CN1966869A - Bearing plate screw adjusting method construction process - Google Patents

Bearing plate screw adjusting method construction process Download PDF

Info

Publication number
CN1966869A
CN1966869A CN 200510110493 CN200510110493A CN1966869A CN 1966869 A CN1966869 A CN 1966869A CN 200510110493 CN200510110493 CN 200510110493 CN 200510110493 A CN200510110493 A CN 200510110493A CN 1966869 A CN1966869 A CN 1966869A
Authority
CN
China
Prior art keywords
plate
equipment
backing plate
grouting
adjusting method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200510110493
Other languages
Chinese (zh)
Other versions
CN100473789C (en
Inventor
杨荣青
过建平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BAOGANG METALLURGICAL CONSTRUCTION CORP SHANGHAI
Original Assignee
BAOGANG METALLURGICAL CONSTRUCTION CORP SHANGHAI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BAOGANG METALLURGICAL CONSTRUCTION CORP SHANGHAI filed Critical BAOGANG METALLURGICAL CONSTRUCTION CORP SHANGHAI
Priority to CNB2005101104935A priority Critical patent/CN100473789C/en
Publication of CN1966869A publication Critical patent/CN1966869A/en
Application granted granted Critical
Publication of CN100473789C publication Critical patent/CN100473789C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

It relates to the close binding of the bottom plate and the base of equipments in installation and maintenance. The screw adjusting method for basic overlay plate goes like this: a. overlay plate processing by welding a piece of steel plate for each of the four corners of the selected qualified flat overlay plate with holes in the middle of the steel plates. B. determining the height mark. c. inspect the basics by eliminating the original secondary grout blanket with the backbone of the first layer exposed and the distance between the lower surface of the flat overly plate and the original concrete layer 120-180mm. d. install the overlay plate by welding the angle steel to the backbone of the basics and welding the bolts on the flat overly plate after positioning based on the technical specifications of the flat overlay plate. E. installs the equipment. It can work a lot of work with simple process and within short time.

Description

Bearing plate screw adjusting method construction process
Technical field
The invention belongs to and require equipment bay and technical fields such as basic installation of combining closely and maintenance engineering.
Background technology
Existing equipment is installed, and comprising equipment installation backing plate polishing, equipment mount pad slurry method and equipment does not have three kinds of backing plate mounting processs.Polishing is owing to be subjected to the influence of grinding precision, the mating face of flat bolster and surface of base is incomplete, cause inhomogeneous contact, the stability on influence basis, and if reach contact precision preferably, then require to have good pincers worker technician to carry out conscientious grinding and adjustment, need a large amount of time and technical force.Seat slurry method is a kind of common method that existing Equipment Foundations backing plate is installed, and in the process of centering backing plate, comes the leveling pad by instruments such as rubber hammers, easily is difficult for down, be easy to cause and do over again, and to the control inaccuracy of backing plate absolute altitude.Equipment does not have the backing plate mounting process and is extensive use of abroad, because no backing plate fastening, to the grouting material requirement height very of device bottom, domestic existing quick-dry type grouting material also is difficult to reach the requirement of bearing high-strength impact power, so seldom be applied.
In the overhaul of the equipments engineering, owing to be pressed for time, the duration is short, for the faster equipment that carries out is exactly installed, particularly for the installation of basic flat bolster, we work out a kind of mode of bolt plain cushion four-corner leveling backing plate are installed, and whole activities is called bearing plate screw adjusting method construction process.
Summary of the invention
Purpose of the present invention is exactly the improvement to present mounting technique, the rapid constructing method that provides a kind of base mat to pull, i.e. bearing plate screw adjusting method construction process.
Base mat of the present invention is pulled screw adjusting method construction process, and its concrete step is:
F, backing plate processing: select flat bolster up to specification for use, weld a block plate respectively, the center drilling of steel plate at flat bolster four jiaos;
G, mensuration absolute altitude;
H, inspection basis: all cut the former back-grouting layer of Equipment Foundations, the main muscle of once grouting layer exposed, make the flat bolster soffit arrive the distance of former layer of concrete simultaneously at 120~180mm;
I, installation backing plate: angle steel is welded on the main muscle of Equipment Foundations,, determines the position of the bolt on flat bolster, be welded on the angle steel platform again according to the technical specification of flat bolster;
J, erection equipment.
During erection equipment, adjust taper liner, then equipment is hung in, the work that utilization wedge, jack and pre-buried center line are finished levelling, centering, looked for absolute altitude, grouting, repetition measurement at last according to the data of prior mensuration.
Beneficial effect of the present invention:
Bearing plate screw adjusting method construction process of the present invention has utilized the main muscle in the concrete once grouting layer, adjustment is bolted on the main muscle, absolute altitude according to Instrument measuring, flat bolster is placed on suitable height, utilize four jiaos adjustment bolt to finely tune up and down, after satisfying the requirement of the levelness of equipment backing plate and absolute altitude, the little template grouting of peripheral branch at plain cushion, form a little grouting pier, after 72 hours, just equipment can be placed and adjust, and reach requirement with all stone bolt are fastening, at last the bottom of equipment is once irritated, finish the construction on basis fast.
In maintenance engineering equipment installation process, use method of the present invention can finish the laying work of large batch of flat bolster, application has large fluidity, does not have and shrink (microdilatancy), the grouting agent of early strong characteristics more fastly, form a grouting pier, after adding a pair of combination taper liner, just directly place apparatus is finely tuned again, and is similar with the installation principle of seat slurry method mounting process, but the laying operation of plain cushion is simplified, easy and simple to handle, answer the right maintenance engineering time short, the requirement of duration urgency.
Bearing plate screw adjusting method construction process of the present invention is applicable to the installation of electromechanical equipment, the installation of workshop steel structure column, and the installation of large-scale crane door sole-plate, and require equipment bay and basic installation of combining closely and maintenance engineering etc.
Description of drawings
Fig. 1 is flat bolster processing schematic diagram.
Fig. 2 is the flat bolster scheme of installation.
The specific embodiment
The rapid constructing method of base mat of the present invention being pulled below in conjunction with accompanying drawing is done and is specified.
1, preparation of construction
1), backing plate processing: size and equipment installation requirement according to engineering quantity are prepared necessary grouting agent, auxiliary material and Work tool, select flat bolster up to specification for use, and weld the steel plate that a block size is about 120*60*10mm respectively at plain cushion four jiaos on request, the circular hole of a φ 18mm is opened at the center of steel plate, sees Fig. 1.Also can determine the size of the fixation steel plate that bottom adjustment bolt is used according to the real size of backing plate.
2), the mensuration of absolute altitude: be directly connected to the setting height(from bottom) of backing plate, the coordinate position of equipment, require to be convenient to measure and adjust.
3), the inspection on basis: the former back-grouting layer of Equipment Foundations should all cut, and the main muscle of once grouting layer exposed, guarantee simultaneously the plain cushion soffit to the distance of former layer of concrete about 120~180mm, with the pier of guaranteeing to be in the milk enough bearing capacities are arranged.
2, backing plate is installed
As shown in Figure 2, angle steel 5 is welded on the main muscle of Equipment Foundations,, determines the position of the bolt 4 on base plate 2, be welded on the angle steel platform again according to the technical specification of backing plate 1,
The upper and lower surface of the taper liner of the upper surface of backing plate and correspondence is all answered smooth smooth, and places after cleaning up again.The adjusting of backing plate is slightly looked for absolute altitude with instrument earlier, adjust the bolt of four jiaos on backing plate again, with upper and lower two nuts 3 move up and down the adjustment backing plate, place two frame levels that precision is 0.25mm at the both direction in length and breadth of backing plate, measure absolute altitude with level gauge again after the backing plate levelling.Plain cushion should be reserved the absolute altitude negative common difference, is lined with surplus equipment is carried out accurate adjustment so that equipment is installed to retread.
The template that supports is reserved the space about 100mm around backing plate, to strengthen the support force of grouting pier, will clean concrete surface, backing plate bottom before the grouting, and wash, rinse slurry.
The stirring of grouting material, each general one bag (25kg dress) that use, the water that in agitator, adds ormal weight earlier, to make an appointment with the grouting material of half to pour in the bucket then, stirred for 10 seconds with the electric hand drill type agitator, half material that will be left is again poured in the bucket and is stirred together, begin to finish generally to be controlled in 60 seconds from feeding intake to stirring, blade should move up and down during stirring, at the bottom of making barrel and the material that adheres to of bucket wall can fully be stirred, but blade must not propose the feed liquid face that is in the milk, in order to avoid air is brought into, mixing water should be used tap water, and water temperature is advisable with 5~30 ℃.
The grouting material that stirs must pour into from the same side of equipment, in order to the air discharge, grout blanket is enriched, and selects a suitable perfusing hole, continuously flows into to guarantee grouting, and the grouting material will be beneficial to the adjustment of equipment installation and taper liner a little less than the upper surface of backing plate.
To cover moistening cloth or straw bag watering (every day 4~6 times) maintenance after the grouting.Must not collide and vibrate the basis in 24 hours, striking time was carried out after 24 hours, continued maintenance after the form removal, reached the condition that equipment is installed in 72 hours.
3, equipment is installed
Data according to prior mensuration are adjusted taper liner, then equipment are hung in the work that utilization wedge, jack and pre-buried center line are finished levelling, centering, looked for absolute altitude.The equipment upper surface should be reserved the absolute altitude plus tolerance, but must not surpass plus tolerance, behind stone bolt 70%~80% design fastening force, reaches the grouting condition.
The integral body grouting of Equipment Foundations requires the same with once grouting, the concrete surface is cleaned, grouting again behind will the brushing one deck 3mm thick adhesive that foundation area is bigger, should make grouting be higher than the bottom surface of equipment bay, and in whole filling process, keep this height, stone bolt, repetition measurement Equipment Foundations base plate absolute altitude and levelness are twisted in maintenance eventually after 72 hours.
4, the selection of material
(1), the grouting material selects for use the grouting of BY series to expect that its performance indications should satisfy table 1 and require:
Grouting material the key technical indexes table 1
Project Degree of mobilization (%) Expansion rate (%) Bleeding rate (%) Compressive strength (MPa) Adhesion stress (MPa) with reinforcing bar Ultimate-use (limiting service) temperature (℃)
Index 5~8 0.00~ 0.04 0 ≥40(3d) ≥55(28d) ≥6.0 600
(2), select the principle of grouting material to be: 3 days compressive strength of grout blanket concrete test block must be greater than the concrete design strength 10MPa of (or equaling) Equipment Foundations.Specifically in equipment installation project, can adopt compressive strength height according to the concrete design strength of Equipment Foundations than table 1.But other index (not comprising the adhesion stress with reinforcing bar) must meet the grouting material that table 1 requires.

Claims (3)

1, a kind of base mat is pulled screw adjusting method construction process, and its concrete step is:
A, backing plate processing: select flat bolster up to specification for use, weld a block plate respectively, the center drilling of steel plate at flat bolster four jiaos;
B, mensuration absolute altitude;
C, inspection basis: all cut the former back-grouting layer of Equipment Foundations, the main muscle of once grouting layer exposed, make the flat bolster soffit arrive the distance of former layer of concrete simultaneously at 120~180mm;
D, installation backing plate: angle steel is welded on the main muscle of Equipment Foundations,, determines the position of the bolt on flat bolster, be welded on the angle steel platform again according to the technical specification of flat bolster;
E, erection equipment.
2, base mat as claimed in claim 1 is pulled screw adjusting method construction process, it is characterized in that, backing plate post-grouting material is installed must pour into from the same side of equipment, and the grouting material is a little less than the upper surface of backing plate.
3, base mat as claimed in claim 2 is pulled screw adjusting method construction process, it is characterized in that, used grouting material is a BY series grouting material, degree of mobilization is 5~8%, and expansion rate is 0~0.04%, and bleeding rate is 0, compressive strength 〉=40Mpa of 3 days, compressive strength 〉=55Mpa of 28 days, with the adhesion stress 〉=6.0Mpa of reinforcing bar, ultimate-use (limiting service) temperature is 600 ℃; 3 days compressive strength of grout blanket concrete test block must be more than or equal to the concrete design strength 10MPa of Equipment Foundations.
CNB2005101104935A 2005-11-17 2005-11-17 Bearing plate screw adjusting method construction process Expired - Fee Related CN100473789C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2005101104935A CN100473789C (en) 2005-11-17 2005-11-17 Bearing plate screw adjusting method construction process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2005101104935A CN100473789C (en) 2005-11-17 2005-11-17 Bearing plate screw adjusting method construction process

Publications (2)

Publication Number Publication Date
CN1966869A true CN1966869A (en) 2007-05-23
CN100473789C CN100473789C (en) 2009-04-01

Family

ID=38075829

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2005101104935A Expired - Fee Related CN100473789C (en) 2005-11-17 2005-11-17 Bearing plate screw adjusting method construction process

Country Status (1)

Country Link
CN (1) CN100473789C (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101831917A (en) * 2010-04-06 2010-09-15 武汉钢铁(集团)公司 Mounting construction method of liner plates during mounting large-scale precision equipment
CN102251537A (en) * 2011-04-28 2011-11-23 中冶建工集团有限公司 Construction method for installing block slurry of sizing block by equipment
CN101397799B (en) * 2007-09-28 2012-02-01 中国二十冶集团有限公司 Flowing grouting method installed on apparatus foundation
CN102535509A (en) * 2010-12-28 2012-07-04 贵阳铝镁设计研究院有限公司 Construction method of high-flatness equipment foundation and adjusting structure thereof
CN103016412A (en) * 2012-12-27 2013-04-03 陕西化建工程有限责任公司 Installation method for embedded base plate of axial flow compressor
CN103143907A (en) * 2013-01-15 2013-06-12 中国核工业二三建设有限公司 Method for installing heavy horizontal equipment in nuclear power station and positioning tooling for installation
CN104863173A (en) * 2015-04-21 2015-08-26 成都佳美嘉科技有限公司 Anchor plate adjusting device
CN104989918A (en) * 2015-05-21 2015-10-21 中冶天工集团有限公司 Method for arranging large-area foundation sizing block
CN107724415A (en) * 2017-09-28 2018-02-23 国网山东省电力公司经济技术研究院 A kind of falsework auxiliary mounting tool
CN107780433A (en) * 2016-08-27 2018-03-09 上海宝冶集团有限公司 The flow grouting construction method of backing plate

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101397799B (en) * 2007-09-28 2012-02-01 中国二十冶集团有限公司 Flowing grouting method installed on apparatus foundation
CN101831917A (en) * 2010-04-06 2010-09-15 武汉钢铁(集团)公司 Mounting construction method of liner plates during mounting large-scale precision equipment
CN101831917B (en) * 2010-04-06 2011-08-10 武汉钢铁(集团)公司 Mounting construction method of liner plates during mounting large-scale precision equipment
CN102535509A (en) * 2010-12-28 2012-07-04 贵阳铝镁设计研究院有限公司 Construction method of high-flatness equipment foundation and adjusting structure thereof
CN102251537A (en) * 2011-04-28 2011-11-23 中冶建工集团有限公司 Construction method for installing block slurry of sizing block by equipment
CN103016412A (en) * 2012-12-27 2013-04-03 陕西化建工程有限责任公司 Installation method for embedded base plate of axial flow compressor
CN103143907A (en) * 2013-01-15 2013-06-12 中国核工业二三建设有限公司 Method for installing heavy horizontal equipment in nuclear power station and positioning tooling for installation
CN103143907B (en) * 2013-01-15 2015-07-29 中国核工业二三建设有限公司 Method and the installation positioning tool of the heavy horizontal-type equipment in nuclear power station are installed
CN104863173A (en) * 2015-04-21 2015-08-26 成都佳美嘉科技有限公司 Anchor plate adjusting device
CN104989918A (en) * 2015-05-21 2015-10-21 中冶天工集团有限公司 Method for arranging large-area foundation sizing block
CN107780433A (en) * 2016-08-27 2018-03-09 上海宝冶集团有限公司 The flow grouting construction method of backing plate
CN107724415A (en) * 2017-09-28 2018-02-23 国网山东省电力公司经济技术研究院 A kind of falsework auxiliary mounting tool
CN107724415B (en) * 2017-09-28 2019-05-10 国网山东省电力公司经济技术研究院 A kind of falsework auxiliary mounting tool

Also Published As

Publication number Publication date
CN100473789C (en) 2009-04-01

Similar Documents

Publication Publication Date Title
CN100473789C (en) Bearing plate screw adjusting method construction process
CN101881031B (en) Installation method of adjustable grouting material base plate device
CN101812819B (en) Whole construction process for double block type ballastless track
CN101397799B (en) Flowing grouting method installed on apparatus foundation
CN102286988A (en) Grouting shim plate construction method
CN103835308A (en) Method for installing embedded base plate of machine tool
CN113216010A (en) Construction method for closure section of corrugated steel web bridge
CN115452573A (en) Method for determining optimal pressure range of compressed pouring common or solid waste concrete
CN108755394B (en) Method for reinforcing special-shaped pier column of bridge by using prestressed tendons
CN114481722A (en) Method for quickly and accurately adjusting track slab of ballastless track of operating high-speed rail
CN201090907Y (en) Base backing plate
CN107083726A (en) The plate-type fragment-free track slab self-compacting concretes four of CRTS III connect block constructing device and method
CN110184864A (en) A method of reducing double-block ballastless track bed board cracking rate
CN101476329B (en) Secondary grouting layer separation and renovation method for bearing support of turbine
CN101457529A (en) Seat slurry plastic sheet construction method
CN1309908C (en) Method for comprehensive treating broken concrete plate on site
CN102943484B (en) Tapered-iron pulp-bedding rapid leveling method for large-size and middle-size equipment installation
CN110230271A (en) Bridge biased displacement post-reinforcing resets construction method
CN207878943U (en) A kind of foundation ground flatness and elevation control device
CN103132538A (en) Auxiliary device for alignment and leveling of slope foundation sand mound with mat iron and mat iron placing method
CN110578298A (en) Concrete pouring process for top of viaduct upright post
CN114016743B (en) Concrete pouring method for large-sized steel-clad reinforced concrete protective door
CN103590289B (en) Epoxy mortar repairs bridge crane track construction structure and construction method
CN203583301U (en) Construction structure for repairing tracks of bridge cranes by aid of epoxy cement gum
CN218912292U (en) Thickness control device for separated cast-in-place concrete floor slab

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090401

Termination date: 20131117