CN201915981U - 用于煤炭综采大采高工作面的过渡支架 - Google Patents
用于煤炭综采大采高工作面的过渡支架 Download PDFInfo
- Publication number
- CN201915981U CN201915981U CN2011200255568U CN201120025556U CN201915981U CN 201915981 U CN201915981 U CN 201915981U CN 2011200255568 U CN2011200255568 U CN 2011200255568U CN 201120025556 U CN201120025556 U CN 201120025556U CN 201915981 U CN201915981 U CN 201915981U
- Authority
- CN
- China
- Prior art keywords
- back timber
- side plate
- lateral plate
- top beam
- hinged
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
本实用新型公开了一种用于煤炭综采大采高工作面的过渡支架,包括底座、移架机构、液压伸缩立柱、前后连杆和设置在液压伸缩立柱顶端的顶梁,铰接在顶梁前端的伸缩护帮机构和后端的掩护梁;掩护梁下端与前后连杆铰接;在顶梁、掩护梁的同一侧铰接有顶梁活侧板和掩护梁活侧板;在顶梁、掩护梁的另一侧分别焊接有箱型结构的顶梁侧板和掩护梁侧板;顶梁侧板、掩护梁侧板的宽度大于顶梁活侧板和掩护梁活侧板的宽度;在顶梁侧板下端水平铰接有顶梁下侧板;在顶梁侧板与顶梁下侧板之间设置有支撑千斤顶。本实用新型优点在于实现工作面中间支架和端头支架支护高度落差较大区域的安全防护,达到有效回收大采高工作面两侧巷顶三角煤、提高煤炭回收率之目的。
Description
技术领域
本实用新型涉及煤矿综采大采高工作面工作面,尤其是涉及采高大于五米的用于煤炭综采大采高工作面的过渡支架。
背景技术
煤矿已使用的综采设备一次开采高度最大7米,并随着综采技术的的发展开采高度不断提高。工作面巷道高度受到掘进、支护设备的限制,高度一般在4米左右,再高将急剧增加劳动强度并存在一定的安全隐患。这样,巷道和工作面就有一个2-3米的高度差,现有的过渡方式是通过几架甚至十几架液压支架逐渐降低高度以实现巷道和工作面衔接处的缓慢过渡;这就造成在工作面两端顶部留有三角形顶煤区,造成了一定的资源浪费,并随着开采高度的提高浪费越来越严重。以采高6.8米、巷道4.4米为例,工作面每推进一千米,丢失顶三角煤5.77万吨。为减少资源浪费,必须研制一种特殊的过渡支架,通过一架液压支架的过渡,即可实现工作面中间架和端头支架高度变化区段过渡和防护,从而安全回收顶三角煤,但目前还未见诸有关报道。
发明内容
本实用新型目的在于提供一种用于煤炭综采大采高工作面的过渡支架,以解决过渡支架与端头支架的大高差防护问题。
为实现上述目的,本实用新型可采取下述技术方案:
本实用新型所述用于煤炭综采大采高工作面的过渡支架,它包括底座,设置在所述底座上的移架机构、液压伸缩立柱、前后连杆,和设置在所述液压伸缩立柱顶端的顶梁,分别铰接在所述顶梁前端的伸缩护帮机构和后端的掩护梁;所述掩护梁下端与所述前后连杆上端相铰接;在顶梁、掩护梁的同一侧分别铰接有顶梁活侧板和掩护梁活侧板;在所述顶梁活侧板与顶梁之间、掩护梁活侧板与掩护梁之间分别设置有侧推千斤顶;在顶梁、掩护梁的另一侧分别焊接有箱型结构的顶梁侧板和掩护梁侧板;所述顶梁侧板、掩护梁侧板的宽度分别大于对应的顶梁活侧板和掩护梁活侧板的宽度;掩护梁侧板前部与顶梁侧板相搭接;在顶梁侧板下端水平铰接有顶梁下侧板;在顶梁侧板与顶梁下侧板之间设置有支撑千斤顶;所述顶梁下侧板由两块板铰接而成。
本实用新型优点在于实现工作面中间支架和端头支架支护高度落差较大区域的安全防护,达到有效回收大采高工作面两侧巷顶三角煤、提高煤炭回收率之目的。工作面设备初安装时,切眼高度一般与巷道高度一致,在工作面推进过程中,中间支架采高逐渐增加。因此,本实用新型的过渡支架使用中根据端头支架和中间支架高度差的不同,可以单独安装使用箱型结构的顶梁侧板,或与顶梁下侧板铰接使用。在工作面布置液压支架时,过渡支架顶梁侧板与相邻的端头支架侧护板搭接,形成基本架与端头支架之间实现过渡,顶梁活侧板与中间支架搭接即可。
附图说明
图1是本实用新型的结构示意图。
图2是图1的左视结构示意图。
图3是本实用新型的工作状态示意图。
具体实施方式
如图1、2、3所示,本实用新型所述用于煤炭综采大采高工作面的过渡支架,它包括底座1,设置在所述底座1上的移架机构、液压伸缩立柱2、前、后连杆3、4,和设置在所述液压伸缩立柱2顶端的顶梁,分别铰接在所述顶梁前端的伸缩护帮机构5和后端的掩护梁;所述掩护梁下端与所述前、后连杆3、4上端相铰接;在顶梁、掩护梁的同一侧分别铰接有顶梁活侧板6和掩护梁活侧板7;在所述顶梁活侧板6与顶梁之间、掩护梁活侧板7与掩护梁之间分别设置有侧推千斤顶;在顶梁、掩护梁的另一侧分别焊接有箱型结构的顶梁侧板8和掩护梁侧板9;所述顶梁侧板8、掩护梁侧板9的宽度分别大于对应的顶梁活侧板6和掩护梁活侧板7的宽度;掩护梁侧板9前部与顶梁侧板8相搭接;在顶梁侧板8下端水平铰接有顶梁下侧板10;在顶梁侧板8与顶梁下侧板10之间设置有支撑千斤顶11;所述顶梁下侧板10由两块板铰接而成。
Claims (1)
1.一种用于煤炭综采大采高工作面的过渡支架,它包括底座(1),设置在所述底座(1)上的移架机构、液压伸缩立柱(2)、前、后连杆(3、4)和设置在所述液压伸缩立柱(2)顶端的顶梁,分别铰接在所述顶梁前端的伸缩护帮机构(5)和后端的掩护梁;所述掩护梁下端与所述前、后连杆(3、4)上端相铰接;其特征在于:在顶梁、掩护梁的同一侧分别铰接有顶梁活侧板(6)和掩护梁活侧板(7);在所述顶梁活侧板(6)与顶梁之间、掩护梁活侧板(7)与掩护梁之间分别设置有侧推千斤顶;在顶梁、掩护梁的另一侧分别焊接有箱型结构的顶梁侧板(8)和掩护梁侧板(9);所述顶梁侧板(8)、掩护梁侧板(9)的宽度分别大于对应的顶梁活侧板(6)和掩护梁活侧板(7)的宽度;掩护梁侧板(9)前部与顶梁侧板(8)相搭接;在顶梁侧板(8)下端水平铰接有顶梁下侧板(10);在顶梁侧板(8)与顶梁下侧板(10)之间设置有支撑千斤顶(11);所述顶梁下侧板(10)由两块板铰接而成。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200255568U CN201915981U (zh) | 2011-01-26 | 2011-01-26 | 用于煤炭综采大采高工作面的过渡支架 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200255568U CN201915981U (zh) | 2011-01-26 | 2011-01-26 | 用于煤炭综采大采高工作面的过渡支架 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201915981U true CN201915981U (zh) | 2011-08-03 |
Family
ID=44415781
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011200255568U Expired - Lifetime CN201915981U (zh) | 2011-01-26 | 2011-01-26 | 用于煤炭综采大采高工作面的过渡支架 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201915981U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102080556A (zh) * | 2011-01-26 | 2011-06-01 | 郑州煤矿机械集团股份有限公司 | 用于煤炭综采大采高工作面的过渡支架 |
-
2011
- 2011-01-26 CN CN2011200255568U patent/CN201915981U/zh not_active Expired - Lifetime
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102080556A (zh) * | 2011-01-26 | 2011-06-01 | 郑州煤矿机械集团股份有限公司 | 用于煤炭综采大采高工作面的过渡支架 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101906982B (zh) | 大采高工作面两级侧护过渡支架 | |
CN202882972U (zh) | 顺槽迈步分体式超前液压支架组 | |
CN203066995U (zh) | 急倾斜煤层工作面两巷超前支护液压支架侧护装置 | |
CN102261257B (zh) | 用于架后充填的液压支架及其操作使用方法 | |
RU121861U1 (ru) | Двухпозиционная двухстоечная гидравлическая крепь для обрушения низкорасположенной верхней пачки угольного пласта | |
CN104047627A (zh) | 回采巷道框架式超前支护支架 | |
CN201650331U (zh) | 机载式临时支护装置 | |
CN203362199U (zh) | 综采工作面端头液压支架 | |
CN103306696A (zh) | 自移式巷道超前支护支架 | |
CN103032091A (zh) | 自移式液压支架 | |
CN102080556A (zh) | 用于煤炭综采大采高工作面的过渡支架 | |
CN201747391U (zh) | 大采高工作面两级侧护过渡支架 | |
CN201915981U (zh) | 用于煤炭综采大采高工作面的过渡支架 | |
CN110925005B (zh) | 一种挡矸液压支架 | |
CN102080557A (zh) | 适于煤炭综采大采高工作面过渡支架的分体侧护装置 | |
CN102926781B (zh) | 一种沿空留巷用反连杆机构支护设备 | |
CN104100287A (zh) | 一种新型自移式采煤巷道超前支护支架 | |
CN103195458A (zh) | 煤矿井下大通道端头悬移液压支架 | |
CN202659267U (zh) | 整体分级跨越式步移支架 | |
CN203257446U (zh) | 一种煤港拱形支撑盾结构 | |
CN203130131U (zh) | 煤矿井下大通道端头悬移液压支架 | |
CN201908671U (zh) | 适于煤炭综采大采高工作面过渡支架的分体侧护装置 | |
CN201943730U (zh) | 适于煤炭综采大采高工作面过渡支架的双级侧护装置 | |
CN203962017U (zh) | 回采巷道框架式超前支护支架 | |
CN102108875A (zh) | 适于煤炭综采大采高工作面过渡支架的单级侧护装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20110803 |