CN101910518A - Be used to pick up the equipment and the method for orbit ballast - Google Patents
Be used to pick up the equipment and the method for orbit ballast Download PDFInfo
- Publication number
- CN101910518A CN101910518A CN2008801238185A CN200880123818A CN101910518A CN 101910518 A CN101910518 A CN 101910518A CN 2008801238185 A CN2008801238185 A CN 2008801238185A CN 200880123818 A CN200880123818 A CN 200880123818A CN 101910518 A CN101910518 A CN 101910518A
- Authority
- CN
- China
- Prior art keywords
- passage
- chain
- equipment
- vertical
- access opening
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B27/00—Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
- E01B27/04—Removing the ballast; Machines therefor, whether or not additionally adapted for taking-up ballast
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Machines For Laying And Maintaining Railways (AREA)
Abstract
Equipment configuration disclosed by the invention has the excavating gear (7) of picking up ballast aggregate from track.Carrier chain (9) is directed in two vertical passages (10) and horizontal chain part (11).Each vertical passage (10) has the access opening (16) in its lower end.Access opening is optionally by first or second channel lid (17,18) sealing.Therefore, in narrow track passageway,, also can utilize littler auxiliary chain (22) to pick up ballast aggregate for example in the zone of railway platform.
Description
Technical field
The present invention relates to a kind of equipment that is used to pick up orbit ballast, this equipment is included on the underframe on the rail (on-track undercarriages) frame movably and has the excavating gear of rotatable circulating conveyor chain, this excavating gear is included in two vertical passages that mutually combine in the zone of chain driver and the horizontal chain part that is connected with the lower end separately of these two vertical passages, wherein, each vertical passage has the inboard and passage outside of passage with respect to the horizontal direction of this equipment.The invention still further relates to a kind of method that is used to pick up orbit ballast.
Background technology
According to US4611541, this equipment that is used for ballast cleaning is known.Owing to utilized carrier chain efficiently, can reach higher cleaning performance.Yet this equipment requires to have the carrier chain of expansion, and still, the carrier chain of expansion for example lacks the track bottleneck zone that can not be used for such as platform edge (platform edge) because of the space.Therefore, in this known embodiment, propose to be positioned at those sleepers in the zone of platform edge, so that for leaving enough spaces at the vertical passage in the transitional region of horizontal chain part along the horizontal direction migration of track.Yet there is such shortcoming in this method: under the situation of the adjacent orbit that existence extends in parallel, the spacing gauge of this adjacent orbit (clearance gauge) is violated.Therefore, the shortcoming of this adjacent orbit is inevitable.
Summary of the invention
The purpose of this invention is to provide the equipment and the method that begin described type, utilize such equipment and method, even in track bottleneck zone, it also is possible picking up ballast aggregate in the spacing gauge of working track.
According to the present invention, utilize the particular types equipment of the feature of characteristic, or utilize the method for the feature of characteristic with claim 3 with claim 1, realize purpose of the present invention.
Utilize such equipment or method, can before arriving bottleneck, reduce the cross section of the bottom key area of long rails, make and in spacing range (clearance profile), still can when the carrier chain that use reduces, utilize this excavating gear.Thereby, can be on adjacent orbit by and unrestricted.
Other advantage of the present invention is by dependent claims and have the description of the drawings and become apparent.
Description of drawings
By the embodiment shown in reference to the accompanying drawings, detailed hereafter the present invention, in the accompanying drawing:
Fig. 1 illustrates the lateral view of the equipment that is used for ballast cleaning;
Fig. 2 illustrates the amplification vertical view of excavating gear;
Fig. 3-6 illustrates the different details of the vertical passage of excavating gear.
The specific embodiment
With reference to figure 1, the equipment 1 that is used to pick up the ballast aggregate 2 of track 3 is included on the rail on the underframe 4 movably frame 5, and this equipment 1 is removable along operative orientation 6.The excavating gear 7 that is used to pick up ballast aggregate 2 is arranged on the rail between the underframe 4.This excavating gear 7 comprises circulating conveyor chain 9, and this circulating conveyor chain 9 is driven that device 8 drives and rotatable, and is directed around track 3.The ballast aggregate of being picked up 2 cleaning in screening plant 24 is emitted on the track 3 subsequently.
More specifically as shown in Figure 2, excavating gear 7 comprises two vertical passages 10 and horizontal chain part 11, and these two vertical passages 10 are in the combination of the zone of chain driver 8.Laterally chain part 11 is positioned at below the track 3, laterally extends with respect to the longitudinal direction of equipment.
Laterally chain part 11 is connected with the lower end 12 of two vertical passages 10 respectively.Each vertical passage 10 comprises with respect to the passage inboard 14 of the horizontal direction 13 of equipment and the passage outside 15, and has the access opening 16 (referring to Fig. 4) that is positioned at the passage outside 15 in its lower end 12.Referring to Fig. 5 and 6, access opening 16 can be sealed by first passage lid 17 or second channel lid 18 down as required the auxiliary of threaded connector 19.
Fig. 3 and 4 respectively illustrates the lower end that has hole 16 12 of vertical passage 10.Among Fig. 4, cause the first passage lid 17 of bigger channel cross-section 20 to illustrate by chain-dotted line.
(the simplification cross section of vertical passage 10) more specifically as shown in Figure 5, when being fixed to vertical passage 10 and covering access opening 16, first passage lid 17 causes bigger channel cross-section 20, and the carrier chain 9 that this bigger channel cross-section 20 is suitable for being used for normal operation passes through.
(the simplification cross section of vertical passage 10) as shown in Figure 6, when being fixed to vertical passage 10 and covering access opening 16, second channel lid 18 causes the channel cross-section 23 that reduces, and this channel cross-section that reduces 23 is suitable for passing through at the littler auxiliary chain 22 of track bottleneck 21 work.Cause above-mentioned track bottleneck 21 situation for example can be railway platform 25.
With respect to operating position shown in the excavating gear 7, the separating plane 26 between access opening 16 and channel cover 17,18 constitutes vertical extent, is parallel to the longitudinal direction of equipment.
In normal operation, utilize the carrier chain 9 that is suitable for vertical passage 10 most to come operating equipment, to realize maximum excavation and cleaning function.Just before arriving railway platform 25, travelling forward of equipment is interrupted.By dismounting threaded connector 19, remove the first passage lid 17 that is positioned at railway platform 25 those sides.The access opening 16 that is in exposed state helps to remove carrier chain 9 (referring to Fig. 4).
Now, the auxiliary chain 22 that reduces is conducted through the access opening 16 that exposes to the open air, and connects the back and become endless-chain at its two ends.Then, the second channel lid 18 that forms the plane is screwed into the on the vertical passage 10, to cover access opening 16.As shown in Figure 6, second channel lid 18 extends along separating plane 26, makes the width B of vertical passage 10 significantly reduce.Therefore, can be when picking up ballast aggregate 2 without a doubt by the zone of railway platform 25, excavating gear 7 needn't laterally pivot.
Claims (3)
1. equipment that is used to pick up orbit ballast, be included on the underframe on the rail (4) frame (5) movably and have the excavating gear (7) of rotatable circulating conveyor chain (9), this excavating gear (7) is included in zone two vertical passages (10) that mutually combine and the horizontal chain part (7) that is connected with this two vertical passages (10) lower end separately of chain driver (8), wherein, each vertical passage (10) has the passage inboard (14) and the passage outside (15) with respect to the horizontal direction of this equipment, and it is characterized in that: a) each vertical passage (10) has the access opening (16) that is positioned at the described passage outside (15) in its lower end; B) described access opening (16) can be as required by first passage lid (17) or second channel lid (18) sealing; C) described first passage lid (17) causes being suitable for the channel cross-section (20) that described carrier chain (9) passes through when being fixed to vertical passage (10); D) described second channel lid (18) auxiliary chain (22) that when being fixed to vertical passage (10), causes only the reducing channel cross-section that reduces (23) that can pass through.
2. equipment as claimed in claim 1, it is characterized in that: with respect to the operating position of described excavating gear (7), the separating plane (26) that is positioned between described access opening (16) and the described channel cover (17,18) constitutes vertical extent, is parallel to the longitudinal direction of described equipment.
3. method that is used for picking up ballast aggregate (2) from railway roadbed, wherein pick up ballast aggregate (2) around the rotation carrier chain (9) of track (3), and with ballast aggregate longitudinally passage (10) upwards be transported to emission point, it is characterized in that: track bottleneck (21) is preceding arriving, replace described carrier chain (9) with littler auxiliary chain (22), and reduce the cross section of the hypomere of described vertical passage (10).
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
ATA4/2008 | 2008-01-02 | ||
AT0000408A AT505911B1 (en) | 2008-01-02 | 2008-01-02 | MACHINE AND METHOD FOR RECEIVING SCRAP OF A TRACK |
PCT/EP2008/010735 WO2009083144A1 (en) | 2008-01-02 | 2008-12-17 | Machine and method for receiving ballast of a track |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101910518A true CN101910518A (en) | 2010-12-08 |
CN101910518B CN101910518B (en) | 2012-07-04 |
Family
ID=40602355
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2008801238185A Active CN101910518B (en) | 2008-01-02 | 2008-12-17 | Machine and method for receiving ballast of a track |
Country Status (10)
Country | Link |
---|---|
EP (1) | EP2238296B1 (en) |
JP (1) | JP5204854B2 (en) |
KR (1) | KR101561715B1 (en) |
CN (1) | CN101910518B (en) |
AT (2) | AT505911B1 (en) |
DK (1) | DK2238296T3 (en) |
EA (1) | EA015980B1 (en) |
ES (1) | ES2373513T3 (en) |
PL (1) | PL2238296T3 (en) |
WO (1) | WO2009083144A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108495965A (en) * | 2016-01-29 | 2018-09-04 | 普拉塞-陶依尔铁路出口股份有限公司 | Machinery with ballast collecting device |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AT510712B1 (en) * | 2011-06-20 | 2012-06-15 | Plasser Bahnbaumasch Franz | MACHINE FOR CLEANING THE SCOT OF A TRAIL |
ITGE20120055A1 (en) * | 2012-05-30 | 2013-12-01 | Enrico Valditerra | "RAILWAY MASSIVE RAILWAY MACHINE WITH VARIABLE FRONT EXCAVATION CHAIN" |
AT512163B1 (en) * | 2012-06-12 | 2013-06-15 | Plasser Bahnbaumasch Franz | Machine with a clearing chain for the transport of gravel and procedures |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CH633598A5 (en) * | 1977-12-16 | 1982-12-15 | Matico Ag | Track-mounted mobile device for taking up the ballast from track skeletons |
AT377551B (en) * | 1983-01-10 | 1985-04-10 | Plasser Bahnbaumasch Franz | FOERDER- OR SPACE CHAIN ARRANGEMENT FOR TRACKING MACHINES |
AT380708B (en) * | 1984-01-31 | 1986-06-25 | Plasser Bahnbaumasch Franz | METHOD AND MACHINE FOR CLEANING A RAILWAY BOTTOM BED |
JPS6447801U (en) * | 1987-09-10 | 1989-03-24 | ||
JP2831142B2 (en) * | 1991-02-22 | 1998-12-02 | 三菱重工業株式会社 | Automatic roadbed excavator |
ES2106313T3 (en) * | 1993-01-29 | 1997-11-01 | Plasser Bahnbaumasch Franz | MACHINE FOR BALLAST ASPIRATION OF A BALLAST BED OF THE VIA. |
-
2008
- 2008-01-02 AT AT0000408A patent/AT505911B1/en not_active IP Right Cessation
- 2008-12-17 DK DK08866459.4T patent/DK2238296T3/en active
- 2008-12-17 JP JP2010541023A patent/JP5204854B2/en active Active
- 2008-12-17 WO PCT/EP2008/010735 patent/WO2009083144A1/en active Application Filing
- 2008-12-17 AT AT08866459T patent/ATE527413T1/en active
- 2008-12-17 KR KR1020107013787A patent/KR101561715B1/en active IP Right Grant
- 2008-12-17 ES ES08866459T patent/ES2373513T3/en active Active
- 2008-12-17 PL PL08866459T patent/PL2238296T3/en unknown
- 2008-12-17 EP EP08866459A patent/EP2238296B1/en active Active
- 2008-12-17 EA EA201000821A patent/EA015980B1/en not_active IP Right Cessation
- 2008-12-17 CN CN2008801238185A patent/CN101910518B/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108495965A (en) * | 2016-01-29 | 2018-09-04 | 普拉塞-陶依尔铁路出口股份有限公司 | Machinery with ballast collecting device |
US10753048B2 (en) | 2016-01-29 | 2020-08-25 | Plasser & Theurer Export Von Bahnbaumaschinen Gesellschaft M.B.H. | Machine with ballast receiving device |
Also Published As
Publication number | Publication date |
---|---|
JP5204854B2 (en) | 2013-06-05 |
EP2238296B1 (en) | 2011-10-05 |
EA201000821A1 (en) | 2011-02-28 |
AT505911B1 (en) | 2009-05-15 |
WO2009083144A1 (en) | 2009-07-09 |
JP2011508838A (en) | 2011-03-17 |
EA015980B1 (en) | 2012-01-30 |
ES2373513T3 (en) | 2012-02-06 |
ATE527413T1 (en) | 2011-10-15 |
KR20100106416A (en) | 2010-10-01 |
AT505911A4 (en) | 2009-05-15 |
KR101561715B1 (en) | 2015-10-19 |
DK2238296T3 (en) | 2012-01-16 |
PL2238296T3 (en) | 2011-12-30 |
EP2238296A1 (en) | 2010-10-13 |
CN101910518B (en) | 2012-07-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7966938B2 (en) | Machine for picking up and storing rail fastenings of a track, and a method | |
US6474241B2 (en) | Machine and method for removing an old track and laying a new track | |
CN101910518B (en) | Machine and method for receiving ballast of a track | |
US7739811B2 (en) | Method and installation for rehabilitating a ballast bed | |
US6415720B2 (en) | Machine for renewing a railroad track | |
CN1152170C (en) | Machine for dismounting old track and laying new-track | |
BRPI0922240B1 (en) | ROUTE RENEWAL MACHINE AND PROCESS | |
CA2352939A1 (en) | A machine for renewing a track | |
AU712887B2 (en) | A track maintenance machine for excavating ballast bed material | |
US5664498A (en) | Track renewal machgine | |
US6792870B2 (en) | Machine for removing an old track and laying a new track | |
US10385517B2 (en) | Method for track renewal | |
AU719850B2 (en) | A machine for picking up bulk material lying on a track | |
DE502004006462D1 (en) | Schienenwechselzug | |
US6782955B2 (en) | Track rehabilitation machine | |
AU779646B2 (en) | A machine for removing an old track and laying a new track | |
CN2780906Y (en) | Auxiliary device for moving and mounting derrick | |
US9157194B2 (en) | Machine for cleaning a ballast bed of a track | |
DE602005002541D1 (en) | Trolley for laying railway tracks | |
AU2005263661B2 (en) | Method for replacing old sleepers of a railway track by new sleepers | |
EP1275781A3 (en) | Apparatus and method for ballast replacement | |
SU983010A1 (en) | Apparatus for loading gondola cars | |
WO2009092896A3 (en) | Railway track renewal train element comprising a ballast clearing system | |
van Dyk | Double-header trains at Great Noligwa mine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |