CN101871265A - Flat shim plate-adjustable grouting installation method - Google Patents
Flat shim plate-adjustable grouting installation method Download PDFInfo
- Publication number
- CN101871265A CN101871265A CN 201010216639 CN201010216639A CN101871265A CN 101871265 A CN101871265 A CN 101871265A CN 201010216639 CN201010216639 CN 201010216639 CN 201010216639 A CN201010216639 A CN 201010216639A CN 101871265 A CN101871265 A CN 101871265A
- Authority
- CN
- China
- Prior art keywords
- flat bolster
- slurry
- shim plate
- flat
- flat shim
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Abstract
The invention relates to a flat shim plate-adjustable grouting installation method, belonging to a method for installing a steel column or a device. The method comprises the following steps: symmetrically welding rectangular plates with holes on the back and forth of the left side and the right side of a flat shim plate at intervals; cutting a grouting pit outside the foundation bolt or the preset hole of the concrete foundation of an installation device; arranging four screw holes which are arranged into a rectangle in the grouting pit; correspondingly and vertically plugging four screws the upper ends of which are respectively screwed with a regulating nut into the four screw holes; correspondingly sheathing the holes on the four rectangular plates of the flat shim plate onto the four screw in a penetrating mode so that the flat shim plate is supported on the regulating nuts; utilizing the regulating nuts to regulate the scale height and the levelness of the flat shim plate; leveling the flat shim plate for the fist time, arranging a grouting box on the foundation surface at the periphery of the grouting pit and placing a grouting material into the grouting box; when the grouting material is prehardened, utilizing the regulating nuts to accurately level the flat shim plate so that both the scale height and the levelness of the flat shim plate reach the installation requirements. When the steel column or the device is installed, an inclined shim plate is not needed for leveling, thus the method is convenient and speedy.
Description
Technical field
The invention belongs to the mounting method of steel column, equipment, especially relate to the seat slurry mounting method of a kind of steel column, equipment.
Background technology
At present, in steel structure column and equipment installation project, the normal seat slurry mounting method that adopts, and the seat slurry is placed backing plate normally: two side positions that are positioned at the anchor (bolt) hole of stone bolt or reservation on the concrete foundation that steel structure column, equipment are installed are dug out seat slurry hole, present again slurry hole is gone up and is placed the seat slurry box of making of wooden form or sheet iron, put into a slurry in the present slurry box, place flat bolster on the present slurry, by measuring the absolute altitude of controlling flat bolster.This method seat slurry time is long, it is bigger that the absolute altitude of flat bolster and levelness are influenced by a slurry, be difficult to accurately control, the equipment of having relatively high expectations for absolute altitude and levelness, have only when installation on flat bolster, to increase by one group of taper liner plate and carry out leveling, increase difficulty of construction, prolonged the duration, improved cost of production.
Summary of the invention
The purpose of this invention is to provide the adjustable seat slurry mounting method of a kind of flat bolster, easy to operate, quick, not only reduction of erection time effectively, reduce cost, and improve construction quality.
The object of the present invention is achieved like this: the seat slurry mounting method that a kind of flat bolster is adjustable, be the bottom of the long limit, left side of flat bolster 1 and right edge all before and after the compartment of terrain symmetry rectangular slab with holes 2 (seeing accompanying drawing 1) that is welded, seat slurry hole 5 is dug out with electric hammer in the outside that is positioned at stone bolt or anchor bolt box on the concrete foundation 6 of erection equipment, the size in this slurry hole 5, the degree of depth will be asked for an interview to GB50231-98 appendix seven, the length in seat slurry hole 5 and wide all than flat bolster 1 big 60~80mm, and the length in seat slurry hole 5 and wide be good all than flat bolster 1 big 70mm, seat slurry hole 5 degree of depth that dig into concrete foundation 6 should be less than 30mm, and seat slurry hole 5 degree of depth that dig into concrete foundation 6 are good with 40mm, and the thickness of seat slurry layer is not less than 50mm, in this slurry hole 5, use electric drill (symmetry in uniform way) to offer into four screw holes of rectangular arrangement again, correspondence four screw rods 4 of plug-in mounting vertically in these four screw holes, the height of screw rod 4 will be higher than the setting height(from bottom) of flat bolster 1, not so there is not the surplus of adjusting, upper end section difference spinning adjusting nut 3 at four screw rods 4, the position in the hole on four rectangular slabs 2 on the position of these four screw rods 4 and the flat bolster 1 is corresponding to the same, hole correspondence on four rectangular slabs 2 on the flat bolster 1 is set on four screw rods 4, and make flat bolster 1 support on each adjusting nut 3, (see accompanying drawing 2), regulate the absolute altitude and the levelness of flat bolster 1 by adjusting nut 3, earlier to flat bolster 1 first levelling, roughly levelling gets final product, on the face of the concrete foundation 6 of present slurry hole 5 peripheries seat slurry box is set, and present the slurry put into a slurry in the box: micro-expansion cement, the bottom of four screw rods 4 all is included in wherein, when treating a slurry initial set, measure the absolute altitude of flat bolster 1 with precision level, levelness with level measurement flat bolster 1, do accurate levelling by 3 pairs of flat bolsters 1 of adjusting nut, make the absolute altitude of flat bolster 1, levelness all reaches installation specification or designing requirement, carry out back-grouting then, with each screw rod 4, the plate body of each adjusting nut 3 and flat bolster 1 all is included in wherein, after slurry solidifies, each spiro rod section that exposes removes with fiery welding, on flat bolster 1, steel column is installed then, equipment, carry out leveling without the taper liner plate, convenient quick again.
The seat slurry mounting method that the flat bolster that the present invention proposes is adjustable, not only convenient, fast, the duration short, and reduced cost, improved the construction quality of steel column, equipment.
Now in conjunction with the accompanying drawings and embodiments the adjustable seat slurry mounting method of flat bolster proposed by the invention is further described.
Description of drawings
Fig. 1 is that the adjustable seat of flat bolster proposed by the invention is starched the part of mentioning in the mounting method 1: the schematic top plan view of flat bolster.
Master when Fig. 2 is the adjustable seat slurry mounting method operation of flat bolster proposed by the invention looks schematic diagram.
Among Fig. 1, Fig. 2: 1, flat bolster 2, rectangular slab 3, adjusting nut 4, screw rod 5, seat slurry hole 6, concrete foundation
The specific embodiment
Embodiment
(1), Pu steel Luojing human relocation project main building steel column structure installs, and adopted the adjustable seat slurry mounting method of this flat bolster, every steel column uses 12 groups to regulate flat bolsters, flat bolster is 120 * 240 * 20mm, adjusting nut, screw rod 4 covers are M12 * 50; K, J, H row factory building amount to 45 steel columns, directly save economic cost: 45 * 12 * 53 yuan=28620 yuan.
(2), all kinds of structural devices are installed in the Pu steel Luojing two step engineering, have adopted the adjustable seat slurry mounting method of this flat bolster, use 400 groups of flat bolsters altogether, flat bolster is 120 * 240 * 20mm, adjusting nut, screw rod 4 covers are M12 * 50; Directly save economic cost: 400 * 53 yuan=21200 yuan.
The expense basis:
1., adopt tradition seat slurry method mounting structure or equipment, need to use 1/4.5kg of flat bolster (120 * 240 * 20mm), 1 group/8kg of taper liner plate (100 * 200 * 25mm)
2., adopt the adjustable seat slurry mounting method of this flat bolster to install, need to use 1 of flat bolster (120 * 240 * 20mm), adjusting nut, screw rod 4 covers (M12 * 50);
3., taper liner plate processing charges: 4500 yuan/t of steel, 2400 yuan/t of processing charges; Adjusting nut, 0.55 yuan/cover of screw rod (M12 * 50);
4., material relatively: adopt the adjustable seat slurry mounting method of this flat bolster to save 1 group of taper liner plate, increased adjusting nut, screw rod 4 covers;
5., expense relatively: save 55.2 yuan of taper liner plate expenses/group, increase adjusting nut, screw rod 4 covers amount to 2.2 yuan;
6., relatively comprehensive: the seat slurry mounting method that one group of this flat bolster of every use is adjustable is installed directly cost saving: 53 yuan.
Claims (2)
1. the adjustable seat of flat bolster is starched mounting method, be the bottom of the long limit, left side of flat bolster (1) and right edge all before and after the compartment of terrain symmetry rectangular slab with holes (2) that is welded, seat slurry hole (5) is dug out with electric hammer in the outside that is positioned at stone bolt or anchor bolt box on the concrete foundation (6) of erection equipment, the length in this seat slurry hole (5) and wide all than the big 60~80mm of flat bolster (1), seat slurry hole (5) digs into the degree of depth of concrete foundation (6) should be less than 30mm, and seat slurry layer thickness is not less than 50mm, in this slurry hole 5, offer into four screw holes of rectangular arrangement again with electric drill, correspondence four screw rods of plug-in mounting (4) vertically in these four screw holes, the height of screw rod (4) will be higher than the setting height(from bottom) of flat bolster (1), upper end section difference spinning adjusting nut (3) at four screw rods (4), the position in the hole on four rectangular slabs (2) on the position of these four screw rods (4) and the flat bolster (1) is corresponding to the same, hole correspondence on four rectangular slabs (2) on the flat bolster (1) is set on four screw rods (4), and make flat bolster (1) support on each adjusting nut (3), regulate the absolute altitude and the levelness of flat bolster (1) by adjusting nut (3), earlier to the first levelling of flat bolster (1), on the face of the concrete foundation (6) of present slurry hole (5) periphery seat slurry box is set, and present the slurry put into a slurry in the box: micro-expansion cement, the bottom of four screw rods (4) all is included in wherein, when treating a slurry initial set, measure the absolute altitude of flat bolster (1) with precision level, levelness with level measurement flat bolster (1), by each adjusting nut (3) flat bolster (1) is done accurate levelling, make the absolute altitude of flat bolster (1), levelness all reaches installation specification or designing requirement, carry out back-grouting then, with each screw rod (4), the plate body of each adjusting nut (3) and flat bolster (1) all is included in wherein, after slurry solidifies, each spiro rod section that exposes removes with fiery welding, goes up at flat bolster (1) then steel column is installed, equipment.
2. flat bolster according to claim 1 is adjustable seat slurry mounting method is characterized in that the length in seat slurry hole (5) and wide all than the big 70mm of flat bolster (1), and the degree of depth that seat slurry hole (5) digs into concrete foundation (6) is 40mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010102166395A CN101871265B (en) | 2010-07-02 | 2010-07-02 | Flat shim plate-adjustable grouting installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010102166395A CN101871265B (en) | 2010-07-02 | 2010-07-02 | Flat shim plate-adjustable grouting installation method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101871265A true CN101871265A (en) | 2010-10-27 |
CN101871265B CN101871265B (en) | 2011-11-23 |
Family
ID=42996334
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010102166395A Active CN101871265B (en) | 2010-07-02 | 2010-07-02 | Flat shim plate-adjustable grouting installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101871265B (en) |
Cited By (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102251537A (en) * | 2011-04-28 | 2011-11-23 | 中冶建工集团有限公司 | Construction method for installing block slurry of sizing block by equipment |
CN102286988A (en) * | 2011-06-29 | 2011-12-21 | 天津二十冶建设有限公司 | Grouting shim plate construction method |
CN102587403A (en) * | 2012-01-18 | 2012-07-18 | 中国石油天然气第六建设公司 | Method for mounting seat pulp cushion plates of petrochemical static equipment and foundation structure |
CN102615277A (en) * | 2012-03-15 | 2012-08-01 | 中国十七冶集团有限公司 | Construction method for mounting rails of buggy ladle |
CN102650135A (en) * | 2012-05-18 | 2012-08-29 | 中国十七冶集团有限公司 | Method for leveling embedded parts at bottom of vertical column in sintered ring cooling machine |
CN103016412A (en) * | 2012-12-27 | 2013-04-03 | 陕西化建工程有限责任公司 | Installation method for embedded base plate of axial flow compressor |
CN103031892A (en) * | 2012-12-04 | 2013-04-10 | 北京龙源冷却技术有限公司 | Steel truss brace and manufacturing method for steel truss platform |
CN103132538A (en) * | 2011-11-28 | 2013-06-05 | 中建七局安装工程有限公司 | Auxiliary device for alignment and leveling of slope foundation sand mound with mat iron and mat iron placing method |
CN103161177A (en) * | 2013-03-04 | 2013-06-19 | 莱芜钢铁集团有限公司 | Integrated and fast equipment alignment device and equipment alignment method |
CN103469812A (en) * | 2013-09-10 | 2013-12-25 | 东风设计研究院有限公司 | Stamping device civil engineering installation level control device and installing method |
CN103572774A (en) * | 2012-07-25 | 2014-02-12 | 中国二十冶集团有限公司 | Leveling ruler flat underboarding mortar bedding method |
CN104359727A (en) * | 2014-10-08 | 2015-02-18 | 江苏工程职业技术学院 | Size film preparation device capable of controlling thickness of size film |
CN104612175A (en) * | 2014-12-30 | 2015-05-13 | 武汉一冶建筑安装工程有限责任公司 | Device and method used for guaranteeing levelness of installation plane of precise equipment |
CN108118715A (en) * | 2016-11-30 | 2018-06-05 | 中国二十冶集团有限公司 | Large equipment base pedestal does paste-making method |
CN108151720A (en) * | 2017-12-20 | 2018-06-12 | 中国二冶集团有限公司 | A kind of installation measuring method of inclined-plane basis mixing machine roller seat |
CN109235903A (en) * | 2018-10-18 | 2019-01-18 | 中国化学工程第六建设有限公司 | Steel structure modularization construction method |
CN111716519A (en) * | 2019-03-18 | 2020-09-29 | 新疆八一钢铁股份有限公司 | Method for mounting and manufacturing embedded steam turbine supporting bottom plate |
CN111760529A (en) * | 2020-07-07 | 2020-10-13 | 郑琼华 | Reaction kettle and reaction kettle installation method |
CN112547801A (en) * | 2020-11-17 | 2021-03-26 | 十四冶建设集团云南安装工程有限公司 | High-precision ultrathin aluminum foil mill unit mounting method |
CN112878356A (en) * | 2021-03-01 | 2021-06-01 | 三门核电有限公司 | Equipment installation method in narrow space |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS58156664A (en) * | 1983-02-28 | 1983-09-17 | 東京瓦斯株式会社 | Adjustment of load added to leg pillar of construction in axial direction |
US4481743A (en) * | 1982-01-07 | 1984-11-13 | Jellen Stephen F | System and method for constructing walls and foundations employing structural components |
CN101250881A (en) * | 2008-01-21 | 2008-08-27 | 武汉冶建安装工程有限责任公司 | Method for installation of seat slurry method construction packing plate |
CN101725154A (en) * | 2009-11-16 | 2010-06-09 | 天津二十冶建设有限公司 | Method and device for installing and regulating light equipment and steel structure |
-
2010
- 2010-07-02 CN CN2010102166395A patent/CN101871265B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4481743A (en) * | 1982-01-07 | 1984-11-13 | Jellen Stephen F | System and method for constructing walls and foundations employing structural components |
JPS58156664A (en) * | 1983-02-28 | 1983-09-17 | 東京瓦斯株式会社 | Adjustment of load added to leg pillar of construction in axial direction |
CN101250881A (en) * | 2008-01-21 | 2008-08-27 | 武汉冶建安装工程有限责任公司 | Method for installation of seat slurry method construction packing plate |
CN101725154A (en) * | 2009-11-16 | 2010-06-09 | 天津二十冶建设有限公司 | Method and device for installing and regulating light equipment and steel structure |
Cited By (26)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102251537A (en) * | 2011-04-28 | 2011-11-23 | 中冶建工集团有限公司 | Construction method for installing block slurry of sizing block by equipment |
CN102286988A (en) * | 2011-06-29 | 2011-12-21 | 天津二十冶建设有限公司 | Grouting shim plate construction method |
CN103132538B (en) * | 2011-11-28 | 2015-04-08 | 中建七局安装工程有限公司 | Auxiliary device for alignment and leveling of slope foundation sand mound with mat iron and mat iron placing method |
CN103132538A (en) * | 2011-11-28 | 2013-06-05 | 中建七局安装工程有限公司 | Auxiliary device for alignment and leveling of slope foundation sand mound with mat iron and mat iron placing method |
CN102587403B (en) * | 2012-01-18 | 2014-07-23 | 中国石油天然气第六建设公司 | Method for mounting seat pulp cushion plates of petrochemical static equipment and foundation structure |
CN102587403A (en) * | 2012-01-18 | 2012-07-18 | 中国石油天然气第六建设公司 | Method for mounting seat pulp cushion plates of petrochemical static equipment and foundation structure |
CN102615277A (en) * | 2012-03-15 | 2012-08-01 | 中国十七冶集团有限公司 | Construction method for mounting rails of buggy ladle |
CN102650135A (en) * | 2012-05-18 | 2012-08-29 | 中国十七冶集团有限公司 | Method for leveling embedded parts at bottom of vertical column in sintered ring cooling machine |
CN102650135B (en) * | 2012-05-18 | 2014-12-17 | 中国十七冶集团有限公司 | Method for leveling embedded parts at bottom of vertical column in sintered ring cooling machine |
CN103572774B (en) * | 2012-07-25 | 2015-11-25 | 中国二十冶集团有限公司 | Leveling ruler plain cushion panel seat slurry processes |
CN103572774A (en) * | 2012-07-25 | 2014-02-12 | 中国二十冶集团有限公司 | Leveling ruler flat underboarding mortar bedding method |
CN103031892B (en) * | 2012-12-04 | 2015-03-04 | 北京龙源冷却技术有限公司 | Steel truss brace and manufacturing method for steel truss platform |
CN103031892A (en) * | 2012-12-04 | 2013-04-10 | 北京龙源冷却技术有限公司 | Steel truss brace and manufacturing method for steel truss platform |
CN103016412A (en) * | 2012-12-27 | 2013-04-03 | 陕西化建工程有限责任公司 | Installation method for embedded base plate of axial flow compressor |
CN103161177A (en) * | 2013-03-04 | 2013-06-19 | 莱芜钢铁集团有限公司 | Integrated and fast equipment alignment device and equipment alignment method |
CN103161177B (en) * | 2013-03-04 | 2015-08-05 | 莱芜钢铁集团有限公司 | Integrated equipment quick centering device and equipment aligning method |
CN103469812A (en) * | 2013-09-10 | 2013-12-25 | 东风设计研究院有限公司 | Stamping device civil engineering installation level control device and installing method |
CN104359727A (en) * | 2014-10-08 | 2015-02-18 | 江苏工程职业技术学院 | Size film preparation device capable of controlling thickness of size film |
CN104612175A (en) * | 2014-12-30 | 2015-05-13 | 武汉一冶建筑安装工程有限责任公司 | Device and method used for guaranteeing levelness of installation plane of precise equipment |
CN108118715A (en) * | 2016-11-30 | 2018-06-05 | 中国二十冶集团有限公司 | Large equipment base pedestal does paste-making method |
CN108151720A (en) * | 2017-12-20 | 2018-06-12 | 中国二冶集团有限公司 | A kind of installation measuring method of inclined-plane basis mixing machine roller seat |
CN109235903A (en) * | 2018-10-18 | 2019-01-18 | 中国化学工程第六建设有限公司 | Steel structure modularization construction method |
CN111716519A (en) * | 2019-03-18 | 2020-09-29 | 新疆八一钢铁股份有限公司 | Method for mounting and manufacturing embedded steam turbine supporting bottom plate |
CN111760529A (en) * | 2020-07-07 | 2020-10-13 | 郑琼华 | Reaction kettle and reaction kettle installation method |
CN112547801A (en) * | 2020-11-17 | 2021-03-26 | 十四冶建设集团云南安装工程有限公司 | High-precision ultrathin aluminum foil mill unit mounting method |
CN112878356A (en) * | 2021-03-01 | 2021-06-01 | 三门核电有限公司 | Equipment installation method in narrow space |
Also Published As
Publication number | Publication date |
---|---|
CN101871265B (en) | 2011-11-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101871265B (en) | Flat shim plate-adjustable grouting installation method | |
CN104234385B (en) | Construction method of installation after a kind of terrace heavy steel plate built-in fitting | |
CN101343879B (en) | Secondary grouting construction method of machine setting | |
CN204059395U (en) | The pre-buried location structure of stone bolt | |
CN203452266U (en) | Fixing and leveling structure of H section steel column | |
CN201896365U (en) | Installing and fixing device for flat plate pre-embedded piece on surface of concrete | |
CN104032969A (en) | Precise positioning and process regulation and control device for vibration isolation support embedded plate | |
CN102286988A (en) | Grouting shim plate construction method | |
CN101294399A (en) | Deviation correcting method for plinth | |
CN105133677A (en) | Foundation reinforcement system and method for wind generating set | |
CN101397799A (en) | Flowing grouting method installed on apparatus foundation | |
CN102733307B (en) | Method for constructing cast-in-place beam falsework | |
CN103821061B (en) | A kind of automobile safety collision test room is with drawing runway and construction in layer method thereof | |
CN105672676A (en) | Device used for shear wall elevation and levelness control and use method thereof | |
CN202039603U (en) | Concrete casting elevation controlling device | |
CN203795264U (en) | Traction track for vehicle safety crash test room | |
CN206503158U (en) | A kind of large scale equipment changes the smart centering system of the simplicity installed | |
CN209799166U (en) | Steel structure column base | |
CN209339179U (en) | Levelling pre-buried structure for large scale equipment installation | |
CN205476528U (en) | Precast pile device of taking one's place fast | |
CN201827604U (en) | Base for high-precision universal mechanical equipment | |
CN203700899U (en) | Steel tool-type temporary construction road | |
CN209760786U (en) | instrumentization support system for controlling precision of two-dimensional component | |
CN206737445U (en) | The vertical dual-purpose adjuster of Simple horizontal | |
CN102943484B (en) | Tapered-iron pulp-bedding rapid leveling method for large-size and middle-size equipment installation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Maanshan MCC17 Engineering Science & Technology Co., Ltd. Assignor: China MCC 17 Group Co., Ltd. Contract record no.: 2011340000503 Denomination of invention: Flat shim plate-adjustable grouting installation method Granted publication date: 20111123 License type: Exclusive License Open date: 20101027 Record date: 20111226 |