusting means | |
CN202000646U (en) | Self-lifting construction platform integrating vertical transportation device and mould frame | |
CN209817430U (en) | Template supporting structure of tower crane reserved hole | |
CN209721363U (en) | A kind of lifting pipeline auxiliary device | |
CN206591449U (en) | Hood type automatic leveling anchor for CFST Arch Bridge suspender replacement | |
CN202564850U (en) | Replacement and lifting tool for tubular bus pillar insulator | |
CN207209809U (en) | A kind of extraordinary Dramatic Air Lifts | |
CN203795311U (en) | Multi-leg high pier and slip form construction device | |
CN206309039U (en) | One kind can assembled movable pump tube support device | |
CN202746764U (en) | Lifting bracket for pipeline butting adjustment | |
CN209308433U (en) | A kind of multi-functional trolley of Cast-in-situ Beam steel reinforcement cage binding installation | |
CN104652424A (en) | Movable lifting hook for lifting reinforcing cage | |
CN204282843U (en) | The sliding hoisted in position device of steel girder erection in a kind of stiffness combination construction | |
CN203613464U (en) | Slip form construction cargo transportation device | |
CN102003070A (en) | Construction method of suspending scaffold | |
CN205114861U (en) | Hoist and mount lacing device | |
CN211621558U (en) | Bored concrete pile steel reinforcement cage elevation control mounting structure | |
CN204551442U (en) | A kind of reinforcing bar cage hoisting movable hook | |
CN103669219B (en) | Many limbs height pier is with sliding construction equipment | |
CN203613461U (en) | Slip form construction lifting system | |
CN208803382U (en) | A kind of CFST Arch Bridge intermediate transverse girder promotion positioning apparatus | |
CN203782575U (en) | Stay cable hanging and tension construction device | |
CN208120620U (en) | Pipe tilting vehicle | |
CN209260563U (en) | A kind of Bailey beam truss entirety transverse sliding device for cast-in-situ continuous beam | |
CN202017347U (en) | Externally-hung discharging platform device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |