DE602005002541D1 - Trolley for laying railway tracks - Google Patents

Trolley for laying railway tracks

Info

Publication number
DE602005002541D1
DE602005002541D1 DE602005002541T DE602005002541T DE602005002541D1 DE 602005002541 D1 DE602005002541 D1 DE 602005002541D1 DE 602005002541 T DE602005002541 T DE 602005002541T DE 602005002541 T DE602005002541 T DE 602005002541T DE 602005002541 D1 DE602005002541 D1 DE 602005002541D1
Authority
DE
Germany
Prior art keywords
frame
railway tracks
trolley
section
track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
DE602005002541T
Other languages
German (de)
Inventor
Graziadio Mazzi
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MAZZI TECNOLOGY Srl
Original Assignee
MAZZI TECNOLOGY Srl
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MAZZI TECNOLOGY Srl filed Critical MAZZI TECNOLOGY Srl
Publication of DE602005002541D1 publication Critical patent/DE602005002541D1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/06Transporting, laying, removing or renewing sleepers
    • E01B29/09Transporting, laying, removing or renewing sleepers under, or from under, installed rails
    • E01B29/10Transporting, laying, removing or renewing sleepers under, or from under, installed rails for inserting or removing sleepers

Abstract

A wagon (1) for laying railway tracks (2) comprises: a supporting frame (6) with a leading bogie (7) and a trailing bogie (8), both engaged under the frame (6) and mobile on a section (2a) of track already formed; pick up means (9) located on the frame (6) to place at least one sleeper (3) between the rails (4) of a section (2b) of track not yet formed; at least one lifting part (26a) for lifting the rails off the ballast and attached to the frame (6) at its front end. The pick up means (9) are positioned on a front portion of the frame (6a) above the section (2b) of track not yet formed and extending between the leading bogie (7) and a front end (10) of the frame.
DE602005002541T 2005-05-18 2005-05-18 Trolley for laying railway tracks Active DE602005002541D1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP05425336A EP1724396B1 (en) 2005-05-18 2005-05-18 A wagon for laying railways tracks

Publications (1)

Publication Number Publication Date
DE602005002541D1 true DE602005002541D1 (en) 2007-10-31

Family

ID=35134194

Family Applications (1)

Application Number Title Priority Date Filing Date
DE602005002541T Active DE602005002541D1 (en) 2005-05-18 2005-05-18 Trolley for laying railway tracks

Country Status (3)

Country Link
EP (1) EP1724396B1 (en)
AT (1) ATE373744T1 (en)
DE (1) DE602005002541D1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH708460B1 (en) * 2013-08-20 2017-06-30 Matisa Matériel Ind Sa Machine for renewing sleepers of a track.
CN110552261A (en) * 2018-05-30 2019-12-10 魏春慧 Railway sleeper single-rail drawing and replacing machine
CN117262626B (en) * 2023-11-20 2024-03-26 中建安装集团有限公司 Intelligent sleeper transportation system and transportation method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1090698B (en) 1958-01-28 1960-10-13 Scheuchzer Fils Auguste Jib crane that can be moved on the track for laying cross sleepers
DE1180767B (en) * 1960-12-15 1964-11-05 Plasser Bahnbaumasch Franz Device for picking up and / or laying cross sleepers
AT305332B (en) 1968-10-16 1973-02-26 Plasser Bahnbaumasch Franz Mobile device for laying and / or picking up the cross sleepers of a track
AT308797B (en) 1970-06-01 1973-07-25 Plasser Bahnbaumasch Franz Mobile device for laying and / or picking up cross sleepers of a track
AT340460B (en) * 1974-10-31 1977-12-12 Plasser Bahnbaumasch Franz MOBILE DEVICE FOR PICKING UP OR LAYING SLEEPERS

Also Published As

Publication number Publication date
EP1724396A1 (en) 2006-11-22
ATE373744T1 (en) 2007-10-15
EP1724396B1 (en) 2007-09-19

Similar Documents

Publication Publication Date Title
AU690679B2 (en) Transport vehicle for track sections
SE7607658L (en) PROCEDURE AND DEVICE FOR SECTIONAL EXCHANGE OF SAVINGS
WO2005070131A3 (en) Rail-car unloading apparatus and method
ATE420994T1 (en) MACHINE FOR TRANSPORTING SWITCHES
CA2352939A1 (en) A machine for renewing a track
DE602005002541D1 (en) Trolley for laying railway tracks
ATE368602T1 (en) UNDERFLOOR RAIL VEHICLE LIFTING SYSTEM
CA2206742A1 (en) A machine for laying a track
TW200639295A (en) Level railway crossing
EA200701212A1 (en) METHOD OF CLEANING CRUSHBON WAY
DE29906181U1 (en) Two-way vehicle for unloading rails
ATE389064T1 (en) RAIL CHANGE TRAIN
ATE527412T1 (en) BENDING BEAM MADE OF STEEL AND A TURNOUT ARRANGEMENT MADE THEREFROM FOR MAGNETIC ELEVATION TRAINS
EP2270282A3 (en) Method for the installation of railway tracks on ballast, without an auxiliary track
DE19981826D2 (en) Threshold frame for a track system for rail-bound vehicles, in particular for a ballast track
EA201001632A1 (en) RAILWAY, IN PARTICULAR, FOR SUSPENDED MONORAL ROAD
DE502007000511D1 (en) Electrodynamic rail brake
ATE523406T1 (en) LOCOMOTIVE WITH TWO DRIVE UNITS ARRANGE ON ONE ANOTHER
ATE435334T1 (en) METHOD FOR CONSTRUCTING A RAIL TRACK FOR RAILWAYS AND THE LIKE. AND A RAILWAY BUILT BY THIS METHOD
ATE236071T1 (en) RAIL-BOUND MOBILE CRANE
TN2010000287A1 (en) Method for the installation of railway tracks on ballast, without an auxiliary track
RU2006109912A (en) QUICK-DOWN TROLLEY FOR TRANSPORTING A WAGON WITH A WRONG WHEEL PAIR
DE502006004366D1 (en) Ballast track for model trains
TH77674A (en) The rail is attached to the sleeper.
TH297A3 (en) A crane set to lift concrete pillows from a train carriage Put down the railway

Legal Events

Date Code Title Description
8332 No legal effect for de