CN103016412A - Installation method for embedded base plate of axial flow compressor - Google Patents

Installation method for embedded base plate of axial flow compressor Download PDF

Info

Publication number
CN103016412A
CN103016412A CN2012105756285A CN201210575628A CN103016412A CN 103016412 A CN103016412 A CN 103016412A CN 2012105756285 A CN2012105756285 A CN 2012105756285A CN 201210575628 A CN201210575628 A CN 201210575628A CN 103016412 A CN103016412 A CN 103016412A
Authority
CN
China
Prior art keywords
base plate
backing plate
axial flow
flow compressor
installation method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012105756285A
Other languages
Chinese (zh)
Inventor
张恺颙
张军
司爱俊
李丽红
任力宏
刘晓霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHAANXI CHEMICAL CONSTRUCTION CO Ltd
Original Assignee
SHAANXI CHEMICAL CONSTRUCTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHAANXI CHEMICAL CONSTRUCTION CO Ltd filed Critical SHAANXI CHEMICAL CONSTRUCTION CO Ltd
Priority to CN2012105756285A priority Critical patent/CN103016412A/en
Publication of CN103016412A publication Critical patent/CN103016412A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention relates to an installation method for an embedded base plate of an axial flow compressor. The conventional large-sized axial flow compressor has the disadvantages of carrying of a large quantity of embedded base plates, large masses of the base plates, complex base plate leveling procedure and low efficiency. The method comprises the following steps of: welding a plurality of nuts on the side wall of the base plate through point welding, screwing bolts into the nuts, and leveling the base plate by adjusting the positions of the bolts; performing single-stage grouting on an aligned base plate; and maintaining the base plate for 2-3 days, unscrewing the bolts, bearing the weight of the base plate completely through the grouting amount, and eliminating hard point contact, wherein the quantity of the nuts welded on the side wall of the base plate is three (in the form of a regular triangle) or four (in the form of a square). Due to the adoption of the method, the installation period of the embedded base plate of the axial flow compressor can be shortened effectively, the levelness of the base plate can be adjusted within 0.1-0.2 millimeters rapidly under the condition of sufficiently fine processing of the surface of the base plate, the elevation is within 1 millimeter, and the aligning accuracy of the base plate is increased.

Description

The installation method of the pre-buried backing plate of axial flow compressor
Technical field
The present invention relates to the installation of catalytic pyrolysis (DCC) ethylene unit main air processed unit, be specifically related to the installation method of the pre-buried backing plate of a kind of axial flow compressor.
Background technique
AV profile shaft stream compressor is the adjustable axial flow compressor of a kind of full stator blade, its aerodynamics characteristics are that flow, pressure regulation range are broad, each operating point efficient is high, this unit has higher automatization level simultaneously, supporting degree is high, operate steadily, all technical is all reached advanced world standards.Compressor mainly holds cylinder, adjusting cylinder, rotor, import circle, Diffuser, bearing housing, oil sealing, sealing, bearing, electric actuator etc. by casing, blade and forms.This unit is dragged by motor, adopts diaphragm coupling to connect, and thrust bearing is arranged on the air inlet side, and the casing dead point is arranged on the air inlet side.When finding in installation process in the past that pre-buried backing plate requires to find the backing plate installation fee to specifications, workload is large and absolute altitude should not be controlled, the pre-buried backing plate that for this reason by analysis compressor is attached at random carries out the technology change, and the method has obtained good effect by enforcement.
The at present large-scale axial flow compressor pre-buried backing plate quantity large (the pre-buried backing plate of general 1 compressor has 30~40) of carrying at random, and installation level and absolute altitude require high.Press the required artificial amount of general norm construction large, construction is long man-hour, and the maintenance period of every pre-buried backing plate all different (will consider because unit is in place that last organizes the set time of pre-buried backing plate).Moreover, the pre-buried backing plate of general Large Axial Compressor is all about 5~6 kilograms, unit is larger, backing plate is heavier, at present pre-buried what basically adopt is without shrinking the back-grouting material to the unit backing plate, back-grouting material good fluidity in the backing plate leveling, will ceaselessly knock with wooden mallet when looking for absolute altitude, has so more been accelerated the flowability of back-grouting material.But the method centering is loaded down with trivial details, and to the discrepancy in elevation, level by after being pressed into backing plate, beaing when adjusting with wooden mallet, absolute altitude must retrieve backing plate in case excessively low, wiped clean adds behind a small amount of grouting material to such an extent that again be pressed into the backing plate adjustment again.
Summary of the invention
The installation method that the purpose of this invention is to provide the pre-buried backing plate of axial flow compressor that a kind of duration is short and installation precision significantly improves.
The technical solution adopted in the present invention is:
The installation method of the pre-buried backing plate of axial flow compressor is characterized in that:
Step 1: at the some nuts of backing plate gusset spot welding, bolt is screwed into nut, by adjusting the bolt high and low position backing plate is carried out levelling;
Step 2: the backing plate of finishing centering is carried out once grouting;
Step 3: the backing plate maintenance is after 2-3 days, and the bolt of back-outing is born backing plate weight fully by the grouting amount, gets rid of the hard spot contact.
In the step 1, the nut quantity of backing plate gusset spot welding is 3, and the position is equilateral triangle.
In the step 1, the nut quantity of backing plate gusset spot welding is 4, and the position is square.
The present invention has the following advantages:
The present invention can effectively shorten the installation period of the pre-buried backing plate of axial flow compressor, as changing 2 axial flow compressor sets of 1,500,000 ton/years of catalytic pyrolysis (DCC) ethylene unit processed elm in the installing engineering of totally 60 polylith backing plates, pre-buried backing plate is adjusted electric welding, the backing plate of screw and is settled centering, backing plate grouting only to use 5 day time, working efficiency significantly improves, reduce the labour force and participate in, and all pre-buried backing plates are identical curing cycle after guaranteeing grouting.In the situation that the backing plate surface Machining is enough meticulous, what the levelness of backing plate can be very fast is transferred in 0.1~0.2mm, and absolute altitude has improved the validity of backing plate centering in 1mm.
Description of drawings
Fig. 1 is the schematic diagram of the original installation method of backing plate.
Fig. 2 is to the transformation schematic diagram of backing plate among the present invention.
Among the figure, 1-backing plate, 2-nut.
Embodiment
The present invention will be described in detail below in conjunction with embodiment.
At present, point out in the installation instructions of catalytic pyrolysis (DCC) ethylene device compressor group processed, seat slurry method is adopted in the installation of backing plate, and general step is as follows:
Step 1: cleaning concrete surface and water flushing are soaked.
Step 2: clean backing plate, make it appearance without greasy dirt.
Step 3: peripheral template is fixed on the line of position.
Step 4: pour into concrete and the tamping of viscous.
Step 5: backing plate is pressed into concrete, and smooths with leveling instrument.Every levelness franchise is 1mm/m, and each is organized the absolute altitude error and is not more than 3mm.
Step 6: with moist piece of sack maintenance more than three days.
Step 7: general silicate concrete, behind the cast fortnight, just can bear machine weight, do not allow too early load-bearing and tighten stone bolt.
The method length consuming time, the maintenance period of every pre-buried backing plate is all different, be by carrying out the backing plate leveling and look for absolute altitude without shrinking the back-grouting material.
For overcoming above-mentioned defective mounting, the present invention is constant to original slurry quality requirement, but the installation that is pressed into to backing plate in work progress changes in advance levelling capturing into, the installation quality of backing plate is improved greatly, if the backing plate surface Machining is meticulous, even levelness can be very fast be transferred in 0.1~0.2mm, absolute altitude is in 1mm.Concrete steps are as follows:
Step 1: at the some nuts of backing plate gusset spot welding, bolt is screwed into nut, by adjusting the bolt high and low position backing plate is carried out levelling;
Step 2: the backing plate of finishing centering is carried out once grouting;
Step 3: the backing plate maintenance is after 2-3 days, and the bolt of back-outing is born backing plate weight fully by the grouting amount, gets rid of the hard spot contact.
In the step 1, the nut quantity of backing plate gusset spot welding is 3, and the position is equilateral triangle; In the situation that the leveling requirement is higher, the nut quantity of backing plate gusset spot welding also can be set to 4, and the position is square.
It is cited that content of the present invention is not limited to embodiment, and the conversion of any equivalence that those of ordinary skills take technical solution of the present invention by reading specification of the present invention is claim of the present invention and contains.

Claims (3)

1. the installation method of the pre-buried backing plate of axial flow compressor is characterized in that:
Step 1: at the some nuts of backing plate gusset spot welding, bolt is screwed into nut, by adjusting the bolt high and low position backing plate is carried out levelling;
Step 2: the backing plate of finishing centering is carried out once grouting;
Step 3: the backing plate maintenance is after 2-3 days, and the bolt of back-outing is born backing plate weight fully by the grouting amount, gets rid of the hard spot contact.
2. the installation method of the pre-buried backing plate of axial flow compressor according to claim 1 is characterized in that:
In the step 1, the nut quantity of backing plate gusset spot welding is 3, and the position is equilateral triangle.
3. the installation method of the pre-buried backing plate of axial flow compressor according to claim 1 is characterized in that:
In the step 1, the nut quantity of backing plate gusset spot welding is 4, and the position is square.
CN2012105756285A 2012-12-27 2012-12-27 Installation method for embedded base plate of axial flow compressor Pending CN103016412A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012105756285A CN103016412A (en) 2012-12-27 2012-12-27 Installation method for embedded base plate of axial flow compressor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012105756285A CN103016412A (en) 2012-12-27 2012-12-27 Installation method for embedded base plate of axial flow compressor

Publications (1)

Publication Number Publication Date
CN103016412A true CN103016412A (en) 2013-04-03

Family

ID=47965382

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012105756285A Pending CN103016412A (en) 2012-12-27 2012-12-27 Installation method for embedded base plate of axial flow compressor

Country Status (1)

Country Link
CN (1) CN103016412A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3963210A (en) * 1975-03-05 1976-06-15 Macklin Charles D Apparatus for setting anchor bolts and other objects in concrete slabs
US5630303A (en) * 1995-12-08 1997-05-20 Nec America, Inc. Remote enclosure anchor frame and installation method
CN1966869A (en) * 2005-11-17 2007-05-23 上海宝钢冶金建设公司 Bearing plate screw adjusting method construction process
CN200978837Y (en) * 2006-12-04 2007-11-21 上海连成(集团)有限公司 Vertical axial flow pump pre-buried pedestal adjusting structure
CN101871265A (en) * 2010-07-02 2010-10-27 中国十七冶集团有限公司 Flat shim plate-adjustable grouting installation method
CN201715188U (en) * 2010-06-29 2011-01-19 上海宝冶集团有限公司 Base plate for equipment installation of nitrogen press
CN201982898U (en) * 2011-02-17 2011-09-21 天津二十冶建设有限公司 Equipment installation base plate regulating device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3963210A (en) * 1975-03-05 1976-06-15 Macklin Charles D Apparatus for setting anchor bolts and other objects in concrete slabs
US5630303A (en) * 1995-12-08 1997-05-20 Nec America, Inc. Remote enclosure anchor frame and installation method
CN1966869A (en) * 2005-11-17 2007-05-23 上海宝钢冶金建设公司 Bearing plate screw adjusting method construction process
CN200978837Y (en) * 2006-12-04 2007-11-21 上海连成(集团)有限公司 Vertical axial flow pump pre-buried pedestal adjusting structure
CN201715188U (en) * 2010-06-29 2011-01-19 上海宝冶集团有限公司 Base plate for equipment installation of nitrogen press
CN101871265A (en) * 2010-07-02 2010-10-27 中国十七冶集团有限公司 Flat shim plate-adjustable grouting installation method
CN201982898U (en) * 2011-02-17 2011-09-21 天津二十冶建设有限公司 Equipment installation base plate regulating device

Similar Documents

Publication Publication Date Title
CN205310514U (en) Building engineering is with energy -conserving high -performance concrete mixer
CN101881031B (en) Installation method of adjustable grouting material base plate device
CN201628056U (en) Machine tool leveling fastening device
CN103644429A (en) Construction method for rapidly adjusting flat base plates with three-point fixation method
CN201960485U (en) Assembly platform of wed pipe of steel pipe tower
CN200959012Y (en) Experimental system for multi-purpose road-building materials
CN102607802A (en) High-speed rotating test device with motor driving structure for verifying fluid-solid coupling algorithms
CN103016412A (en) Installation method for embedded base plate of axial flow compressor
CN105415103A (en) Field turning device for exciting sliding ring of steam turbine generator set and field construction method
CN202247939U (en) Sizing block-free equipment installation mechanism
CN202083543U (en) Fixture for test fan blade of aero-generator
CN201603984U (en) Pneumatic pushing equipment for nickel-base honeycomb vacuum brazing filler metal strips
CN104307934A (en) Method for calibrating shaft of sludge digestion tank blender
CN104084871A (en) Repair equipment for shaft diameter of high-temperature high-pressure steam turbine rotor
CN208788535U (en) A kind of bearing block overturning structure
CN103909457B (en) For the repairing tool of automobile of large-sized low-speed crankshaft of diesel engine thrust card
CN211340337U (en) Road concrete crack prosthetic devices
CN208514103U (en) For processing the fixture of wind-power electricity generation machine part
CN112629987A (en) Screwing type anti-seepage testing mold device
CN109319405A (en) A kind of generator maintenance shift unit and displacement method
CN206084331U (en) Quiet leaf graphite bearing tensioning device of TRT turbine
CN101723234B (en) Consignment balancing device
CN204160297U (en) High temperature and High pressure Steam Turbine rotor diameter of axle prosthetic appliance
CN212399366U (en) Recyclable embedded bolt positioning device
CN205976537U (en) Concrete laser machine of making level

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130403