CN103161177B - Integrated equipment quick centering device and equipment aligning method - Google Patents

Integrated equipment quick centering device and equipment aligning method Download PDF

Info

Publication number
CN103161177B
CN103161177B CN201310068284.3A CN201310068284A CN103161177B CN 103161177 B CN103161177 B CN 103161177B CN 201310068284 A CN201310068284 A CN 201310068284A CN 103161177 B CN103161177 B CN 103161177B
Authority
CN
China
Prior art keywords
adjustment
equipment
ear
parallels
hold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310068284.3A
Other languages
Chinese (zh)
Other versions
CN103161177A (en
Inventor
邹伟
郑希增
徐翠翠
葛庆涛
谷树林
申洪斌
郭仲利
于德录
陈静
纪小强
王占辉
王继良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Laigang Construction Co., Ltd.
Original Assignee
Laiwu Iron and Steel Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Laiwu Iron and Steel Group Co Ltd filed Critical Laiwu Iron and Steel Group Co Ltd
Priority to CN201310068284.3A priority Critical patent/CN103161177B/en
Publication of CN103161177A publication Critical patent/CN103161177A/en
Application granted granted Critical
Publication of CN103161177B publication Critical patent/CN103161177B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention relates to a kind of integrated equipment quick centering device and equipment aligning method, described alignment device comprises a center parallels, the periphery of described center parallels arranges three adjustment ears by isosceles triangle, and described three adjustment ears are positioned at three summits of isosceles triangle; The central bore of described three adjustment ears, wear an adjustment bolt in arbitrary hole, rotation set one adjusting nut and a hold-down nut on described adjustment bolt, described adjusting nut is positioned at the below of adjustment ear, and described hold-down nut is positioned at above adjustment ear.The present invention draws materials easily, adjustment accurate, operation is simple, applied widely, and adopts the present invention to carry out equipment installation, and both can ensure the absolute altitude of ram pack, levelness precision, can carry again large weight equipment, and arrange fast, cost is low.

Description

Integrated equipment quick centering device and equipment aligning method
Technical field
The present invention relates to mechanical equipment installation field, particularly, the present invention relates to a kind of integrated equipment quick centering device and equipment aligning method.
Background technology
Mechanical equipment installation is the core of Industrial Engineering, the quality of mechanical equipment installation directly have influence on equipment go into operation after operation stability and the life-span, its job content mainly comprises: equipment absolute altitude centering, equipment are fixed to centre line aligning, equipment level degree centering, equipment in length and breadth, its workload is large, labour intensity is high, and quality requirement is high simultaneously.But at present in mechanical equipment installation construction, general instrument is plain cushion iron-inclined sizing block combination in pairs, adjustment jackscrew, plain cushion iron-paired inclined sizing block combination can carry large weight equipment, but paired inclined sizing block need be used to carry out centering, and need be positioned over after in plain cushion iron-paired inclined sizing block combination at equipment, again carry out the accurate adjustment of equipment absolute altitude, levelness, because weight of equipment is large, therefore Adjustment precision is limited, and complex procedures; The Adjustment precision of adjustment jackscrew is high, regulates the speed fast, but because jackscrew screw thread wants load bearing equipment weight, so the jackscrew centering mode scope of application is narrower.Therefore, existing mounting method exists that Adjustment precision is limited, the technical problem of complex procedures, restricted application.
Summary of the invention
The object of the invention is to, a kind of integrated equipment quick centering device is provided, this alignment device can fast, high accuracy carries out equipment installation, and can be applicable to large weight, high-precision equipment is installed, save expense, time, improve efficiency.
For achieving the above object, present invention employs following technical scheme:
A kind of integrated equipment quick centering device, described alignment device comprises a center parallels 1, and the periphery of described center parallels 1 arranges three adjustment ears 2 by isosceles triangle, and described three adjustment ears 2 are positioned at three summits of isosceles triangle;
Wherein, the central bore of described three adjustment ears 2, wears an adjustment bolt 3, rotation set one adjusting nut 4 and a hold-down nut 5 on described adjustment bolt 3 in arbitrary hole, described adjusting nut 4 is positioned at the below of adjustment ear 2, and described hold-down nut 5 is positioned at above adjustment ear 2.
Described center parallels 1 is rectangle, also can be other shapes, such as trapezoidal.
Described center parallels 1 and adjustment ear 2 are made up of steel plate, other materials also can be adopted to make, such as cast iron.
Described center parallels 1 and adjustment ear 2 are fixed together.
Described adjustment bolt 3 is expansion bolt, also can adopt other bolts, such as flat head bolt.
The lower plane of described center parallels 1 and the lower plane of adjustment ear 2 are in same plane.
Another object of the present invention is, provide a kind of equipment aligning method based on integrated equipment quick centering device, described method comprises the steps:
1) in equipment Foundations cutter seat slurry processed hole;
2) punch in equipment Foundations, adjustment bolt is located in hole also fixing;
3) the adjustment ear muff on the parallels of center is located at adjustment bolt on, and adjustment ear hold-down nut and adjusting nut are set respectively up and down;
4) first adjust that three adjusting nuts make the absolute altitude of plane on alignment device, levelness reaches equipment installation requirement, then tighten three hold-down nuts in top;
5) adjust suitable after, reperfusion serosity, reaches after intensity until grout cures and directly carries out equipment installation.
Slurries in described step 5) are quick slightly expanded concrete.
The present invention is relative to prior art, and tool has the following advantages:
1, adopt the present invention to carry out equipment installation, both can ensure the absolute altitude of ram pack, levelness precision, can carry again large weight equipment, and arrange fast, cost is low;
2, the present invention draws materials easily, and such as the common expansion bolt in market selected by above-mentioned adjustment bolt;
3, Adjustment precision of the present invention is accurate, and operation is simple, applied widely.
Accompanying drawing explanation
Fig. 1 is the structural representation of integrated equipment quick centering device of the present invention;
Fig. 2 is the right side view of Fig. 1;
Fig. 3 is the scheme of installation of integrated equipment quick centering device of the present invention.
In figure: 1, center parallels; 2, ear is adjusted; 3, bolt is adjusted; 4, adjusting nut; 5, hold-down nut; 6, equipment Foundations; 7, seat slurry hole, 8, template; 9, quick slightly expanded concrete slurries.
Detailed description of the invention
With the drawings and specific embodiments, the present invention is further detailed explanation below.
As depicted in figs. 1 and 2, a kind of integrated equipment quick centering device, described alignment device comprises a center parallels 1, and the periphery of described center parallels 1 arranges three adjustment ears 2 by isosceles triangle, and described three adjustment ears 2 are positioned at three summits of isosceles triangle;
Wherein, the central bore of three adjustment ears 2, wears an adjustment bolt 3, rotation set one adjusting nut 4 and a hold-down nut 5 on described adjustment bolt 3 in arbitrary hole, described adjusting nut 4 is positioned at the below of adjustment ear 2, and described hold-down nut 5 is positioned at above adjustment ear 2.
Described center parallels 1 is rectangle, and center parallels 1 is made together with Plate Welding with adjustment ear 2, and described adjustment bolt 3 is expansion bolt, and the lower plane of described center parallels 1 and the lower plane of adjustment ear 2 are in same plane.
Before the present embodiment uses, parallels and adjustment bolt can be separated and deposit, to save memory space, during use, be combined into one according to Fig. 1 and 2.
Equipment aligning method based on the present embodiment is: as shown in Figure 3, and first in equipment Foundations 6, cutter makes seat slurry hole 7, then the position punching of the interior corresponding adjustment bolt 3 in present slurry hole 7; Then adjustment bolt 3 is arranged in hole, and makes adjustment bolt 3 be fixed in equipment Foundations 6; Sheathed adjusting nut 4, adjustment ear 2 and hold-down nut 5 successively on adjustment bolt 3 again, adjust three adjusting nuts 4, make plane absolute altitude on center parallels 1, levelness reaches equipment installation requirement, because of the distribution of three adjustment 3 one-tenth, bolt isosceles triangles, so during adjustment center parallels, two adjusting nuts 4 being in isosceles triangle base first can be adjusted and reaches requirement; Adjustment is positioned at the adjusting nut 4 of isosceles triangle corner position again, then hold-down nut 5 is tightened with fixed center parallels 1, and adjustment bolt 3 is removed higher than the part of center parallels 1, present slurry hole 7 surrounding arranges template 8 simultaneously, in template 8, in seat slurry hole, pour into quick slightly expanded concrete slurries 9 and carry out maintenance, requiring that concrete surface is lower than center parallels 1 upper surface 2 ~ 5mm; Finally repetition measurement absolute altitude, levelness after concrete curing terminates, can carry out equipment installation after reaching equipment installation requirement.
It should be noted that, heart parallels is rectangle in the present embodiment, but in other embodiments, the shape of center parallels can change according to need of production, such as trapezoidal etc.; Secondly, in the present embodiment, center parallels and adjustment ear are made up of steel plate, but in other embodiments, can adopt other materials as required, such as cast iron etc.; Finally, adjustment bolt is in the present embodiment expansion bolt, in other embodiments, also can adopt other bolts as required, such as flat head bolt etc.
It should be noted last that, above embodiment is only in order to illustrate technical scheme of the present invention and unrestricted.Although with reference to embodiment to invention has been detailed description, will be understood by those skilled in the art that, modify to technical scheme of the present invention or equivalent replacement, do not depart from the spirit and scope of technical solution of the present invention, it all should be encompassed in the middle of right of the present invention.

Claims (3)

1. an integrated equipment quick centering device, it is characterized in that, described alignment device comprises a center parallels (1), the periphery at described center parallels (1) arranges three adjustment ear (2) by isosceles triangle, and described three adjustment ear (2) are positioned at three summits of isosceles triangle;
Wherein, the central bore of described three adjustment ear (2), an adjustment bolt (3) is worn in arbitrary hole, upper rotation set one adjusting nut (4) of described adjustment bolt (3) and a hold-down nut (5), described adjusting nut (4) is positioned at the below of adjustment ear (2), and described hold-down nut (5) is positioned at adjustment ear (2) top;
Described adjustment bolt (3) is expansion bolt;
Described center parallels (1) is rectangle;
Described center parallels (1) and adjustment ear (2) are made up of steel plate;
The lower plane at described center parallels (1) and the lower plane of adjustment ear (2) are in same plane.
2., based on an equipment aligning method for integrated equipment quick centering device described in claim 1, described method comprises the steps:
1) in equipment Foundations cutter seat slurry processed hole;
2) punch in equipment Foundations, adjustment bolt is located in hole also fixing;
3) the adjustment ear muff on the parallels of center is located at adjustment bolt on, and adjustment ear hold-down nut and adjusting nut are set respectively up and down;
4) first adjust that three adjusting nuts make the absolute altitude of plane on alignment device, levelness reaches equipment installation requirement, then tighten three hold-down nuts in top;
5) adjust suitable after, reperfusion serosity, reaches after intensity until grout cures and directly carries out equipment installation.
3. equipment aligning method according to claim 2, is characterized in that, described slurries are quick slightly expanded concrete.
CN201310068284.3A 2013-03-04 2013-03-04 Integrated equipment quick centering device and equipment aligning method Expired - Fee Related CN103161177B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310068284.3A CN103161177B (en) 2013-03-04 2013-03-04 Integrated equipment quick centering device and equipment aligning method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310068284.3A CN103161177B (en) 2013-03-04 2013-03-04 Integrated equipment quick centering device and equipment aligning method

Publications (2)

Publication Number Publication Date
CN103161177A CN103161177A (en) 2013-06-19
CN103161177B true CN103161177B (en) 2015-08-05

Family

ID=48584686

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310068284.3A Expired - Fee Related CN103161177B (en) 2013-03-04 2013-03-04 Integrated equipment quick centering device and equipment aligning method

Country Status (1)

Country Link
CN (1) CN103161177B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104676205A (en) * 2015-02-13 2015-06-03 江苏新美星包装机械股份有限公司 Adjustable weighing ground foot
CN108869971B (en) * 2017-05-16 2021-01-26 合肥欣奕华智能机器有限公司 Glass bears device and glass check out test set
CN109323087A (en) * 2018-10-12 2019-02-12 安徽马钢设备检修有限公司 A kind of centering leveling structure and its construction method for equipment installation
CN110258617A (en) * 2019-06-24 2019-09-20 中国二十二冶集团有限公司 Equipment parallels precision grout construction method
CN110523933B (en) * 2019-07-24 2021-10-01 中国一冶集团有限公司 Continuous casting machine guide rail replacement streamlined installation method
CN110695873A (en) * 2019-10-14 2020-01-17 济南重工股份有限公司 Distributing machine ground supporting wheel leveling tool and method
CN111076032A (en) * 2019-12-31 2020-04-28 广西建工集团第一安装有限公司 High-precision mounting device and method for sizing block of large high-rotation-speed equipment

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2820421Y (en) * 2005-08-05 2006-09-27 长安汽车(集团)有限责任公司 Device for regulating machine tool levelness
CN101871265A (en) * 2010-07-02 2010-10-27 中国十七冶集团有限公司 Flat shim plate-adjustable grouting installation method
CN102135223A (en) * 2010-01-26 2011-07-27 五冶集团上海有限公司 Method for adjusting base plates for high-accuracy machinery installation
CN102251537A (en) * 2011-04-28 2011-11-23 中冶建工集团有限公司 Construction method for installing block slurry of sizing block by equipment
CN202532108U (en) * 2012-04-06 2012-11-14 中国十九冶集团有限公司 Adjustable base plate
CN203188233U (en) * 2013-03-04 2013-09-11 莱芜钢铁集团有限公司 Integrated equipment fast aligning device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2820421Y (en) * 2005-08-05 2006-09-27 长安汽车(集团)有限责任公司 Device for regulating machine tool levelness
CN102135223A (en) * 2010-01-26 2011-07-27 五冶集团上海有限公司 Method for adjusting base plates for high-accuracy machinery installation
CN101871265A (en) * 2010-07-02 2010-10-27 中国十七冶集团有限公司 Flat shim plate-adjustable grouting installation method
CN102251537A (en) * 2011-04-28 2011-11-23 中冶建工集团有限公司 Construction method for installing block slurry of sizing block by equipment
CN202532108U (en) * 2012-04-06 2012-11-14 中国十九冶集团有限公司 Adjustable base plate
CN203188233U (en) * 2013-03-04 2013-09-11 莱芜钢铁集团有限公司 Integrated equipment fast aligning device

Also Published As

Publication number Publication date
CN103161177A (en) 2013-06-19

Similar Documents

Publication Publication Date Title
CN103161177B (en) Integrated equipment quick centering device and equipment aligning method
CN103644429A (en) Construction method for rapidly adjusting flat base plates with three-point fixation method
CN203270600U (en) Fixed support for installing embedded bolts of high-precision equipment
CN204024092U (en) A kind of Novel section steel post positioning component
CN102135223A (en) Method for adjusting base plates for high-accuracy machinery installation
CN203404564U (en) Calibration device used for centering and leveling in installing process of equipment
CN105252310A (en) Box machining device
CN103422573A (en) Hyperbolical variable point-supported three dimensional universal adjustable support
CN102535509A (en) Construction method of high-flatness equipment foundation and adjusting structure thereof
CN102862032B (en) Once-clamping machining method of large-negative-angle bolt-sphere bolt hole
CN204611233U (en) Equipment construction bolt, parallels seat slurry associating alignment device
CN202901710U (en) Adjustable grouting sizing block
CN202302573U (en) Base plate for inclined mortar filling
CN202096979U (en) Mounting structure for main reducer of roller mill
CN203188233U (en) Integrated equipment fast aligning device
CN103990841A (en) Method for milling end surface of large-cross-section steel component
CN213297202U (en) Concrete floor elevation control module
CN205343431U (en) Prefabricated wall body grout sleeve strip solid matter exposes accurate positioning die of reinforcing bar
CN210422852U (en) Center adjusting assembly of oil receiver of vertical water turbine
CN205999915U (en) A kind of adjustable standard component for reserving bolt suitable for each size
CN212240845U (en) Hydraulic damper rubber joint press mounting angle tool for railway vehicle
CN204367159U (en) A kind of anchor plate positioner
CN202630861U (en) Measurement device for seal ring of three-eccentric center butterfly valve
CN202571922U (en) Clamping device for machining wind driven generator seat
CN103808517B (en) Test chamber engine pedestal supporting leg three-dimensional micromatic setting

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170310

Address after: Donghai West Road 266071 Shandong city of Qingdao province No. 43 B triumph East Tower Building 32 layer

Patentee after: Shandong Laigang Construction Co., Ltd.

Address before: 271104 Shandong Province, Laiwu City Gangcheng District Front Street No. 99

Patentee before: Laiwu Iron & Steel Group Corp., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150805

Termination date: 20190304