CN107282641A - A kind of parallels construction method of Bar Wire Product vertical mill base - Google Patents

A kind of parallels construction method of Bar Wire Product vertical mill base Download PDF

Info

Publication number
CN107282641A
CN107282641A CN201610204827.3A CN201610204827A CN107282641A CN 107282641 A CN107282641 A CN 107282641A CN 201610204827 A CN201610204827 A CN 201610204827A CN 107282641 A CN107282641 A CN 107282641A
Authority
CN
China
Prior art keywords
backing plate
vertical mill
mill base
bolt
attachment spacers
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610204827.3A
Other languages
Chinese (zh)
Other versions
CN107282641B (en
Inventor
王海龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201610204827.3A priority Critical patent/CN107282641B/en
Publication of CN107282641A publication Critical patent/CN107282641A/en
Application granted granted Critical
Publication of CN107282641B publication Critical patent/CN107282641B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B31/00Rolling stand structures; Mounting, adjusting, or interchanging rolls, roll mountings, or stand frames

Abstract

A kind of parallels construction method of Bar Wire Product vertical mill base, it is characterised in that comprise the following steps:A, making and attachment spacers is installed, b, attachment spacers is passed through using bolt(1)Four attachment spacers on regulation adjustment backing plate, c, insert pad piece is inserted on the outside of slave unit or inner side on one side between adjustment backing plate and plant bottom case(3), d, adjusting device:Using jack and foundation bolt come adjusting device absolute altitude, perpendicularity, center line and the distance between with roll line, e, by the way that bolt M10 is elastic, the increase and decrease of insert pad piece, equipment T-bolt are elastic adjusts base repeatedly, f, are stoppered using pad, installation terminates.The parallels construction method of the Bar Wire Product vertical mill base of the present invention has adjustment pallet device simple in construction, easy to make, Bar Wire Product vertical mill installation is simple to operation, craft science is reasonable, installation quality is safe and reliable, accelerate installation progress, operating expenses is saved, the advantage of reduction engineering cost is improved.

Description

A kind of parallels construction method of Bar Wire Product vertical mill base
Technical field
It is a kind of parallels construction method of Bar Wire Product vertical mill base specifically the present invention relates to a kind of parallels construction method of mechanical equipment installation.
Background technology
Vertical mill equipment is Bar Wire Product production line nucleus equipment, and vertical mill equipment is fixed on rolling mill base, and the installation of rolling mill base parallels is the basis of milling equipment floor installation, therefore it installs fine or not most important.
Rod project enters equipment erection stage in May, 2015, the new smelting steel special steel in Hubei.This engineering in general equipment is all as common Bar Wire Product equipment, and technical staff and master worker have more rich theory and practice experience.Maximum difficult point vertical mill base parallels with unlike is installed, and this engineering vertical mill base parallels is installed in two steps:First, after the completion of equipment basic pre-buried part construction and maintenance, in setting adjusting pad Board position polishing built-in fitting iron oxide, the adjustment backing plate of adjustment installation finishing, qualified rear and built-in fitting full weld finishes the plane that adjustment parallels falls for vertical mill base.2nd, distance is designed as 10mm between rolling mill base bottom surface and adjustment backing plate polished surface, then using the insert pad pad of different size(Thickness is 8mm, 5mm, 2mm, 1mm, 0.5mm, 0.3mm, 0.1mm and 0.05mm respectively)Be adjusted, repeatedly adjust base after, after T-bolt is tightened, vertical mill base perpendicularity, center line, absolute altitude, away from roll line distance simultaneously meet drawing code requirement, that is, adjust qualified.
In the parallels installation steps of Bar Wire Product vertical mill base, although first step program is simple, but difficulty is far longer than second step with time-consuming.Parallels, which installs difficult point, following several respects:1st, backing plate weight weight is adjusted, lifting is difficult:The most light 26g of monolithic backing plate weight(Steel plate thickness 30mm specifications 360mmx310mm), most weigh 73kg(Steel plate thickness 30mm specifications 500mmx620mm).Using artificial carrying, it is difficult to operate.Using driving because vertical mill foundation structure hinders, driving can not be lifted directly in place.2nd, when the adjustment of adjustment backing plate is fixed, it is difficult to fixed easily to slide.3rd, adjustment difficulty is big, and quantity is more, long in time limit:Adjusting one group of backing plate needs to consider its center, absolute altitude, perpendicularity, level, and adjustment difficulty is not less than general precision equipment adjustment difficulty, totally 50 groups of this engineering vertical mill backing plate, so adjustment difficulty is big, it is long in time limit.4th, the adjust pad after adjustment is installed is because by Adjustment precision, middle shim liner, plant bottom case bottom surface machining accuracy, the cumulative errors of adjusting pad plate weld deformation, contact surface is unable to reach ideal effect.
Therefore the parallels construction of known Bar Wire Product vertical mill base there are problems that above-mentioned a variety of inconvenience and.
The content of the invention
The purpose of the present invention, is to propose a kind of laborsaving time saving, the parallels construction method of raising efficiency of construction and the high Bar Wire Product vertical mill base of installation accuracy.
To achieve the above object, technical solution of the invention is:
A kind of parallels construction method of Bar Wire Product vertical mill base, Bar Wire Product vertical mill respectively sets 5 foundation bolts from bottom to top in its left and right sides, one foundation bolt sets one group of adjustment backing plate, adjustment backing plate plane is stood to installation, adjustment backing plate is arranged between rolling mill base insert pad piece and basic built-in fitting, being connected by screw bolts attachment spacers makes rolling mill base and adjusting pad plate shape integral, it is characterised in that comprise the following steps:
A, making and installation attachment spacers
Take thickness 6mm-10mm steel plates, use gas cutting that steel plate is made into some specifications for 50mm x 50mm attachment spacers, φ 12mm holes are set in the middle of each attachment spacers, every group of adjustment backing plate welds 4 attachment spacers in the left and right sides corner location of its rectangle, the attachment spacers that purpose is with rolling mill base is welded is corresponding, and reserves insertion space to insert pad piece;In vertical mill base using same method and adjustment backing plate same size, attachment spacers is welded on the base of corresponding device;
B, bolt are M10 bolts, adjust four attachment spacers, four attachment spacers positions corresponding with vertical mill base on adjustment backing plate by attachment spacers using bolt, vertical mill plant bottom case is linked together with adjustment backing plate, form an entirety;
C, according to drawing and live actual, measured dimension, a number of insert pad piece is inserted on the outside of slave unit or inner side on one side between adjustment backing plate and plant bottom case, then M10 bolting apparatus base and adjusts backing plate and forms it into one, hanging device is in place;
D, adjusting device:Using jack and foundation bolt come adjusting device absolute altitude, perpendicularity, center line and the distance between with roll line, according to adjustment milling equipment base perpendicularity and with the distance between roll line increase and decrease the quantity of insert pad piece;
E, by the way that bolt M10 is elastic, the increase and decrease of insert pad piece, equipment T-bolt is elastic adjusts base repeatedly, finally reach after T-bolt tightens, vertical mill base perpendicularity, center line, absolute altitude, away from roll line distance simultaneously meet drawing code requirement, that is, adjust qualified;
F, equipment basic pre-buried part steel plate are directly connected by anchor fluke with concrete foundation, because equipment basic pre-buried part plane smoothness does not reach requirement, adjustment backing plate is caused to have local gap or slightly-inclined with basic built-in fitting, stoppered using the pad of different size and different in width, last full weld adjust pad and built-in fitting, installation terminate.
The parallels construction method of the Bar Wire Product vertical mill base of the present invention can also be further achieved by the following technical measures.
Foregoing method, wherein the adjusting pad plate is the thick polished surface rectangle backing plates of 30mm, dimensions 360mmx310mm-500mmx620mm, plate is adjusted according to design requirement in the middle part of backing plate or middle and upper part is provided with T-bolt hole.
Foregoing method, wherein the perpendicularity of the vertical mill base, center line, absolute altitude, the specification away from roll line distance:Perpendicularity 0.1/1000, center line 0.3mm, absolute altitude ± 0.25mm, away from rolling distance ± 0.3mm.
After adopting the above technical scheme, the parallels construction method of the Bar Wire Product vertical mill base of the present invention has advantages below:
1st, adjustment pallet device is simple in construction, easy to make;
2nd, the installation of Bar Wire Product vertical mill is simple to operation, craft science is reasonable, installation quality is safe and reliable, both the problem of the separately installed adjustment of adjust pad had been solved, every error of vertical mill base backing plate and pad is eliminated again, substantially increases efficiency of construction and installation accuracy;
3rd, accelerate installation progress, save operating expenses, improve reduction engineering cost.
Brief description of the drawings
Fig. 1 arranges schematic diagram for the parallels of the Bar Wire Product vertical mill base of the embodiment of the present invention;
Fig. 2 is the detail drawing at P positions in Fig. 1;
Fig. 3 is the A-A sectional views in Fig. 2;
Fig. 4 is the insert pad chip architecture schematic diagram of the embodiment of the present invention;
Fig. 5 is the thick adjusting pad plate structure schematic diagrams of 30mm of the embodiment of the present invention.
In figure:1 attachment spacers, 2 bolts, 3 insert pad pieces, 4T shape bolts, 5 adjustment backing plates, 6 basic built-in fittings, 7 bolts hole, 8T shape bolts hole.
Embodiment
With reference to embodiments and its accompanying drawing to the present invention illustrate further.
Embodiment 1
The parallels construction method of the Bar Wire Product vertical mill base of the present invention, Bar Wire Product vertical mill respectively sets 5 foundation bolts from bottom to top in its left and right sides, one foundation bolt sets one group of adjustment backing plate, adjustment backing plate plane is stood to installation, adjustment backing plate 5 is arranged between rolling mill base insert pad piece 3 and basic embedded part 6, being connected by screw bolts attachment spacers 1 makes rolling mill base form one with adjustment backing plate 5, comprises the following steps:
Referring now to Fig. 1-Fig. 3, Fig. 1 is the parallels arrangement schematic diagram of the Bar Wire Product vertical mill base of the embodiment of the present invention, and Fig. 2 is the detail drawing at P positions in Fig. 1, and Fig. 3 is the A-A sectional views in Fig. 2.
A, making and installation attachment spacers
Take thickness 6mm ~ 10mm steel plates, use gas cutting that steel plate is made into some specifications for 50mm x 50mm attachment spacers 1, φ 12mm holes are set in the middle of each attachment spacers 1, every group of adjustment backing plate welds 4 attachment spacers in the left and right sides corner location of its rectangle, the attachment spacers that purpose is with rolling mill base is welded is corresponding, and reserves insertion space to insert pad piece 3;In vertical mill base using same method and adjustment backing plate same size, attachment spacers is welded on the base of corresponding device;The adjustment backing plate 5 is 30 thick polished surface quadrangle backing plates, the most light 26g of backing plate weight(Steel plate thickness 30mm, specification is 360mmx310mm), most weigh 73kg(Steel plate thickness 30mm, specification is 500mmx620mm), backing plate is according in the middle part of design requirement or middle part is on the upper side hole(T-bolt hole).Because equipment embedded part flatness can not meet equipment mounting surface requirement, backing plate is adjusted by leveling and reaches equipment mounting surface requirement.Fig. 5 is the thick adjusting pad plate structure schematic diagrams of 30mm of the embodiment of the present invention.
B, bolt 2 are M10 bolts, four attachment spacers, four attachment spacers positions corresponding with vertical mill base on adjustment backing plate are adjusted by attachment spacers 1 using bolt, vertical mill plant bottom case is linked together with adjustment backing plate 5, form an entirety.
Fig. 4 is the insert pad chip architecture schematic diagram of the embodiment of the present invention.
C, according to drawing and live actual, measured dimension, a number of insert pad piece 3 is inserted on the outside of slave unit or inner side on one side between adjustment backing plate and plant bottom case, then M10 bolting apparatus base and adjusts backing plate and forms it into one, hanging device is in place.
D, adjusting device:Using jack and foundation bolt come adjusting device absolute altitude, perpendicularity, center line and the distance between with roll line, according to adjustment milling equipment base perpendicularity and with the distance between roll line increase and decrease the quantity of insert pad piece.
E, bolt M10 are elastic and equipment T-bolt tightly can effectively identify the coverage between adjustment backing plate and basic embedded part by naked eyes or clearance gauge.By the way that bolt M10 is elastic, the increase and decrease of insert pad piece, equipment T-bolt is elastic adjusts base repeatedly, finally reach after T-bolt tightens, vertical mill base perpendicularity, center line, absolute altitude, away from roll line distance simultaneously meet drawing code requirement, that is, adjust qualified;The vertical mill base perpendicularity, center line, absolute altitude, the specification away from roll line distance:Perpendicularity 0.1/1000, center line 0.3mm, absolute altitude ± 0.25mm, away from rolling distance ± 0.3mm.
F, standby basic embedded part steel plate are directly connected by anchor fluke with concrete foundation, because equipment basic pre-buried part plane smoothness does not reach requirement, adjustment backing plate and built-in fitting is caused to have local gap or slightly-inclined, stoppered using the pad of different size and different in width, last full weld adjust pad and built-in fitting, installation terminate.
The present invention has substantive distinguishing features and significant technological progress, the parallels construction method of the Bar Wire Product vertical mill base of the present invention, vertical mill base and adjusting pad plate shape is allowed to be installed into an entirety by bolt and attachment spacers, constructing, simple to operation, craft science is reasonable, with low cost, both solved the problem of the separately installed adjustment of adjust pad, every error of vertical mill base backing plate and pad is eliminated again, substantially increase efficiency of construction, accelerate installation progress, operating expenses has been saved, installation accuracy is improved.
The parallels construction method of the Bar Wire Product vertical mill base of the present invention is used in the new smelting steel special steel in Hubei in rod engineering, and significantly, parallels sets laborsaving time saving to effect, improves operating efficiency and installation accuracy.
Above example is used for illustrative purposes only, rather than limitation of the present invention, person skilled in the relevant technique, without departing from the spirit and scope of the present invention, can also make various conversion or change.Therefore, all equivalent technical schemes should also belong to scope of the invention, should be limited by each claim.

