height
mining
coal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2010102704078A
Other languages
English (en)
Other versions
CN101915107A (zh
Inventor
向家雨
刘付营
王继生
龚宇
贺海涛
倪和平
孙红发
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Shenhua Energy Co Ltd
Zhengzhou Coal Mining Machinery Group Co Ltd
Original Assignee
China Shenhua Energy Co Ltd
Zhengzhou Coal Mining Machinery Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Shenhua Energy Co Ltd, Zhengzhou Coal Mining Machinery Group Co Ltd filed Critical China Shenhua Energy Co Ltd
Priority to CN2010102704078A priority Critical patent/CN101915107B/zh
Publication of CN101915107A publication Critical patent/CN101915107A/zh
Application granted granted Critical
Publication of CN101915107B publication Critical patent/CN101915107B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明公开了一种煤矿大采高工作面设备布置方法,包括由中间支架支撑的工作面,开设在所述工作面两头的巷道;布置在工作面内的采煤机、运输机;在所述巷道内布置有端头支架,所述端头支架顶梁高度与巷道高度相同,相邻端头支架之间布置一架过渡支架,高度与中间支架高度相同;过渡支架与中间支架相邻的一侧为由千斤顶驱动伸缩的活动侧护板结构,使用时展开后与中间支架顶梁相搭接;过渡支架与端头支架相邻的一侧铰接有加强型侧护板,使用时与端头支架顶梁相搭接。本发明解决了传统缓慢过渡所造成工作面两端留有三角形顶煤的不足,大大提高了大采高工作面的资源回收率。

Description

煤矿大采高工作面设备布置方法
技术领域
本发明涉及煤矿综采工作面开采方法,尤其是涉及煤矿大采高工作面设备布置方法。
背景技术
目前煤矿井下综采工作面一次开采高度最大为6m,随着综采技术的发展,开采高度也随之在不断地提高。综采工作面巷道在掘进时受掘进和支护设备的限制,高度一般在4m左右。因此,巷道顶壁与开采工作面顶壁之间就存在一个2米左右的高度差。传统的解决办法是采取缓慢过渡,这样在过渡段就存在未开采的三角形顶煤区域,如图1所示,造成了一定的资源浪费。随着开采高度的提高这种浪费越来越严重。因此,急需一种能够回收过渡段顶部三角煤层的开采方法,以提高综采工作面的资源开采率,但目前还未见诸有关这方面的报道。
发明内容
本发明目的在于提供一种提高综采工作面开采率的煤矿大采高工作面设备布置方法。
为实现上述目的,本发明可采取下述技术方案:
本发明所述的煤矿大采高工作面设备布置方法,它包括由中间支架支撑的工作面,开设在所述工作面两头的巷道;布置在工作面内的采煤机、运输机;在所述巷道内布置有端头支架,所述端头支架顶梁高度与巷道高度相同,在端头支架和中间支架之间布置一架过渡支架,所述过渡支架高度与中间支架高度相同;过渡支架与中间支架相邻的一侧为由千斤顶驱动伸缩的活动侧护板结构,使用时展开后与中间支架顶梁相搭接;过渡支架与端头支架相邻的一侧铰接有侧护板,使用时与端头支架顶梁相搭接。
本发明优点在于间隔布置在所述巷道内的端头支架,所述端头支架顶梁高度与巷道高度相同,相邻端头支架之间布置一架过渡支架,所述过渡支架高度与中间支架高度相同;过渡支架与中间支架相邻的一侧为由千斤顶驱动伸缩的活动侧护板结构,使用时展开后与中间支架顶梁相搭接;过渡支架与端头支架相邻的一侧铰接有加强型侧护板,使用时与端头支架顶梁相搭接。因此解决了传统缓慢过渡所造成工作面两端留有三角形顶煤的不足,大大提高了大采高工作面的资源回收率,有利于大采高工作面两头靠近巷道处顶煤的回收。采用过渡支架实现正常采高和巷道高度大落差的支护。
附图说明
图1是采取传统缓慢过渡所造成未开采的三角形顶煤区域示意图。
图2是本发明所述工作面设备布置示意图。
图3是图2的俯视示意图。
具体实施方式
如图所示,本发明所述的煤矿大采高工作面设备布置方法,它包括由中间支架4支撑的工作面8,开设在所述工作面8两头的巷道1;布置在工作面8内的采煤机2、运输机7;在所述巷道1内间隔布置有端头支架6,所述端头支架6顶梁高度与巷道1高度相同,相邻端头支架6之间布置一架过渡支架5,所述过渡支架5高度与中间支架4高度相同;过渡支架5与中间支架4相邻的一侧为由千斤顶驱动伸缩的活动侧护板结构,使用时展开后与中间支架4顶梁相搭接;过渡支架5与端头支架6相邻的一侧铰接有侧护板,使用时与端头支架6顶梁相搭接。
采煤工作时,当采煤机2行走到采煤机滚筒3与过渡支架5中心位置时(图2所示位置),停止采煤机2行走,采煤机滚筒3下摆,以降低开采高度与巷道1平齐,然后采煤机2继续行走采煤。

Claims (1)

1.一种煤矿大采高工作面设备布置方法,它包括由中间支架(4)支撑的工作面(8),开设在所述工作面(8)两头的巷道(1);布置在工作面(8)内的采煤机(2)、运输机(7);其特征在于:在所述两端巷道(1)内布置有端头支架(6),所述端头支架(6)顶梁高度与巷道(1)高度相同,在端头支架(6)和中间支架(4)之间布置一架过渡支架(5),所述过渡支架(5)高度与中间支架(4)高度相同;过渡支架(5)与中间支架(4)相邻的一侧为由千斤顶驱动伸缩的活动侧护板结构,使用时展开后与中间支架(4)顶梁相搭接;过渡支架(5)与端头支架(6)相邻的一侧铰接有加强型侧护板,使用时与端头支架(6)相搭接。
CN2010102704078A 2010-09-02 2010-09-02 煤矿大采高工作面设备布置方法 Active CN101915107B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102704078A CN101915107B (zh) 2010-09-02 2010-09-02 煤矿大采高工作面设备布置方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102704078A CN101915107B (zh) 2010-09-02 2010-09-02 煤矿大采高工作面设备布置方法

Publications (2)

Publication Number Publication Date
CN101915107A CN101915107A (zh) 2010-12-15
CN101915107B true CN101915107B (zh) 2012-01-04

Family

ID=43322721

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102704078A Active CN101915107B (zh) 2010-09-02 2010-09-02 煤矿大采高工作面设备布置方法

Country Status (1)

Country Link
CN (1) CN101915107B (zh)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102116155A (zh) * 2011-01-26 2011-07-06 郑州煤矿机械集团股份有限公司 大采高工作面过渡段支护、采煤方法
CN102080557A (zh) * 2011-01-26 2011-06-01 郑州煤矿机械集团股份有限公司 适于煤炭综采大采高工作面过渡支架的分体侧护装置
CN102108875A (zh) * 2011-01-26 2011-06-29 郑州煤矿机械集团股份有限公司 适于煤炭综采大采高工作面过渡支架的单级侧护装置
CN102080555A (zh) * 2011-01-26 2011-06-01 郑州煤矿机械集团股份有限公司 适于煤炭综采大采高工作面过渡支架的双级侧护装置
CN102080556A (zh) * 2011-01-26 2011-06-01 郑州煤矿机械集团股份有限公司 用于煤炭综采大采高工作面的过渡支架
CN102182486A (zh) * 2011-04-01 2011-09-14 中煤北京煤矿机械有限责任公司 大落差过渡支架
CN102168573A (zh) * 2011-04-12 2011-08-31 天地科技股份有限公司 一种大采高综采工作面设备配套方式
CN103256050B (zh) * 2013-03-25 2014-12-03 枣庄矿业(集团)付村煤业有限公司 三角形综放工作面的采煤方法
CN104594932B (zh) * 2014-12-29 2017-02-22 中国神华能源股份有限公司 采煤用支护支架设备及其采煤方法
CN105715273A (zh) * 2016-04-06 2016-06-29 中国神华能源股份有限公司 特厚硬煤下分层的巷道布置方式

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3726562A (en) * 1971-04-07 1973-04-10 G Wharton Mining machine including means for utilizing vacuum at working face and methods of operation thereof
CN1763351A (zh) * 2003-12-12 2006-04-26 肖自立 “四控”式全面采煤方法
CN100567703C (zh) * 2005-05-19 2009-12-09 兖矿集团有限公司 长壁采煤法综采工艺
CN101372891B (zh) * 2008-06-10 2010-08-11 沈阳市华祥矿山机械厂 条带充填整体回采采煤方法

Also Published As

Publication number Publication date
CN101915107A (zh) 2010-12-15

Similar Documents

Publication Publication Date Title
CN101915107B (zh) 煤矿大采高工作面设备布置方法
WO2018228217A1 (zh) 一种快速掘进后配套运输及支护系统
CN104564050B (zh) 一种掘锚平行作业施工装备
CN102410017B (zh) 支护式综合掘锚机
CN102704929B (zh) 一种掘锚钻一体化的掘锚机
CN105697013A (zh) 掘进巷道可收缩式临时支架
CN106837392A (zh) 隧道用门架式多功能支护台车
CN102606153A (zh) 全密封煤巷掘锚同步机
CN202391424U (zh) 支护式综合掘锚机
CN104329096A (zh) 一种盾构过站始发平移施工工艺
CN203769787U (zh) 矿用全断面矩形掘进机支撑推进与调向机构
CN206419048U (zh) 隧道用门架式多功能支护台车
CN103075153B (zh) 露天用钻式采煤机
CN202882911U (zh) 一种掘锚钻一体化的掘锚机
CN102116155A (zh) 大采高工作面过渡段支护、采煤方法
CN102536229A (zh) 掘、护、锚平行作业系统与施工工艺
CN102392667A (zh) 千万吨级综放工作面设备快速安装方法
US3873157A (en) Mobile mine tunnelling machine having cooperable cutter, trough, loader and converyors
CN202645555U (zh) 全密封煤巷掘锚同步机
CN104863599B (zh) 综采工作面同步扩帮安装方法及支护系统
CN204492846U (zh) 带仰拱衬砌设备的移动式过车栈桥
CN203740486U (zh) 地下矿山运输出碴皮带廊桥设备
CN202743922U (zh) 一种转载机的自移装置
CN103075188B (zh) 一种井下矸石充填设备及应用所述设备的充填方法
CN202767982U (zh) 大坡度掘进机辅助爬坡装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: ZHENGZHOU COAL MINING MACHINERY GROUP CO., LTD.

Owner name: CHINA SHENHUA ENERGY COMPANY LIMITED

Free format text: FORMER OWNER: ZHENGZHOU COAL MINING MACHINERY GROUP CO., LTD.

Effective date: 20110525

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 450013 NO. 105, HUASHAN ROAD, ZHONGYUAN DISTRICT, ZHENGZHOU CITY, HE NAN PROVINCE TO: 100011 SHENHUA BUILDING, NO. 22, XIBINHE ROAD, OUTER ANDINGMEN, DONGCHENG DISTRICT

TA01 Transfer of patent application right

Effective date of registration: 20110525

Address after: 100011 Dongcheng District Anwai Binhe West Road No. 22 Shenhua building

Applicant after: China Shenhua Energy Co., Ltd.

Co-applicant after: Zhengzhou Coal Mining Machinery Group Co., Ltd.

Address before: 450013 No. 105, Huashan Road, Zhongyuan District, Henan, Zhengzhou

Applicant before: Zhengzhou Coal Mining Machinery Group Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant