CN107390663A - Board production Status Reporting system - Google Patents
Board production Status Reporting system Download PDFInfo
- Publication number
- CN107390663A CN107390663A CN201710767535.5A CN201710767535A CN107390663A CN 107390663 A CN107390663 A CN 107390663A CN 201710767535 A CN201710767535 A CN 201710767535A CN 107390663 A CN107390663 A CN 107390663A
- Authority
- CN
- China
- Prior art keywords
- board
- billboard
- data acquisition
- control box
- motion
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 110
- 230000033001 locomotion Effects 0.000 claims description 65
- 230000001133 acceleration Effects 0.000 claims description 22
- 230000002159 abnormal effect Effects 0.000 claims description 16
- 230000005540 biological transmission Effects 0.000 claims description 7
- 238000003860 storage Methods 0.000 claims description 2
- 230000015572 biosynthetic process Effects 0.000 abstract description 5
- 238000003786 synthesis reaction Methods 0.000 abstract description 5
- 230000009286 beneficial effect Effects 0.000 abstract description 4
- 238000000034 method Methods 0.000 description 22
- 238000007726 management method Methods 0.000 description 16
- 230000008569 process Effects 0.000 description 7
- 230000000694 effects Effects 0.000 description 6
- 230000008859 change Effects 0.000 description 5
- 230000008901 benefit Effects 0.000 description 4
- 239000002699 waste material Substances 0.000 description 4
- 230000009471 action Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000007613 environmental effect Effects 0.000 description 2
- 230000005284 excitation Effects 0.000 description 2
- 230000006872 improvement Effects 0.000 description 2
- 239000004973 liquid crystal related substance Substances 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 230000008520 organization Effects 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 239000000243 solution Substances 0.000 description 2
- 241000894007 species Species 0.000 description 2
- 241000256844 Apis mellifera Species 0.000 description 1
- HCBIBCJNVBAKAB-UHFFFAOYSA-N Procaine hydrochloride Chemical compound Cl.CCN(CC)CCOC(=O)C1=CC=C(N)C=C1 HCBIBCJNVBAKAB-UHFFFAOYSA-N 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 230000002950 deficient Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 238000009499 grossing Methods 0.000 description 1
- 238000001746 injection moulding Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000005012 migration Effects 0.000 description 1
- 238000013508 migration Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 210000005036 nerve Anatomy 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 238000004321 preservation Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
- G05B19/41865—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/32—Operator till task planning
- G05B2219/32252—Scheduling production, machining, job shop
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Quality & Reliability (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Automation & Control Theory (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Present invention is disclosed a kind of board production Status Reporting system, including at least unit control box, the unit control box is installed on each board and for controlling the board to run or stop, the unit control box connects to the data acquisition device for gathering product quantity on the corresponding board, the data acquisition device with to show that the board billboard of data that the data acquisition device collected is connected, each data acquisition device also with for showing that the synthesis billboard of all boards production product quantities is connected;The device also includes server, and the server is connected with the unit control box, board billboard and comprehensive billboard respectively.The beneficial effects are mainly as follows:Effectively prevent the leak in field management, realize the unified management to scene;The production information at scene is transmitted, understands the job task of oneself in time from board billboard;Meanwhile the production information at scene can be understood in real time, adjustment in real time.
Description
Technical field
The present invention relates to a kind of machinery production field, specifically, more particularly to a kind of board production Status Reporting
System.
Background technology
21 century for manufacturing industry right and wrong often with the challenging age.It is well known that current customer demand and change
Change more and more, product becomes increasingly complex, and quality requirement also more and more higher, causes enterprise's life order production to be unable to reach economic effect
Benefit, cause production cost more and more higher, while it is omnipresent to waste behavior.At present, it is domestic to be molded manufacturing enterprise more and more
Produced using the higher equipment of automaticity, but the following problem of generally existing:Every equipment works independently, per tour
Production information such as yield, defective products quantity, board state, which need to be counted manually, submits form, and production information can not embody in time, leads to
Often want shift's end or even detailed production information is known to the second talent, influence management level decision-making;Live visualizing degree is not
Height, influence manager and grasp instant production information and make decision-making fast and accurately;When production occurs abnormal, without timely
Alarming processing, can only manual report, waste time and energy, in addition processing influence performance not in time.Such as:During equipment fault, often to look for
People repairs and expends many times;Production abnormal information is largely manual record and statistical report, and data accuracy is not high,
Historical record query statistic is very inconvenient, it is difficult to make for abnormal improvement alternative;Board is safeguarded and mould maintenance is not strong
Strong historical data statistics support, such as:Monitoring of die life etc.;Technological parameter(Injection molding parameter)Due to various
Reason, arbitrarily modification phenomenon be present, lack effective supervision;The production schedule is filled out by human hand and singly arranged production, decision data(Order
Quantity and stockpile number)Lack and not in time, the reasonable and efficient production schedule can not be formulated;The related all departments' contact of production
It is not tight(Production, engineering, product examine, warehouse, finance etc.), phenomenon of being shift onto each other in management is easily caused, production is influenceed and is normally carried out.
Obviously, another effective production organization mode is found, it is very urgent to improve production management level.
JIT production mode is applied to manufacture or assemble using pipeline system the enterprise of product, and typical industry is automobile system
Make industry.Management thought in its mode of production:Such as put and end to waste and excessive production, flexible production plan, equipment quickly adjust, entirely
Member participates in improvement activity etc., has reference for enterprise.
Lean production is world today's advanced management method, its Toyota Company originating from Japan, therefore also referred to as lean
The mode of production is Toyota's production system.The immense success of Toyota Company so that Lean Production is promoted out in the world
Come.The marrow of lean production is just among " essence " and " benefit ".So-called " essence ", it is exactly " fewer but better ", not putting into unnecessary production will
Element, simply in the market in urgent need product of reasonable time production necessary amount(Or the product that next procedure is badly in need of);So-called " benefit ",
I.e. all business activities will have economic benefit beneficial to effectively.Lean Production is both a kind of to reduce to greatest extent
The shared resource of enterprise's production and reduction business administration and operation cost are the main syllabus target mode of production, and a kind of reason
Read, a kind of culture.Reach lean production to first have to first complete line balancing.The balance of so-called production line, refers to production line
Production time between place of working will reach unanimity and reach the work of no bottleneck.Line balancing will reach following three mesh
Mark:Total quantity balance, product variety are balanced, mixing production.Beat theory is the effective way for solving line balancing problem.Section
Clap(Takt Time)Refer to be continuously finished two products of identical(Or service twice, or two batches product)Between interval time.
In other words, that is, the average time needed for one product of completion is referred to.The decision of beat has following three method:The demand of client,
Equipment capacity, personnel's production capacity.JIT production(JIT)It is one of three broad theory pillars of lean production, JIT is to drop
Low cost is basic object, in a kind of new organization of production side for making production effectively carry out that production links are in full swing
Formula.And JIT production is realized, it is necessary to which a matched information approach, here it is our usually said kanban systems.
Kanban system in lean production is to manage the production of full company in phase, billboard just as each procedure of ingenious connection nerve and
Play an important role, by necessary product, must when, an information system only being manufactured by necessary quantity
System.
Kanban system, often write " kanban " management(From Japanese " billboard ", power Application ノ ミ Application, the spelling of Japanese Rome:
kanban), it is the key concept in Toyota's production model, is to reach the instrument that JIT modes control produced on-site flow.It is accurate
When the mode of production in it is pull-type(Pull)Production system can shorten the flow of information, and coordinate quantitative, fixed goods container
Etc. mode, and make the Flow of Goods and Materials in the mode of production smooth.Traditional mode of production uses last process to next procedure delivery, processed
Journey is promoted from the first procedure to last procedure, therefore is referred to as " driving " production.And the main thought of kanban system
It is:Internal user principle is followed, using the needs of user as the foundation produced.Billboard production is produced using " extending type ", by rear
Procedure instructs to preceding working procedure picking, together genuine pass on from the front to the back.
Kanban system method is that logistics or the transmission of information flow are carried out between same procedure or front and rear process.JIT
It is a kind of way to manage of extending type, it is needed from last procedure by a procedure transmission information on information flow direction, this
The carrier of kind transmission information is exactly billboard.There is no billboard, JIT can not be carried out.Therefore, the JIT modes of production are also claimed sometimes
Make the billboard mode of production.After once MPS determines, production ordering will be assigned to each workshop, it is then each
Each procedure of individual workshop again forwardly assigns production ordering, finally assigns phase to storehouse management department, purchasing department again
The instruction answered.The transmission of these production orderings is all completed by billboard.Billboard type is broadly divided into:Triangle billboard,
Equipment billboard, quality billboard, production management billboard, process management billboard, in product billboard etc..The information of billboard may include:Zero
Piece number code, the name of an article, manufacture numbering, vessel form, send billboard numbering, migration place, accessory appearance etc..The essence of billboard be
The time needed, amount on demand sends a kind of information media body of production ordering to required parts, and realizes this function
Form can be diversified.With the rapid development of information technology, current billboard mode is showed gradually by computer
The trend substituted.Now MRP systems the most popular be exactly by JIT produce between billboard replaced with computer, per together
All networked between process, the assigning of instruction, the information communication between process is all completed by computer.It is domestic at present a lot
MRP is all carrying out in enterprise, but really succeed seldom, wherein the main reason for be exactly enterprise in no implementation JIT
In the case of just directly implementation MRP.In fact, a kind of MRP only computerized softwares hand-manipulated by numerous complicated, though
Production efficiency can be so greatly improved, but some ideas and method that JIT is proposed can not be handled.Therefore, MRP is only
One instrument, it is necessary to establish on the basis for carrying out JIT.Nucleus module of the electronic board management as MRP, it is possible to increase car
Between production process control ability, the optimization of structure and whole plant working flow to MRP is respectively provided with very big effect.If
Enterprise does not carry out JIT and just directly uses MRP, and that can waste time and money.The JIT modes of production are a kind of production after all
Management philosophy, and a kind of billboard only management tool.Billboard is only synchronous in integrated process, production smoothing, production
On the premise of change, be possible to play a role.
The content of the invention
The purpose of the present invention is to overcome the shortcomings of the prior art, there is provided a kind of board production Status Reporting system
System.
The purpose of the present invention is achieved through the following technical solutions:
A kind of board production Status Reporting system, it is characterised in that:Including the unit control being provided separately within each board
Box processed, the unit control box are used to control its corresponding board operation or stopped, and the unit control box gathers phase with being used for
Answer product quantity and the data acquisition device of motion connection on the board, the data acquisition device with showing the number
The board billboard connection of the data collected according to harvester, the board billboard are arranged on each board, each described
Data acquisition device also with for showing that the synthesis billboard of all boards production product quantities is connected;The system also includes clothes
Business device, the server is connected with the unit control box, board billboard and comprehensive billboard respectively, to the institute that will be received
The signal that unit control box, board billboard and comprehensive billboard are sent is stated to send to control terminal or workshop host computer.
Preferably, the unit control box, data acquisition device, board billboard, comprehensive billboard, server and host computer
Between connected by wireless device, the wireless device is WIFI or CAN or private local area network.
Preferably, at least provided with call button, abnormal button, operation button in the unit control box.
Preferably, authority device is additionally provided with the unit control box, the authority device is described including at least being arranged on
It is used to store the identification card of identity information, in unit control box reading the reading of the identity information in the identification card
Card device and it is connected with the card reader, the identity information read according to the card reader discharges corresponding entitlement messages and simultaneously controlled
The board carries out the control unit of corresponding operating.
Preferably, the data acquisition device comprises at least data acquisition unit and fortune of the configuration on each board
Dynamic sensor, is attached, the data acquisition between the motion sensor and the data acquisition unit by USB data line
Device is connected with board billboard, wherein:
The motion sensor is used for the movement locus and acceleration of motion for detecting the product of the board;
The movement locus and acceleration of motion that the data acquisition unit is detected according to the motion sensor are to the board
Product quantity carries out real-time tracing and total quantity statistics, and real-time tracing data and total quantity statistics are uploaded into board and seen
Plate;
The motion sensor carries out detecting in advance dry run track and the acceleration of motion of the product on the board, and will
Obtain skimulated motion track and acceleration of motion is sent to the data acquisition unit and stored, during production, the motion-sensing
Device detect the actual motion track of the product of the board and acceleration of motion and is sent to the data acquisition unit, described
Data acquisition unit judges whether the actual motion track and acceleration of motion accelerate with the skimulated motion track to prestore and motion
Whether degree is consistent, if not meeting, controls the board to be stopped by the unit control box, data carry out termination meter
Number;If being consistent, product data are counted.
Preferably, the data acquisition unit is additionally provided with abnormity prompt module, if to product quantity carry out stop counting when
Between exceed default time range, then to sending abnormity prompt information in the unit control box.
Preferably, the data acquisition unit is additionally provided with prompting module up to standard, if the total quantity of the product quantity of the board
When statistics reaches default desired value, then to sending prompting message up to standard in the unit control box.
Preferably, the board billboard and comprehensive billboard are two-sided display screen.
Preferably, also it is equipped with warning device on the unit control box and host computer.
Preferably, the warning device is buzzer or tri coloured lantern.
The beneficial effects are mainly as follows:
1st, the present invention carries out the identification of product movement locus and acceleration of motion by motion sensor and action judges, so as to real
The statistics of existing product quantity, motion sensor without directly contacting with product are not easy that product is caused to damage;On the other hand, no
By external environmental interference, stability is good, and accuracy is higher.
2nd, the production information at the present invention scene of can transmitting in time, the operation of oneself can be understood in time from board billboard and appointed
Business;Meanwhile the production information at scene can be understood in real time, adjustment in real time.
3rd, the leak in field management is effectively prevented, by comprehensive billboard, production link personnel can directly slap
The present situations such as manufacturing schedule, quality are controlled, carrying out management and control for it provides direct basis.
4th, fairization of performance appraisal, transparence.Can be very clear to work achievement by comprehensive billboard, make to production
Performance appraisal is come into the open, transparence, at the same also play excitation it is advanced, supervise laggard effect.
5th, ensure production scene order of work, lift corporate image.
Brief description of the drawings
Technical solution of the present invention is described further below in conjunction with the accompanying drawings:
Fig. 1:The structural representation of the present invention.
Embodiment
Below with reference to embodiment shown in the drawings, the present invention will be described in detail.But these embodiments are simultaneously
The present invention is not limited to, structure that one of ordinary skill in the art is made according to these embodiments, method or functionally
Conversion is all contained in protection scope of the present invention.
As shown in figure 1, present invention is disclosed a kind of board production Status Reporting system, including at least unit control box
1, the unit control box 1 is installed on each board and for controlling the board to run or stop, the unit control box 1
Connected to the data acquisition device 2 for gathering product quantity on the corresponding board, the data acquisition device 2 with to aobvious
Show that the board billboard 3 for the data that the data acquisition device 2 is collected connects, each data acquisition device 2 also with
Connected in the synthesis billboard 4 for showing all board production product quantities.
In above-mentioned, pass through nothing between the unit control box 1, data acquisition device 2, board billboard 3 and comprehensive billboard 4
Line apparatus connects, and the wireless device be WIFI or CAN or private local area network, certainly, it is of the invention in wireless device not
Make specific limit.
Further, institute is controlled by the operation button 13 at least provided with operation button 13 in the unit control box 1
State the operation or stopping of board.
Authority device 14 is additionally provided with the unit control box 1, the authority device 14 comprises at least and is arranged on the list
The identification card for being used to store identity information in machine control box 1, to read the reading of the identity information in the identification card
Card device and it is connected with the card reader, the identity information read according to the card reader discharges corresponding entitlement messages and simultaneously controlled
The board carries out the control unit of corresponding operating.
Above-mentioned using the identification card is due to attendance card that the card can directly utilize operating personnel, therefore need not
Neocaine is bought, has saved cost.And identification card has reading and preservation and the indeformable ability of more than 100,000 times,
If identification card is damaged or lost, because typically there is standby identification card in company, change also very convenient.
The present invention carries out the distribution of authority by following steps, including:Read the identity information stored in identification card
Step S1;The step S2 of the authority information of the corresponding identity information of release;Equipment is carried out according to the authority information
The step S3 of corresponding operating, it is achieved in being allocated the various operating rights of the board.
The data acquisition device 2 comprises at least data acquisition unit 21 and motion of the configuration on each board and passed
Sensor 22, it is attached between the motion sensor 22 and the data acquisition unit 21 by USB data line, the data are adopted
Storage 21 is connected with board billboard 3, wherein:
The motion sensor 22 is used for the movement locus and acceleration of motion for detecting the product of the board;
The movement locus and acceleration of motion that the data acquisition unit 21 is detected according to the motion sensor 22 are to the machine
The product quantity of platform carries out real-time tracing and total quantity statistics, and real-time tracing data and total quantity statistics are uploaded into machine
Platform billboard 3;
The motion sensor 22 in advance detect dry run track and the acceleration of motion of the product on the board, and
Skimulated motion track will be obtained and acceleration of motion is sent to the data acquisition unit 21 and stored, during production, the motion
Sensor 22 detect the actual motion track of the product of the board and acceleration of motion and is sent to the data acquisition
Device 21, the data acquisition unit 21 judge the actual motion track and acceleration of motion whether with the skimulated motion track that prestores
Whether it is consistent with acceleration of motion, if not meeting, controls the board to be stopped by the unit control box 1, number
According to carrying out termination counting;If being consistent, product data are counted.
The data acquisition unit 21 is additionally provided with abnormity prompt module, if the time for product quantity stop counting exceedes
Default time range, then to transmission abnormity prompt information in the unit control box 1, now, the lamp of the abnormal button 12
Light is red flashing light lamp.
The data acquisition unit 21 is additionally provided with prompting module up to standard, if the total quantity statistical number of the product quantity of the board
During according to reaching default desired value, then to prompting message up to standard is sent in the unit control box 1, now, the call button
11 light flash.
Present invention additionally comprises server 5, the server 5 respectively with the unit control box 1, board billboard 3 and comprehensive
Close billboard 4 to connect, the signal the unit control box 1 received, board billboard 3 and comprehensive billboard 4 to be sent is sent out
Deliver to control terminal or workshop host computer 6.
Connected in the present invention between preferable scheme server 5 and host computer 6 by wireless device, the wireless device
For WIFI or CAN or private local area network, certainly, the specific transmission means present invention is not construed as limiting.
Further, warning device is also equipped with the unit control box 1 and host computer 6, the warning device is honeybee
Ring device or tri coloured lantern, in order to which operating personnel and the personnel of upper seat in the plane can know its problem in time, does corresponding deployment.This
The personnel of upper seat in the plane include quality departmental staff, machine maintenance departmental staff, production section personnel, mould departmental staff etc. in invention,
During as abnormal conditions occurring in process of production, when finding that quality abnormal needs to ask for help according to the producers of board, press
Under abnormal button in the unit control box 1, now the alarm lamp on the billboard be changed into " red " from " green ", it is described to see
Producing line status display on plate is also from being changed into " quality abnormal " " in production ";This machine station information shown by the synthesis billboard of workshop
It is changed into " red " from " green ", and shows " quality abnormal ";Show and exhale on the computer of the control terminal on described on seat in the plane simultaneously
It is the code of presentation of information exception board;After quality departmental staff is connected to call request, liquid crystal touch control screen is operated after reaching the spot,
The specific species of screen display quality abnormal, the species of quality personnel selection quality abnormal, now the board billboard, synthesis are seen
Alarm lamp on plate and computer abnormal call billboard is changed into " yellow " from " red ", and shows " quality+Exception Type ";It is abnormal
Quality departmental staff operates liquid crystal touch control screen and releases abnormal call after being disposed, this call information on all display devices
Disappear.
The beneficial effects are mainly as follows:
1st, the present invention carries out the identification of product movement locus and acceleration of motion by motion sensor and action judges, so as to real
The statistics of existing product quantity, motion sensor without directly contacting with product are not easy that product is caused to damage;On the other hand, no
By external environmental interference, stability is good, and accuracy is higher.
2nd, the production information at the present invention scene of can transmitting in time, same idea, can understand oneself in time from board billboard
Job task, meanwhile, can understand in real time scene production information, in real time adjustment.
3rd, the leak in field management is effectively prevented, by comprehensive billboard, production link personnel can directly slap
The present situations such as manufacturing schedule, quality are controlled, carrying out management and control for it provides direct basis.
4th, fairization of performance appraisal, transparence.Can be very clear to work achievement by comprehensive billboard, make to production
Performance appraisal is come into the open, transparence, at the same also play excitation it is advanced, supervise laggard effect.
5th, ensure production scene order of work, lift corporate image.
It should be appreciated that although the present specification is described in terms of embodiments, not each embodiment only includes one
Individual independent technical scheme, this narrating mode of specification is only that those skilled in the art will should say for clarity
For bright book as an entirety, the technical scheme in each embodiment may also be suitably combined to form those skilled in the art can
With the other embodiment of understanding.
Those listed above is a series of to be described in detail only for feasibility embodiment of the invention specifically
Bright, they simultaneously are not used to limit the scope of the invention, all equivalent implementations made without departing from skill spirit of the present invention
Or change should be included in the scope of the protection.
Claims (10)
1. board production Status Reporting system, it is characterised in that:Including the unit control being provided separately within each board
Box(1), the unit control box(1)For controlling its corresponding board operation or stopping, the unit control box(1)With for
Product quantity and the data acquisition device of motion on the corresponding board of collection(2)Connection, the data acquisition device(2)With with
To show the data acquisition device(2)The board billboard of the data collected(3)Connection, the board billboard(3)Set
On each board, each data acquisition device(2)Also with for showing the comprehensive of all boards production product quantities
Close billboard(4)Connection;
The system also includes server(5), the server(5)Respectively with the unit control box(1), board billboard(3)With
And comprehensive billboard(4)Connection, to the unit control box that will be received(1), board billboard(3)And comprehensive billboard(4)
The signal sent is sent to control terminal or workshop host computer(6).
2. board production Status Reporting system according to claim 1, it is characterised in that:The unit control box
(1), data acquisition device(2), board billboard(3), comprehensive billboard(4), server(5)And host computer(6)Between pass through nothing
Line apparatus connects, and the wireless device is WIFI or CAN or private local area network.
3. board production Status Reporting system according to claim 1, it is characterised in that:The unit control box
(1)On at least provided with call button(11), abnormal button(12), operation button(13).
4. board production Status Reporting system according to claim 1, it is characterised in that:The unit control box
(1)On be additionally provided with authority device(14), the authority device(14)Including at least being arranged on the unit control box(1)On use
In storage identity information identification card, to read the card reader of the identity information in the identification card and with the reading
Card device connects, and the identity information read according to the card reader discharges corresponding entitlement messages and controls the board to carry out accordingly
The control unit of operation.
5. board production Status Reporting system according to claim 1, it is characterised in that:The data acquisition device
(2)Including at least data acquisition unit of the configuration on each board(21)And motion sensor(22), the motion biography
Sensor(22)With the data acquisition unit(21)Between be attached by USB data line, the data acquisition unit(21)With machine
Platform billboard(3)Connection, wherein:
The motion sensor(22)For the movement locus and acceleration of motion of the product for detecting the board;
The data acquisition unit(21)According to the motion sensor(22)The movement locus and acceleration of motion detected is to institute
The product quantity for stating board carries out real-time tracing and total quantity statistics, and real-time tracing data and total quantity statistics are uploaded
To board billboard(3);
The motion sensor(22)In advance detect dry run track and the acceleration of motion of the product on the board,
And skimulated motion track will be obtained and acceleration of motion is sent to the data acquisition unit(21)Stored, it is described during production
Motion sensor(22)Detect the actual motion track of the product of the board and acceleration of motion and be sent to the number
According to collector(21), the data acquisition unit(21)Judge the actual motion track and acceleration of motion whether with the mould that prestores
Intend movement locus and whether acceleration of motion is consistent, if not meeting, pass through the unit control box(1)Control the board
It is stopped, data carry out termination counting;If being consistent, product data are counted.
6. board production Status Reporting system according to claim 5, it is characterised in that:The data acquisition unit
(21)Abnormity prompt module is additionally provided with, if the time for product quantity stop counting exceedes default time range, to
The unit control box(1)Upper transmission abnormity prompt information.
7. board production Status Reporting system according to claim 6, it is characterised in that:The data acquisition unit
(21)Prompting module up to standard is additionally provided with, if the total quantity statistics of the product quantity of the board reaches default desired value
When, then to the unit control box(1)It is upper to send prompting message up to standard.
8. board production Status Reporting system according to claim 1, it is characterised in that:The board billboard(3)
With comprehensive billboard(4)For two-sided display screen.
9. board production Status Reporting system according to claim 1, it is characterised in that:The unit control box
(1)And host computer(6)On be also equipped with warning device.
10. board production Status Reporting system according to claim 9, it is characterised in that:The warning device is
Buzzer or tri coloured lantern.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710767535.5A CN107390663A (en) | 2017-08-31 | 2017-08-31 | Board production Status Reporting system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710767535.5A CN107390663A (en) | 2017-08-31 | 2017-08-31 | Board production Status Reporting system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107390663A true CN107390663A (en) | 2017-11-24 |
Family
ID=60348045
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710767535.5A Pending CN107390663A (en) | 2017-08-31 | 2017-08-31 | Board production Status Reporting system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107390663A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109230450A (en) * | 2018-08-29 | 2019-01-18 | 苏州精濑光电有限公司 | Prevent intelligent control method, the apparatus and system of sensor degradation |
CN113377077A (en) * | 2021-07-08 | 2021-09-10 | 刘志程 | Intelligent manufacturing digital factory system |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201111093Y (en) * | 2007-07-31 | 2008-09-03 | 惠州市新天健服装有限公司 | Data acquiring and treating device based on radio frequency card |
CN104091224A (en) * | 2014-06-10 | 2014-10-08 | 东莞市麦蒂科技有限公司 | System and method for real-time acquisition and analysis of production line data |
CN106779592A (en) * | 2016-12-02 | 2017-05-31 | 林冠良 | A kind of improving production management banner system and application process |
CN106779406A (en) * | 2016-12-14 | 2017-05-31 | 重庆川仪自动化股份有限公司 | MES system based on RFID |
CN106780826A (en) * | 2016-12-20 | 2017-05-31 | 厦门盈趣科技股份有限公司 | Industrialized production automatic data acquisition system and method |
CN207380539U (en) * | 2017-08-31 | 2018-05-18 | 德仕科技(深圳)有限公司 | Board production Status Reporting system |
-
2017
- 2017-08-31 CN CN201710767535.5A patent/CN107390663A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201111093Y (en) * | 2007-07-31 | 2008-09-03 | 惠州市新天健服装有限公司 | Data acquiring and treating device based on radio frequency card |
CN104091224A (en) * | 2014-06-10 | 2014-10-08 | 东莞市麦蒂科技有限公司 | System and method for real-time acquisition and analysis of production line data |
CN106779592A (en) * | 2016-12-02 | 2017-05-31 | 林冠良 | A kind of improving production management banner system and application process |
CN106779406A (en) * | 2016-12-14 | 2017-05-31 | 重庆川仪自动化股份有限公司 | MES system based on RFID |
CN106780826A (en) * | 2016-12-20 | 2017-05-31 | 厦门盈趣科技股份有限公司 | Industrialized production automatic data acquisition system and method |
CN207380539U (en) * | 2017-08-31 | 2018-05-18 | 德仕科技(深圳)有限公司 | Board production Status Reporting system |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109230450A (en) * | 2018-08-29 | 2019-01-18 | 苏州精濑光电有限公司 | Prevent intelligent control method, the apparatus and system of sensor degradation |
CN113377077A (en) * | 2021-07-08 | 2021-09-10 | 刘志程 | Intelligent manufacturing digital factory system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106779592A (en) | A kind of improving production management banner system and application process | |
CN101944773A (en) | Intelligent distribution patrol and management system and work flow thereof | |
CN110009760A (en) | A kind of safety patrol inspection system and method | |
CN111047257A (en) | Production order management system based on 5G network | |
CN103926900A (en) | Production line management control system | |
CN107391747A (en) | Community management method, apparatus, system, storage medium and server | |
CN106516543B (en) | A kind of machine tool manages cabinet and its management method automatically | |
CN105335828A (en) | Operation method of production management | |
CN203552352U (en) | Vending system and vending terminal | |
CN108319638B (en) | Dangerous goods production and manufacturing execution system applying handheld inspection equipment | |
CN109615722A (en) | Computer room method for inspecting, electronic equipment and computer storage medium based on cloud monitoring | |
CN201839086U (en) | Power distribution intelligent inspection and management system | |
CN105398900A (en) | Internet of things monitoring method for elevator maintenance | |
CN109214040A (en) | A kind of fabricated construction real-time monitoring system and method based on BIM | |
CN106502219A (en) | A kind of bearing Internet of Things intelligence fabrication line process control system | |
CN107390663A (en) | Board production Status Reporting system | |
CN207380539U (en) | Board production Status Reporting system | |
CN212083982U (en) | Management and control system for production workshop | |
CN207833527U (en) | A kind of shelf magazine cigarette based on Quick Response Code is packed in library scan code system | |
CN107272613B (en) | A kind of New Process control system applied to woodworking | |
CN110837879A (en) | Intelligent management system and management method for machine room assets based on U-bit level monitoring | |
CN111125235A (en) | Production control method | |
CN202854576U (en) | Automobile production line data management system | |
CN208506582U (en) | A kind of flexible production control system in dynamic regulation production path | |
CN111754159A (en) | Efficient fabric resource management system and resource management method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171124 |