CN101906982A - 大采高工作面两级侧护过渡支架 - Google Patents
大采高工作面两级侧护过渡支架 Download PDFInfo
- Publication number
- CN101906982A CN101906982A CN 201010270409 CN201010270409A CN101906982A CN 101906982 A CN101906982 A CN 101906982A CN 201010270409 CN201010270409 CN 201010270409 CN 201010270409 A CN201010270409 A CN 201010270409A CN 101906982 A CN101906982 A CN 101906982A
- Authority
- CN
- China
- Prior art keywords
- side plate
- box
- bracket
- caving shield
- shaped upper
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000007704 transition Effects 0.000 title claims abstract description 14
- 238000005065 mining Methods 0.000 title abstract description 12
- 239000003245 coal Substances 0.000 abstract description 9
- 238000011084 recovery Methods 0.000 abstract description 4
- 238000005516 engineering process Methods 0.000 description 2
- 240000007594 Oryza sativa Species 0.000 description 1
- 235000007164 Oryza sativa Nutrition 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000012467 final product Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 235000009566 rice Nutrition 0.000 description 1
- 230000001052 transient effect Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
本发明公开了一种大采高工作面两级侧护过渡支架,它包括焊接于支架顶梁一侧的箱型上侧板,铰接于所述箱型上侧板下边沿的下侧板,在箱型上侧板和下侧板之间设置有伸缩千斤顶;在位于箱型上侧板一侧的掩护梁上焊接有掩护梁大侧板,所述掩护梁大侧板前部与箱型上侧板和下侧板相衔接;在支架顶梁和掩护梁另一侧分别铰接有顶梁活侧板和掩护梁活侧板;所述顶梁活侧板和掩护梁活侧板分别通过侧推千斤顶与顶梁、掩护梁联接。本发明优点在于实现了工作面中间支架和端头支架支护高度落差较大区域的安全防护,并且达到有效回收大采高工作面两巷顶三角区域的煤,提高了煤炭回收率。
Description
技术领域
本发明涉及煤矿综采大采高工作面过渡支架的侧护装置,特别适用于采高大于5米的综采工作面,实现工作面和巷道高度变化区域的防护。
背景技术
煤矿已使用的综采设备一次开采高度最大6m,并随着综采技术的的发展开采高度不断提高,目前7m高度综采工作面也开始使用。工作面巷道高度受到掘进、支护设备的限制,高度一般在4m左右,再高会急剧增加劳动强度并有一定的安全隐患。这样,巷道和工作面就有一个2-3米的高度差,现有的过渡方式是通过几架甚至十几架液压支架逐渐降低高度实现缓慢过渡,在工作面两端顶部留有三角形顶煤,造成了一定的资源浪费,并随着开采高度的提高浪费越来越严重。以采高6.8m、巷道4.4m为例,工作面每推进一千米,丢失顶三角煤5.77万吨。
发明内容
本发明目的在于提供一种煤矿大采高工作面使用的过渡支架侧护机构,主要解决过渡支架与端头支架的大高差防护问题。
为实现上述目的,本发明可采取下述技术方案:
本发明所述的大采高工作面两级侧护过渡支架,它包括焊接于支架顶梁一侧的箱型上侧板,铰接于所述箱型上侧板下边沿的下侧板,在箱型上侧板和下侧板之间设置有伸缩千斤顶;在位于箱型上侧板一侧的掩护梁上焊接有掩护梁大侧板,所述掩护梁大侧板前部与箱型上侧板和下侧板相衔接;在支架顶梁和掩护梁另一侧分别铰接有顶梁活侧板和掩护梁活侧板;所述顶梁活侧板和掩护梁活侧板分别通过侧推千斤顶与顶梁、掩护梁联接。
本发明优点在于实现煤矿综采大采高工作面的安全防护。在工作面布置液压支架时,所述过渡支架顶梁一侧的箱型上侧板和下侧板与端头支架侧护板搭接,过渡支架顶梁另一侧活侧板与中间支架搭接即可。工作面设备初安装时,切眼高度一般与巷道一致,在工作面推进过程中,中间支架采高逐渐增加,过渡支架使用中根据端头支架和中间支架高度差的不同,可以单独使用箱型上侧板或上、下侧板同时使用。从而实现了工作面中间支架和端头支架支护高度落差较大区域的安全防护,并且达到有效回收大采高工作面两巷顶三角区域的煤,提高了煤炭回收率。
附图说明
图1是本发明的结构示意图。
图2是图1的左视结构示意图。
具体实施方式
如图1、2所示,本发明所述的大采高工作面两级侧护过渡支架,它包括焊接于支架顶梁1一侧的箱型上侧板2,铰接于所述箱型上侧板2下边沿的下侧板3,在箱型上侧板2和下侧板3之间设置有伸缩千斤顶4;在位于箱型上侧板2一侧的掩护梁5上焊接有掩护梁大侧板6,所述掩护梁大侧板6前部与箱型上侧板2和下侧板3相衔接;在支架顶梁1和掩护梁5另一侧分别铰接有顶梁活侧板7和掩护梁活侧板8;所述顶梁活侧板7和掩护梁活侧板8分别通过侧推千斤顶与顶梁1、掩护梁5联接。
Claims (1)
1.一种大采高工作面两级侧护过渡支架,其特征在于:它包括焊接于支架顶梁(1)一侧的箱型上侧板(2),铰接于所述箱型上侧板(2)下边沿的下侧板(3),在箱型上侧板(2)和下侧板(3)之间设置有伸缩千斤顶(4);在位于箱型上侧板(2)一侧的掩护梁(5)上焊接有掩护梁大侧板(6),所述掩护梁大侧板(6)前部与箱型上侧板(2)和下侧板(3)相衔接;在支架顶梁(1)和掩护梁(5)另一侧分别铰接有顶梁活侧板(7)和掩护梁活侧板(8);所述顶梁活侧板(7)和掩护梁活侧板(8)分别通过侧推千斤顶与顶梁(1)、掩护梁(5)联接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010102704097A CN101906982B (zh) | 2010-09-02 | 2010-09-02 | 大采高工作面两级侧护过渡支架 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010102704097A CN101906982B (zh) | 2010-09-02 | 2010-09-02 | 大采高工作面两级侧护过渡支架 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101906982A true CN101906982A (zh) | 2010-12-08 |
CN101906982B CN101906982B (zh) | 2011-12-21 |
Family
ID=43262549
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010102704097A Active CN101906982B (zh) | 2010-09-02 | 2010-09-02 | 大采高工作面两级侧护过渡支架 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101906982B (zh) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102080556A (zh) * | 2011-01-26 | 2011-06-01 | 郑州煤矿机械集团股份有限公司 | 用于煤炭综采大采高工作面的过渡支架 |
CN102080557A (zh) * | 2011-01-26 | 2011-06-01 | 郑州煤矿机械集团股份有限公司 | 适于煤炭综采大采高工作面过渡支架的分体侧护装置 |
CN102080555A (zh) * | 2011-01-26 | 2011-06-01 | 郑州煤矿机械集团股份有限公司 | 适于煤炭综采大采高工作面过渡支架的双级侧护装置 |
CN102108875A (zh) * | 2011-01-26 | 2011-06-29 | 郑州煤矿机械集团股份有限公司 | 适于煤炭综采大采高工作面过渡支架的单级侧护装置 |
CN102116155A (zh) * | 2011-01-26 | 2011-07-06 | 郑州煤矿机械集团股份有限公司 | 大采高工作面过渡段支护、采煤方法 |
CN102168573A (zh) * | 2011-04-12 | 2011-08-31 | 天地科技股份有限公司 | 一种大采高综采工作面设备配套方式 |
CN102182477A (zh) * | 2011-04-07 | 2011-09-14 | 中国神华能源股份有限公司 | 综采工作面端头采煤方法及其相应的端头支护支架 |
CN109441516A (zh) * | 2018-12-11 | 2019-03-08 | 贵州大学 | 一种角度便于调节的煤矿开采沉陷区保护装置 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2827431A1 (de) * | 1978-06-22 | 1980-01-17 | Gewerk Eisenhuette Westfalia | Ausbauschild |
SU1406391A1 (ru) * | 1986-10-14 | 1988-06-30 | Государственный проектно-конструкторский и технологический институт подъемно-транспортного машиностроения | Секци механизированной крепи |
DE19729727A1 (de) * | 1997-07-11 | 1999-01-14 | Adam Udo Maschinenfabrik | Selbstschreitender Drillings-Saumschild |
DE19814246A1 (de) * | 1998-03-31 | 1999-10-07 | Saartech Ges Fuer Ind Und Berg | Schildausbaugestell mit die Bruchkante beeinflussender Abzugsöffnung |
CN2844442Y (zh) * | 2005-11-04 | 2006-12-06 | 天地科技股份有限公司 | 一种两柱掩护式大采高放顶煤液压支架 |
CN101440711A (zh) * | 2008-11-26 | 2009-05-27 | 枣庄矿业(集团)有限责任公司第二机械厂 | 大采高放顶煤液压支架 |
CN201747391U (zh) * | 2010-09-02 | 2011-02-16 | 郑州煤矿机械集团股份有限公司 | 大采高工作面两级侧护过渡支架 |
-
2010
- 2010-09-02 CN CN2010102704097A patent/CN101906982B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2827431A1 (de) * | 1978-06-22 | 1980-01-17 | Gewerk Eisenhuette Westfalia | Ausbauschild |
SU1406391A1 (ru) * | 1986-10-14 | 1988-06-30 | Государственный проектно-конструкторский и технологический институт подъемно-транспортного машиностроения | Секци механизированной крепи |
DE19729727A1 (de) * | 1997-07-11 | 1999-01-14 | Adam Udo Maschinenfabrik | Selbstschreitender Drillings-Saumschild |
DE19814246A1 (de) * | 1998-03-31 | 1999-10-07 | Saartech Ges Fuer Ind Und Berg | Schildausbaugestell mit die Bruchkante beeinflussender Abzugsöffnung |
CN2844442Y (zh) * | 2005-11-04 | 2006-12-06 | 天地科技股份有限公司 | 一种两柱掩护式大采高放顶煤液压支架 |
CN101440711A (zh) * | 2008-11-26 | 2009-05-27 | 枣庄矿业(集团)有限责任公司第二机械厂 | 大采高放顶煤液压支架 |
CN201747391U (zh) * | 2010-09-02 | 2011-02-16 | 郑州煤矿机械集团股份有限公司 | 大采高工作面两级侧护过渡支架 |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102080556A (zh) * | 2011-01-26 | 2011-06-01 | 郑州煤矿机械集团股份有限公司 | 用于煤炭综采大采高工作面的过渡支架 |
CN102080557A (zh) * | 2011-01-26 | 2011-06-01 | 郑州煤矿机械集团股份有限公司 | 适于煤炭综采大采高工作面过渡支架的分体侧护装置 |
CN102080555A (zh) * | 2011-01-26 | 2011-06-01 | 郑州煤矿机械集团股份有限公司 | 适于煤炭综采大采高工作面过渡支架的双级侧护装置 |
CN102108875A (zh) * | 2011-01-26 | 2011-06-29 | 郑州煤矿机械集团股份有限公司 | 适于煤炭综采大采高工作面过渡支架的单级侧护装置 |
CN102116155A (zh) * | 2011-01-26 | 2011-07-06 | 郑州煤矿机械集团股份有限公司 | 大采高工作面过渡段支护、采煤方法 |
CN102182477A (zh) * | 2011-04-07 | 2011-09-14 | 中国神华能源股份有限公司 | 综采工作面端头采煤方法及其相应的端头支护支架 |
CN102168573A (zh) * | 2011-04-12 | 2011-08-31 | 天地科技股份有限公司 | 一种大采高综采工作面设备配套方式 |
CN109441516A (zh) * | 2018-12-11 | 2019-03-08 | 贵州大学 | 一种角度便于调节的煤矿开采沉陷区保护装置 |
CN109441516B (zh) * | 2018-12-11 | 2024-02-20 | 贵州大学 | 一种角度便于调节的煤矿开采沉陷区保护装置 |
Also Published As
Publication number | Publication date |
---|---|
CN101906982B (zh) | 2011-12-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101906982B (zh) | 大采高工作面两级侧护过渡支架 | |
CN203066995U (zh) | 急倾斜煤层工作面两巷超前支护液压支架侧护装置 | |
CN206625858U (zh) | 一种带侧护板的自移式超前支护液压支架 | |
CN104047627A (zh) | 回采巷道框架式超前支护支架 | |
CN202483604U (zh) | 一种用于斜顶巷道超前支护的液压支架 | |
CN103410545A (zh) | 可实现放顶煤和充填作业的液压支架 | |
CN106761874A (zh) | 一种带侧护板的自移式超前支护液压支架 | |
CN201650331U (zh) | 机载式临时支护装置 | |
CN203962014U (zh) | 综采充填两用工作面液压支架 | |
CN203362199U (zh) | 综采工作面端头液压支架 | |
CN201747391U (zh) | 大采高工作面两级侧护过渡支架 | |
CN102080556A (zh) | 用于煤炭综采大采高工作面的过渡支架 | |
CN104863599A (zh) | 综采工作面同步扩帮安装方法及支护系统 | |
CN102080557A (zh) | 适于煤炭综采大采高工作面过渡支架的分体侧护装置 | |
CN111828072A (zh) | 一种煤矿沿空留巷弓形柔性掩护支架及系统 | |
CN204691807U (zh) | 综采工作面同步扩帮安装支护系统 | |
CN104100287A (zh) | 一种新型自移式采煤巷道超前支护支架 | |
CN103485775A (zh) | 新型连续采煤机 | |
CN201943729U (zh) | 适于煤炭综采大采高工作面过渡支架的单级侧护装置 | |
CN201915981U (zh) | 用于煤炭综采大采高工作面的过渡支架 | |
CN102108875A (zh) | 适于煤炭综采大采高工作面过渡支架的单级侧护装置 | |
CN104806271A (zh) | 一种具有自动推进功能的带预切糟u型钢支架及施工方法 | |
CN201943730U (zh) | 适于煤炭综采大采高工作面过渡支架的双级侧护装置 | |
CN201908671U (zh) | 适于煤炭综采大采高工作面过渡支架的分体侧护装置 | |
CN201606075U (zh) | 一种掘护机械 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: CHINA SHENHUA ENERGY COMPANY LIMITED |
|
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20110525 Address after: 450013 No. 105, Huashan Road, Zhongyuan District, Henan, Zhengzhou Applicant after: Zhengzhou Coal Mining Machinery Group Co., Ltd. Co-applicant after: China Shenhua Energy Co., Ltd. Address before: 450013 No. 105, Huashan Road, Zhongyuan District, Henan, Zhengzhou Applicant before: Zhengzhou Coal Mining Machinery Group Co., Ltd. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |