CN109323087A - A kind of centering leveling structure and its construction method for equipment installation - Google Patents

A kind of centering leveling structure and its construction method for equipment installation Download PDF

Info

Publication number
CN109323087A
CN109323087A CN201811189174.1A CN201811189174A CN109323087A CN 109323087 A CN109323087 A CN 109323087A CN 201811189174 A CN201811189174 A CN 201811189174A CN 109323087 A CN109323087 A CN 109323087A
Authority
CN
China
Prior art keywords
flat bolster
nut
equipment
supporting block
expansion bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811189174.1A
Other languages
Chinese (zh)
Inventor
晏延军
潘辉
韩云松
赖金春
魏海峰
陈曦
李柯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Magang Equipment Overhaul Co Ltd
Original Assignee
Anhui Magang Equipment Overhaul Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Magang Equipment Overhaul Co Ltd filed Critical Anhui Magang Equipment Overhaul Co Ltd
Priority to CN201811189174.1A priority Critical patent/CN109323087A/en
Publication of CN109323087A publication Critical patent/CN109323087A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16MFRAMES, CASINGS OR BEDS OF ENGINES, MACHINES OR APPARATUS, NOT SPECIFIC TO ENGINES, MACHINES OR APPARATUS PROVIDED FOR ELSEWHERE; STANDS; SUPPORTS
    • F16M7/00Details of attaching or adjusting engine beds, frames, or supporting-legs on foundation or base; Attaching non-moving engine parts, e.g. cylinder blocks
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16MFRAMES, CASINGS OR BEDS OF ENGINES, MACHINES OR APPARATUS, NOT SPECIFIC TO ENGINES, MACHINES OR APPARATUS PROVIDED FOR ELSEWHERE; STANDS; SUPPORTS
    • F16M9/00Special layout of foundations with respect to machinery to be supported

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Machine Tool Units (AREA)

Abstract

The invention discloses a kind of centering leveling structures and its construction method for equipment installation.The construction method while guaranteeing that flat bolster center of gravity is constant, is provided with vertical through-hole in the fixed several supporting blocks in the edge of flat bolster, the supporting block the following steps are included: determine plain cushion board size according to equipment;On the basis of fix several expansion bolts and screw on the first nut;On the basis of flat bolster is placed on, expansion bolt passes through the through-hole in supporting block, screws on the second nut in expansion bolt;On the basis of construct muti-piece flat bolster, measure flat bolster using level, adjust high and low position of first nut on expansion bolt, it is horizontal so as to adjust flat bolster and reach designed elevation, fasten the second nut;On the basis of construction grouting material formed grout blanket;Absolute altitude and level are checked, equipment is in place, levels by the centering that cushioning shim liner completes equipment.Constructing structure of the present invention is simple, convenient and efficient, and installation effectiveness is high, is not limited by equipment installation space, shortens the set-up time, improves installation accuracy.

Description

A kind of centering leveling structure and its construction method for equipment installation
Technical field
The present invention relates to mechanical equipment installation technical field more particularly to a kind of centering leveling structures for equipment installation And its construction method.
Background technique
Mechanical equipment is in use, the height of mechanical equipment and whether horizontal, all close work effect for influencing mechanical equipment Rate and quality.Currently, frequently with parallels seat slurry processes and mud jacking, the position of equipment installation is first determined when mechanical equipment installation, if After standby in place, then by inclined sizing block group mechanical equipment centering is leveled, when adjustment, to adjust inclined sizing block group repeatedly, process is numerous Trivial, if part of inclined sizing block is arranged on the inside of equipment, since space is very narrow, the work belt leveled to centering is next difficult, The installation effectiveness of equipment is seriously affected, or even influences precision of equipment installation.
Summary of the invention
In order to solve mechanical equipment installation low efficiency, the problems such as installation accuracy is low, the present invention proposes a kind of to pacify for equipment The centering leveling structure and its construction method of dress, which is positioned flat bolster using expansion bolt, then passes through expanding screw Two nuts on bolt level and fix flat bolster, then will fill real with grouting material below plain cushion iron, after equipment is in place, only need It is finely adjusted by cushioning shim liner, process is simple, and convenient and efficient, installation effectiveness is high, and installation accuracy is high.
To achieve the goals above, the present invention uses following scheme:
The purpose of the present invention is to provide a kind of centering leveling structure for equipment installation, including basis, the centerings Leveling structure is made of multiple adjustment components, if the adjustment component include flat bolster, several supporting blocks, several expansion bolts, Dry first nut and several second nuts, are provided with several blind holes on the basis of described, the expansion bolt is fixed on the blind hole on basis It is interior;Vertical through holes are provided in the supporting block, the supporting block is fixed on the edge of flat bolster;Second nut, supporting block It is successively sleeved on expansion bolt from top to bottom with the first nut.
Further, the number of the supporting block, expansion bolt, the first nut and the second nut is equal, the supporting block Lead to the hole site and expansion bolt position correspond, to position flat bolster.
Further, construction has grout blanket on the basis of described, and the grout blanket tamps the gap between flat bolster and basis.
Another object of the present invention is to provide a kind of construction methods of centering leveling structure for equipment installation, including Following steps:
Step 1: according to basic and equipment bay drawing, the number for determining adjustment component is required by the density of load and is put down The size of backing plate, paving location;
Step 2: the upper surface of flat bolster is polished, solid at the edge of flat bolster while guaranteeing that flat bolster center of gravity is constant Determine several supporting blocks, is provided with vertical through-hole in the supporting block;
Step 3: fixing several expansion bolts on the basis of the paving location of flat bolster, screws in the expansion bolt First nut;
Step 4: on the basis of flat bolster is placed on paving location, expansion bolt passes through corresponding through-hole in supporting block, The second nut is screwed in the expansion bolt;
Step 5: repeating Step 2: step 3 and step 4, complete the construction of multiple adjustment components;It is surveyed using level Flat bolster is measured, then position of the first nut of adjustment on expansion bolt up and down, so as to adjust flat bolster level and reaches design mark Height fastens the second nut;
Step 6: on the basis of construction grouting material form grout blanket, grout blanket upper surface is lower than apart from flat bolster upper surface, It is filled below flat bolster real;
Step 7: after reach prescribed strength to grout blanket maintenance 75%, grinding process flat bolster upper surface, review mark It is high and horizontal;
Step 8: equipment is in place, is leveled by the centering that cushioning shim liner completes equipment.
Further, in the step 7, if the height of flat bolster is not horizontal higher than designed elevation, upper surface, file is utilized The upper surface of knife and sanding machine polishing flat bolster, until flat bolster upper surface is horizontal and reaches designed elevation.
Compared with the prior art, the advantages of the present invention are as follows: the centering leveling structure of the present invention for equipment installation And its construction method is positioned muti-piece flat bolster using expansion bolt, then pass through expansion bolt during mechanical equipment installation On two nuts level and fix flat bolster, then will fill real with grouting material below plain cushion iron, and after equipment is in place, need to only lead to Cushioning shim liner to be crossed to be finely adjusted, constructing structure is simple, and convenient and efficient, installation effectiveness is high, it is not limited by equipment installation space, The set-up time is shortened, installation accuracy is improved.
Detailed description of the invention
Fig. 1 is the centering leveling structure schematic diagram of the present invention for equipment installation.
Fig. 2 is partial structure diagram in Fig. 1.
Fig. 3 is the flat bolster schematic diagram of the centering leveling structure of the present invention for equipment installation.
Specific embodiment
The present invention is described in further detail with reference to the accompanying drawings and examples, in favor of those skilled in the art's energy It is enough to be more apparent from.
It is of the present invention for equipment installation centering leveling structure and its construction method, to install horse steel factory 2#, 4#TRT unit equipment, the centering leveling structure include basis 3, and the centering leveling structure is made of multiple adjustment components, institute Stating each adjustment component includes first the second nut of nut 5 and 36 of expansion bolt 4,3 of supporting block 2,3 of flat bolster 1,3, Blind hole is provided on described basic 3, the expansion bolt 4 is fixed in the blind hole on basis 3;It is provided in the supporting block 2 vertical logical Hole, the supporting block 2 are fixed on the edge of flat bolster 1;Second nut 6, supporting block 2 and the first nut 5 from top to bottom according to It is secondary to be sleeved on expansion bolt 4.The lead to the hole site of the supporting block 2 and the position of expansion bolt 4 correspond, to position plain cushion Plate 1;Construction has grout blanket on described basic 3, and the grout blanket tamps the gap between flat bolster 1 and basis 3.
The construction method of the above-mentioned centering leveling structure for equipment installation, comprising the following steps:
1 production of flat bolster processing: it as shown in figure 3, according to basis 3 and equipment bay drawing, requires to determine by the density of load The number of component and the paving location of flat bolster 1 are adjusted, determines that flat bolster 1 is rectangle, by δ=30mm thick steel plate blanking; The upper surface of flat bolster 1 is polished, upper surface roughness < Ra3.2 μm, while guaranteeing that 1 center of gravity of flat bolster is constant, in plain cushion 3 supporting blocks 2 are fixed at the edge of plate 1, supporting block 2 with a thickness of 10mm, the centre of the supporting block 2 is provided with vertical through-hole, Through-hole diameter is φ 13mm;
1 centering of flat bolster leveling: as depicted in figs. 1 and 2, when each adjustment component is constructed, in the paving location of flat bolster 1 Basis 3 on open three blind holes, the position of blind hole and through-hole correspond, and expansion bolt with matching is fixed in blind hole 4, the first nut 5 then is screwed in expansion bolt 4, the first nut 5 is M12 nut;Flat bolster 1 is placed on to the base of paving location On plinth 3, while expansion bolt 4 is passed through into corresponding through-hole in supporting block 2, then screws on the second nut in the expansion bolt 4 6, the second nut 6 is M12 nut;After being sequentially completed the construction of multiple adjustment components, flat bolster 1, adjustment are measured using level High and low position of first nut 5 on expansion bolt 4 is transversely and horizontally spent, vertical equity degree and height so as to adjust flat bolster 1 Reach designed elevation, it is desirable that absolute altitude error≤0.05mm, horizontal error≤0.05/1000mm fasten the second nut 6;
Mechanical equipment installation: construction grouting material forms grout blanket on basis 3, and grout blanket upper surface is lower than apart from flat bolster 1 upper surface 5mm is filled below flat bolster 1 real;After reach prescribed strength to grout blanket maintenance 75%, grinding process flat bolster 1 Absolute altitude and level are checked in upper surface, using the upper surface of file and sanding machine processing flat bolster 1, until 1 upper surface water of flat bolster It puts down and reaches designed elevation;Equipment is in place, is leveled by the centering that cushioning shim liner completes equipment.
Above-mentioned TRT units' installation is fast, saves a large amount of manpower and material resources, improves installation accuracy, the equipment that effectively shortens peace Dress the duration 5 days or more.
Centering leveling structure and its construction method of the present invention for equipment installation, in mechanical equipment installation process In, flat bolster is positioned using expansion bolt, then level and fix flat bolster by two nuts on expansion bolt, then It filling real with grouting material below plain cushion iron, after equipment is in place, need to be only finely adjusted by cushioning shim liner, constructing structure is simple, Convenient and efficient, installation effectiveness is high, is not limited by equipment installation space, shortens the set-up time, improves installation accuracy.

Claims (5)

1. a kind of centering leveling structure for equipment installation, including it is basic (3), it is characterised in that: the centering leveling structure Be made of multiple adjustment components, the adjustment component include flat bolster (1), several supporting blocks (2), several expansion bolts (4) if, Dry first nut (5) and several second nuts (6) are provided with several blind holes on basic (3), and the expansion bolt (4) is fixed In the blind hole of basic (3);Vertical through holes are provided on the supporting block (2), the supporting block (2) is fixed on flat bolster (1) Edge;Second nut (6), supporting block (2) and the first nut (5) are successively sleeved on expansion bolt (4) from top to bottom.
2. the centering leveling structure for equipment installation according to claim 1, it is characterised in that: the supporting block (2), swollen The number of swollen bolt (4), the first nut (5) and the second nut (6) is equal, the lead to the hole site and expanding screw of the supporting block (2) The position of bolt (4) corresponds.
3. the centering leveling structure for equipment installation according to claim 1, it is characterised in that: applied on the basis (3) Work has grout blanket, and the grout blanket tamps the gap between flat bolster (1) and basic (3).
4. a kind of construction method as described in claims 1 to 3 for the centering leveling structure of equipment installation, which is characterized in that The following steps are included:
Step 1: according to basic (3) and equipment bay drawing, the number and plain cushion that determine adjustment component are required by the density of load The size of plate (1), paving location;
Step 2: the upper surface of flat bolster (1) is polished, while guaranteeing that flat bolster (1) center of gravity is constant, in flat bolster (1) Several supporting blocks (2) are fixed at edge, are provided with vertical through-hole on the supporting block (2);
Step 3: several expansion bolts (4) are fixed on the basis (3) of the paving location of flat bolster (1) in the expansion bolt (4) the first nut (5) are screwed on;
Step 4: flat bolster (1) is placed on the basis (3) of paving location, and expansion bolt (4) passes through supporting block (2) on pair The through-hole answered screws on the second nut (6) in the expansion bolt (4);
Step 5: repeating Step 2: step 3 and step 4, complete the construction of multiple adjustment components;It is measured using level flat Backing plate (1), then position of the adjustment the first nut (5) on expansion bolt (4) up and down, so as to adjust flat bolster (1) level and reach To designed elevation, fasten the second nut (6);
Step 6: construction grouting material forms grout blanket on basic (3), and grout blanket upper surface is lower than the table on flat bolster (1) Face, flat bolster (1) lower section fill real;
Step 7: after reach prescribed strength to grout blanket maintenance 75%, grinding process flat bolster (1) upper surface, review mark It is high and horizontal;
Step 8: equipment is in place, is leveled by the centering that cushioning shim liner completes equipment.
5. the construction method for the centering leveling structure of equipment installation according to claim 4, it is characterised in that: the step In rapid seven, if the height of flat bolster (1) is not horizontal higher than designed elevation, upper surface, file and sanding machine polishing flat bolster are utilized (1) upper surface, until flat bolster (1) upper surface is horizontal and reaches designed elevation.
CN201811189174.1A 2018-10-12 2018-10-12 A kind of centering leveling structure and its construction method for equipment installation Pending CN109323087A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811189174.1A CN109323087A (en) 2018-10-12 2018-10-12 A kind of centering leveling structure and its construction method for equipment installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811189174.1A CN109323087A (en) 2018-10-12 2018-10-12 A kind of centering leveling structure and its construction method for equipment installation

Publications (1)

Publication Number Publication Date
CN109323087A true CN109323087A (en) 2019-02-12

Family

ID=65261911

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811189174.1A Pending CN109323087A (en) 2018-10-12 2018-10-12 A kind of centering leveling structure and its construction method for equipment installation

Country Status (1)

Country Link
CN (1) CN109323087A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109958148A (en) * 2019-03-27 2019-07-02 中国化学工程第三建设有限公司 The levelling method of cold box foundation bottom plate centering
CN110523933A (en) * 2019-07-24 2019-12-03 中国一冶集团有限公司 A kind of conticaster replacement guide rail streamlined installation method
CN110735368A (en) * 2019-10-23 2020-01-31 上海宝冶集团有限公司 equipment rail installation system and method
CN111716519A (en) * 2019-03-18 2020-09-29 新疆八一钢铁股份有限公司 Method for mounting and manufacturing embedded steam turbine supporting bottom plate
CN112623937A (en) * 2020-12-14 2021-04-09 中国化学工程第六建设有限公司 Assembly alignment installation construction method for complete equipment of spinning machine

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6088729A (en) * 1983-10-18 1985-05-18 Ishikawajima Harima Heavy Ind Co Ltd Foundation bolt and installation of structure using foundation bolt
JPH09158905A (en) * 1995-12-08 1997-06-17 Jgc Corp Installation method for equipment
CN102135223A (en) * 2010-01-26 2011-07-27 五冶集团上海有限公司 Method for adjusting base plates for high-accuracy machinery installation
CN103161177A (en) * 2013-03-04 2013-06-19 莱芜钢铁集团有限公司 Integrated and fast equipment alignment device and equipment alignment method
CN103644429A (en) * 2013-12-13 2014-03-19 中国二冶集团有限公司 Construction method for rapidly adjusting flat base plates with three-point fixation method
CN103711141A (en) * 2013-12-17 2014-04-09 攀钢集团工程技术有限公司 Construction method for equipment installation without sizing block
CN104989918A (en) * 2015-05-21 2015-10-21 中冶天工集团有限公司 Method for arranging large-area foundation sizing block

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6088729A (en) * 1983-10-18 1985-05-18 Ishikawajima Harima Heavy Ind Co Ltd Foundation bolt and installation of structure using foundation bolt
JPH09158905A (en) * 1995-12-08 1997-06-17 Jgc Corp Installation method for equipment
CN102135223A (en) * 2010-01-26 2011-07-27 五冶集团上海有限公司 Method for adjusting base plates for high-accuracy machinery installation
CN103161177A (en) * 2013-03-04 2013-06-19 莱芜钢铁集团有限公司 Integrated and fast equipment alignment device and equipment alignment method
CN103644429A (en) * 2013-12-13 2014-03-19 中国二冶集团有限公司 Construction method for rapidly adjusting flat base plates with three-point fixation method
CN103711141A (en) * 2013-12-17 2014-04-09 攀钢集团工程技术有限公司 Construction method for equipment installation without sizing block
CN104989918A (en) * 2015-05-21 2015-10-21 中冶天工集团有限公司 Method for arranging large-area foundation sizing block

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111716519A (en) * 2019-03-18 2020-09-29 新疆八一钢铁股份有限公司 Method for mounting and manufacturing embedded steam turbine supporting bottom plate
CN109958148A (en) * 2019-03-27 2019-07-02 中国化学工程第三建设有限公司 The levelling method of cold box foundation bottom plate centering
CN110523933A (en) * 2019-07-24 2019-12-03 中国一冶集团有限公司 A kind of conticaster replacement guide rail streamlined installation method
CN110735368A (en) * 2019-10-23 2020-01-31 上海宝冶集团有限公司 equipment rail installation system and method
CN112623937A (en) * 2020-12-14 2021-04-09 中国化学工程第六建设有限公司 Assembly alignment installation construction method for complete equipment of spinning machine

Similar Documents

Publication Publication Date Title
CN109323087A (en) A kind of centering leveling structure and its construction method for equipment installation
CN101871265B (en) Flat shim plate-adjustable grouting installation method
CN110789685A (en) Method for mounting heavy equipment on ship to base
CN101343879B (en) Secondary grouting construction method of machine setting
CN103644429A (en) Construction method for rapidly adjusting flat base plates with three-point fixation method
CN106836272A (en) The jackscrew adjusting method construction technology that a kind of equipment is installed without parallels
CN103835308A (en) Method for installing embedded base plate of machine tool
CN104034595A (en) Measurement device and measurement method for fresh mortar non-lateral-confinement bearing capacity
CN106522377B (en) High-precision rigidity height and angle adjusting device
CN105135158B (en) High-precision levelling device
CN108318206B (en) Base frequency adjustable vibrating table model test shear box with in-plane multidirectional loading
CN103624537A (en) Leveling method and leveling device for equipment installation
CN107282641A (en) A kind of parallels construction method of Bar Wire Product vertical mill base
CN101845821B (en) Obliquity control method for basic cushion iron of large tilting equipment
CN111076032A (en) High-precision mounting device and method for sizing block of large high-rotation-speed equipment
CN111155549A (en) Construction method of steel structure combined embedded part
CN103132538A (en) Auxiliary device for alignment and leveling of slope foundation sand mound with mat iron and mat iron placing method
CN206233261U (en) It is a kind of to can be used to pour the fixing device for reclaiming ground packing material
CN202302573U (en) Base plate for inclined mortar filling
CN112627227B (en) Equipment foundation with elastic interlayer leveling piece and manufacturing method thereof
CN205938362U (en) Horizontal adjusting device of equipment support foot
CN105350568B (en) A kind of installation method of large-size ball mill main floor
CN110230749B (en) Method for installing and adjusting rail seat of high-precision roll grinder
CN110374130A (en) A kind of heavy hydraulic press is basic and its installs manufacture craft
CN208501728U (en) A kind of combination mat slab adjusting device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190212

RJ01 Rejection of invention patent application after publication