CN102168573A - 一种大采高综采工作面设备配套方式 - Google Patents

一种大采高综采工作面设备配套方式 Download PDF

Info

Publication number
CN102168573A
CN102168573A CN2011100901697A CN201110090169A CN102168573A CN 102168573 A CN102168573 A CN 102168573A CN 2011100901697 A CN2011100901697 A CN 2011100901697A CN 201110090169 A CN201110090169 A CN 201110090169A CN 102168573 A CN102168573 A CN 102168573A
Authority
CN
China
Prior art keywords
mining
working surface
hydraulic support
big
height
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011100901697A
Other languages
English (en)
Inventor
王国法
刘成峰
张银亮
石增武
王兴顺
徐东民
朱军
徐亚军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tiandi Science and Technology Co Ltd
Original Assignee
Tiandi Science and Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tiandi Science and Technology Co Ltd filed Critical Tiandi Science and Technology Co Ltd
Priority to CN2011100901697A priority Critical patent/CN102168573A/zh
Publication of CN102168573A publication Critical patent/CN102168573A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本发明为一种大采高综采工作面设备配套方式。5~7m厚煤层一次采全高大采高综采工作面,由于上下两条巷道断面高度低于工作面采高,高度差达到1~3m,常规工作面设备配套方式从上下两巷道端头液压支架经过渡液压支架逐渐过渡到工作面中部正常采高,造成工作面上下两端部过渡段顶部三角煤损失和支架偏载加剧。本发明从上下两巷道端头液压支架经特殊端头液压支架直接大梯度过渡到工作面中部正常采高,这种大梯度过渡方式显著减少了工作面上下两端部过渡段顶部三角煤损失,改善了液压支架受载状态,提高了煤炭回收率。特殊端头液压支架与端头液压支架搭接侧,采用大侧护板,实现大梯度搭接配套。

Description

一种大采高综采工作面设备配套方式
技术领域
本发明涉及煤矿大采高工作面液压支架与采煤机及刮板输送机的配套方式,适用于5m以上厚煤层一次采全高大采高综采工作面。
技术背景
煤炭高效集约化生产是世界煤炭工业发展的主流,也是我国煤炭工业发展的方向,其中一次采全高大采高开采技术是实现厚煤层高效集约化生产的最有效方法之一。随着大采高开采技术的进步,开采高度不断提高,目前工作面煤层开采高度已达到7m,而工作面巷道高度受到掘进设备及支护技术的限制,一般在3.5~4m,进一步提高巷道高度不仅急剧增加巷道投入维护成本,增加工作人员劳动强度,而且还存在一定的安全隐患。这样工作面采高与巷道就至少形成了1m的高度差。常规工作面设备配套方式是从上下两巷道端头液压支架经几架甚至几十架过渡液压支架逐渐过渡到工作面中部正常采高,这种配套方式造成工作面上下两端部过渡段顶部三角煤损失和支架偏载加剧,并随着工作面采高的加大,顶部三角煤损失增加,煤炭资源的浪费越来越严重。
发明内容
本发明为我国煤矿厚煤层一次采全高大采高综采工作面设备配套提供了一种新的配套方式,目的在于减少综采工作面上下两端部过渡段顶部三角煤损失,改善液压支架受载状态,提高煤炭回收效率,减少煤炭资源的浪费。
为实现上述目的,本发明采用如下技术方案:
一种大采高综采工作面设备配套方式,适用于5m以上厚煤层一次采全高大采高综采工作面,工作面主要设备包括端头液压支架、特殊端头液压支架、过渡液压支架、工作面基本液压支架、滚筒式采煤机和工作面刮板输送机组成。上下两巷道采用端头支架支护巷道顶板,布置特殊端头液压支架直接大梯度过渡到工作面中部正常采高。特殊端头液压支架采用大侧护板与端头液压支架侧护板搭接,实现大梯度搭接配套,保证工作面的安全防护。工作面上下两巷道的特殊端头液压支架的大侧护板为反方向设置。
附图说明
图1为一次采全高大采高工作面配套示意图;
图2为本发明上巷道配套示意图;
图3为本发明下巷道配套示意图。
具体实施方式
如图1、2、3所示,本发明所述大采高综采工作面设备的配套包括端头支架1、特殊端头支架2、过渡支架3、工作面支架4、采煤机5、刮板输送机6的配套。大采高工作面两端巷道由端头支架1支护。特殊端头支架2的中心向下巷道偏移,保证特殊端头支架2大侧护板8的安装空间,大侧护板8与相邻端头支架1侧护板9相搭接直接大梯度过渡到工作面采高,另一侧与过渡支架3侧护板搭接,保证工作面的安全防护。过渡支架3采用不及时支护方式,支架顶梁加长,保证工作面支架梁端距的一致性。特殊端头支架7大侧护板10与特殊端头支架2的大侧护板9反方向设置,其中心向上巷道偏移,保证大侧护板10的安装空间,大侧护板10与相邻端头支架1的一侧侧护板搭接,直接由工作面采高大梯度过渡到下巷道高度。

Claims (3)

1.一种大采高综采工作面设备配套方式,适用于5m以上厚煤层一次采全高大采高综采工作面。工作面主要设备包括端头液压支架、特殊端头液压支架、过渡液压支架、工作面基本液压支架、滚筒式采煤机和工作面刮板输送机组成。其特征在于采用从上下两巷道特殊端头液压支架直接大梯度过渡到工作面中部正常采高。
2.根据权利要求1所述的大采高综采工作面设备配套方式,特殊端头液压支架采用大侧护板与端头液压支架侧护板搭接,实现大梯度搭接配套。
3.根据权利要求1所述的大采高综采工作面设备配套方式,其工作面上下两巷道的特殊端头液压支架的大侧护板为反方向设置。
CN2011100901697A 2011-04-12 2011-04-12 一种大采高综采工作面设备配套方式 Pending CN102168573A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100901697A CN102168573A (zh) 2011-04-12 2011-04-12 一种大采高综采工作面设备配套方式

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100901697A CN102168573A (zh) 2011-04-12 2011-04-12 一种大采高综采工作面设备配套方式

Publications (1)

Publication Number Publication Date
CN102168573A true CN102168573A (zh) 2011-08-31

Family

ID=44489872

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100901697A Pending CN102168573A (zh) 2011-04-12 2011-04-12 一种大采高综采工作面设备配套方式

Country Status (1)

Country Link
CN (1) CN102168573A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111734412A (zh) * 2020-06-08 2020-10-02 扎赉诺尔煤业有限责任公司 一种厚煤层分层铺网开采工作面设备选型配套型式
CN112879008A (zh) * 2021-01-26 2021-06-01 中国矿业大学 适用于自掘通道式回撤工艺的支护系统及支护方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4192632A (en) * 1977-07-16 1980-03-11 Gewerkschaft Eisenhutte Westfalia Support systems for mineral mining installations
RU2276729C1 (ru) * 2004-10-04 2006-05-20 Аркадий Маркович Долинский Комплекс для наклонных и крутых пластов кдк долинского, став конвейера, система управления комплекса
CN101906982A (zh) * 2010-09-02 2010-12-08 郑州煤矿机械集团股份有限公司 大采高工作面两级侧护过渡支架
CN101915107A (zh) * 2010-09-02 2010-12-15 郑州煤矿机械集团股份有限公司 煤矿大采高工作面设备布置方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4192632A (en) * 1977-07-16 1980-03-11 Gewerkschaft Eisenhutte Westfalia Support systems for mineral mining installations
RU2276729C1 (ru) * 2004-10-04 2006-05-20 Аркадий Маркович Долинский Комплекс для наклонных и крутых пластов кдк долинского, став конвейера, система управления комплекса
CN101906982A (zh) * 2010-09-02 2010-12-08 郑州煤矿机械集团股份有限公司 大采高工作面两级侧护过渡支架
CN101915107A (zh) * 2010-09-02 2010-12-15 郑州煤矿机械集团股份有限公司 煤矿大采高工作面设备布置方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111734412A (zh) * 2020-06-08 2020-10-02 扎赉诺尔煤业有限责任公司 一种厚煤层分层铺网开采工作面设备选型配套型式
CN112879008A (zh) * 2021-01-26 2021-06-01 中国矿业大学 适用于自掘通道式回撤工艺的支护系统及支护方法

Similar Documents

Publication Publication Date Title
CN203066995U (zh) 急倾斜煤层工作面两巷超前支护液压支架侧护装置
CN104653182B (zh) 一种含厚夹矸煤层煤矸分采的采煤方法
CN102383794B (zh) 综放工作面后部输送机交叉侧卸布置配套方式与支架结构
CN104500069B (zh) 一种特厚煤层边角煤的连续采煤机放顶煤开采工艺
CN101526001A (zh) 薄煤层综采对拉工作面采煤工艺
CN101187308A (zh) 薄煤层高效综采工艺
CN103104260B (zh) 复杂地质条件下综—机对拉面采煤方法
CN101881168A (zh) 极薄煤层爬底式综合机械化开采方法
CN103075153B (zh) 露天用钻式采煤机
CN102418525A (zh) 软煤层长壁大采高综合机械化采煤末采方法
CN105736044A (zh) 一种急倾斜煤层综采工作面设备快速回撤方法
CN203962014U (zh) 综采充填两用工作面液压支架
CN106437825A (zh) 一种高瓦斯矿井综放工作面高位钻孔的瓦斯抽采方法
CN105240012A (zh) 一种实现煤柱同采的f型区段采煤方法
CN102168573A (zh) 一种大采高综采工作面设备配套方式
CN102116155A (zh) 大采高工作面过渡段支护、采煤方法
CN204691807U (zh) 综采工作面同步扩帮安装支护系统
CN203130131U (zh) 煤矿井下大通道端头悬移液压支架
CN203285464U (zh) 煤矿井下掘进掩护支架
CN102392663A (zh) 超前支护液压支架及超前支护液压支架系统
CN203430546U (zh) 采煤工作面巷顶护网装置
CN105804751B (zh) 一种综采工作面快速过岩溶陷落柱的处理方法
CN204402528U (zh) 一种用于掘进和回采的盾构支架
CN202531201U (zh) 一种液压支架立柱保护装置
CN203669899U (zh) 一种用于隔离工作面后方巷道与采空区的条带钢筋网

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110831