CN101944773A - Intelligent distribution patrol and management system and work flow thereof - Google Patents

Intelligent distribution patrol and management system and work flow thereof Download PDF

Info

Publication number
CN101944773A
CN101944773A CN2010102762088A CN201010276208A CN101944773A CN 101944773 A CN101944773 A CN 101944773A CN 2010102762088 A CN2010102762088 A CN 2010102762088A CN 201010276208 A CN201010276208 A CN 201010276208A CN 101944773 A CN101944773 A CN 101944773A
Authority
CN
China
Prior art keywords
tour
equipment
inspection tour
inspection
management system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010102762088A
Other languages
Chinese (zh)
Inventor
林朝辉
林鹏程
岑旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Fujian Electric Power Co Ltd
Fuzhou Power Supply Co of State Grid Fujian Electric Power Co Ltd
Original Assignee
Fuzhou Power Supply Co of State Grid Fujian Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuzhou Power Supply Co of State Grid Fujian Electric Power Co Ltd filed Critical Fuzhou Power Supply Co of State Grid Fujian Electric Power Co Ltd
Priority to CN2010102762088A priority Critical patent/CN101944773A/en
Publication of CN101944773A publication Critical patent/CN101944773A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/126Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wireless data transmission

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses an intelligent distribution patrol and management system and a work flow thereof. The system comprises a local area network composed of a GIS work station and a GIS server and an RFID mobile patrol terminal, wherein a wireless network transmission device is used for transmission between the local area network and the RFID mobile patrol terminal. By using the non-contact automatic identification technology of the RFID system, each distribution equipment is printed with a unique electronic marker, and a unique identification marker of each equipment is established in a distribution GIS system database. Patrol staff can accurately track the running condition of each equipment and import data into the distribution GIS system database by using the RFID mobile patrol terminal. Thus, the defects of inappropriate patrol, unscheduled patrol and nonstandard recording on the distribution equipment can be fundamentally solved, and simultaneously, the complicated and repeated work of recording equipment defects in the charge of group members can be avoided, thereby relieving the patrol workload of the group and improving the patrol efficiency and accuracy.

Description

Distribution intelligent patrol detection management system and workflow thereof
Technical field
The present invention relates to a kind of controller switching equipment and make an inspection tour device, particularly a kind of distribution intelligent patrol detection management system and workflow thereof.
Background technology
It is most basic work in the power distribution management that controller switching equipment is maked an inspection tour, and occupies important status in operation maintenance work.Because controller switching equipment quantity increases year by year, controller switching equipment is multi-point and wide-ranging, exposes to the open air outdoor throughout the year, is subject to the destruction of various factorss such as artificial and weather.For guaranteeing the reliable and stable operation of distribution network, equipment tour work is most important.But having caused making an inspection tour management, all factors become a weak link of management difficulty maximum for a long time: the one, because distribution tour work is very arduous, often there is the phenomenon that the understaffing of operation maintenance department is serious, personnel aging, educational background is on the low side.The 2nd, the mechanism of electric power system, personnel and equipment change are frequent, cause the division management difficulty of zone of responsibility to strengthen; The 3rd, because distribution facility quantity is huge, unusual fluctuation is frequent, administrative staff have no way of examining tour personnel tour whether to put, whether omit the equipment of patrolling in place, be difficult to the work qualitative, quantitative of making an inspection tour personnel is assessed examination, old tour system has been difficult to guarantee to make an inspection tour quality; The 4th, write down lack of standardization: because the tour contents of a project are numerous and diverse, and the personnel of tour professional skill is uneven, so fill substance is simple or complicated, or grabs incessantly emphasis, or grabs less than essence; The 5th, loaded down with trivial details when making an inspection tour working expenditure: each project all will record on the paper by pen, also need be aided with mapping in case of necessity, how time-consumingly measures; The 6th, the post-processed difficulty: each mass data of returning of making an inspection tour need in time put in order, analyzes, report.Because the workload of post-processed is big, this work is often out in the cold.Tradition is maked an inspection tour in the circuit system and is had many drawbacks, and reform tour management mode and means are imperative.
Summary of the invention
The objective of the invention is to overcome the deficiencies in the prior art part, and provide a kind of can fundamentally solve controller switching equipment make an inspection tour not in place, not according to the persistent ailment that the cycle makes an inspection tour, solved owing to make an inspection tour the distribution intelligent patrol detection management system that the administrative staff of causing not in place can't accurately grasp the field apparatus health status.
Another object of the present invention also is to provide a kind of workflow of distribution intelligent patrol detection management system.
Distribution intelligent patrol detection management system of the present invention mainly comprises the local area network (LAN) that is made of GIS work station and GIS server, and RFID moves the tour terminal, and local area network (LAN) and RFID move to make an inspection tour and adopt the wireless network transmissions device to transmit between the terminal.
The distribution GPMS system that the native system utilization has been come into operation provides digitlization geography information, electric network composition information, power equipment figure and machine account, stamp unique electronic marker for each station power distribution equipment, in the Distributing Network GIS system database, set up the identity sign of these equipment uniqueness.System adopts ultra-high frequency RFID technology, realizes the unique identification of distribution net equipment, and whether realization puts in place to operating personnel's work on the spot and follow the tracks of examination under the situation of erasure signal blind area and assurance system reliability, guarantees cyclic in-position measuring.The tour personnel utilize RFID to move the tour terminal in daily tour work, accurately follow the tracks of the ruuning situation of every equipment, and with in the data importing Distributing Network GIS system database, provide important basic data for making an inspection tour management.The staff will make an inspection tour task and corresponding specialty before setting out on a round of official calls standard tour job instruction, defect standard storehouse and historical defect situation move on the tour terminal to RFID by the wireless network transmissions device synchronization from the GIS server; The staff needed to move the tour result and the defect record of writing down on the tour terminal and gets back to server GIS database synchronously after tour finished.
Described wireless network transmissions device or be the WIFI wireless network transmissions, or be bluetooth.
The WIFI wireless network transmissions can be maked an inspection tour terminal synchrodata simultaneously for many simultaneously; Need not to open work station and get final product synchrodata.
Described RFID moves the tour terminal: be made up of PDA and RFID reader and inspection tour system software.
Built-in tour job instruction of described inspection tour system software and distribution defect standard storehouse.
Described RFID moves the PDA-RFID reader all-in-one that the hardware device of making an inspection tour terminal is selected technical grade.
The inspection tour system software of the last installation of PDA is divided into aerial construction, cell equipment, three specialties of cable machinery tour according to making an inspection tour specialty.
The tour personnel utilize RFID reader fetch equipment information, automatically identifying call device attribute table; The inspection tour system software of the last installation of PDA is divided into aerial construction, cell equipment, three specialties of cable machinery tour according to making an inspection tour specialty.The tour personnel call relevant standard according to different specialties and make an inspection tour job instruction, make an inspection tour the multiple conventional records of making an inspection tour such as record, nameplate record, transformer load test record, equipment infrared measurement of temperature record and defect record by task instruction requirement tour equipment and typing.Reference is called for tour personnel scene in the built-in distribution defect standard storehouse of inspection tour system software, alleviates on-the-spot hand-written typing workload, and the fill substance and the defective of standard defect situation are qualitative,
Described distribution intelligent patrol detection management system also comprises local area network (LAN) is linked to each other with the WEB server.
The local area network (LAN) of distribution intelligent patrol detection management system is linked to each other with the WEB server, can play the effect of control area net internal security like this.
The workflow of distribution intelligent patrol detection management system of the present invention: 1, when work carried out initialization according to equipment cycle of making an inspection tour on date of putting into operation to the tour date of each unit by the GIS work station, and 2, system generated to expire and need the equipment list maked an inspection tour and generate the tour plan by specialty in every month automatically; Counting the equipment list that exceeds the time limit not make an inspection tour and staff list per season automatically imports RFID with information such as all line patterns and attribute datas by the wireless network transmissions device by the GIS server for monthly appraisal and moves the tour terminal, 3, make an inspection tour task by making an inspection tour planned assignment, and with tasks synchronization to making an inspection tour terminal, 4, the floor manager enters and makes an inspection tour task module separately, at aerial construction, cell equipment, cable machinery is maked an inspection tour one by one, move and make an inspection tour terminal obtains field apparatus according to the RFID fetch equipment essential information, automatically access the electric pole that meets this information, station equipment, the cable machinery attribute list, one by one the tour project is filled in for the floor manager, and recording exceptional and defect situation, reference is called for tour personnel scene in tour job instruction that inspection tour system software is built-in and distribution defect standard storehouse, alleviate on-the-spot hand-written typing workload, the fill substance and the defective of standard defect situation are qualitative, the RFID reader does not read the situation of tour equipment electronic labeling information, be considered as this equipment without tour, can't write down tour information, stop to make an inspection tour phenomenon not in place and that the equipment leakage is maked an inspection tour with this.5, after finishing tour, the floor manager will move make an inspection tour terminal by the wireless network transmissions device with data upload to the Distributing Network GIS database, system will make an inspection tour the result automatically and be merged into server database, server can focus on according to the data that the tour personnel are imported into, generate and make an inspection tour record and equipment deficiency record, chamber leaders of institute at different levels and class monitor and group leader can in time see tour result and defect record by production management system, the automatic calculation squad group membership's of simultaneity factor tour completion rate also refreshes the tour cycle of making an inspection tour equipment, and this equipment enters next round and makes an inspection tour the cycle.
In sum, the following compared to existing technology advantage of the present invention:
Utilize rfid system " contactless automatic identification " technology, stamp unique electronic marker, in the Distributing Network GIS system database, set up the identity sign of these equipment uniqueness for each station power distribution equipment.The tour personnel utilize RFID to move the tour terminal in daily tour work, accurately follow the tracks of the ruuning situation of every equipment, and with in the data importing Distributing Network GIS system database, provide important basic data for making an inspection tour management.Thereby fundamentally solved controller switching equipment make an inspection tour not in place, not according to the cycle make an inspection tour, not according to the persistent ailment of canonical record defective, simultaneously can avoid the personnel of teams and groups to the loaded down with trivial details repetition typing work of equipment deficiency, alleviate the workload that teams and groups are maked an inspection tour, improve and make an inspection tour efficient and accuracy.
Description of drawings
Fig. 1 is the functional-block diagram of the distribution intelligent patrol detection management system of the embodiment of the invention 1
Fig. 2 is the functional-block diagram of the distribution intelligent patrol detection management system of the embodiment of the invention 2
Embodiment
Below in conjunction with embodiment the present invention is described in more detail.
Embodiment 1
A kind of distribution intelligent patrol detection management system as shown in Figure 1 comprises the local area network (LAN) that is made of GIS work station and GIS server, and RFID moves the tour terminal, and local area network (LAN) and RFID move to make an inspection tour and adopt the wireless network transmissions device to transmit between the terminal.Described wireless network transmissions device or be the WIFI wireless network transmissions.Described RFID moves the tour terminal: be made up of PDA and RFID reader and inspection tour system software.Described RFID moves the PDA-RFID reader all-in-one that the hardware device of making an inspection tour terminal is selected technical grade.The inspection tour system software of the last installation of PDA is divided into aerial construction, cell equipment, three specialties of cable machinery tour according to making an inspection tour specialty.Built-in tour job instruction of inspection tour system software and distribution defect standard storehouse.
The workflow of distribution intelligent patrol detection management system of the present invention: 1, when work carried out initialization according to equipment cycle of making an inspection tour on date of putting into operation to the tour date of each unit by the GIS work station, and 2, system generated to expire and need the equipment list maked an inspection tour and generate the tour plan by specialty in every month automatically; Counting the equipment list that exceeds the time limit not make an inspection tour and staff list per season automatically imports RFID with information such as all line patterns and attribute datas by the wireless network transmissions device by the GIS server for monthly appraisal and moves the tour terminal, 3, make an inspection tour task by making an inspection tour planned assignment, and with tasks synchronization to making an inspection tour terminal, 4, the floor manager enters and makes an inspection tour task module separately, at aerial construction, cell equipment, cable machinery is maked an inspection tour one by one, move and make an inspection tour terminal obtains field apparatus according to the RFID fetch equipment essential information, automatically access the electric pole that meets this information, station equipment, the cable machinery attribute list, one by one the tour project is filled in for the floor manager, and recording exceptional and defect situation, reference is called for tour personnel scene in tour job instruction that inspection tour system software is built-in and distribution defect standard storehouse, alleviate on-the-spot hand-written typing workload, the fill substance and the defective of standard defect situation are qualitative, the RFID reader does not read the situation of tour equipment electronic labeling information, be considered as this equipment without tour, can't write down tour information, stop to make an inspection tour phenomenon not in place and that the equipment leakage is maked an inspection tour with this, 5, after finishing tour, the floor manager will move make an inspection tour terminal by the wireless network transmissions device with data upload to the Distributing Network GIS database, system will make an inspection tour the result automatically and be merged into server database, server can focus on according to the data that the tour personnel are imported into, generate and make an inspection tour record and equipment deficiency record, chamber leaders of institute at different levels and class monitor and group leader can in time see tour result and defect record by production management system, the automatic calculation squad group membership's of simultaneity factor tour completion rate also refreshes the tour cycle of making an inspection tour equipment, this equipment enters next round and makes an inspection tour the cycle, goes round and begins again.
It is same as the prior art that present embodiment is not stated part.
Embodiment 2
Present embodiment is substantially the same manner as Example 1, and just local area network (LAN) wherein also is connected with the WEB server.

Claims (8)

1. distribution intelligent patrol detection management system, it is characterized in that: mainly comprise the local area network (LAN) that is made of GIS work station and GIS server, RFID moves the tour terminal, and local area network (LAN) and RFID move to make an inspection tour and adopt the wireless network transmissions device to transmit between the terminal.
2. distribution intelligent patrol detection management system according to claim 1 is characterized in that: described wireless network transmissions device or for the WIFI wireless network transmissions, or be bluetooth.
3. distribution intelligent patrol detection management system according to claim 1 and 2, it is characterized in that: described RFID moves the tour terminal: be made up of PDA and RFID reader and inspection tour system software.
4. distribution intelligent patrol detection management system according to claim 3 is characterized in that: built-in tour job instruction of described inspection tour system software and distribution defect standard storehouse.
5. distribution intelligent patrol detection management system according to claim 4 is characterized in that: described RFID moves the PDA-RFID reader all-in-one that the hardware device of making an inspection tour terminal is selected technical grade.
6. distribution intelligent patrol detection management system according to claim 5 is characterized in that: the inspection tour system software of the last installation of PDA is divided into aerial construction, cell equipment, three specialties of cable machinery tour according to making an inspection tour specialty.
7. distribution intelligent patrol detection management system according to claim 1 is characterized in that: described distribution intelligent patrol detection management system also comprises local area network (LAN) is linked to each other with the WEB server.
8. the workflow of a distribution intelligent patrol detection management system: 1, according to equipment cycle of making an inspection tour on date of putting into operation the tour date of each unit is carried out initialization by the GIS work station during work, 2, system generated to expire and need the equipment list maked an inspection tour and generate the tour plan by specialty in every month automatically; Count the equipment list and the staff list that exceed the time limit not make an inspection tour per season and supply monthly appraisal, by the GIS server information such as all line patterns and attribute data are imported RFID automatically by the wireless network transmissions device and move the tour terminal, 3, make an inspection tour task by making an inspection tour planned assignment, and with tasks synchronization to making an inspection tour terminal, 4, the floor manager enters and makes an inspection tour task module separately, at aerial construction, cell equipment, cable machinery is maked an inspection tour one by one, move and make an inspection tour terminal obtains field apparatus according to the RFID fetch equipment essential information, automatically access the electric pole that meets this information, station equipment, the cable machinery attribute list, one by one the tour project is filled in for the floor manager, and recording exceptional and defect situation, reference is called for tour personnel scene in tour job instruction that inspection tour system software is built-in and distribution defect standard storehouse, alleviate on-the-spot hand-written typing workload, the fill substance and the defective of standard defect situation are qualitative, the RFID reader does not read the situation of tour equipment electronic labeling information, be considered as this equipment without tour, can't write down tour information, stop to make an inspection tour phenomenon not in place and that the equipment leakage is maked an inspection tour with this, 5, after finishing tour, the floor manager will move make an inspection tour terminal by the wireless network transmissions device with data upload to the Distributing Network GIS database, system will make an inspection tour the result automatically and be merged into server database, server can focus on according to the data that the tour personnel are imported into, generate and make an inspection tour record and equipment deficiency record, chamber leaders of institute at different levels and class monitor and group leader can in time see tour result and defect record by production management system, the automatic calculation squad group membership's of simultaneity factor tour completion rate also refreshes the tour cycle of making an inspection tour equipment, and this equipment enters next round and makes an inspection tour the cycle.
CN2010102762088A 2010-09-07 2010-09-07 Intelligent distribution patrol and management system and work flow thereof Pending CN101944773A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102762088A CN101944773A (en) 2010-09-07 2010-09-07 Intelligent distribution patrol and management system and work flow thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102762088A CN101944773A (en) 2010-09-07 2010-09-07 Intelligent distribution patrol and management system and work flow thereof

Publications (1)

Publication Number Publication Date
CN101944773A true CN101944773A (en) 2011-01-12

Family

ID=43436612

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102762088A Pending CN101944773A (en) 2010-09-07 2010-09-07 Intelligent distribution patrol and management system and work flow thereof

Country Status (1)

Country Link
CN (1) CN101944773A (en)

Cited By (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102176252A (en) * 2011-01-26 2011-09-07 新疆中钜电子科技有限公司 Equipment and facility safety inspection intelligent patrolling operation system and application method thereof
CN102593750A (en) * 2012-02-20 2012-07-18 萧山供电局 Distribution line inspection system
CN102637027A (en) * 2012-04-25 2012-08-15 深圳市速普瑞科技有限公司 Overhaul control system and method for railway signaling device
CN102740558A (en) * 2012-05-31 2012-10-17 深圳市致烨科技有限公司 Method for controlling urban lighting facility based on intelligent terminal, intelligent terminal and system
CN102737415A (en) * 2012-07-16 2012-10-17 航天科工深圳(集团)有限公司 Intelligent inspection system and method for formulating inspection tasks
CN102878993A (en) * 2012-08-27 2013-01-16 苏州左海电气有限公司 Distribution inspection map navigation and equipment information management service platform system
CN103049823A (en) * 2012-12-26 2013-04-17 深圳供电局有限公司 Distribution network cable field maintenance terminal and corresponding management system
CN103458000A (en) * 2013-08-07 2013-12-18 广东电网公司佛山供电局 Terminal data synchronizing system and method
CN103701208A (en) * 2013-11-27 2014-04-02 国家电网公司 Intelligent mobile power patrol terminal
CN104050726A (en) * 2014-06-18 2014-09-17 铁道第三勘察设计院集团有限公司 Closed inspection system and method based on NFC (Near Field Communication) technology
CN104076767A (en) * 2012-04-25 2014-10-01 深圳市速普瑞科技有限公司 Railway signal equipment overhauling control system and method
CN104123759A (en) * 2013-04-25 2014-10-29 巨路国际股份有限公司 Plant inspection method and system
CN104320453A (en) * 2014-10-22 2015-01-28 山东大学 Patrol method of intelligent patrol system on basis of Android mobile phone
CN104504529A (en) * 2014-12-31 2015-04-08 北京太格时代自动化系统设备有限公司 Overhead line routing inspection electronic tag system based on wireless radio frequency technology
CN104715312A (en) * 2013-12-11 2015-06-17 智捷科技股份有限公司 Person patrolling system and patrolling method thereof
CN105337173A (en) * 2014-08-11 2016-02-17 国家电网公司 Processing method, processing apparatus and processing system for overhead line electric pole, and overhead line electric pole
CN105468060A (en) * 2015-11-27 2016-04-06 国家电网公司 Substation inspection management system
CN106257533A (en) * 2016-03-24 2016-12-28 北京市环丽清扫保洁服务中心 Intelligent response disposal management platform and method for environmental sanitation emergency guarantee
CN106654986A (en) * 2016-11-16 2017-05-10 国家电网公司 Operating method of transmission and distribution line inspection tour device
CN106643904A (en) * 2016-12-30 2017-05-10 珠海晶通科技有限公司 Power system intelligent monitoring device based on super high frequency RFID
CN106845647A (en) * 2016-12-08 2017-06-13 国网北京市电力公司 The tour repair method of charging station, apparatus and system
CN107730066A (en) * 2017-08-25 2018-02-23 北京元心科技有限公司 Cruising inspection system task cooperation processing method and processing device
CN107909155A (en) * 2017-09-30 2018-04-13 中建钢构有限公司 A kind of equipment management system and method
CN108344454A (en) * 2018-04-21 2018-07-31 国网四川省电力公司电力科学研究院 A kind of intelligent substation patrol positioning system based on UWB
CN108563671A (en) * 2018-01-24 2018-09-21 苏州星宇测绘科技有限公司 A kind of data of one-stop three-dimensional Electromagnetic Survey of Underground Pipelines build library system
CN110648422A (en) * 2019-09-17 2020-01-03 北京派克盛宏电子科技有限公司 Standardized inspection method, system and platform

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《农村电气化 》 20080331 黄淮扬 PDA和RFID在配电巡检中的应用 59-60 , 第3期 2 *

Cited By (31)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102176252A (en) * 2011-01-26 2011-09-07 新疆中钜电子科技有限公司 Equipment and facility safety inspection intelligent patrolling operation system and application method thereof
CN102593750A (en) * 2012-02-20 2012-07-18 萧山供电局 Distribution line inspection system
CN104076767A (en) * 2012-04-25 2014-10-01 深圳市速普瑞科技有限公司 Railway signal equipment overhauling control system and method
CN102637027A (en) * 2012-04-25 2012-08-15 深圳市速普瑞科技有限公司 Overhaul control system and method for railway signaling device
CN102740558A (en) * 2012-05-31 2012-10-17 深圳市致烨科技有限公司 Method for controlling urban lighting facility based on intelligent terminal, intelligent terminal and system
CN102740558B (en) * 2012-05-31 2014-09-17 深圳市致烨科技有限公司 Method for controlling urban lighting facility based on intelligent terminal, intelligent terminal and system
CN102737415A (en) * 2012-07-16 2012-10-17 航天科工深圳(集团)有限公司 Intelligent inspection system and method for formulating inspection tasks
CN102878993A (en) * 2012-08-27 2013-01-16 苏州左海电气有限公司 Distribution inspection map navigation and equipment information management service platform system
CN103049823A (en) * 2012-12-26 2013-04-17 深圳供电局有限公司 Distribution network cable field maintenance terminal and corresponding management system
CN103049823B (en) * 2012-12-26 2016-09-21 深圳供电局有限公司 Distribution network cable field maintenance terminal and corresponding management system
CN104123759A (en) * 2013-04-25 2014-10-29 巨路国际股份有限公司 Plant inspection method and system
CN103458000A (en) * 2013-08-07 2013-12-18 广东电网公司佛山供电局 Terminal data synchronizing system and method
CN103458000B (en) * 2013-08-07 2016-06-08 广东电网公司佛山供电局 Terminal data synchro system and method
CN103701208A (en) * 2013-11-27 2014-04-02 国家电网公司 Intelligent mobile power patrol terminal
CN104715312A (en) * 2013-12-11 2015-06-17 智捷科技股份有限公司 Person patrolling system and patrolling method thereof
CN104050726A (en) * 2014-06-18 2014-09-17 铁道第三勘察设计院集团有限公司 Closed inspection system and method based on NFC (Near Field Communication) technology
CN105337173A (en) * 2014-08-11 2016-02-17 国家电网公司 Processing method, processing apparatus and processing system for overhead line electric pole, and overhead line electric pole
CN105337173B (en) * 2014-08-11 2018-09-18 国家电网公司 Overhead transmission line electric pole processing method, device, system and overhead transmission line electric pole
CN104320453A (en) * 2014-10-22 2015-01-28 山东大学 Patrol method of intelligent patrol system on basis of Android mobile phone
CN104504529A (en) * 2014-12-31 2015-04-08 北京太格时代自动化系统设备有限公司 Overhead line routing inspection electronic tag system based on wireless radio frequency technology
CN105468060A (en) * 2015-11-27 2016-04-06 国家电网公司 Substation inspection management system
CN106257533A (en) * 2016-03-24 2016-12-28 北京市环丽清扫保洁服务中心 Intelligent response disposal management platform and method for environmental sanitation emergency guarantee
CN106654986A (en) * 2016-11-16 2017-05-10 国家电网公司 Operating method of transmission and distribution line inspection tour device
CN106845647A (en) * 2016-12-08 2017-06-13 国网北京市电力公司 The tour repair method of charging station, apparatus and system
CN106643904A (en) * 2016-12-30 2017-05-10 珠海晶通科技有限公司 Power system intelligent monitoring device based on super high frequency RFID
CN107730066A (en) * 2017-08-25 2018-02-23 北京元心科技有限公司 Cruising inspection system task cooperation processing method and processing device
CN107909155A (en) * 2017-09-30 2018-04-13 中建钢构有限公司 A kind of equipment management system and method
CN108563671A (en) * 2018-01-24 2018-09-21 苏州星宇测绘科技有限公司 A kind of data of one-stop three-dimensional Electromagnetic Survey of Underground Pipelines build library system
CN108344454A (en) * 2018-04-21 2018-07-31 国网四川省电力公司电力科学研究院 A kind of intelligent substation patrol positioning system based on UWB
CN108344454B (en) * 2018-04-21 2023-12-08 国网四川省电力公司电力科学研究院 UWB-based intelligent substation inspection positioning system
CN110648422A (en) * 2019-09-17 2020-01-03 北京派克盛宏电子科技有限公司 Standardized inspection method, system and platform

Similar Documents

Publication Publication Date Title
CN101944773A (en) Intelligent distribution patrol and management system and work flow thereof
CN201839086U (en) Power distribution intelligent inspection and management system
CN103325153A (en) Inspection method and inspection system
CN105574593B (en) Track state static detection and control system and method based on cloud computing and big data
CN107402332A (en) A kind of Intelligent power distribution terminal multi-epitope automatic checkout system and its detection method
CN202615415U (en) Full lifecycle management system of electric automobile power cell and based on Internet of Things
CN107909155A (en) A kind of equipment management system and method
CN105321051A (en) Extra-high voltage substation intelligent operation and maintenance management and method for generating report thereof
CN104123602A (en) Intelligent school badge management system and method
CN109447286A (en) A kind of power transformation O&M Intelligent mobile job platform based on Internet of Things
CN103143572A (en) Altitude air-cooling coiling tracking and coiling control system
CN113722311A (en) Power distribution network power failure range positioning method, system, equipment and medium
CN112687022A (en) Intelligent building inspection method and system based on video
CN103399562A (en) Device and method for processing real-time dynamic cost calculation information of production line
CN103067421A (en) Device management system and method synchronously based on mobile terminal and server
CN202677464U (en) An intelligent warehouse management system
CN107272613A (en) A kind of New Process control system applied to woodworking
CN103577945A (en) Intelligent warehouse management system
CN117079363A (en) Inspection operation content generation system and method based on wearable PDA
CN202924224U (en) Radio frequency identification (RFID)-based delivery and warehousing device for electrical energy metering equipment
CN105488644A (en) Intelligent warehouse management system method
CN116777386A (en) Intelligent manufacturing collaborative platform management system for beam field
CN107390663A (en) Board production Status Reporting system
CN110826926A (en) Intelligent manufacturing execution system for surface assembly production line
CN203573358U (en) Intermediate material position obtaining system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: FUJIAN ELECTRIC POWER CO., LTD. FUZHOU ELECTRIC PO

Effective date: 20121127

Owner name: STATE GRID CORPORATION OF CHINA

Free format text: FORMER OWNER: FUZHOU ELECTRIC POWER BUREAU, FUJIAN ELECTRIC POWER CO., LTD.

Effective date: 20121127

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 350009 FUZHOU, FUJIAN PROVINCE TO: 100031 XICHENG, BEIJING

TA01 Transfer of patent application right

Effective date of registration: 20121127

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant after: State Grid Corporation of China

Applicant after: Fujian Electric Power Co., Ltd.

Applicant after: Fuzhou Electric Power Bureau, Fujian Electric Power Co., Ltd.

Address before: 350009 Taijiang Fuzhou District, Fujian province Xingang Road No. 4 strip type frame, 12 storey building

Applicant before: Fuzhou Electric Power Bureau, Fujian Electric Power Co., Ltd.

C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20110112