CN103195458A - 煤矿井下大通道端头悬移液压支架 - Google Patents
煤矿井下大通道端头悬移液压支架 Download PDFInfo
- Publication number
- CN103195458A CN103195458A CN201310091648XA CN201310091648A CN103195458A CN 103195458 A CN103195458 A CN 103195458A CN 201310091648X A CN201310091648X A CN 201310091648XA CN 201310091648 A CN201310091648 A CN 201310091648A CN 103195458 A CN103195458 A CN 103195458A
- Authority
- CN
- China
- Prior art keywords
- back timber
- carriage
- top beam
- spring
- part back
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本发明公开了一种煤矿井下大通道端头悬移液压支架,涉及矿山设备。左、右顶梁端部各只用一根液压支柱Ⅰ支撑,中部顶梁用五根液压支柱Ⅱ支撑。中部顶梁的下部设置托架,托架通过托架浮动导向组件与中部顶梁滑动连接,托架与中部顶梁之间有间隙,可以上下浮动。左、右顶梁通过托架浮动组件与托架梁端部连接,两者之间有间隙,可以上下浮动。工作面向前延伸时,通过两侧的左、右顶梁和中部顶梁的交替向前移动,实现端头处的顶板不间断支撑和设备的机械移动。中部顶梁宽度大,解决了转载机无法安装设备不能配套的问题。本支架的支护及移动完全机械化操作,极大的减轻工人的劳动强度,提高了安全性能和劳动效率。
Description
技术领域
本发明涉及一种矿山设备,具体涉及一种煤矿井下工作面大通道端头部位支护用的悬移式液压支架。
背景技术
煤矿井下采煤工作面与回采巷道的交汇处称为端头,用于端头部位的支护称为端头支护。端头部位是刮板输送机与转载机等设备的交汇点,又是人行通道、通风、运料及输煤的咽喉部位。端头支护的好坏,是决定工作面能否正常运行的关键所在,据有关安全部门统计,在端头部位出现的人身伤亡事故占井下事故的一半以上。如在普采工作面采用单体液压支柱加顶梁组成的端头支护方式进行支护,支护的安全性能差,工人劳动强度大,支护工作效率低。
近年来,新型的支护设备整体顶梁组合悬移液压支架:在煤矿得到推广使用,但在端头支护的方法是采用两组整体顶梁组合悬移液压支架并联在一起使用,由于每个支架上两根液压支柱在宽度方向的中心距较小,无法安装转载机,给使用带来不便。
因此,急需一种通道宽阔、安全、高效并且减轻工人劳动强度的设备“大通道端头悬移液压支架”
发明内容
为了解决上述技术问题,本发明提供一种具有通道宽阔、安全、煤矿井下大通道端头悬移液压支架,大大减轻工人的劳动强度。
本发明是通过如下技术方案实现的:一种煤矿井下大通道端头悬移液压支架,它包括左顶梁、右顶梁、中部顶梁和液压支柱。所述的左、右顶梁为矩形管,所述的矩形管的由液压支柱Ⅰ支撑。所述的中部顶梁矩形方管,中部顶梁由液压支柱Ⅱ支撑。其特征在于:所述的左、右顶梁端部各只用一根液压支柱Ⅰ支撑,所述的中部顶梁四角各用一根液压支柱Ⅱ支撑,中部顶梁的后端加装一根液压支柱Ⅰ支撑。
所述的中部顶梁的下部设置托架,所述的托架由两根平行的托架梁和两根托架连接梁连接组成井字形架板;托架通过托架浮动导向组件与中部顶梁连接。所述的中部顶梁下部制作导向槽,所述的托架浮动导向组件上有导向轮,所述的中部顶梁通过导向轮和导向槽实现与托架之间的前后滑动连接。托架与中部顶梁、之间有间隙;托架浮动导向组件内装有弹簧Ⅱ,在弹簧Ⅱ的作用下,托架梁与中部顶梁之间可以上下浮动。
所述的左、右顶梁下部垂直固定轴,所述的轴通过托架浮动组件与托架梁端部连接;托架与左、右顶梁之间有间隙;所述的托架浮动组件内装有弹簧Ⅰ,在弹簧Ⅰ的作用下,托架梁与左、右顶梁之间可以上下浮动。
所述的中部顶梁与托架之间设置推移油缸,所述的推移油缸驱动中部顶梁与托架之间的前后滑动。
所述的托架浮动导向组件包括:导向轮、轴和弹簧Ⅱ。所述的导向轮位于导向槽内,所述的弹簧Ⅱ位于托架梁内,所述的轴穿过导向轮和弹簧Ⅱ,并用螺母Ⅱ锁紧在轴上,在弹簧Ⅱ的作用下,托架梁与中部顶梁之间可以上下浮动。
所述的弹簧Ⅱ外侧有套筒Ⅱ,所述的套筒Ⅱ上端固定在托架梁上;所述的套筒Ⅱ下端有盖板,所述的盖板通过弹簧挡圈安装在套筒Ⅱ上。
所述的托架浮动组件包括:套筒Ⅰ、弹簧Ⅰ和螺母Ⅰ。所述的套筒Ⅰ内孔为上端小、下端大的圆形管,套筒Ⅰ固定在托架梁上,套筒Ⅰ下端大孔内装有弹簧Ⅰ,弹簧Ⅰ的下端用螺母Ⅰ固定在轴上。
本发明的有益效果是:
1、左、右顶梁和中部顶梁之间移动方便、快捷。大幅度降低了工人的劳动强度,明显的提高工作效率和安全性能,减少不安全事故的发生。
2、中部顶梁宽度大,解决了转载机无法安装的问题,生产效率大幅度提高,实现了设备的均衡配套生产。
附图说明
下面根据附图和实施例对本发明进一步说明。
图1为本发明结构示意图。
图2是图1的A-A剖视图。
图3是图1的B-B剖视图。
图4是图1的D向视图。
图5是图2的E处局部放大图。
图6为故有技术结构示意图。
图中:1、右顶梁,2、中部顶梁,2-1、导向槽,3、托架,3-1、托架梁,3-2、托架连接梁,4、左顶梁,5、液压支柱Ⅰ,5-1、液压支柱Ⅱ,6、推移油缸,7、托架浮动组件,7-1、套筒Ⅰ,7-2、弹簧Ⅰ,7-3、螺母Ⅰ,7-4、垫圈,8、托架浮动导向组件,8-1、导向轮,8-2、轴,8-3、弹簧Ⅱ,8-4、套筒Ⅱ,8-5、螺母Ⅱ,8-6、盖板,9、轴。
具体实施方式
如图1至图5所示:一种煤矿井下大通道端头悬移液压支架,它包括左顶梁4、右顶梁1、中部顶梁2和液压支柱5。所述的左、右顶梁4、1为矩形管,所述的矩形管的由液压支柱Ⅰ5支撑;所述的中部顶梁2矩形方管,中部顶梁2由液压支柱Ⅱ5-1支撑。其特征在于:所述的左、右顶梁4、1端部各只用一根液压支柱Ⅰ5支撑,所述的中部顶梁2四角各用一根液压支柱Ⅱ5-1支撑,中部顶梁2的后端加装一根液压支柱Ⅰ5-1支撑;
所述的中部顶梁2的下部设置托架3,所述的托架3由两根平行的托架梁3-1和两根托架连接梁3-2连接组成井字形架板。托架3通过托架浮动导向组件8与中部顶梁2连接。所述的中部顶梁2下部制作导向槽2-1,所述的托架浮动导向组件8上有导向轮8-1,所述的中部顶梁2通过导向轮8-1和导向槽2-1实现与托架3之间的前后滑动连接。中部顶梁2与托架3之间设置推移油缸6,所述的推移油缸6驱动中部顶梁2与托架3之间的前后滑动。托架3与中部顶梁2之间有间隙;托架浮动导向组件8内装有弹簧Ⅱ8-3,在弹簧Ⅱ8-3的作用下,托架梁3-1与中部顶梁2之间可以上下浮动。
所述的左、右顶梁4、1下部垂直固定轴9,所述的轴9通过托架浮动组件7与托架梁3-1端部连接;托架3与左、右顶梁4、1之间有间隙;所述的托架浮动组件7内装有弹簧Ⅰ7-2,在弹簧Ⅰ7-2的作用下,托架梁3-1与左、右顶梁4、1之间可以上下浮动。
所述的托架浮动导向组件8包括:导向轮8-1、轴8-2和弹簧Ⅱ8-3。所述的导向轮8-1位于导向槽2-1内,所述的弹簧Ⅱ8-3位于托架梁3-1内,所述的轴8-2穿过导向轮8-1和弹簧Ⅱ8-3,并用螺母Ⅱ8-5锁紧在轴8-2上,在弹簧Ⅱ8-3的作用下,托架梁3-1与中部顶梁2之间可以上下浮动。
所述的弹簧Ⅱ8-3外侧有套筒Ⅱ8-4,所述的套筒Ⅱ8-4上端固定在托架梁3-1上;所述的套筒Ⅱ8-4下端有盖板8-6,所述的盖板8-6通过弹簧挡圈安装在套筒Ⅱ8-4上。套筒Ⅱ8-4的作用是保护弹簧Ⅱ8-3和轴8-2不受污染。
所述的托架浮动组件7包括:套筒Ⅰ7-1、弹簧Ⅰ7-2和螺母Ⅰ7-3。所述的套筒Ⅰ7-1内孔为上端小、下端大的圆形管,套筒Ⅰ7-1固定在托架梁3-1上,套筒Ⅰ7-1下端大孔内装有弹簧Ⅰ7-2,弹簧Ⅰ7-2的下端用螺母Ⅰ7-3固定在轴9上。
如图2、3、5所示:托架浮动组件7和托架浮动导向组件8可以使托架梁3-1与中部顶梁2和左、右顶梁4、1之间可以上下浮动,这种上下浮动的作用优点是.:不管端头支架上方的巷道顶板是否有高差,中部顶梁2和左、右顶梁4、1都可以接触到巷道顶板,达到中部顶梁2和左、右顶梁4、1对巷道顶板的有效支撑。
A、如果中部顶梁2上部巷道顶板高于左顶梁4或右顶梁1上部巷道顶板时,中部顶梁2在液压支柱的支撑力作用下升高,导向轮8-1、轴8-2跟随中部顶梁2一起升高,弹簧Ⅱ8-3被压缩,补偿了上部巷道顶板的高度差。
B、如果左顶梁4或右顶梁1上部巷道顶板高于中部顶梁2上部巷道顶板时,左顶梁4或右顶梁1在液压支柱的支撑力作用下升高,轴9跟随左顶梁4或右顶梁1升高,弹簧弹簧Ⅰ,7-2被压缩,补偿了上部巷道顶板的高度差。
本实施例的使用过程是:
当巷道向前延伸,需要移动端头液压支架时,先将左、右顶梁4、1下部的液压支柱Ⅰ5缩回,左、右顶梁4、1及液压支柱Ⅰ5的重量通过托架3压在中部顶梁2上。向推移油缸6注液,活柱伸出推动托架3,并且带动两侧的左、右顶梁4、1移动一个步距,然后将左、右顶梁4、1下的液压支柱Ⅰ5注液,使之伸出,完成移动一个步距后的支护。
当巷道继续向前延伸需要移动端头液压支架时,先将中部顶梁2下部的液压支柱Ⅱ5-1缩回,中部顶梁2及液压支柱Ⅱ5-1的重量通过托架3压在左、右顶梁4、1上,向推移油缸6另一端注液,活柱缩回拉动托架3,并且带动中部顶梁2移动一个步距,然后将中部顶梁2下的液压支柱Ⅱ5-1注液伸出,又完成了移动一个步距后的支护。
通过两侧的左、右顶梁4、1和中部顶梁2的交替向前移动,实现了端头处的顶板不间断支撑和设备的机械移动。
如图1、2、3和图6所示:煤矿井下大通道端头悬移液压支架与故有技术及单体液压支柱支护比较,本实施例的优点是:解决了转载机无法安装设备不能配套的问题。本支架的支护及移动完全机械化操作,极大的减轻工人的劳动强度,提高了安全性能和劳动效率。
Claims (5)
1.一种煤矿井下大通道端头悬移液压支架,它包括左顶梁(4)、右顶梁(1)、中部顶梁(2)和液压支柱(5);所述的左、右顶梁(4、1)为矩形管,所述的矩形管的由液压支柱Ⅰ(5)支撑;所述的中部顶梁(2)矩形方管,中部顶梁(2)由液压支柱Ⅱ(5-1)支撑;其特征在于:所述的左、右顶梁(4、1)端部各只用一根液压支柱Ⅰ(5)支撑,所述的中部顶梁(2)四角各用一根液压支柱Ⅱ(5-1)支撑,中部顶梁(2)的后端加装一根液压支柱Ⅰ(5-1)支撑;
所述的中部顶梁(2)的下部设置托架(3),所述的托架(3)由两根平行的托架梁(3-1)和两根托架连接梁(3-2)连接组成井字形架板;托架(3)通过托架浮动导向组件(8)与中部顶梁(2)连接;所述的中部顶梁(2)下部制作导向槽(2-1),所述的托架浮动导向组件(8)上有导向轮(8-1),所述的中部顶梁(2)通过导向轮(8-1)和导向槽(2-1)实现与托架(3)之间的前后滑动连接;托架(3)与中部顶梁(2)之间有间隙;托架浮动导向组件(8)内装有弹簧Ⅱ(8-3),在弹簧Ⅱ(8-3)的作用下,托架梁(3-1)与中部顶梁(2)之间可以上下浮动;
所述的左、右顶梁(4、1)下部垂直固定轴(9),所述的轴(9)通过托架浮动组件(7)与托架梁(3-1)端部连接;托架(3)与左、右顶梁(4、1)之间有间隙;所述的托架浮动组件(7)内装有弹簧Ⅰ(7-2),在弹簧Ⅰ(7-2)的作用下,托架梁(3-1)与左、右顶梁(4、1)之间可以上下浮动。
2.根据权利要求1所述的煤矿井下大通道端头悬移液压支架,其特征在于:所述的中部顶梁(2)与托架(3)之间设置推移油缸(6),所述的推移油缸(6)驱动中部顶梁(2)与托架(3)之间的前后滑动。
3.根据权利要求1所述的煤矿井下大通道端头悬移液压支架,其特征在于:所述的托架浮动导向组件(8)包括:导向轮(8-1)、轴(8-2)和弹簧Ⅱ(8-3);所述的导向轮(8-1)位于导向槽(2-1)内,所述的弹簧Ⅱ(8-3)位于托架梁(3-1)内,所述的轴(8-2)穿过导向轮(8-1)和弹簧Ⅱ(8-3),并用螺母Ⅱ(8-5)锁紧在轴(8-2)上,在弹簧Ⅱ(8-3)的作用下,托架梁(3-1)与中部顶梁(2)之间可以上下浮动。
4.根据权利要求3所述的煤矿井下大通道端头悬移液压支架,其特征在于:所述的弹簧Ⅱ(8-3)外侧有套筒Ⅱ(8-4),所述的套筒Ⅱ(8-4)上端固定在托架梁(3-1)上;所述的套筒Ⅱ(8-4)下端有盖板(8-6),所述的盖板(8-6)通过弹簧挡圈安装在套筒Ⅱ(8-4)上。
5.根据权利要求1所述的煤矿井下大通道端头悬移液压支架,其特征在于:所述的托架浮动组件(7)包括:套筒Ⅰ(7-1)、弹簧Ⅰ(7-2)和螺母Ⅰ(7-3);所述的套筒Ⅰ(7-1)内孔为上端小、下端大的圆形管,套筒Ⅰ(7-1)固定在托架梁(3-1)上,套筒Ⅰ(7-1)下端大孔内装有弹簧Ⅰ(7-2),弹簧Ⅰ(7-2)的下端用螺母Ⅰ(7-3)固定在轴(9)上。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310091648XA CN103195458A (zh) | 2013-03-20 | 2013-03-20 | 煤矿井下大通道端头悬移液压支架 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310091648XA CN103195458A (zh) | 2013-03-20 | 2013-03-20 | 煤矿井下大通道端头悬移液压支架 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103195458A true CN103195458A (zh) | 2013-07-10 |
Family
ID=48718257
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310091648XA Pending CN103195458A (zh) | 2013-03-20 | 2013-03-20 | 煤矿井下大通道端头悬移液压支架 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103195458A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107091106A (zh) * | 2017-06-30 | 2017-08-25 | 山东科技大学 | 一种采充独立复合液压支架 |
CN107642372A (zh) * | 2017-08-17 | 2018-01-30 | 龙口矿业集团有限公司 | 具有前探梁的掘进支架 |
CN108798739A (zh) * | 2018-07-17 | 2018-11-13 | 中煤隧道工程有限公司 | 一种可快速安装大型型钢支撑的液压自移支撑平台 |
CN109469501A (zh) * | 2018-11-29 | 2019-03-15 | 安徽省皖北煤电集团有限责任公司 | 一种煤矿井下大通道端头悬移液压支架 |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201080829Y (zh) * | 2008-01-24 | 2008-07-02 | 潘英会 | 组合式悬移支架 |
CN201125736Y (zh) * | 2007-10-17 | 2008-10-01 | 王广涛 | 一种带前后拖梁的悬移液压支架 |
CN201125735Y (zh) * | 2007-10-17 | 2008-10-01 | 程永军 | 带翻转梁的悬移液压支架 |
CN201141307Y (zh) * | 2007-08-22 | 2008-10-29 | 陕西蒲白三通有限公司 | 一种带前探梁的悬移液压支架 |
CN101906984A (zh) * | 2010-08-02 | 2010-12-08 | 北京诚田恒业煤矿设备有限公司 | 一种煤矿用联顶梁滑移液压支架系统 |
CN201687489U (zh) * | 2010-01-19 | 2010-12-29 | 北京诚田恒业煤矿设备有限公司 | 组合悬移液压支架套筒型托梁 |
CN201826877U (zh) * | 2010-10-29 | 2011-05-11 | 中平能化集团机械制造有限公司 | 带立柱保护装置的整体顶梁组合悬移支架 |
CN202483601U (zh) * | 2012-03-23 | 2012-10-10 | 徐州天能矿山机械有限责任公司 | 大游隙浮动整体顶梁组合悬移液压支架 |
CN202690098U (zh) * | 2012-07-08 | 2013-01-23 | 北京宇田世纪矿山设备有限公司 | 一种六柱支撑式分体组合端头液压支架 |
CN203130131U (zh) * | 2013-03-20 | 2013-08-14 | 徐州天能矿山机械有限责任公司 | 煤矿井下大通道端头悬移液压支架 |
-
2013
- 2013-03-20 CN CN201310091648XA patent/CN103195458A/zh active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201141307Y (zh) * | 2007-08-22 | 2008-10-29 | 陕西蒲白三通有限公司 | 一种带前探梁的悬移液压支架 |
CN201125736Y (zh) * | 2007-10-17 | 2008-10-01 | 王广涛 | 一种带前后拖梁的悬移液压支架 |
CN201125735Y (zh) * | 2007-10-17 | 2008-10-01 | 程永军 | 带翻转梁的悬移液压支架 |
CN201080829Y (zh) * | 2008-01-24 | 2008-07-02 | 潘英会 | 组合式悬移支架 |
CN201687489U (zh) * | 2010-01-19 | 2010-12-29 | 北京诚田恒业煤矿设备有限公司 | 组合悬移液压支架套筒型托梁 |
CN101906984A (zh) * | 2010-08-02 | 2010-12-08 | 北京诚田恒业煤矿设备有限公司 | 一种煤矿用联顶梁滑移液压支架系统 |
CN201826877U (zh) * | 2010-10-29 | 2011-05-11 | 中平能化集团机械制造有限公司 | 带立柱保护装置的整体顶梁组合悬移支架 |
CN202483601U (zh) * | 2012-03-23 | 2012-10-10 | 徐州天能矿山机械有限责任公司 | 大游隙浮动整体顶梁组合悬移液压支架 |
CN202690098U (zh) * | 2012-07-08 | 2013-01-23 | 北京宇田世纪矿山设备有限公司 | 一种六柱支撑式分体组合端头液压支架 |
CN203130131U (zh) * | 2013-03-20 | 2013-08-14 | 徐州天能矿山机械有限责任公司 | 煤矿井下大通道端头悬移液压支架 |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107091106A (zh) * | 2017-06-30 | 2017-08-25 | 山东科技大学 | 一种采充独立复合液压支架 |
CN107091106B (zh) * | 2017-06-30 | 2023-06-02 | 山东科技大学 | 一种采充独立复合液压支架 |
CN107642372A (zh) * | 2017-08-17 | 2018-01-30 | 龙口矿业集团有限公司 | 具有前探梁的掘进支架 |
CN108798739A (zh) * | 2018-07-17 | 2018-11-13 | 中煤隧道工程有限公司 | 一种可快速安装大型型钢支撑的液压自移支撑平台 |
CN108798739B (zh) * | 2018-07-17 | 2024-04-26 | 中煤隧道工程有限公司 | 一种可快速安装大型型钢支撑的液压自移支撑平台 |
CN109469501A (zh) * | 2018-11-29 | 2019-03-15 | 安徽省皖北煤电集团有限责任公司 | 一种煤矿井下大通道端头悬移液压支架 |
CN109469501B (zh) * | 2018-11-29 | 2024-03-12 | 安徽省皖北煤电集团有限责任公司 | 一种煤矿井下大通道端头悬移液压支架 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202882972U (zh) | 顺槽迈步分体式超前液压支架组 | |
CN101634230B (zh) | 采煤工作面自移式超前支架 | |
CN103233761A (zh) | 转载机辅助移动大循环式机巷超前支护支架 | |
CN206625858U (zh) | 一种带侧护板的自移式超前支护液压支架 | |
CN108457686A (zh) | 一种上下平衡式可伸缩移动支护拱架 | |
CN104047627A (zh) | 回采巷道框架式超前支护支架 | |
CN106677813A (zh) | 新型煤矿巷道综掘面临时支护装置 | |
CN202483604U (zh) | 一种用于斜顶巷道超前支护的液压支架 | |
CN103195458A (zh) | 煤矿井下大通道端头悬移液压支架 | |
CN203362198U (zh) | 履带行走式综掘巷道及时支护装置 | |
CN106761874A (zh) | 一种带侧护板的自移式超前支护液压支架 | |
CN203130131U (zh) | 煤矿井下大通道端头悬移液压支架 | |
CN202391442U (zh) | 充填开采两柱掩护式液压支架 | |
CN103032091A (zh) | 自移式液压支架 | |
CN203362199U (zh) | 综采工作面端头液压支架 | |
CN102748052B (zh) | 综采轨道顺槽循环前移式超前支护系统 | |
CN104179518B (zh) | 一种用于巷道支护的液压支架 | |
CN101509388A (zh) | 一种巷道超前支护支架 | |
CN212479300U (zh) | 一种掘进工作面循环支撑组合支架 | |
CN202520350U (zh) | 节式可伸缩悬移顶梁巷道超前支架 | |
CN101769159B (zh) | 一种煤矿用柔性掩护式液压支架 | |
CN102392663A (zh) | 超前支护液压支架及超前支护液压支架系统 | |
CN203847142U (zh) | 煤矿巷道端头用悬移式液压支架 | |
CN110159327A (zh) | 掘锚分离的巷道连续掘进临时支护装置及方法 | |
CN201372805Y (zh) | 巷道超前支护支架 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20130710 |