CN101457529A CNA2007101721375A CN200710172137A CN101457529A CN 101457529 A CN101457529 A CN 101457529A CN A2007101721375 A CNA2007101721375 A CN A2007101721375A CN 200710172137 A CN200710172137 A CN 200710172137A CN 101457529 A CN101457529 A CN 101457529A
Authority
CN
China
Prior art keywords
backing plate
seat slurry
concrete
construction method
plastic sheet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2007101721375A
Other languages
Chinese (zh)
Inventor
樊金田
解亚利
史涛
郭九春
祃丽婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA MCC20 CONSTRUCTION Co Ltd
Original Assignee
CHINA MCC20 CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA MCC20 CONSTRUCTION Co Ltd filed Critical CHINA MCC20 CONSTRUCTION Co Ltd
Priority to CNA2007101721375A priority Critical patent/CN101457529A/en
Publication of CN101457529A publication Critical patent/CN101457529A/en
Pending legal-status Critical Current

Links

Abstract

The invention relates to grouting construction. A construction method of starching a base plate, comprises a base plate with a certain length and width and comprises the following steps of: excavating and starching; supporting formworks; grouting; measuring elevation; compacting; and demounting formworks and maintenance. The starching method has simple method, convenient operation and high mounting precision for starching the base plate, simplifies the mounting process, reduces the working load of mounting and shortens the mounting construction period greatly.

Description

Seat slurry plastic sheet construction method
Technical field
The present invention relates to grouting construction, relate in particular to the backing plate grout construction method.
Background technology
The requirement of stability in the plant equipment installation process, so its base all adopts cement to build to form usually, the used grouting material of present grouting method needs outsourcing, and is transported to the job site, and construction cost is higher.Need at the construction field (site) grouting is expected to stir, what what stir with, go back GPRS proportioning and mixing time simultaneously, it is more loaded down with trivial details to construct, and installation accuracy is poor, and the workload of installation is big and long with installation period.
Summary of the invention
The present invention is intended to solve the above-mentioned defective of existing grouting method, and a kind of seat slurry plastic sheet construction method is provided.Seat paste-making method of the present invention is simple, easy to operate, and seat slurry plastic sheet installation accuracy height has been simplified erection procedure, has reduced the workload of installing; Installation period shortens significantly.
The present invention is achieved in that
A kind of seat slurry plastic sheet construction method includes the backing plate of certain length and width, and it comprises the following steps:
Dig seat slurry hole step:
Dig out seat slurry hole at the concrete foundation position that backing plate is set;
Prop up the template step:
After seat slurry cross-cut chisel became, water dashed or blows down foreign material in the hole with compressed air, and wetting, eliminated ponding, greasy dirt in the hole then;
Grouting step:
Be coated with the thin cement paste of one deck in the seat slurry hole of digging out, do template with checkered steel plate, pour in the hole with the strong concrete that is about to stir, answer layering to make firm by ramming during placing, every layer thickness is preferably the 40-50 millimeter, smashes continuously to slurry float gage layer; Grouting performs one group of concrete test block simultaneously, test three days compressive strength up to three days compressive strength greater than 40MPa;
Measure the absolute altitude step:
Concrete surface after bleeding or the disappearance of water mark, is not placed backing plate and is also measured absolute altitude.Backing plate is positioned over and uses hand on the concrete, knocks the backing plate face with hand hammer chock plate, makes its steady decline,
Make real step:
The backing plate absolute altitude makes real the backing plate circumferential concrete after measuring, and makes it firm.Concrete surface layer should be lower than backing plate face 2-5 millimeter, checks the backing plate absolute altitude before the concrete initial set once more.
Tear open and touch the maintenance step:
Cover straw bag, the moistening beginning maintenance of watering must not collide and vibrate between curing time, and striking time should be carried out after maintenance begins 24 hours, continued maintenance 48 hours after the form removal.
Described seat slurry plastic sheet construction method, in the step of described cutting seat slurry hole, the length in described seat slurry hole is than the long 60-80 millimeter of backing plate, and width should be than the wide 40-60 millimeter of backing plate, and the degree of depth that digs into surface of base is greater than 30 millimeters.
Described seat slurry plastic sheet construction method, the cement paste water/binder ratio in the described grouting step is: cement 0.5Kg, water 1-1.2Kg.
Described seat slurry plastic sheet construction method, the template thickness in the described grouting step are 5-8mm.
Described seat slurry plastic sheet construction method, in the described grouting step, high low arc all around in the middle of concrete surface layer is shaped as.
Described seat slurry plastic sheet construction method, the weight proportion of cement, yellow sand, stone and the water of the seat slurry high-strength concrete in the described grouting step is 1:1:1:0.36.
Seat slurry plastic sheet construction method of the present invention has been realized the stability in the equipment installation process, has simplified construction sequence, has significantly reduced installation workload.The present invention is adapted to heavy mechanical equipment and installs, and has simplified erection procedure, and is easy and simple to handle, simple.The seat slurry is simple, easy to operate, backing plate installation accuracy height; The present invention has effectively reduced the workload of installing; Improved installation rate; Installation period contracts significantly., not only at metallurgy industry, other relates to heavy mechanical equipment, and the industry that electric fixtures is installed all can be used, and good application prospects is arranged.
The specific embodiment
Adopt a preferred embodiment of the present invention to further specify the present invention below:
The present invention is for the stability in the plant equipment installation process, improves the requirement of equipment installment quality and installation rate and develops, and carries out according to the following step:
(1) digs out seat slurry hole at the concrete foundation position that backing plate is set, the length in seat slurry hole should be than the long 60-80 millimeter of backing plate, width should be than the wide 40-60 millimeter of backing plate, seat slurry cross-cut chisel is gone into the degree of depth of surface of base must not be less than 30 millimeters, and seat slurry floor height reinforced concrete thickness must not be less than 50 millimeters, use the concrete that exceeds a grade of base concrete label to carry out during the seat slurry.
The seat slurry plastic sheet embedding precision
Sequence number Content Unit Precision
1 The absolute altitude franchise mm +0~0.5
2 Levelness mm/m 0.10
Seat slurry high-strength concrete match ratio
Cement Sand Stone Water Remarks
1 1 1 0.36 Weight ratio
(2) after seat slurry cross-cut chisel became, water dashed or blows down odd job in the hole with compressed air, and wetting 30 minutes, eliminate ponding in the hole then, must not speckle with greasy dirt in the hole.Be coated with the thin cement paste of one deck in the hole, in order to bond between fresh and hardened concretes, the cement paste water/binder ratio is: cement 0.5Kg, water 1-1.2Kg.Checkered steel plate with thickness δ=6mm is done template, pours in the hole with the strong concrete that is about to stir, and answers layering to make firm by ramming during placing, and every layer thickness is preferably the 40-50 millimeter, smashes continuously to starching the float gage layer in order to clapping slurry.High low arc all around in the middle of the concrete surface layer shape is answered, exhaust air during in order to the placement backing plate.Perform one group of concrete test block simultaneously, test three days compressive strength.Compressive strength should be greater than 40MPa in three days.
(3) when concrete surface not after bleeding or water mark disappear, can place backing plate and measure absolute altitude.Backing plate surface absolute altitude limit deviation is ± 0.5 millimeter, and backing plate is positioned over and uses hand on the concrete, knocks the backing plate face with hand hammer chock plate, makes its steady decline, must not tiltedly hit when knocking, in order to avoid air is scurried between backing plate and the concrete surface.The backing plate absolute altitude makes real the backing plate circumferential concrete after measuring, and makes it firm.Concrete surface layer should be lower than backing plate face 2-5 millimeter, checks the backing plate absolute altitude before the concrete initial set once more.And cover the straw bag moist curing three days (72 hours) that waters.Must not collide and vibrate between curing time.
Striking time should be carried out after 24 hours, continued maintenance after the form removal.

Claims (6)

1. seat slurry plastic sheet construction method includes the backing plate of certain length and width, it is characterized in that it comprises the following steps:
Dig seat slurry hole step:
Dig out seat slurry hole at the concrete foundation position that backing plate is set;
Prop up the template step:
After seat slurry cross-cut chisel became, water dashed or blows down foreign material in the hole with compressed air, and wetting, eliminated ponding, greasy dirt in the hole then;
Grouting step:
Be coated with the thin cement paste of one deck in the seat slurry hole of digging out, do template with checkered steel plate, pour in the hole with the strong concrete that is about to stir, answer layering to make firm by ramming during placing, every layer thickness is preferably the 40-50 millimeter, smashes continuously to slurry float gage layer; Grouting performs one group of concrete test block simultaneously, test three days compressive strength up to three days compressive strength greater than 40MPa;
Measure the absolute altitude step:
Concrete surface after bleeding or the disappearance of water mark, is not placed backing plate and is also measured absolute altitude.Backing plate is positioned over and uses hand on the concrete, knocks the backing plate face with hand hammer chock plate, makes its steady decline,
Make real step:
The backing plate absolute altitude makes real the backing plate circumferential concrete after measuring, and makes it firm.Concrete surface layer should be lower than backing plate face 2-5 millimeter, checks the backing plate absolute altitude before the concrete initial set once more.
Tear open and touch the maintenance step:
Cover straw bag, the moistening beginning maintenance of watering must not collide and vibrate between curing time, and striking time should be carried out after maintenance begins 24 hours, continued maintenance 48 hours after the form removal.
2. seat slurry plastic sheet construction method according to claim 1, it is characterized in that in the step of described cutting seat slurry hole, the length in described seat slurry hole is than the long 60-80 millimeter of backing plate, width is than the wide 40-60 millimeter of backing plate, and the degree of depth that digs into surface of base is greater than 30 millimeters.
3. seat slurry plastic sheet construction method according to claim 1 is characterized in that, the described cement paste water/binder ratio of described grouting step is: cement 0.5Kg, water 1-1.2Kg.
4. seat slurry plastic sheet construction method according to claim 1 is characterized in that, it is 5-8mm that the mould in the described grouting step is touched plate thickness.
5. to play 1 described seat slurry plastic sheet construction method according to right, it is characterized in that, in the described grouting step, high low arc all around in the middle of concrete surface layer is shaped as.
6. seat slurry plastic sheet construction method according to claim 1 is characterized in that, in the described grouting step, the weight proportion of cement, yellow sand, stone and the water of described seat slurry high-strength concrete is 1:1:1:0.36.
CNA2007101721375A 2007-12-12 2007-12-12 Seat slurry plastic sheet construction method Pending CN101457529A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2007101721375A CN101457529A (en) 2007-12-12 2007-12-12 Seat slurry plastic sheet construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2007101721375A CN101457529A (en) 2007-12-12 2007-12-12 Seat slurry plastic sheet construction method

Publications (1)

Publication Number Publication Date
CN101457529A true CN101457529A (en) 2009-06-17

Family

ID=40768632

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2007101721375A Pending CN101457529A (en) 2007-12-12 2007-12-12 Seat slurry plastic sheet construction method

Country Status (1)

Country Link
CN (1) CN101457529A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102251537A (en) * 2011-04-28 2011-11-23 中冶建工集团有限公司 Construction method for installing block slurry of sizing block by equipment
CN106759451A (en) * 2016-11-14 2017-05-31 中国三冶集团有限公司 A kind of seat slurry plastic sheet constructing device
CN106801433A (en) * 2017-03-31 2017-06-06 中国化学工程第七建设有限公司 The seat slurry method construction technique that a kind of equipment is installed without parallels
CN110284517A (en) * 2019-07-17 2019-09-27 华西能源工程有限公司 Rotating machinery mounting and adjusting pedestal slurry processes

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102251537A (en) * 2011-04-28 2011-11-23 中冶建工集团有限公司 Construction method for installing block slurry of sizing block by equipment
CN106759451A (en) * 2016-11-14 2017-05-31 中国三冶集团有限公司 A kind of seat slurry plastic sheet constructing device
CN106759451B (en) * 2016-11-14 2019-01-01 中国三冶集团有限公司 A kind of seat slurry plastic sheet constructing device
CN106801433A (en) * 2017-03-31 2017-06-06 中国化学工程第七建设有限公司 The seat slurry method construction technique that a kind of equipment is installed without parallels
CN110284517A (en) * 2019-07-17 2019-09-27 华西能源工程有限公司 Rotating machinery mounting and adjusting pedestal slurry processes

Similar Documents

Publication Publication Date Title
CN103570317B (en) A kind of clear-water concrete using construction refuse regenerated aggregate to produce
CN100450964C (en) Micro-slump concrete for roller compacted concrete dam and construction method thereof
CN100575642C (en) Special fine sand high-strength high-performance concrete ultra-high pumping construction method
CN106150001B (en) A kind of fabricated assembly overall stair construction method
CN104831734B (en) A kind of deep basal pit building rotary churning pile Composition Soil Nailing Walls construction method
CN105133487B (en) Construction method for using combined type bridge temporary support to rapidly build continuous beams
CN103452221A (en) Pitched roof concrete construction method
CN100473789C (en) Bearing plate screw adjusting method construction process
CN102286988A (en) Grouting shim plate construction method
CN103496926B (en) A kind of manufacture method of producing prestressed concrete waveform sheet pile
CN101397799A (en) Flowing grouting method installed on apparatus foundation
CN101457529A (en) Seat slurry plastic sheet construction method
CN108457469A (en) A kind of concrete structure construction method with assembled masonry filler wall
CN113372075B (en) Concrete based on 3D printing, preparation method thereof and 3D printing column template
CN202731936U (en) Tunnel inverted arch end mold
JP2002308660A (en) Grout
CN106801433A (en) The seat slurry method construction technique that a kind of equipment is installed without parallels
CN107905609A (en) Underground people's air defense construction method
CN107023170A (en) Post stretching bonded prestress construction
CN108755394B (en) Method for reinforcing special-shaped pier column of bridge by using prestressed tendons
CN1073655C (en) Continuous bed mortar soleplate method
CN205035732U (en) Interim support of combined type bridge
CN102943484B (en) Tapered-iron pulp-bedding rapid leveling method for large-size and middle-size equipment installation
CN101476329A (en) Secondary grouting layer separation and renovation method for bearing support of turbine
CN106869387A (en) Multi-ribbed plate Structural Floor System HZ concrete film construction methods

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination