CN209721363U - A kind of lifting pipeline auxiliary device - Google Patents

A kind of lifting pipeline auxiliary device Download PDF

Info

Publication number
CN209721363U
CN209721363U CN201920415040.0U CN201920415040U CN209721363U CN 209721363 U CN209721363 U CN 209721363U CN 201920415040 U CN201920415040 U CN 201920415040U CN 209721363 U CN209721363 U CN 209721363U
Authority
CN
China
Prior art keywords
crossbar
auxiliary device
vertical bar
fixed
lifting pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920415040.0U
Other languages
Chinese (zh)
Inventor
王光林
张树参
张振杰
孔倩倩
韩世杰
孙汝英
薛顺卿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Yellow River Construction Group Co Ltd
Jinan Yellow River Bridge Constrution Group Co Ltd
Original Assignee
Jinan Yellow River Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Yellow River Construction Group Co Ltd filed Critical Jinan Yellow River Construction Group Co Ltd
Priority to CN201920415040.0U priority Critical patent/CN209721363U/en
Application granted granted Critical
Publication of CN209721363U publication Critical patent/CN209721363U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

It needs frequently to bundle to solve the prior art in pipe laying, the problem of unbundlings, the utility model provides a kind of lifting pipeline auxiliary device, it is characterized in that, it mainly include the first crossbar and second crossbar of upper and lower parallelly distribute on, it is fixedly connected on the vertical bar that between the first crossbar and the same side end of second crossbar and vertical direction is distributed, the first crossbar is equipped with two for overlapping the fixation pillar of fixed hanging belt far from the end front-rear direction of vertical bar one end, the fixed pillar is perpendicular to first crossbar axis direction horizontal distribution, furthermore, the second crossbar is greater than the length of first crossbar far from the length of vertical bar one end, structure used by this programme, without frequently bundling, unbundlings, speed of application is fast, greatly improve working efficiency.

Description

A kind of lifting pipeline auxiliary device
Technical field
The utility model relates to pipe installation technology field, in particular to a kind of lifting pipeline auxiliary device.
Background technique
Currently, Pipe installing needs to be lifted using truck crane in construction work, it is also necessary to which site operation personnel make Pipeline is bundled with hanging belt, when pipeline is seated to designated position, it is also necessary to which construction personnel unbinds hanging belt. This pipeline construction mode not only needs several construction personnel to cooperate, but also in the construction process, hanging belt can be such that two pipelines connect It meets place there are gaps and waste the construction time so as to cause the next step constructional difficulties, also reduce whole aesthetics; Meanwhile the liftings such as truck crane large machines is unable to operate normally in the narrow place of some roads, can not play advantage, therefore need A kind of auxiliary tool of Portable power saving is designed, construction personnel is helped to complete Pipe installing.
Summary of the invention
To solve the above-mentioned problems, the utility model provides a kind of lifting pipeline auxiliary device, the technical solution of use It is as follows:
A kind of lifting pipeline auxiliary device, which is characterized in that mainly include the first crossbar and second of upper and lower parallelly distribute on Cross bar is fixedly connected on the vertical bar that between the first crossbar and the same side end of second crossbar and vertical direction is distributed, institute It states first crossbar and is equipped with two for overlapping the fixation pillar of fixed hanging belt, institute far from the end front-rear direction of vertical bar one end Fixed pillar is stated perpendicular to first crossbar axis direction horizontal distribution, in addition, big in the length far from vertical bar side second crossbar In the length of first crossbar.
Preferably, the first crossbar, second crossbar and vertical bar length are adjustable.
Preferably, the first crossbar, second crossbar and vertical bar are made of fixed link and motion bar, the motion bar It can be slidably connected to fixed link along fixed link axis direction, position phase on circumferencial direction is equipped in the fixed link and motion bar Corresponding fixation hole, fixed link and motion bar pass through fixation hole by bolt and are fixed by nut.
Preferably, the second crossbar outer surface is equipped with one layer of anti-slip layer.
Preferably, the anti-slip layer is rubber layer.
The utility model has the beneficial effects that:
1, structure is simple, is lifted by crane by the way that long end steel pipe to be inserted into pipeline, avoids construction personnel from frequently bundling, unbinds and hang Band is filled, manipulation strength and personnel's investment is reduced, improves integral construction speed and quality;
2, first crossbar, second crossbar and vertical bar are stretching structure, and length and position are adjustable, and basis is facilitated not sympathize with Condition is adjusted, applied widely.
Detailed description of the invention
Fig. 1 is lifting pipeline assistant apparatus structure schematic diagram
Fig. 2 lifting pipeline auxiliary device main view
Wherein, 1- first crossbar, 2- second crossbar, 3- vertical bar, the fixed pillar of 4-, 5- hanging belt, 6- fixation hole, 7- are solid Determine bolt, 8- fixed link, 9- motion bar.
Specific embodiment
1-2 and specific embodiment are described in further detail the utility model with reference to the accompanying drawing.
Lifting pipeline auxiliary device as shown in Figs. 1-2, mainly includes first crossbar 1, second crossbar 2 and vertical bar 3, and the One cross bar 1 is located at the surface of second crossbar 2, first crossbar 1 and the distribution of 2 horizontal cross of second crossbar and the two left end Alignment, 3 vertical direction of vertical bar is distributed and is fixedly connected between 2 left end of first crossbar 1 and second crossbar, in first crossbar 1 right part is equipped with two fixed pillars 4 being distributed perpendicular to 1 axis front-rear direction of first crossbar, and the fixed pillar 4 is using tool There is the connection reinforcing bar of some strength, wherein first crossbar 1, second crossbar 2 and 3 three of vertical bar are by fixed link 8 and motion bar 9 Composition, motion bar 9 are slidably coupled to inside fixed link 8, carry out the adjusting in length with this, and 9 surface of motion bar is equipped with Several fixation holes 6 being in axial direction distributed, 8 surface of fixed link are equipped with one with the fixation hole 6 on motion bar 9 in circumference side The corresponding fixation hole 6 in upward position, after regulating corresponding relationship between fixed link 8 and motion bar 9, passes through 7 He of fixing bolt Fixation hole 6 is fixed, in addition, being also enclosed with one layer on the outer surface of second crossbar 2 for increasing the rubber layer of frictional force.
In actual work progress, first crossbar 1, second crossbar 2 and vertical bar 3 can choose the side left unused in engineering Steel pipe or round steel pipe, the left end with first crossbar 1 and second crossbar 2 is respectively welded in 3 upper and lower ends of vertical bar, firstly, according to pipe The length of road length adjustment first crossbar 1 and second crossbar 2, and be fixed by fixing bolt 7, then by 5 liang of hanging belt End is respectively fixedly connected on two fixed pillars 4, and then lifting machine slings hanging belt 5 by drop hanger, then by second crossbar 2 Movable end protrude into inside pipeline, hoisting machinery is sling be put into pipeline groove vertically, adjust good position after, by second crossbar 2 Level pulls out and lifts, and continues the lifting of next length of tubing.
By the utilization of the present apparatus, staff's institute's wave in the circulation process that binding, unbundlings bundle again is greatly reduced The time taken, improve construction efficiency and quality.
The above is only the preferred embodiment of the utility model, it should be pointed out that: for the common skill of the art For art personnel, without departing from the principle of this utility model, several improvement can also be made, these improvement also should be regarded as The protection scope of the utility model.

Claims (5)

1. a kind of lifting pipeline auxiliary device, which is characterized in that the mainly first crossbar including upper and lower parallelly distribute on and the second cross Bar is fixedly connected on the vertical bar that between the first crossbar and the same side end of second crossbar and vertical direction is distributed, described First crossbar is equipped with two fixation pillars for being used to overlap fixed hanging belt far from the end front-rear direction of vertical bar one end, described Fixed pillar is perpendicular to first crossbar axis direction horizontal distribution, in addition, being greater than in the length far from vertical bar side second crossbar The length of first crossbar.
2. lifting pipeline auxiliary device according to claim 1, which is characterized in that the first crossbar, second crossbar with And vertical bar length is adjustable.
3. lifting pipeline auxiliary device according to claim 2, which is characterized in that the first crossbar, second crossbar with And vertical bar is made of fixed link and motion bar, the motion bar can be slidably connected to fixed link, institute along fixed link axis direction It states and is equipped with the corresponding fixation hole in position on circumferencial direction on fixed link and motion bar, fixed link and motion bar pass through fixed spiral shell Bolt passes through fixation hole and is fixed by nut.
4. lifting pipeline auxiliary device according to claim 1 or 3, which is characterized in that on the second crossbar outer surface Equipped with one layer of anti-slip layer.
5. lifting pipeline auxiliary device according to claim 4, which is characterized in that the anti-slip layer is rubber layer.
CN201920415040.0U 2019-03-29 2019-03-29 A kind of lifting pipeline auxiliary device Active CN209721363U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920415040.0U CN209721363U (en) 2019-03-29 2019-03-29 A kind of lifting pipeline auxiliary device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920415040.0U CN209721363U (en) 2019-03-29 2019-03-29 A kind of lifting pipeline auxiliary device

Publications (1)

Publication Number Publication Date
CN209721363U true CN209721363U (en) 2019-12-03

Family

ID=68689323

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920415040.0U Active CN209721363U (en) 2019-03-29 2019-03-29 A kind of lifting pipeline auxiliary device

Country Status (1)

Country Link
CN (1) CN209721363U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111874796A (en) * 2020-09-14 2020-11-03 中冶南方城市建设工程技术有限公司 Multifunctional pipeline hoisting and positioning auxiliary device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111874796A (en) * 2020-09-14 2020-11-03 中冶南方城市建设工程技术有限公司 Multifunctional pipeline hoisting and positioning auxiliary device

Similar Documents

Publication Publication Date Title
CN205689895U (en) Heavy caliber compound pipeline complex pipeline boil on the nape opposite the mouth adjusting means
CN202000646U (en) Self-lifting construction platform integrating vertical transportation device and mould frame
CN209817430U (en) Template supporting structure of tower crane reserved hole
CN209721363U (en) A kind of lifting pipeline auxiliary device
CN206591449U (en) Hood type automatic leveling anchor for CFST Arch Bridge suspender replacement
CN202564850U (en) Replacement and lifting tool for tubular bus pillar insulator
CN207209809U (en) A kind of extraordinary Dramatic Air Lifts
CN203795311U (en) Multi-leg high pier and slip form construction device
CN206309039U (en) One kind can assembled movable pump tube support device
CN202746764U (en) Lifting bracket for pipeline butting adjustment
CN209308433U (en) A kind of multi-functional trolley of Cast-in-situ Beam steel reinforcement cage binding installation
CN104652424A (en) Movable lifting hook for lifting reinforcing cage
CN204282843U (en) The sliding hoisted in position device of steel girder erection in a kind of stiffness combination construction
CN203613464U (en) Slip form construction cargo transportation device
CN102003070A (en) Construction method of suspending scaffold
CN205114861U (en) Hoist and mount lacing device
CN211621558U (en) Bored concrete pile steel reinforcement cage elevation control mounting structure
CN204551442U (en) A kind of reinforcing bar cage hoisting movable hook
CN103669219B (en) Many limbs height pier is with sliding construction equipment
CN203613461U (en) Slip form construction lifting system
CN208803382U (en) A kind of CFST Arch Bridge intermediate transverse girder promotion positioning apparatus
CN203782575U (en) Stay cable hanging and tension construction device
CN208120620U (en) Pipe tilting vehicle
CN209260563U (en) A kind of Bailey beam truss entirety transverse sliding device for cast-in-situ continuous beam
CN202017347U (en) Externally-hung discharging platform device