CN205689895U - Heavy caliber compound pipeline complex pipeline boil on the nape opposite the mouth adjusting means - Google Patents

Heavy caliber compound pipeline complex pipeline boil on the nape opposite the mouth adjusting means Download PDF

Info

Publication number
CN205689895U
CN205689895U CN201620529574.2U CN201620529574U CN205689895U CN 205689895 U CN205689895 U CN 205689895U CN 201620529574 U CN201620529574 U CN 201620529574U CN 205689895 U CN205689895 U CN 205689895U
Authority
CN
China
Prior art keywords
pipeline
hoisting beam
adjusting means
boil
heavy caliber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620529574.2U
Other languages
Chinese (zh)
Inventor
刘洪全
熊琪
梁志宏
毛胜坤
陈静华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Industrial Equipment Installation Group Co ltd
Original Assignee
Chongqing Industrial Equipment Installation Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Industrial Equipment Installation Group Co ltd filed Critical Chongqing Industrial Equipment Installation Group Co ltd
Priority to CN201620529574.2U priority Critical patent/CN205689895U/en
Application granted granted Critical
Publication of CN205689895U publication Critical patent/CN205689895U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of heavy caliber compound pipeline complex pipeline boil on the nape opposite the mouth adjusting means, including pipeline adjusting means and pipeline butt take-up device;Described pipeline adjusting means includes bracing frame and by the hoisting beam of its support, and spacing mobile device;Hoisting beam includes main hoisting beam and time hoisting beam, and main hoisting beam is fixedly installed on bracing frame along pipeline radial direction, and secondary hoisting beam is perpendicular to main hoisting beam and arranges, and can slide along main hoisting beam, moves along main hoisting beam direction adjusting pipeline;Secondary hoisting beam is provided with hoisting device, and hoisting device can slide along secondary hoisting beam and move along time hoisting beam direction with adjustment pipeline;Spacing mobile device is for regulating the position of time hoisting beam;Described pipeline butt take-up device includes pipeline band and tightener.The construction difficult problems such as this device efficiently solves heavy caliber compound pipeline complex pipeline concentricity in boil on the nape opposite the mouth work progress and linearity controls and regulation pipe level moves, be rapidly separated open tightening, device and pipeline.

Description

Heavy caliber compound pipeline complex pipeline boil on the nape opposite the mouth adjusting means
Technical field
This utility model relates to pipeline butt adjusting means, particularly one heavy caliber compound pipeline complex pipeline boil on the nape opposite the mouth adjusting means, It is suitable for the pipeline connection construction of various heavy caliber composites.
Background technology
Large diameter pipeline boil on the nape opposite the mouth difficulty is big, and the quality of boil on the nape opposite the mouth quality is directly connected to the bonding machine installation quality of pipeline, The installation progress of restriction pipeline and the construction quality of subsequent job.The main cause that large diameter pipeline boil on the nape opposite the mouth difficulty is big is boil on the nape opposite the mouth work Skill difference and the backwardness of aligning tool.
In the traditional construction that large diameter pipeline boil on the nape opposite the mouth connects, frequently with the instrument such as bottle gouard moved by hands, jack, pipeline butt is even The concentricity, the linearity that connect control poor, affect construction quality.
China Patent Publication No. 202021448U(publication date 2011.11.02) disclose a kind of large diameter pipeline boil on the nape opposite the mouth dress Put, including screw jack, be to be connected to one section of connecting tube or connecting rod, connecting tube or company at the two ends of screw jack The end of extension bar is provided with cambered plate, reaches to be easy to manual operation, do not hinder mother metal, effect with low cost.
China Patent Publication No. 201376170(publication date 2010.01.06) disclose a kind of large diameter pipeline line-up clamp, By being flexibly connected of boil on the nape opposite the mouth fixed block and conduit coupling, two pipelines are linked into an integrated entity, in conduit coupling and boil on the nape opposite the mouth Setting space adjustment block between fixed block, plays the spacing of two pipelines of fine setting, improves the effect of boil on the nape opposite the mouth accuracy.Use pipeline Axis correction assembly, after two pipeline butts, the central axis utilizing axis trimming block two pipelines of adjustment is straight at same On line.
Boil on the nape opposite the mouth for heavy caliber compound pipeline complex pipeline regulates, and yet suffers from concentricity and linearity controls and adjusts in work progress Joint difficulty, pipe level move the difficult problems such as inconvenience, device the best to open tightening and pipeline are rapidly separated.Labor intensity is big, pipeline The efficiency of construction of boil on the nape opposite the mouth is low, construction quality and safety be difficult to ensure.
Utility model content
The purpose of this utility model is to provide a kind of new heavy caliber compound pipeline complex pipeline boil on the nape opposite the mouth adjusting means, can effectively solve big Bore compound pipeline complex pipeline concentricity in boil on the nape opposite the mouth work progress and linearity control and regulation, pipe level move, to open tightening, Device and pipeline the construction difficult problem such as be rapidly separated.Reduce labor intensity, improve the efficiency of construction of pipeline butt, ensure that Construction quality and safety.
The heavy caliber compound pipeline complex pipeline boil on the nape opposite the mouth adjusting means that this utility model provides, including pipeline adjusting means (1) and pipeline Boil on the nape opposite the mouth take-up device (2);
Described pipeline adjusting means (1) includes bracing frame and by the hoisting beam of its support, and spacing mobile device (3); Hoisting beam includes main hoisting beam (4) and time hoisting beam (5), and main hoisting beam (4) is fixedly installed on bracing frame along pipeline radial direction On, secondary hoisting beam (5) is perpendicular to main hoisting beam (4) and arranges, and can slide along main hoisting beam (4), to adjust pipeline along main lifting Beam (4) direction is moved;Secondary hoisting beam (5) is provided with hoisting device (6), and hoisting device (6) can slide to adjust along secondary hoisting beam (5) Homogeneous tube road moves along time hoisting beam (5) direction;
Spacing mobile device (3) includes the stop nut (3-1) being fixed on time hoisting beam (5), is fixedly installed in support With the block (3-2) of perforation on frame, and trapezoidal screw (3-3), trapezoidal screw (3-3) one end passes stop nut (3-1), The other end is through block (3-2) and is being equipped with sprocket wheel through one end of block and is pulling chain;
Described pipeline butt take-up device (2) includes pipeline band (2-1) and tightener (2-2).
Described main hoisting beam (4) and time hoisting beam (5) can be arranged to different size, according to pipe diameter, length etc. Actual demand carries out exchanging use, very convenient.The axial direction of main hoisting beam (4) is axially vertical with pipeline.Main hoisting beam (4) It is vertically arranged with secondary hoisting beam (5), both can adjust pipeline and move radially, pipeline can be adjusted again and move axially.
Described pipeline band (2-1), can be nylon suspension dress band, and colligation is two ends at pipeline butt, and use tightener (2-2) nylon lifting band is carried out tensioning.According to pipe diameter, use 2 ~ 3 groups of tighteners (2-2), uniform along pipeline circumference.
Preferably, above-mentioned heavy caliber compound pipeline complex pipeline boil on the nape opposite the mouth adjusting means, support frame as described above includes column (7) and longeron (8), Column (7), longeron (8) and main hoisting beam (4) are connected by frame connecting apparatus (9) is fixing, are built into rectangular frame structure, institute State frame connecting apparatus (9) and be provided with bolt connecting hole for by the end of column (7), the end of longeron (8) and main hoisting beam (4) End be bolted to connection.In this technical scheme, main hoisting beam (4) is equivalent to crossbeam, main hoisting beam (4), Longeron (8) and column (7) have respectively constituted the limit of rectangular frame, the most vertically, increase bracing frame stability.Framework connects Device (9), corresponding to being respectively provided with bolt arrangement on crossbeam, longeron (8) and column (7) these three direction, makes main hoisting beam (4) Or when longeron (8) is replaced according to different demands, it is not necessary to change attachment means, also save into while convenient handling This.
Preferably, above-mentioned heavy caliber compound pipeline complex pipeline boil on the nape opposite the mouth adjusting means, described column (7) bottom is by trapezoidal screw (10) Be connected the levelness to regulate rectangular frame structure with base steel plate (11).
Preferably, above-mentioned heavy caliber compound pipeline complex pipeline boil on the nape opposite the mouth adjusting means, described trapezoidal screw (10) includes leading screw and nut, Column (7) bottom is longitudinally provided with the screw for leading screw precession, nut periphery socket base steel plate (11) along column (7);Leading screw one End is connected to be positioned on the ground steel plate (12) on ground, and the other end passes nut precession screw.
Preferably, above-mentioned heavy caliber compound pipeline complex pipeline boil on the nape opposite the mouth adjusting means, it is positioned at column (7) the bottom inside face of pipeline both sides Position is respectively equipped with groove (13), for fixing the traverse square steel (16) in duct bottom with support pipeline.Square steel (16) two ends Fix in groove and by base steel plate (11) support, set up a square steel bracket, after pipeline taken on by square steel bracket, its nose end Can carry out easily polishing, cleaning.
Preferably, above-mentioned heavy caliber compound pipeline complex pipeline boil on the nape opposite the mouth adjusting means, in described spacing mobile device (3), stop nut (3-1), at be positioned at that time hoisting beam (5) is axial 1/2, block (3-2) is positioned at longeron (8) is axial 1/2.
Preferably, above-mentioned heavy caliber compound pipeline complex pipeline boil on the nape opposite the mouth adjusting means, described main hoisting beam (4) and time hoisting beam (5) are equal For I-steel.
Preferably, above-mentioned heavy caliber compound pipeline complex pipeline boil on the nape opposite the mouth adjusting means, described hoisting device (6) is hand pulling type chain calabash Reed, is provided with underslung trolley (14), between secondary hoisting beam (5) and main hoisting beam (4) between hoisting device (6) and time hoisting beam (5) It is provided with underslung trolley (14), slides through underslung trolley (14) and slide on I-steel realization.
Underslung trolley (14) is provided with the roller that can slide on i-beam track, by secondary hoisting beam (5) and underslung trolley (14) there is roller one end to hang on main hoisting beam (4) underslung trolley (14) again after fixing connection, time hoisting beam (5) can be realized And the relative slip between main hoisting beam (4).In like manner, the relative slip between hoisting device (6) and time hoisting beam (5) is also taked This mode realizes.
Preferably, above-mentioned heavy caliber compound pipeline complex pipeline boil on the nape opposite the mouth adjusting means, it is positioned between two columns (7) of pipeline side, if There is reinforcing longeron (15), reinforce the supporting role of bracing frame.
Preferably, above-mentioned heavy caliber compound pipeline complex pipeline boil on the nape opposite the mouth adjusting means, described main hoisting beam (4) two ends and longeron (8) two End is all with rectangular steel plates end socket, then is bolted on frame connecting apparatus (9).
The heavy caliber compound pipeline complex pipeline boil on the nape opposite the mouth adjusting means that this utility model provides, has the advantages that
Heavy caliber compound pipeline complex pipeline boil on the nape opposite the mouth adjusting means of the present utility model efficiently solves heavy caliber compound pipeline complex pipeline in boil on the nape opposite the mouth Concentricity in work progress and linearity control and regulation, pipe level move, the most de-with pipeline to open tightening, device From waiting construction difficult problem.Reduce labor intensity, improve the efficiency of construction of pipeline butt, ensure that construction quality and safety.
Accompanying drawing explanation
Fig. 1 is that heavy caliber compound pipeline complex pipeline boil on the nape opposite the mouth adjusting means uses view;
Fig. 2 is the polishing view using device of the present utility model to adjust heavy caliber compound pipeline complex pipeline;
Fig. 3 is heavy caliber compound pipeline complex pipeline boil on the nape opposite the mouth adjusting means structural representation of the present utility model;
Fig. 4 is the rectangular frame structural representation of pipeline adjusting means;
Fig. 5 is the secondary hoisting beam of pipeline adjusting means and spacing mobile device structural representation;
Fig. 6 is the perspective structure schematic diagram that trapezoidal screw is connected with base steel plate;
Description of reference numerals:
1. pipeline adjusting means;2. pipeline butt take-up device;
2-1. pipeline band;2-2. tightener;
The most spacing mobile device;3-1. stop nut;
3-2. block;3-3. trapezoidal screw;
The most main hoisting beam;5. time hoisting beam;
6. hoisting device;7. column;
8. longeron;9. frame connecting apparatus;
10. trapezoidal screw;11. base steel plates;
12. ground steel plates;13. grooves;
14. underslung trolleys;15. reinforce longeron;
16. square steel.
Detailed description of the invention
In order to make those skilled in the art be more fully understood that this utility model scheme, below in conjunction with the accompanying drawings and be embodied as The utility model is described in further detail for mode.
Refer to Fig. 2 ~ 6, as a kind of embodiment, heavy caliber compound pipeline complex pipeline boil on the nape opposite the mouth adjusting means of the present utility model, Including pipeline adjusting means 1 and pipeline butt take-up device 2;
Described pipeline adjusting means 1 includes bracing frame and by the hoisting beam of its support, and spacing mobile device 3.Lifting Beam is i-beam structure.Hoisting beam includes main hoisting beam 4 and time hoisting beam 5, and main hoisting beam 4 sets along pipeline radial direction is fixing Putting on bracing frame, secondary hoisting beam 5 is perpendicular to main hoisting beam 4 and arranges.
Bracing frame is made up of four root posts 7 and two longerons 8, and two main hoisting beams 4, as crossbeam, are assembled into rectangle together Tower structure.Longeron 8 and crossbeam two ends all with rectangular steel plates end socket, connect by frame connecting apparatus 9 is fixing, and framework connects Device 9, corresponding to being respectively provided with bolt arrangement on crossbeam, longeron 8 and column 7 these three direction, is bolted fastening and builds Rectangular tower structure.In addition to reinforce the supporting role of bracing frame, between two columns 7 of pipeline side, if There is reinforcing longeron 15.
The two ends of secondary hoisting beam 5 are installed with underslung trolley 14, and the roller of underslung trolley 14 can be along main hoisting beam 4 I-steel slides, and drives time hoisting beam 5 to horizontally slip along main hoisting beam direction, and then reaches to adjust pipeline left and right in the radial direction thereof The purpose of movement.
Secondary hoisting beam 5 is provided with hoisting device 6, and hoisting device 6 is hand pulling type chain block, and hoisting device 6 is by hanging Dolly 14 can move along it adjusting pipeline axially back and forth along secondary hoisting beam 5 slide anteroposterior.
Spacing mobile device 3 includes being fixed on the stop nut 3-1 at time hoisting beam 5 is axial 1/2, is fixedly installed in The block 3-2 with trapezoidal thread at the longeron 8 axial 1/2 of support, and trapezoidal screw 3-3, trapezoidal screw 3-3 one end wears Crossing stop nut 3-1, the other end is equipped with sprocket wheel and pull chain through block 3-2 and at this through end.
It is connected with base steel plate 11 by trapezoidal screw 10 with regulation rectangular frame structure bottom the column 7 of bracing frame Levelness.More particularly, trapezoidal screw 10 includes leading screw and nut, is longitudinally provided with for leading screw precession along column 7 bottom column 7 Screw, nut periphery socket base steel plate 11;Leading screw one end is connected to be positioned on the ground steel plate 12 on ground, and the other end is worn Cross nut precession screw.Column height, and then the levelness of regulation bracing frame is adjusted by adjusting screw protruded length.
The position, column 7 bottom inside face being positioned at pipeline both sides is respectively equipped with groove 13, is used for fixing traverse at the bottom of pipeline The square steel 16 in portion is with support pipeline.Square steel 16 two ends fix in groove and by base steel plate 11 support, set up a square steel torr Frame, after pipeline taken on by square steel bracket, its nose end can carry out polishing easily, cleaning.Groove 13 and column 7 and base Steel plate 11 is fixing to be connected.
Described pipeline butt take-up device 2 includes pipeline band 2-1 and tightener 2-2.
Pipeline band 2-1 can be nylon suspension dress band, and symmetrical colligation is in pipeline butt end, and with tightener 2-2 to nylon Hanging belt carries out tensioning.According to pipe diameter, use 2 ~ 3 groups of tightener 2-2, uniform along pipeline circumference.
Using method:
Refer to accompanying drawing 1 ~ 5, heavy caliber compound pipeline complex pipeline boil on the nape opposite the mouth adjusting means of the present utility model is in use, first smooth This device is assembled complete by ground, is lifted to the foundation ditch laying bed course with crane, is placed in Pipe installing path On, at pipeline construction section 1/2, arrange a table apparatus;A table apparatus is arranged to be installed section 1/2 of pipeline.Again pipeline is hung Delivering in foundation ditch, along in insertion apparatus, be placed in ground, pipe joint should be close proximity to (see accompanying drawing 1);Adjust heavy caliber multiple tube The base (being adjusted by trapezoidal screw 10) of road boil on the nape opposite the mouth adjusting means, makes device lateral and longitudinal holding level.Hang with secondary Hand pulling type chain block on dress beam 5 is sling pipeline, after Pipeline lift, and can be in the groove 13 of two column bottom positions horizontal one Root square steel 16, then pipeline is transferred, make pipeline one end tilt, construction section and the to be installed section of mouth of pipe can be repaired and polished (see accompanying drawing 2).
After having polished, can be to unfitness of butt joint up and down and the straight line connecting pipeline by promoting and transfer hand pulling type chain block Degree is adjusted, by pull the chain of spacing mobile device 3 rotate trapezoidal screw 3-3 can push-and-pull time hoisting beam 5, with the company of adjustment The left and right unfitness of butt joint in adapter road and linearity.Pipe laying boil on the nape opposite the mouth take-up device 2, the interface both sides mouth of pipe (is i.e. managed with nylon sling Road band 2-1) binding, and strain with tightener 2-2, according to pipe diameter size, use two to three group pipeline butt tension dresses Put 2, be distributed in mouth of pipe circumference.The boil on the nape opposite the mouth interval of pipeline and socket joint thrust can be realized by synchronous tension pipeline butt take-up device (see accompanying drawing 3), pipeline will move as anterior-posterior horizontal along time hoisting beam 5 along with chain block.Until connecting pipeline linearity, boil on the nape opposite the mouth Gap or the socket joint degree of depth meet the requirements, and can start pipeline fusing operation.
The explanation of above example is only intended to help to understand core concept of the present utility model.It should be pointed out that, for this For the those of ordinary skill of technical field, on the premise of without departing from this utility model principle, it is also possible to this utility model Carrying out some improvement and modification, these improve and modification also falls in this utility model scope of the claims.

Claims (10)

1. heavy caliber compound pipeline complex pipeline boil on the nape opposite the mouth adjusting means, it is characterised in that include pipeline adjusting means (1) and pipeline butt tension Device (2);
Described pipeline adjusting means (1) includes bracing frame and by the hoisting beam of its support, and spacing mobile device (3);Lifting Beam includes main hoisting beam (4) and time hoisting beam (5), and main hoisting beam (4) is fixedly installed on bracing frame along pipeline radial direction, secondary Hoisting beam (5) is perpendicular to main hoisting beam (4) and arranges and can slide to adjust pipeline along main hoisting beam (4) side along main hoisting beam (4) To movement;Secondary hoisting beam (5) is provided with hoisting device (6), and hoisting device (6) can slide along secondary hoisting beam (5) to adjust pipeline Move along time hoisting beam (5) direction;
Spacing mobile device (3) includes the stop nut (3-1) being fixed on time hoisting beam (5), is fixedly installed on bracing frame With the block (3-2) of perforation, and trapezoidal screw (3-3), trapezoidal screw (3-3) one end passes stop nut (3-1), another Hold through block (3-2) and be equipped with sprocket wheel through one end of block and pulling chain;
Described pipeline butt take-up device (2) includes pipeline band (2-1) and tightener (2-2).
Heavy caliber compound pipeline complex pipeline boil on the nape opposite the mouth adjusting means the most according to claim 1, it is characterised in that support frame as described above includes Column (7) and longeron (8), column (7), longeron (8) and main hoisting beam (4) are connected by frame connecting apparatus (9) is fixing, are built into Rectangular frame structure, described frame connecting apparatus (9) is provided with bolt connecting hole for by the end of column (7), longeron (8) The end of end and main hoisting beam (4) is bolted to connection.
Heavy caliber compound pipeline complex pipeline boil on the nape opposite the mouth adjusting means the most according to claim 2, it is characterised in that described column (7) end Portion by trapezoidal screw (10) be connected with base steel plate (11) with regulation rectangular frame structure levelness.
Heavy caliber compound pipeline complex pipeline boil on the nape opposite the mouth adjusting means the most according to claim 3, it is characterised in that described trapezoidal screw (10) including leading screw and nut, column (7) bottom is longitudinally provided with the screw for leading screw precession along column (7), and nut periphery is socketed Base steel plate (11);Leading screw one end is connected to be positioned on the ground steel plate (12) on ground, and the other end passes nut precession screw.
Heavy caliber compound pipeline complex pipeline boil on the nape opposite the mouth adjusting means the most according to claim 3, it is characterised in that be positioned at pipeline both sides Position, column (7) bottom inside face is respectively equipped with groove (13), for fixing the traverse square steel (16) in duct bottom with support Pipeline.
Heavy caliber compound pipeline complex pipeline boil on the nape opposite the mouth adjusting means the most according to claim 2, it is characterised in that described spacing mobile dress Putting in (3), stop nut (3-1) is positioned at time hoisting beam (5) is axial 1/2, and block (3-2) is positioned at 1/2 that longeron (8) is axial Place.
7. according to the arbitrary described heavy caliber compound pipeline complex pipeline boil on the nape opposite the mouth adjusting means of claim 2 ~ 6, it is characterised in that described master hangs Dress beam (4) and time hoisting beam (5) are I-steel.
Heavy caliber compound pipeline complex pipeline boil on the nape opposite the mouth adjusting means the most according to claim 7, it is characterised in that described hoisting device (6) it is hand pulling type chain block, between hoisting device (6) and time hoisting beam (5), is provided with underslung trolley (14), secondary hoisting beam (5) And it is provided with underslung trolley (14) between main hoisting beam (4), slides through underslung trolley (14) and slide on I-steel realization.
Heavy caliber compound pipeline complex pipeline boil on the nape opposite the mouth adjusting means the most according to claim 8, it is characterised in that be positioned at pipeline side Between two columns (7), it is provided with reinforcing longeron (15).
Heavy caliber compound pipeline complex pipeline boil on the nape opposite the mouth adjusting means the most according to claim 9, it is characterised in that described main hoisting beam (4) two ends and longeron (8) two ends are all with rectangular steel plates end socket, then are bolted on frame connecting apparatus (9).
CN201620529574.2U 2016-06-03 2016-06-03 Heavy caliber compound pipeline complex pipeline boil on the nape opposite the mouth adjusting means Expired - Fee Related CN205689895U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620529574.2U CN205689895U (en) 2016-06-03 2016-06-03 Heavy caliber compound pipeline complex pipeline boil on the nape opposite the mouth adjusting means

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620529574.2U CN205689895U (en) 2016-06-03 2016-06-03 Heavy caliber compound pipeline complex pipeline boil on the nape opposite the mouth adjusting means

Publications (1)

Publication Number Publication Date
CN205689895U true CN205689895U (en) 2016-11-16

Family

ID=57261402

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620529574.2U Expired - Fee Related CN205689895U (en) 2016-06-03 2016-06-03 Heavy caliber compound pipeline complex pipeline boil on the nape opposite the mouth adjusting means

Country Status (1)

Country Link
CN (1) CN205689895U (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106826081A (en) * 2017-01-22 2017-06-13 中国十七冶集团有限公司 A kind of major diameter corrugated pipe pipeline counterpart installation method
CN107191673A (en) * 2017-06-28 2017-09-22 青岛安装建设股份有限公司 A kind of ultra-large type GRP pipe installs counterpart construction method
CN107443307A (en) * 2017-08-16 2017-12-08 胜利油田高原石油装备有限责任公司 A kind of tightening mechanism for large diameter pipeline screw thread
CN109250650A (en) * 2018-11-22 2019-01-22 中国十七冶集团有限公司 Super large caliber helical bellows contra-aperture device and application method
CN109734009A (en) * 2019-01-30 2019-05-10 浙江伟达园林工程有限公司 A kind of above-water hoisting device
CN110802363A (en) * 2019-11-22 2020-02-18 北京金河水务建设集团有限公司 Pipeline aligning device and using method
CN111365540A (en) * 2020-04-14 2020-07-03 朱士红 Municipal drainage pipeline joint fixing device and implementation method thereof
CN111457155A (en) * 2020-04-22 2020-07-28 中石化第十建设有限公司 Suspension progressive pipe penetrating device and method
CN112377674A (en) * 2020-10-28 2021-02-19 宁波市鄞州世纪耀达市政建设有限公司 Pipeline transferring and hoisting device and underground sewage pipeline construction method
CN112605624A (en) * 2020-12-03 2021-04-06 上海二十冶建设有限公司 Rapid installation method for coiled pipeline
CN115789337A (en) * 2022-12-26 2023-03-14 安徽工业大学 Modularized pipeline installation and butt joint auxiliary device and method
CN118026001A (en) * 2024-02-23 2024-05-14 山东大图数控设备有限公司 Hoisting equipment for processing large welding parts

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106826081B (en) * 2017-01-22 2019-02-26 中国十七冶集团有限公司 A kind of major diameter corrugated pipe pipeline counterpart installation method
CN106826081A (en) * 2017-01-22 2017-06-13 中国十七冶集团有限公司 A kind of major diameter corrugated pipe pipeline counterpart installation method
CN107191673A (en) * 2017-06-28 2017-09-22 青岛安装建设股份有限公司 A kind of ultra-large type GRP pipe installs counterpart construction method
CN107443307A (en) * 2017-08-16 2017-12-08 胜利油田高原石油装备有限责任公司 A kind of tightening mechanism for large diameter pipeline screw thread
CN109250650B (en) * 2018-11-22 2024-05-03 中国十七冶集团有限公司 Ultra-large diameter helical bellows aligning device and use method thereof
CN109250650A (en) * 2018-11-22 2019-01-22 中国十七冶集团有限公司 Super large caliber helical bellows contra-aperture device and application method
CN109734009A (en) * 2019-01-30 2019-05-10 浙江伟达园林工程有限公司 A kind of above-water hoisting device
CN110802363A (en) * 2019-11-22 2020-02-18 北京金河水务建设集团有限公司 Pipeline aligning device and using method
CN111365540A (en) * 2020-04-14 2020-07-03 朱士红 Municipal drainage pipeline joint fixing device and implementation method thereof
CN111457155A (en) * 2020-04-22 2020-07-28 中石化第十建设有限公司 Suspension progressive pipe penetrating device and method
CN111457155B (en) * 2020-04-22 2021-11-05 中石化第十建设有限公司 Suspension progressive pipe penetrating device and method
CN112377674A (en) * 2020-10-28 2021-02-19 宁波市鄞州世纪耀达市政建设有限公司 Pipeline transferring and hoisting device and underground sewage pipeline construction method
CN112605624A (en) * 2020-12-03 2021-04-06 上海二十冶建设有限公司 Rapid installation method for coiled pipeline
CN115789337A (en) * 2022-12-26 2023-03-14 安徽工业大学 Modularized pipeline installation and butt joint auxiliary device and method
CN118026001A (en) * 2024-02-23 2024-05-14 山东大图数控设备有限公司 Hoisting equipment for processing large welding parts

Similar Documents

Publication Publication Date Title
CN205689895U (en) Heavy caliber compound pipeline complex pipeline boil on the nape opposite the mouth adjusting means
CN202137546U (en) Opening-to-opening centralizer for welding of pipelines
CN202106162U (en) Butting joint alignment device for butt welding of tubes
CN203160133U (en) Three-dimensional combined accurate positioning device for stayed-cable bridge body cable duct
CN205967986U (en) Device is used in adjustable straightness's of hanging down corundum wear -resistant pipeline flange welding
CN207986489U (en) Hang regulating device in large diameter pile foundation steel reinforcement cage aperture
CN109339458A (en) A kind of multi-functional trolley of Cast-in-situ Beam steel reinforcement cage binding installation
CN105133825A (en) Multifunctional decoration platform
CN211102477U (en) Pipeline aligning device
CN103341531A (en) Inner support device for manufacturing penstock
CN107335948A (en) A kind of quick assembly tool of T profile
CN110203852B (en) Road construction major diameter cement pipeline section handling device
CN111827125A (en) Accurate adjustment method and device for installation line shape of steel upright post of arch bridge
CN206928188U (en) A kind of bracket system for the positioning of T negative moment of girder stretch-draw jack
CN105776044A (en) Lifting appliance special for demounting and mounting of universal coupling on vertical mill and application method of lifting device
JP7506898B2 (en) Boom tray and boom nut attachment device for girder lifting device
CN204983582U (en) Multi -functional fitment platform
CN209308433U (en) A kind of multi-functional trolley of Cast-in-situ Beam steel reinforcement cage binding installation
CN202829363U (en) Column type lifting frame for overhauling mineralizer of flotation machine
CN114427200A (en) Suspension device for bridge engineering construction
CN209721363U (en) A kind of lifting pipeline auxiliary device
CN102371624A (en) Method for tensioning pre-stressed reinforcement of ballast-less transition sleeper of ballast-less track
CN101767753B (en) Method for hoisting by lifting belt vertically
CN208135600U (en) A kind of large size wire and cable spiral wheeled support device
CN103669219B (en) Many limbs height pier is with sliding construction equipment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161116

Termination date: 20210603