CN102615277A - Construction method for mounting rails of buggy ladle - Google Patents

Construction method for mounting rails of buggy ladle Download PDF

Info

Publication number
CN102615277A
CN102615277A CN2012100682336A CN201210068233A CN102615277A CN 102615277 A CN102615277 A CN 102615277A CN 2012100682336 A CN2012100682336 A CN 2012100682336A CN 201210068233 A CN201210068233 A CN 201210068233A CN 102615277 A CN102615277 A CN 102615277A
Authority
CN
China
Prior art keywords
backing plate
embedded bolt
car track
ladle car
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012100682336A
Other languages
Chinese (zh)
Inventor
倪淑梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN2012100682336A priority Critical patent/CN102615277A/en
Publication of CN102615277A publication Critical patent/CN102615277A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Casting Support Devices, Ladles, And Melt Control Thereby (AREA)

Abstract

The invention discloses a construction method for mounting rails of a buggy ladle and belongs to a construction method for mounting metallurgical equipment. The construction method is characterized by comprising the following steps of: selecting a group of embedded bolts at every 2 to 3 meters from various embedded bolts on a concrete foundation of the buggy ladle rail; respectively downwards threading along an original screw thread of each embedded bolt by using threading dies with the same specification; respectively screwing adjusting nuts to a threading section of front and rear embedded bolts; respectively sleeving various adjusting backing plates of which front and rear holes are correspondingly drilled in each group of embedded bolts and supporting the adjusting backing plates on each adjusting nut; screwing and rotating the adjusting nuts for aligning the levelness and the elevation; after each adjusting backing plate is aligned and qualified, carrying out firm spot welding on each adjusting bolt corresponding to a screw rod of each embedded bolt; then correspondingly placing steel rails of the buggy ladle on each adjusting backing plate; rechecking by using a measuring instrument; after the specification requirements are respectively met, firmly mounting the rails by using a rail hold-down plate and mounting nuts; and then secondarily grounting the rails of the buggy ladle. The construction method is safe and reliable in construction, so that the mounting quality of the rails of the buggy ladle is ensured.

Description

The construction method that a kind of ladle car track is installed
Technical field
The invention belongs to the construction method that metallurgical equipment is installed, especially relate to the construction method that a kind of ladle car track is installed.
Background technology
Domestic metallurgy industry steelmaking system is installed ladle car track, and the installation quality of invar hired car track requires high, is seated on the concrete foundation owing to ladle car track again; And the flatness on concrete foundation surface is difficult to be controlled in the code requirement; To ladle car track the installation quality problem of bringing is installed for the flatness of eliminating the concrete foundation surface, lays thick along the ladle car track direction usually during construction and be the long steel plate of 14mm, then this long steel plate carried out horizontal centering again; On long steel plate, ladle car track is installed; The long steel plate of this laying is installed the end back in ladle car track and is built in the back-grouting layer, the expense of not only taking a lot of work material, and also work efficiency is low.
Summary of the invention
The objective of the invention is to propose the construction method that a kind of ladle car track is installed, not only construction safety is reliable, guarantees the installation quality of ladle car track, and labor and material saving improves installation efficiency simultaneously, shortens installation period.
The objective of the invention is to realize like this: the construction method that a kind of ladle car track is installed; It is characterized in that each pre-embedded bolt on the ladle car track concrete foundation; Length direction along ladle car track is whenever selected one group of (each pre-embedded bolt of symmetry promptly) pre-embedded bolt at a distance from 2 meters-3 meters; With the screw die of same specification along the former screw thread of this pre-embedded bolt downwards (promptly direction) earthward all carry out mantle fiber; The length of this mantle fiber screw thread is 30-35mm, will be screwed to respectively with the adjusting nut of pre-embedded bolt same specification on the mantle fiber screw thread section of pre-embedded bolt before and after this, with correspondence bored front and rear gaps respectively regulate backing plate be set in respectively organize on the pre-embedded bolt and carriage on each adjusting nut; This length * wide * height of regulating backing plate is 300mm * 120mm * 14mm; Regulate backing plate with measuring instrument N2 spirit level to every and carry out the centering of levelness and absolute altitude through twisting adjusting nut, make the levelness of respectively regulating backing plate reach 0.3/1000mm, absolute altitude also meets the requirements; Each regulate the backing plate centering qualified after; The all corresponding screw rod spot welding with pre-embedded bolt of each adjusting nut is firm; Then buggy ladle rail correspondence is placed on and respectively regulates on the backing plate, recheck longitudinal centre line, gauge, the absolute altitude of ladle car track, the difference of height of two ladle car track of vertical equity degree and same cross section with measuring instrument again, all satisfy code requirement after; With track pressing plate and installation nut track is installed firmly, then ladle car track is carried out back-grouting.
The construction method that a kind of ladle car track proposed by the invention is installed, not only construction safety is reliable, guarantees the installation quality of ladle car track, and labor and material saving has improved installation efficiency simultaneously, has shortened installation period.
The construction method that a kind of ladle car track that at present combines accompanying drawing and embodiment that the present invention is proposed is installed is described further.
Description of drawings
Fig. 1 is that the master that ladle car track is installed in a kind of ladle car track that the present invention the proposes construction method of installing looks sketch map.
Fig. 2 is that sketch map is looked on the left side that ladle car track is installed in a kind of ladle car track that the present invention the proposes construction method of installing.
Fig. 3 is a part 1 among Fig. 2: the sketch map of regulating backing plate.
Among Fig. 1-Fig. 3: 1, regulate backing plate 2, adjusting nut 3, pre-embedded bolt 4, ladle car track 5, concrete foundation 6, installation nut 7, track pressing plate.
The specific embodiment
Embodiment
During 100T electric furnace plant equipment in last steel one factory's stainless steel is made steel engineering is installed; The construction method that a kind of ladle car track that we utilize the present invention to propose is installed is installed the ladle car track of this 100T electric furnace; Its practical implementation is: every at a distance from two meters selected one group (promptly respectively a pre-embedded bolt 3) pre-embedded bolt 3 to each pre-embedded bolt 3 on the ladle car track coagulation earth basis 5 along the length direction of ladle car track, all carry out mantle fiber with the screw die of same specification along the former screw thread downward (direction earthward) of bolt; The length of mantle fiber screw thread is 30mm; The adjusting nut 2 of same specification is screwed on the mantle fiber screw thread section of front and back pre-embedded bolt 3, adjusting backing plate 1 correspondence of having bored front and rear gaps is placed on every group of adjusting nut 2, this length * wide * height of regulating backing plate 1 is 300mm * 120mm * 14mm; With measuring instrument N2 spirit level each is regulated backing plate 1 and carry out levelness and absolute altitude centering through twisting adjusting nut 2; Make the levelness of regulating backing plate 1 reach 0.3/1000mm, absolute altitude also meets the requirements, after each piece adjusting backing plate 1 centering is qualified; The all corresponding screw rod spot welding with pre-embedded bolt of each adjusting nut is firm; Then buggy ladle rail 4 is placed on and respectively regulates on the backing plate 1, recheck the difference of height of longitudinal centre line, gauge, absolute altitude, vertical equity degree and same cross section two ladle car track 4 of ladle car track 4 again with measuring instrument, all satisfy code requirement after; With track pressing plate 7, installation nut 6 track 4 is installed firmly, then ladle car track 4 is carried out back-grouting.
The ladle car track that the construction method that a kind of ladle car track that application the present invention proposes is installed is installed the 100T electric furnace; Accomplished to 5 Tian Bao quality guarantee amounts the installation task in advance, whenever 1 day in advance, the owner can earn a profit 1,000,000 yuan; Therefore we have created very big economic benefit for the owner; Obtained praising highly of last steel one factory, also practiced thrift 50,000 yuan of labour costs, construction period, fee of material simultaneously, for our company has opened up more vast market at home.

Claims (1)

1. the ladle car track construction method of installing; It is characterized in that each pre-embedded bolt on the ladle car track concrete foundation; Length direction along ladle car track is whenever selected one group of pre-embedded bolt at a distance from 2 meters-3 meters; Screw die with same specification all carries out mantle fiber downwards along each former screw thread of organizing pre-embedded bolt; The length of this mantle fiber screw thread is 30-35mm, will be screwed to the adjusting nut of pre-embedded bolt same specification on the mantle fiber screw thread section of respectively organizing pre-embedded bolt, with correspondence bored front and rear gaps respectively regulate backing plate be set in respectively organize on the pre-embedded bolt and carriage on adjusting nut; This length * wide * height of regulating backing plate is 300mm * 120mm * 14mm; Regulate backing plate with measuring instrument N2 spirit level to every and carry out the centering of levelness and absolute altitude through twisting adjusting nut, make the levelness of respectively regulating backing plate reach 0.3/1000mm, absolute altitude also meets the requirements; Each regulate the backing plate centering qualified after; The all corresponding screw rod spot welding with pre-embedded bolt of each adjusting nut is firm; Then buggy ladle rail correspondence is placed on and respectively regulates on the backing plate, recheck longitudinal centre line, gauge, the absolute altitude of ladle car track, the difference of height of two ladle car track of vertical equity degree and same cross section with measuring instrument again, all satisfy code requirement after; With track pressing plate and installation nut track is installed firmly, then ladle car track is carried out back-grouting.
CN2012100682336A 2012-03-15 2012-03-15 Construction method for mounting rails of buggy ladle Pending CN102615277A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012100682336A CN102615277A (en) 2012-03-15 2012-03-15 Construction method for mounting rails of buggy ladle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012100682336A CN102615277A (en) 2012-03-15 2012-03-15 Construction method for mounting rails of buggy ladle

Publications (1)

Publication Number Publication Date
CN102615277A true CN102615277A (en) 2012-08-01

Family

ID=46555677

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012100682336A Pending CN102615277A (en) 2012-03-15 2012-03-15 Construction method for mounting rails of buggy ladle

Country Status (1)

Country Link
CN (1) CN102615277A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103741710A (en) * 2013-12-17 2014-04-23 攀钢集团工程技术有限公司 Construction method of installation equipment without sizing block
CN105438742A (en) * 2014-08-15 2016-03-30 上海船厂船舶有限公司 Trolley rack for blowout preventer of moon poll of drilling ship and track installation method
CN109577364A (en) * 2018-11-23 2019-04-05 上海宝冶冶金工程有限公司 A kind of stacker-reclaimer track foundation construction method
CN110080280A (en) * 2019-05-21 2019-08-02 成都建筑材料工业设计研究院有限公司 A kind of stacker-reclaimer track foundation construction method
CN110159016A (en) * 2019-06-26 2019-08-23 中国铁路设计集团有限公司 A kind of column check pit that prefabricated assembled adjustable rail top mark is high
CN111412810A (en) * 2020-03-20 2020-07-14 上海二十冶建设有限公司 Method for improving installation precision of tundish car track by using self-made gauge block
CN113668305A (en) * 2021-06-29 2021-11-19 上海二十冶建设有限公司 Measuring and mounting method for door-type and half-door-type tundish car rails
CN115030506A (en) * 2022-06-21 2022-09-09 中国五冶集团有限公司 Installation method of light I-steel rail

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1726713A1 (en) * 2005-05-25 2006-11-29 BWG GmbH & Co. KG Rail fastener system for a concrete sleeper
CN101250881A (en) * 2008-01-21 2008-08-27 武汉冶建安装工程有限责任公司 Method for installation of seat slurry method construction packing plate
CN201605596U (en) * 2010-03-14 2010-10-13 沈观耕 Fixing device for foundation
CN101871265A (en) * 2010-07-02 2010-10-27 中国十七冶集团有限公司 Flat shim plate-adjustable grouting installation method
CN201809985U (en) * 2010-07-08 2011-04-27 中国中轻国际工程有限公司 Leveling device for top ends of glass smelting kiln bottom concrete upright columns
CN102296797A (en) * 2011-06-01 2011-12-28 天津一建建筑工程有限公司 Fixed height-adjustable steel rail support capable of controlling paving thickness of cast-in-situ concrete

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1726713A1 (en) * 2005-05-25 2006-11-29 BWG GmbH & Co. KG Rail fastener system for a concrete sleeper
CN101250881A (en) * 2008-01-21 2008-08-27 武汉冶建安装工程有限责任公司 Method for installation of seat slurry method construction packing plate
CN201605596U (en) * 2010-03-14 2010-10-13 沈观耕 Fixing device for foundation
CN101871265A (en) * 2010-07-02 2010-10-27 中国十七冶集团有限公司 Flat shim plate-adjustable grouting installation method
CN201809985U (en) * 2010-07-08 2011-04-27 中国中轻国际工程有限公司 Leveling device for top ends of glass smelting kiln bottom concrete upright columns
CN102296797A (en) * 2011-06-01 2011-12-28 天津一建建筑工程有限公司 Fixed height-adjustable steel rail support capable of controlling paving thickness of cast-in-situ concrete

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103741710A (en) * 2013-12-17 2014-04-23 攀钢集团工程技术有限公司 Construction method of installation equipment without sizing block
CN103741710B (en) * 2013-12-17 2015-10-14 攀钢集团工程技术有限公司 Without the construction method of parallels erection equipment
CN105438742A (en) * 2014-08-15 2016-03-30 上海船厂船舶有限公司 Trolley rack for blowout preventer of moon poll of drilling ship and track installation method
CN109577364A (en) * 2018-11-23 2019-04-05 上海宝冶冶金工程有限公司 A kind of stacker-reclaimer track foundation construction method
CN110080280A (en) * 2019-05-21 2019-08-02 成都建筑材料工业设计研究院有限公司 A kind of stacker-reclaimer track foundation construction method
CN110159016A (en) * 2019-06-26 2019-08-23 中国铁路设计集团有限公司 A kind of column check pit that prefabricated assembled adjustable rail top mark is high
CN110159016B (en) * 2019-06-26 2023-12-05 中国铁路设计集团有限公司 Column type inspection pit of prefabricated adjustable rail top elevation
CN111412810A (en) * 2020-03-20 2020-07-14 上海二十冶建设有限公司 Method for improving installation precision of tundish car track by using self-made gauge block
CN113668305A (en) * 2021-06-29 2021-11-19 上海二十冶建设有限公司 Measuring and mounting method for door-type and half-door-type tundish car rails
CN115030506A (en) * 2022-06-21 2022-09-09 中国五冶集团有限公司 Installation method of light I-steel rail
CN115030506B (en) * 2022-06-21 2023-08-22 中国五冶集团有限公司 Installation method of light I-steel rail

Similar Documents

Publication Publication Date Title
CN102615277A (en) Construction method for mounting rails of buggy ladle
CN101871265B (en) Flat shim plate-adjustable grouting installation method
CN206458918U (en) A kind of adjustable subway suspension and support
CN201794168U (en) Steel column butt-joint connector
CN105609148B (en) Device for precision control of embedded assembly of push-pull device of nuclear power plant and installation method
CN203639932U (en) Pre-embedded foundation structure used for installation of machine column of high-column signal machine of railway
CN103243621A (en) Method for mounting integrated steel rail supporting frame for adjustment of groove type steel rails of tramcar
CN103644429A (en) Construction method for rapidly adjusting flat base plates with three-point fixation method
CN202390730U (en) Fine adjustment device for mounting a track
CN102518300B (en) Embedded conical bearing joint type steel structural support and construction method thereof
CN107178091A (en) The pinpoint method of can-type calcine furnace steel construction pillar embedding anchor bolts
CN212002364U (en) Foundation bolt mounting and positioning device for steel structure stand column
CN202482717U (en) Mounting device for buggy ladle track
CN102286939A (en) Beam moving and connecting construction method of existing viaducts in urban rail transits
CN202519631U (en) Emptying gate
CN104153451A (en) Construction method for installing concrete pipeline through prefabricated supporting block
CN103520925A (en) Roller coaster stand column structure and installation method
CN103590495B (en) The construction method of indoor GIS universal adjustable flooring basis embedded part
CN105220892A (en) The means to save the situation of pre-buried i beam position deviation
CN202302573U (en) Base plate for inclined mortar filling
CN206986721U (en) A kind of tower top cat road turns cable saddle Chu Mao roads track cable adjusting means
CN114197258A (en) Installation method of independent fine adjustment device for ballastless track of depot line
CN203781657U (en) Ground track fixing device
CN203160707U (en) Adjustable t-shaped controller
CN202248943U (en) Auxiliary device for positioning pedestal embedded part of large steel structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120801