CN102116155A - 大采高工作面过渡段支护、采煤方法 - Google Patents

大采高工作面过渡段支护、采煤方法 Download PDF

Info

Publication number
CN102116155A
CN102116155A CN 201110028058 CN201110028058A CN102116155A CN 102116155 A CN102116155 A CN 102116155A CN 201110028058 CN201110028058 CN 201110028058 CN 201110028058 A CN201110028058 A CN 201110028058A CN 102116155 A CN102116155 A CN 102116155A
Authority
CN
China
Prior art keywords
coal
support
height
coalmining
transition
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201110028058
Other languages
English (en)
Inventor
焦承尧
刘付营
龚宇
孙红发
赵琪
孙远方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Coal Mining Machinery Group Co Ltd
Original Assignee
Zhengzhou Coal Mining Machinery Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Coal Mining Machinery Group Co Ltd filed Critical Zhengzhou Coal Mining Machinery Group Co Ltd
Priority to CN 201110028058 priority Critical patent/CN102116155A/zh
Publication of CN102116155A publication Critical patent/CN102116155A/zh
Pending legal-status Critical Current

Links

Images

Abstract

本发明公开了一种大采高工作面过渡段支护、采煤方法,按下述步骤进行:在位于采煤工作面两端的巷道内布置端头支架,按设计的开采高度在采煤工作面布置中间支架;在位于所述端头支架与中间支架衔接处布置一台过渡支架,过渡支架的支护高度与中间支架相等;在过渡支架顶梁上位于与中间支架顶梁相邻的一侧边沿上铰接有由液压千斤顶驱动伸缩的活动侧护板并与中间支架侧护板相搭接;在过渡支架顶梁上位于与端头支架顶梁相邻的一侧边沿上垂直向下焊接有箱型结构的侧护板并与端头支架侧护板相搭接;当采煤机滚筒行走到过渡支架中心位置时,采煤机停止行走,采煤机滚筒向下摆降低开采高度与巷道高度平齐,然后继续采煤机行走采煤。本发明在于提高采煤率。

Description

大采高工作面过渡段支护、采煤方法
技术领域
本发明涉及适用于大采高煤矿综合机械化开采工作面的机头机尾过渡段支护方式,尤其是涉及大采高工作面过渡段支护、采煤方法。
背景技术
目前煤矿综采工作面一次开采高度最大七米,并随着综采技术的的发展开采高度不断提高。工作面巷道在掘进时受掘进和支护设备限制,高度一般在四米左右,这样,巷道和工作面就有一个将近三米的高度差。传统的解决办法是通过几架甚至十几架液压支架逐渐降低高度以实现巷道和工作面衔接处的缓慢过渡;如图1所示,这种方法在工作面两端留有三角形顶煤,造成了一定的煤资源浪费,并随着开采高度的提高浪费越来越严重。
发明内容
本发明目的在于提供一种提高大采高工作面煤资源回收率的大采高工作面过渡段支护、采煤方法。
为实现上述目的,本发明可采取下述技术方案:
本发明所述大采高工作面过渡段支护、采煤方法,按照下述步骤进行:在位于采煤工作面两端的巷道内布置端头支架,按照设计的开采高度在采煤工作面布置中间支架;在位于所述端头支架与中间支架衔接处布置一台过渡支架,所述过渡支架的支护高度与中间支架相等;在过渡支架顶梁上位于与中间支架顶梁相邻的一侧边沿上铰接有由液压千斤顶驱动伸缩的活动侧护板并与中间支架侧护板相搭接;在过渡支架顶梁上位于与端头支架顶梁相邻的一侧边沿上垂直向下焊接有箱型结构的侧护板并与端头支架侧护板相搭接;采煤机工作过程中,当采煤机的滚筒行走到过渡支架中心位置时,采煤机停止行走,采煤机滚筒向下摆降低开采高度与巷道高度平齐,然后继续采煤机行走采煤。
在所述过渡支架箱型结构的侧护板下边沿铰接有下侧板,在侧护板与下侧板之间设置用于下侧板伸缩的支撑千斤顶,根据采煤工作面与巷道之间高度差的不同,通过伸展或缩回下侧板进行调节。
本发明优点就在于解决现有大采高工作面过渡段支护使用液压支架较多、巷道和工作面衔接处留有三角形顶煤造成煤资源浪费的不足。通过设置在所述端头支架与中间支架衔接处布置的一台过渡支架,即完成了巷道与工作面高度差的过渡,节省了设备的投资,提高了采煤率。
附图说明
图1是现有工作面过渡段支护、采煤示意图。
图2是本发明所述工作面过渡段支护、采煤示意图。
具体实施方式
如图2所示,大采高工作面过渡段支护、采煤方法,按照下述步骤进行:在位于采煤工作面两端的巷道1内布置端头支架2,按照设计的开采高度在采煤工作面布置中间支架3;在位于所述端头支架2与中间支架3衔接处布置一台过渡支架4,所述过渡支架4的支护高度与中间支架3相等;在过渡支架4顶梁上位于与中间支架3顶梁相邻的一侧边沿上铰接有由液压千斤顶驱动伸缩的活动侧护板5并与中间支架3侧护板相搭接;在过渡支架4顶梁上位于与端头支架2顶梁相邻的一侧边沿上垂直向下焊接有箱型结构的侧护板6并与端头支架2侧护板相搭接;采煤机7工作过程中,当采煤机7的滚筒8行走到过渡支架4中心位置9时,采煤机7停止行走,采煤机7的滚筒8向下摆降低开采高度与巷道1高度平齐,然后继续采煤机7行走采煤。在过渡支架箱型结构的侧护板6下边沿铰接有下侧板10,在侧护板6与下侧板10之间设置用于下侧板10伸缩的支撑千斤顶11,根据采煤工作面与巷道1之间高度差的不同,通过伸展或缩回下侧板10进行调节。

Claims (2)

1.一种大采高工作面过渡段支护、采煤方法,其特征在于:按照下述步骤进行:在位于采煤工作面两端的巷道(1)内布置端头支架(2)按照设计的开采高度在采煤工作面布置中间支架(3)在位于所述端头支架(2)与中间支架(3)衔接处布置一台过渡支架(4)所述过渡支架(4)的支护高度与中间支架(3)相等;在过渡支架(4)顶梁上位于与中间支架(3)顶梁相邻的一侧边沿上铰接有由液压千斤顶驱动伸缩的活动侧护板(5)并与中间支架(3)侧护板相搭接;在过渡支架(4)顶梁上位于与端头支架(2)顶梁相邻的一侧边沿上垂直向下焊接有箱型结构的侧护板(6)并与端头支架(2)侧护板相搭接;采煤机(7)工作过程中,当采煤机(7)的滚筒(8)行走到过渡支架(4)中心位置(9)时,采煤机(7)停止行走,采煤机(7)的滚筒(8)向下摆降低开采高度与巷道(1)高度平齐,然后继续采煤机(7)行走采煤。
2.根据权利要求1所述的大采高工作面过渡段支护、采煤方法,其特征在于:大台阶过渡支护方式,在所述过渡支架箱型结构的侧护板(6)下边沿铰接有下侧板(10),在侧护板(6)与下侧板(10)之间设置用于下侧板(10)伸缩的支撑千斤顶(11),根据采煤工作面与巷道(1)之间高度差的不同,通过伸展或缩回下侧板(10)进行调节。
CN 201110028058 2011-01-26 2011-01-26 大采高工作面过渡段支护、采煤方法 Pending CN102116155A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110028058 CN102116155A (zh) 2011-01-26 2011-01-26 大采高工作面过渡段支护、采煤方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110028058 CN102116155A (zh) 2011-01-26 2011-01-26 大采高工作面过渡段支护、采煤方法

Publications (1)

Publication Number Publication Date
CN102116155A true CN102116155A (zh) 2011-07-06

Family

ID=44215068

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110028058 Pending CN102116155A (zh) 2011-01-26 2011-01-26 大采高工作面过渡段支护、采煤方法

Country Status (1)

Country Link
CN (1) CN102116155A (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102877845A (zh) * 2012-08-30 2013-01-16 中国矿业大学 一种确定断层区采煤机自动割煤轨迹的方法
WO2017185724A1 (zh) * 2016-04-29 2017-11-02 中国矿业大学 一种充填与综采混采面过渡支架支护参数设计方法
CN108952721A (zh) * 2018-08-23 2018-12-07 江苏中机矿山设备有限公司 一种适应性强的薄煤层采煤机及采煤方法
US11008860B2 (en) 2015-06-24 2021-05-18 Manchao He Equipment system for no-roadway no-coal-pillar retained roadway mining method
CN114320418A (zh) * 2022-01-05 2022-04-12 国家能源集团国源电力有限公司 煤矿工作面支架及其控制方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3726562A (en) * 1971-04-07 1973-04-10 G Wharton Mining machine including means for utilizing vacuum at working face and methods of operation thereof
CN1763351A (zh) * 2003-12-12 2006-04-26 肖自立 “四控”式全面采煤方法
CN1865657A (zh) * 2005-05-19 2006-11-22 兖矿集团有限公司 长壁采煤法综采工艺
CN101372891A (zh) * 2008-06-10 2009-02-25 沈阳市华祥矿山机械厂 条带充填整体回采采煤方法
CN101906982A (zh) * 2010-09-02 2010-12-08 郑州煤矿机械集团股份有限公司 大采高工作面两级侧护过渡支架
CN101915107A (zh) * 2010-09-02 2010-12-15 郑州煤矿机械集团股份有限公司 煤矿大采高工作面设备布置方法

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3726562A (en) * 1971-04-07 1973-04-10 G Wharton Mining machine including means for utilizing vacuum at working face and methods of operation thereof
CN1763351A (zh) * 2003-12-12 2006-04-26 肖自立 “四控”式全面采煤方法
CN1865657A (zh) * 2005-05-19 2006-11-22 兖矿集团有限公司 长壁采煤法综采工艺
AU2005203458A1 (en) * 2005-05-19 2006-12-07 Yankuang Group Corporation Limited Fully mechanized mining technique of longwall mining method
CN101372891A (zh) * 2008-06-10 2009-02-25 沈阳市华祥矿山机械厂 条带充填整体回采采煤方法
CN101906982A (zh) * 2010-09-02 2010-12-08 郑州煤矿机械集团股份有限公司 大采高工作面两级侧护过渡支架
CN101915107A (zh) * 2010-09-02 2010-12-15 郑州煤矿机械集团股份有限公司 煤矿大采高工作面设备布置方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
20100228 王继明 世界首个7m大采高综采面投产 第15页 , 第2期 2 *
20100330 李根威等 大采高整层综采面开采技术研究 第5-7页 , 第1期 2 *
20100830 张书敬 厚煤层中小煤矿改造技术途径 第12-14页 第15卷, 第4期 2 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102877845A (zh) * 2012-08-30 2013-01-16 中国矿业大学 一种确定断层区采煤机自动割煤轨迹的方法
CN102877845B (zh) * 2012-08-30 2014-10-29 中国矿业大学 一种确定断层区采煤机自动割煤轨迹的方法
US11008860B2 (en) 2015-06-24 2021-05-18 Manchao He Equipment system for no-roadway no-coal-pillar retained roadway mining method
WO2017185724A1 (zh) * 2016-04-29 2017-11-02 中国矿业大学 一种充填与综采混采面过渡支架支护参数设计方法
RU2679767C1 (ru) * 2016-04-29 2019-02-12 Китайский Университет Горного Дела И Технологии Метод расчета опорных параметров переходной опоры очистного забоя смешанного типа при использовании закладки и механизированной опоры
US10301939B2 (en) 2016-04-29 2019-05-28 China University Of Mining And Technology Method for designing supporting parameters of transition support for mixed mining face of filling and fully-mechanized mining
CN108952721A (zh) * 2018-08-23 2018-12-07 江苏中机矿山设备有限公司 一种适应性强的薄煤层采煤机及采煤方法
CN114320418A (zh) * 2022-01-05 2022-04-12 国家能源集团国源电力有限公司 煤矿工作面支架及其控制方法
CN114320418B (zh) * 2022-01-05 2023-11-03 国家能源集团国源电力有限公司 煤矿工作面支架及其控制方法

Similar Documents

Publication Publication Date Title
CN101915107B (zh) 煤矿大采高工作面设备布置方法
CN103899249B (zh) 一种煤矿巷道底板锚固钻车
CN102116155A (zh) 大采高工作面过渡段支护、采煤方法
CN202391424U (zh) 支护式综合掘锚机
CN203531747U (zh) 综采面过断层用架柱式乳化液钻机
CN203362198U (zh) 履带行走式综掘巷道及时支护装置
CN203403900U (zh) 吊装自移式锚杆锚索支护设备
CN204627622U (zh) 一种隧道多功能施工台车
CN201705376U (zh) 煤矿井下充填采煤专用液压支架
CN103233734A (zh) 带钻孔凿岩功能的高效型多功能挖掘装载机
CN201560798U (zh) 水平定向钻机机架
CN101709642B (zh) 一种履带式四臂凿岩台车
CN102704964A (zh) 煤矿综采工作面拆除支架整体快速装车装置
CN203285470U (zh) 一种适用于急倾斜煤层开采的液压支架
CN201314234Y (zh) 螺旋钻采煤机钻具快速装卸装置
CN202767982U (zh) 大坡度掘进机辅助爬坡装置
CN203130131U (zh) 煤矿井下大通道端头悬移液压支架
CN202659267U (zh) 整体分级跨越式步移支架
CN110566199A (zh) 向下开采式采煤机及配套装置
CN101775990B (zh) 三维空间曲面钢模台车
RU123065U1 (ru) Крепь сопряжения для работы в выработках, сохраняемых для повторного использования
CN202645601U (zh) 一种巷道支护机
CN202788857U (zh) 隧道开挖台车
CN210564526U (zh) 向下开采式采煤机及三机配套采煤装置
CN202628173U (zh) 薄煤层刮板输送机

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20110706