CN101975072B - 普通综采工作面液压支架回收方法 - Google Patents

普通综采工作面液压支架回收方法 Download PDF

Info

Publication number
CN101975072B
CN101975072B CN201010285209A CN201010285209A CN101975072B CN 101975072 B CN101975072 B CN 101975072B CN 201010285209 A CN201010285209 A CN 201010285209A CN 201010285209 A CN201010285209 A CN 201010285209A CN 101975072 B CN101975072 B CN 101975072B
Authority
CN
China
Prior art keywords
hydraulic support
cover
support
withdrawing
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201010285209A
Other languages
English (en)
Other versions
CN101975072A (zh
Inventor
张文斌
田志勇
席刚
李淑锋
杨文晋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Jincheng Anthracite Mining Group Co Ltd
Original Assignee
Shanxi Jincheng Anthracite Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Jincheng Anthracite Mining Group Co Ltd filed Critical Shanxi Jincheng Anthracite Mining Group Co Ltd
Priority to CN201010285209A priority Critical patent/CN101975072B/zh
Publication of CN101975072A publication Critical patent/CN101975072A/zh
Application granted granted Critical
Publication of CN101975072B publication Critical patent/CN101975072B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

本发明涉及一种中小型煤矿井下普通综采工作面液压支架的回收方法。解决中小型矿井的煤矿液压支架回收的问题。方法是从工作面开始,先将倒数第二个液压支架抽出顶在煤壁侧升起作为一号掩护架,把倒数第一个液压支架斜拉作为二号掩护架;然后把倒数第四个液压支架抽出运走,把倒数第三个液压支架拉斜作为三号掩护架,随着倒数第四、倒数第五、倒数第六个液压支架的撤出后,使三号、二号、一号掩护架逐步走正,所有的顶板支护将由三号、二号、一号掩护架代替,这样随着支架的撤出,三个掩护架交替前进,可以保证综采面支架的顺利回收。因此安全系数比较高,工序比较简单,回收速度比较快,节省了人力资源。

Description

普通综采工作面液压支架回收方法
技术领域
本发明涉及一种中小型煤矿井下普通综采工作面液压支架的回收方法。
背景技术
目前,随着普通综采工作面机械设备在我国各中小煤矿的不断推广和运用,各工作面使用中、小型液压支架的频率越来越高,已成为综采工作面切眼常用的一种主要顶板支护设备。由于中小型煤矿的综采工作面回收空间比较狭小,不能和大型煤矿一样可以使用吊、叉车进行回收,当综采工作面被回采完以后,如何回收支架的方法比较混乱,并且存在的弊端主要有:1、回收时由于使用多根单体柱支护顶板,回收效率比较低,工序比较复杂。2、由于回收人员必须在支架近端,如果稍不注意,就容易出现安全事故。3、施工时,需要同时作业的人员比较多。
发明内容
本发明为了解决中小型矿井的煤矿液压支架回收的问题而提供了一种普通综采工作面液压支架回收方法。
本发明是由以下技术方案实现的,一种普通综采工作面液压支架回收方法,从工作面开始,先将倒数第二个液压支架抽出顶在煤壁侧升起作为一号掩护架,在倒数第二个液压支架原位置使用“一梁四柱”支护原顶板,把倒数第一个液压支架斜拉作为二号掩护架;然后把倒数第四个液压支架抽出运走,同时在倒数第四个液压支架原位置使用“一梁四柱”支护原顶板,把倒数第三个液压支架拉斜作为三号掩护架,随着倒数第四、倒数第五、倒数第六个液压支架的撤出后,使三号、二号、一号掩护架逐步走正,所有的顶板支护将由三号、二号、一号掩护架代替,三号、二号、一号掩护架位置分别为:一号掩护架访片帮板始终能保持升起后挑住被撤架下的支护梁,二号掩护架的前梁将垂直紧靠被撤架的前梁,三号掩护架的前梁将垂直紧靠被撤架的顶梁,这样随着支架的撤出,三个掩护架交替前进,可以保证综采面支架的顺利回收。
本工艺主要是在综采工作面通过使用回柱绞车配合单滑轮缓缓移动回收支架出工作面装车,顶板支护主要有两种方式:在支架回收初期,主要采取在支架原位置支护两排液压单体柱,形式为“一梁四柱”,排*行=700*500;在中后期主要采用三个掩护架交替支护来维护顶板,以保持正常的回收秩序。
与其它回收技术相比,因为本发明是使用回柱绞车连接支架,在支架回收期间,人员不需要站在支架近侧作业,更不需要人员不停地使用液压单体柱戗、顶作业来调整支架位置。在顶板管理方面,由于在支架回收中后期使用了三个支架作为掩护架来维护顶板,三个掩护架交替迈步前行,保证了支架回收期间的顶板压力的稳定。同时又避免了原来的使用大量的液压单体柱支护,既不安全,工序又比较复杂的局面。因此安全系数比较高,工序比较简单,回收速度比较快,节省了人力资源。
附图说明
图1、2、3、4、5、6为回收的支架位置变化示意图
图中1、2、3、4、5、6、7为依次排列的被撤液压支架
具体实施方式
一种普通综采工作面液压支架回收方法,如图1所示意,如果工作面前有100个支架需要回收,从工作面开始,如图2所示意,先将倒数第二个液压支架2抽出顶在煤壁侧升起作为一号掩护架,在倒数第二个液压支架原位置使用“一梁四柱”支护原顶板,如图3所示意,把倒数第一个液压支架1斜拉作为二号掩护架;如图4所示意,然后把倒数第四个液压支架4抽出运走,同时在倒数第四个液压支架原位置使用“一梁四柱”支护原顶板,如图5所示意,把倒数第三个液压支架3拉斜作为三号掩护架,如图6所示意,随着倒数第四、倒数第五、倒数第六个液压支架4、5、6的撤出后,三号、二号、一号掩护架将会逐步走正,这样从倒数第五个液压支架5往前,所有的支架将不必要在使用单体柱在支架原位置进行支护顶板,所有的顶板支护将由三号、二号、一号掩护架代替,三号、二号、一号掩护架位置分别为:一号掩护架访片帮板始终能保持升起后挑住被撤架下的支护梁,二号掩护架的前梁将垂直紧靠被撤架的前梁,三号掩护架的前梁将垂直紧靠被撤架的顶梁,这样随着支架的撤出,三个掩护架交替前进,可以保证综采面支架的顺利回收。

Claims (1)

1.一种普通综采工作面液压支架回收方法,其特征在于:从工作面开始,先将倒数第二个液压支架抽出顶在煤壁侧升起作为一号掩护架,在倒数第二个液压支架原位置使用“一梁四柱”支护原顶板,把倒数第一个液压支架斜拉作为二号掩护架;然后把倒数第四个液压支架抽出运走,同时在倒数第四个液压支架原位置使用“一梁四柱”支护原顶板,把倒数第三个液压支架拉斜作为三号掩护架,随着倒数第四、倒数第五、倒数第六个液压支架的撤出后,使三号、二号、一号掩护架逐步走正,所有的顶板支护将由三号、二号、一号掩护架代替,三号、二号、一号掩护架位置分别为:一号掩护架访片帮板始终能保持升起后挑住倒数第六个液压支架被撤出后的被撤架下的支护梁,二号掩护架的前梁将垂直紧靠倒数第六个液压支架被撤出后的被撤架的前梁,三号掩护架的前梁将垂直紧靠倒数第六个液压支架被撤出后的被撤架的顶梁,这样随着支架的撤出,三个掩护架交替前进,可以保证综采面支架的顺利回收。
CN201010285209A 2010-09-13 2010-09-13 普通综采工作面液压支架回收方法 Active CN101975072B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010285209A CN101975072B (zh) 2010-09-13 2010-09-13 普通综采工作面液压支架回收方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010285209A CN101975072B (zh) 2010-09-13 2010-09-13 普通综采工作面液压支架回收方法

Publications (2)

Publication Number Publication Date
CN101975072A CN101975072A (zh) 2011-02-16
CN101975072B true CN101975072B (zh) 2012-10-03

Family

ID=43574978

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010285209A Active CN101975072B (zh) 2010-09-13 2010-09-13 普通综采工作面液压支架回收方法

Country Status (1)

Country Link
CN (1) CN101975072B (zh)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102900444B (zh) * 2012-09-10 2015-03-18 山西晋城无烟煤矿业集团有限责任公司 改进型综采工作面液压支架回撤工艺
CN104131829B (zh) 2014-06-25 2016-05-04 中国矿业大学 一种固体充填采煤液压支架撤架方法
CN104453972A (zh) * 2014-12-09 2015-03-25 辽宁威跃集团机械制造有限公司 液压支架牵引调向运输回撤装置
CN105134270A (zh) * 2015-08-06 2015-12-09 李连祥 一种综采工作面的支架回撤方法
CN105569702A (zh) * 2016-01-11 2016-05-11 安徽理工大学 综采面收作时液压支架无坑木回撤方法
CN105863691A (zh) * 2016-05-04 2016-08-17 淮南矿业(集团)有限责任公司 一种综采工作面支架回撤顶板支护施工方法
CN109083663A (zh) * 2018-08-24 2018-12-25 淮北矿业股份有限公司 一种用于煤矿井下综采工作面的拆除装置

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3026266A1 (de) * 1980-07-11 1982-02-04 Ruhrkohle Ag, 4300 Essen Schildausbaueinheit mit hydraulisch steuerbarer prallplatte
DE3700692A1 (de) * 1987-01-13 1988-07-21 Gewerk Eisenhuette Westfalia Schildausbaugestell, insbesondere fuer den elektrohydraulisch gesteuerten strebausbau
CN1083895A (zh) * 1993-07-24 1994-03-16 徐州矿务局庞庄煤矿 用于回收工作面支架及设备的巷道支护方法
CN1224793A (zh) * 1999-01-29 1999-08-04 王晓利 放顶煤中完整硬柔顶煤回收方法
CN1932240A (zh) * 2006-09-21 2007-03-21 闫振东 一次全高、后退、分体移动、全跨落综合机械化采煤方法及设备

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3026266A1 (de) * 1980-07-11 1982-02-04 Ruhrkohle Ag, 4300 Essen Schildausbaueinheit mit hydraulisch steuerbarer prallplatte
DE3700692A1 (de) * 1987-01-13 1988-07-21 Gewerk Eisenhuette Westfalia Schildausbaugestell, insbesondere fuer den elektrohydraulisch gesteuerten strebausbau
CN1083895A (zh) * 1993-07-24 1994-03-16 徐州矿务局庞庄煤矿 用于回收工作面支架及设备的巷道支护方法
CN1224793A (zh) * 1999-01-29 1999-08-04 王晓利 放顶煤中完整硬柔顶煤回收方法
CN1932240A (zh) * 2006-09-21 2007-03-21 闫振东 一次全高、后退、分体移动、全跨落综合机械化采煤方法及设备

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张立英.《综采工作面上行拆除工艺》.《水力采煤》.2006,(第3期),32-33. *
李正昌等.综放工作面推进过程中支架快速拆除的实践.《煤炭科技》.2002,(第3期),35-36. *

Also Published As

Publication number Publication date
CN101975072A (zh) 2011-02-16

Similar Documents

Publication Publication Date Title
CN101975072B (zh) 普通综采工作面液压支架回收方法
CN105019927B (zh) 一种液压支架回撤系统及其回撤方法
CN202882972U (zh) 顺槽迈步分体式超前液压支架组
CN105697013A (zh) 掘进巷道可收缩式临时支架
CN103032091A (zh) 自移式液压支架
CN202391442U (zh) 充填开采两柱掩护式液压支架
CN104727847A (zh) 充填墙体自消除的无煤柱沿空留巷方法
CN105134270A (zh) 一种综采工作面的支架回撤方法
CN203145980U (zh) 矿用抬棚支架
CN204002884U (zh) 软岩巷道超前支架防扎底装置
CN201786365U (zh) 井内煤矿用液压伸缩支架
CN203978469U (zh) 一种简易组装式液压支架装置
CN101333932B (zh) 双层超静定液压支架
CN201225163Y (zh) 煤矿短壁开采用自移液压支架
CN203488179U (zh) 多功能采煤机
CN102392663A (zh) 超前支护液压支架及超前支护液压支架系统
CN101333929B (zh) 双层双叉型超静定液压支架
CN201738358U (zh) 一种尾矿库取砂装置
CN202467883U (zh) 双稳定反四连杆机构轻型液压支架
CN102268992A (zh) 一种尾矿库取砂方法及取砂装置
CN201891424U (zh) 一种具有调架千斤顶的液压支架
CN201232561Y (zh) 双层双叉型超静定液压支架
CN204344147U (zh) 一种掩护式液压支架
CN103195458A (zh) 煤矿井下大通道端头悬移液压支架
CN211287737U (zh) 滑移支架的立柱双位装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant