CN103161177B - Integrated equipment quick centering device and equipment aligning method - Google Patents
Integrated equipment quick centering device and equipment aligning method Download PDFInfo
- Publication number
- CN103161177B CN103161177B CN201310068284.3A CN201310068284A CN103161177B CN 103161177 B CN103161177 B CN 103161177B CN 201310068284 A CN201310068284 A CN 201310068284A CN 103161177 B CN103161177 B CN 103161177B
- Authority
- CN
- China
- Prior art keywords
- adjustment
- equipment
- ear
- parallels
- hold
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
The present invention relates to a kind of integrated equipment quick centering device and equipment aligning method, described alignment device comprises a center parallels, the periphery of described center parallels arranges three adjustment ears by isosceles triangle, and described three adjustment ears are positioned at three summits of isosceles triangle; The central bore of described three adjustment ears, wear an adjustment bolt in arbitrary hole, rotation set one adjusting nut and a hold-down nut on described adjustment bolt, described adjusting nut is positioned at the below of adjustment ear, and described hold-down nut is positioned at above adjustment ear.The present invention draws materials easily, adjustment accurate, operation is simple, applied widely, and adopts the present invention to carry out equipment installation, and both can ensure the absolute altitude of ram pack, levelness precision, can carry again large weight equipment, and arrange fast, cost is low.
Description
Technical field
The present invention relates to mechanical equipment installation field, particularly, the present invention relates to a kind of integrated equipment quick centering device and equipment aligning method.
Background technology
Mechanical equipment installation is the core of Industrial Engineering, the quality of mechanical equipment installation directly have influence on equipment go into operation after operation stability and the life-span, its job content mainly comprises: equipment absolute altitude centering, equipment are fixed to centre line aligning, equipment level degree centering, equipment in length and breadth, its workload is large, labour intensity is high, and quality requirement is high simultaneously.But at present in mechanical equipment installation construction, general instrument is plain cushion iron-inclined sizing block combination in pairs, adjustment jackscrew, plain cushion iron-paired inclined sizing block combination can carry large weight equipment, but paired inclined sizing block need be used to carry out centering, and need be positioned over after in plain cushion iron-paired inclined sizing block combination at equipment, again carry out the accurate adjustment of equipment absolute altitude, levelness, because weight of equipment is large, therefore Adjustment precision is limited, and complex procedures; The Adjustment precision of adjustment jackscrew is high, regulates the speed fast, but because jackscrew screw thread wants load bearing equipment weight, so the jackscrew centering mode scope of application is narrower.Therefore, existing mounting method exists that Adjustment precision is limited, the technical problem of complex procedures, restricted application.
Summary of the invention
The object of the invention is to, a kind of integrated equipment quick centering device is provided, this alignment device can fast, high accuracy carries out equipment installation, and can be applicable to large weight, high-precision equipment is installed, save expense, time, improve efficiency.
For achieving the above object, present invention employs following technical scheme:
A kind of integrated equipment quick centering device, described alignment device comprises a center parallels 1, and the periphery of described center parallels 1 arranges three adjustment ears 2 by isosceles triangle, and described three adjustment ears 2 are positioned at three summits of isosceles triangle;
Wherein, the central bore of described three adjustment ears 2, wears an adjustment bolt 3, rotation set one adjusting nut 4 and a hold-down nut 5 on described adjustment bolt 3 in arbitrary hole, described adjusting nut 4 is positioned at the below of adjustment ear 2, and described hold-down nut 5 is positioned at above adjustment ear 2.
Described center parallels 1 is rectangle, also can be other shapes, such as trapezoidal.
Described center parallels 1 and adjustment ear 2 are made up of steel plate, other materials also can be adopted to make, such as cast iron.
Described center parallels 1 and adjustment ear 2 are fixed together.
Described adjustment bolt 3 is expansion bolt, also can adopt other bolts, such as flat head bolt.
The lower plane of described center parallels 1 and the lower plane of adjustment ear 2 are in same plane.
Another object of the present invention is, provide a kind of equipment aligning method based on integrated equipment quick centering device, described method comprises the steps:
1) in equipment Foundations cutter seat slurry processed hole;
2) punch in equipment Foundations, adjustment bolt is located in hole also fixing;
3) the adjustment ear muff on the parallels of center is located at adjustment bolt on, and adjustment ear hold-down nut and adjusting nut are set respectively up and down;
4) first adjust that three adjusting nuts make the absolute altitude of plane on alignment device, levelness reaches equipment installation requirement, then tighten three hold-down nuts in top;
5) adjust suitable after, reperfusion serosity, reaches after intensity until grout cures and directly carries out equipment installation.
Slurries in described step 5) are quick slightly expanded concrete.
The present invention is relative to prior art, and tool has the following advantages:
1, adopt the present invention to carry out equipment installation, both can ensure the absolute altitude of ram pack, levelness precision, can carry again large weight equipment, and arrange fast, cost is low;
2, the present invention draws materials easily, and such as the common expansion bolt in market selected by above-mentioned adjustment bolt;
3, Adjustment precision of the present invention is accurate, and operation is simple, applied widely.
Accompanying drawing explanation
Fig. 1 is the structural representation of integrated equipment quick centering device of the present invention;
Fig. 2 is the right side view of Fig. 1;
Fig. 3 is the scheme of installation of integrated equipment quick centering device of the present invention.
In figure: 1, center parallels; 2, ear is adjusted; 3, bolt is adjusted; 4, adjusting nut; 5, hold-down nut; 6, equipment Foundations; 7, seat slurry hole, 8, template; 9, quick slightly expanded concrete slurries.
Detailed description of the invention
With the drawings and specific embodiments, the present invention is further detailed explanation below.
As depicted in figs. 1 and 2, a kind of integrated equipment quick centering device, described alignment device comprises a center parallels 1, and the periphery of described center parallels 1 arranges three adjustment ears 2 by isosceles triangle, and described three adjustment ears 2 are positioned at three summits of isosceles triangle;
Wherein, the central bore of three adjustment ears 2, wears an adjustment bolt 3, rotation set one adjusting nut 4 and a hold-down nut 5 on described adjustment bolt 3 in arbitrary hole, described adjusting nut 4 is positioned at the below of adjustment ear 2, and described hold-down nut 5 is positioned at above adjustment ear 2.
Described center parallels 1 is rectangle, and center parallels 1 is made together with Plate Welding with adjustment ear 2, and described adjustment bolt 3 is expansion bolt, and the lower plane of described center parallels 1 and the lower plane of adjustment ear 2 are in same plane.
Before the present embodiment uses, parallels and adjustment bolt can be separated and deposit, to save memory space, during use, be combined into one according to Fig. 1 and 2.
Equipment aligning method based on the present embodiment is: as shown in Figure 3, and first in equipment Foundations 6, cutter makes seat slurry hole 7, then the position punching of the interior corresponding adjustment bolt 3 in present slurry hole 7; Then adjustment bolt 3 is arranged in hole, and makes adjustment bolt 3 be fixed in equipment Foundations 6; Sheathed adjusting nut 4, adjustment ear 2 and hold-down nut 5 successively on adjustment bolt 3 again, adjust three adjusting nuts 4, make plane absolute altitude on center parallels 1, levelness reaches equipment installation requirement, because of the distribution of three adjustment 3 one-tenth, bolt isosceles triangles, so during adjustment center parallels, two adjusting nuts 4 being in isosceles triangle base first can be adjusted and reaches requirement; Adjustment is positioned at the adjusting nut 4 of isosceles triangle corner position again, then hold-down nut 5 is tightened with fixed center parallels 1, and adjustment bolt 3 is removed higher than the part of center parallels 1, present slurry hole 7 surrounding arranges template 8 simultaneously, in template 8, in seat slurry hole, pour into quick slightly expanded concrete slurries 9 and carry out maintenance, requiring that concrete surface is lower than center parallels 1 upper surface 2 ~ 5mm; Finally repetition measurement absolute altitude, levelness after concrete curing terminates, can carry out equipment installation after reaching equipment installation requirement.
It should be noted that, heart parallels is rectangle in the present embodiment, but in other embodiments, the shape of center parallels can change according to need of production, such as trapezoidal etc.; Secondly, in the present embodiment, center parallels and adjustment ear are made up of steel plate, but in other embodiments, can adopt other materials as required, such as cast iron etc.; Finally, adjustment bolt is in the present embodiment expansion bolt, in other embodiments, also can adopt other bolts as required, such as flat head bolt etc.
It should be noted last that, above embodiment is only in order to illustrate technical scheme of the present invention and unrestricted.Although with reference to embodiment to invention has been detailed description, will be understood by those skilled in the art that, modify to technical scheme of the present invention or equivalent replacement, do not depart from the spirit and scope of technical solution of the present invention, it all should be encompassed in the middle of right of the present invention.
Claims (3)
1. an integrated equipment quick centering device, it is characterized in that, described alignment device comprises a center parallels (1), the periphery at described center parallels (1) arranges three adjustment ear (2) by isosceles triangle, and described three adjustment ear (2) are positioned at three summits of isosceles triangle;
Wherein, the central bore of described three adjustment ear (2), an adjustment bolt (3) is worn in arbitrary hole, upper rotation set one adjusting nut (4) of described adjustment bolt (3) and a hold-down nut (5), described adjusting nut (4) is positioned at the below of adjustment ear (2), and described hold-down nut (5) is positioned at adjustment ear (2) top;
Described adjustment bolt (3) is expansion bolt;
Described center parallels (1) is rectangle;
Described center parallels (1) and adjustment ear (2) are made up of steel plate;
The lower plane at described center parallels (1) and the lower plane of adjustment ear (2) are in same plane.
2., based on an equipment aligning method for integrated equipment quick centering device described in claim 1, described method comprises the steps:
1) in equipment Foundations cutter seat slurry processed hole;
2) punch in equipment Foundations, adjustment bolt is located in hole also fixing;
3) the adjustment ear muff on the parallels of center is located at adjustment bolt on, and adjustment ear hold-down nut and adjusting nut are set respectively up and down;
4) first adjust that three adjusting nuts make the absolute altitude of plane on alignment device, levelness reaches equipment installation requirement, then tighten three hold-down nuts in top;
5) adjust suitable after, reperfusion serosity, reaches after intensity until grout cures and directly carries out equipment installation.
3. equipment aligning method according to claim 2, is characterized in that, described slurries are quick slightly expanded concrete.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310068284.3A CN103161177B (en) | 2013-03-04 | 2013-03-04 | Integrated equipment quick centering device and equipment aligning method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310068284.3A CN103161177B (en) | 2013-03-04 | 2013-03-04 | Integrated equipment quick centering device and equipment aligning method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103161177A CN103161177A (en) | 2013-06-19 |
CN103161177B true CN103161177B (en) | 2015-08-05 |
Family
ID=48584686
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310068284.3A Expired - Fee Related CN103161177B (en) | 2013-03-04 | 2013-03-04 | Integrated equipment quick centering device and equipment aligning method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103161177B (en) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104676205A (en) * | 2015-02-13 | 2015-06-03 | 江苏新美星包装机械股份有限公司 | Adjustable weighing ground foot |
CN108869971B (en) * | 2017-05-16 | 2021-01-26 | 合肥欣奕华智能机器有限公司 | Glass bears device and glass check out test set |
CN109323087A (en) * | 2018-10-12 | 2019-02-12 | 安徽马钢设备检修有限公司 | A kind of centering leveling structure and its construction method for equipment installation |
CN110258617A (en) * | 2019-06-24 | 2019-09-20 | 中国二十二冶集团有限公司 | Equipment parallels precision grout construction method |
CN110523933B (en) * | 2019-07-24 | 2021-10-01 | 中国一冶集团有限公司 | Continuous casting machine guide rail replacement streamlined installation method |
CN110695873A (en) * | 2019-10-14 | 2020-01-17 | 济南重工股份有限公司 | Distributing machine ground supporting wheel leveling tool and method |
CN111076032A (en) * | 2019-12-31 | 2020-04-28 | 广西建工集团第一安装有限公司 | High-precision mounting device and method for sizing block of large high-rotation-speed equipment |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2820421Y (en) * | 2005-08-05 | 2006-09-27 | 长安汽车(集团)有限责任公司 | Device for regulating machine tool levelness |
CN101871265A (en) * | 2010-07-02 | 2010-10-27 | 中国十七冶集团有限公司 | Flat shim plate-adjustable grouting installation method |
CN102135223A (en) * | 2010-01-26 | 2011-07-27 | 五冶集团上海有限公司 | Method for adjusting base plates for high-accuracy machinery installation |
CN102251537A (en) * | 2011-04-28 | 2011-11-23 | 中冶建工集团有限公司 | Construction method for installing block slurry of sizing block by equipment |
CN202532108U (en) * | 2012-04-06 | 2012-11-14 | 中国十九冶集团有限公司 | Adjustable base plate |
CN203188233U (en) * | 2013-03-04 | 2013-09-11 | 莱芜钢铁集团有限公司 | Integrated equipment fast aligning device |
-
2013
- 2013-03-04 CN CN201310068284.3A patent/CN103161177B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2820421Y (en) * | 2005-08-05 | 2006-09-27 | 长安汽车(集团)有限责任公司 | Device for regulating machine tool levelness |
CN102135223A (en) * | 2010-01-26 | 2011-07-27 | 五冶集团上海有限公司 | Method for adjusting base plates for high-accuracy machinery installation |
CN101871265A (en) * | 2010-07-02 | 2010-10-27 | 中国十七冶集团有限公司 | Flat shim plate-adjustable grouting installation method |
CN102251537A (en) * | 2011-04-28 | 2011-11-23 | 中冶建工集团有限公司 | Construction method for installing block slurry of sizing block by equipment |
CN202532108U (en) * | 2012-04-06 | 2012-11-14 | 中国十九冶集团有限公司 | Adjustable base plate |
CN203188233U (en) * | 2013-03-04 | 2013-09-11 | 莱芜钢铁集团有限公司 | Integrated equipment fast aligning device |
Also Published As
Publication number | Publication date |
---|---|
CN103161177A (en) | 2013-06-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103161177B (en) | Integrated equipment quick centering device and equipment aligning method | |
CN103644429A (en) | Construction method for rapidly adjusting flat base plates with three-point fixation method | |
CN203270600U (en) | Fixed support for installing embedded bolts of high-precision equipment | |
CN204024092U (en) | A kind of Novel section steel post positioning component | |
CN102135223A (en) | Method for adjusting base plates for high-accuracy machinery installation | |
CN203404564U (en) | Calibration device used for centering and leveling in installing process of equipment | |
CN105252310A (en) | Box machining device | |
CN103422573A (en) | Hyperbolical variable point-supported three dimensional universal adjustable support | |
CN102535509A (en) | Construction method of high-flatness equipment foundation and adjusting structure thereof | |
CN102862032B (en) | Once-clamping machining method of large-negative-angle bolt-sphere bolt hole | |
CN204611233U (en) | Equipment construction bolt, parallels seat slurry associating alignment device | |
CN202901710U (en) | Adjustable grouting sizing block | |
CN202302573U (en) | Base plate for inclined mortar filling | |
CN202096979U (en) | Mounting structure for main reducer of roller mill | |
CN203188233U (en) | Integrated equipment fast aligning device | |
CN103990841A (en) | Method for milling end surface of large-cross-section steel component | |
CN213297202U (en) | Concrete floor elevation control module | |
CN205343431U (en) | Prefabricated wall body grout sleeve strip solid matter exposes accurate positioning die of reinforcing bar | |
CN210422852U (en) | Center adjusting assembly of oil receiver of vertical water turbine | |
CN205999915U (en) | A kind of adjustable standard component for reserving bolt suitable for each size | |
CN212240845U (en) | Hydraulic damper rubber joint press mounting angle tool for railway vehicle | |
CN204367159U (en) | A kind of anchor plate positioner | |
CN202630861U (en) | Measurement device for seal ring of three-eccentric center butterfly valve | |
CN202571922U (en) | Clamping device for machining wind driven generator seat | |
CN103808517B (en) | Test chamber engine pedestal supporting leg three-dimensional micromatic setting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20170310 Address after: Donghai West Road 266071 Shandong city of Qingdao province No. 43 B triumph East Tower Building 32 layer Patentee after: Shandong Laigang Construction Co., Ltd. Address before: 271104 Shandong Province, Laiwu City Gangcheng District Front Street No. 99 Patentee before: Laiwu Iron & Steel Group Corp., Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150805 Termination date: 20190304 |