Claims (3)

1. a kind of parallels construction method of Bar Wire Product vertical mill base, Bar Wire Product vertical mill respectively sets 5 foundation bolts in its left and right sides from bottom to top, a foundation bolt sets one group of adjustment backing plate, and adjustment backing plate plane is stood to installation, adjusts backing plate(5)It is arranged on rolling mill base insert pad piece(3)With basic built-in fitting(6)Between, it is connected by screw bolts attachment spacers(1)Make rolling mill base and adjustment backing plate(5)Form one, it is characterised in that comprise the following steps:
A, making and installation attachment spacers
Thickness 6mm-10mm steel plates are taken, use gas cutting that steel plate is made into some specifications for 50mm x 50mm attachment spacers(1), in each attachment spacers(1)Centre sets φ 12mm holes, and every group of adjustment backing plate welds 4 attachment spacers in the left and right sides corner location of its rectangle, it is therefore an objective to corresponding with the attachment spacers that rolling mill base is welded, and to insert pad piece(3)Reserved insertion space;In vertical mill base using same method and adjustment backing plate same size, attachment spacers is welded on the base of corresponding device;
B, bolt(2)For M10 bolts, attachment spacers is passed through using bolt(1)Four attachment spacers, four attachment spacers positions corresponding with vertical mill base on regulation adjustment backing plate, make vertical mill plant bottom case and adjustment backing plate(5)Link together, form an entirety;
C, according to drawing and live actual, measured dimension, between adjustment backing plate and plant bottom case on the outside of slave unit or inner side is while insert a number of insert pad piece(3), M10 bolting apparatus base and adjustment backing plate are then formed it into one, hanging device is in place;
D, adjusting device:Using jack and foundation bolt come adjusting device absolute altitude, perpendicularity, center line and the distance between with roll line, according to adjustment milling equipment base perpendicularity and with the distance between roll line increase and decrease the quantity of insert pad piece;
E, by the way that bolt M10 is elastic, the increase and decrease of insert pad piece, equipment T-bolt is elastic adjusts base repeatedly, finally reach after T-bolt tightens, vertical mill base perpendicularity, center line, absolute altitude, away from roll line distance simultaneously meet drawing code requirement, that is, adjust qualified;
F, equipment basic pre-buried part steel plate are directly connected by anchor fluke with concrete foundation, because equipment basic pre-buried part plane smoothness does not reach requirement, adjustment backing plate is caused to have local gap or slightly-inclined with basic built-in fitting, stoppered using the pad of different size and different in width, last full weld adjust pad terminates with basic built-in fitting, installation.
2. the parallels construction method of Bar Wire Product vertical mill base as claimed in claim 1, it is characterised in that the adjustment backing plate(5)For the thick polished surface rectangle backing plates of 30mm, dimensions 360mmx310mm-500mmx620mm is adjusted in the middle part of backing plate according to design requirement or middle and upper part is provided with T-bolt hole.
3. the parallels construction method of Bar Wire Product vertical mill base as claimed in claim 1, it is characterised in that perpendicularity, center line, absolute altitude, the specification away from roll line distance of the vertical mill base:Perpendicularity 0.1/1000, center line 0.3mm, absolute altitude ± 0.25mm, away from rolling distance ± 0.3mm.
CN201610204827.3A 2016-04-05 2016-04-05 A kind of parallels construction method of Bar Wire Product vertical mill pedestal Active CN107282641B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610204827.3A CN107282641B (en) 2016-04-05 2016-04-05 A kind of parallels construction method of Bar Wire Product vertical mill pedestal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610204827.3A CN107282641B (en) 2016-04-05 2016-04-05 A kind of parallels construction method of Bar Wire Product vertical mill pedestal

Publications (2)

Publication Number Publication Date
CN107282641A true CN107282641A (en) 2017-10-24
CN107282641B CN107282641B (en) 2019-07-30

Family

ID=60087327

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610204827.3A Active CN107282641B (en) 2016-04-05 2016-04-05 A kind of parallels construction method of Bar Wire Product vertical mill pedestal

Country Status (1)

Country Link
CN (1) CN107282641B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109441063A (en) * 2018-12-14 2019-03-08 上海市建筑装饰工程集团有限公司 The snap-type steel skirting of bright bolt decoration
CN112547801A (en) * 2020-11-17 2021-03-26 十四冶建设集团云南安装工程有限公司 High-precision ultrathin aluminum foil mill unit mounting method
CN112620353A (en) * 2020-12-12 2021-04-09 中冶天工集团有限公司 Vertical rolling mill stand foundation embedded part mounting device and mounting adjustment method
CN112658035A (en) * 2020-11-30 2021-04-16 中国十九冶集团有限公司 Positioning and aligning method for rolling mill base plate and frame

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU688252A1 (en) * 1978-05-22 1979-09-30 Череповецкий Ордена Ленина Металлургический Завод Им. 50-Летия Ссср Device for securing roll stand baseplate to foundation
JPH10166011A (en) * 1996-12-12 1998-06-23 Mitsubishi Heavy Ind Ltd Hot rolling equipment
JPH11290909A (en) * 1998-04-07 1999-10-26 Nippon Steel Corp Combination mill
CN2858086Y (en) * 2005-12-01 2007-01-17 马鞍山钢铁股份有限公司 Rolling guide and protective base capable of off-line adjusting
CN101275400A (en) * 2007-03-27 2008-10-01 鞍钢建设集团有限公司 Method for mounting large-sized rolling mills
CN101391267A (en) * 2008-11-04 2009-03-25 北京首钢建设集团有限公司 On-line assembling entirety on-position assembling method of edge mill
CN105080976A (en) * 2015-08-28 2015-11-25 中国一冶集团有限公司 Installation method and device for backing plates of vertical rolling mill

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU688252A1 (en) * 1978-05-22 1979-09-30 Череповецкий Ордена Ленина Металлургический Завод Им. 50-Летия Ссср Device for securing roll stand baseplate to foundation
JPH10166011A (en) * 1996-12-12 1998-06-23 Mitsubishi Heavy Ind Ltd Hot rolling equipment
JPH11290909A (en) * 1998-04-07 1999-10-26 Nippon Steel Corp Combination mill
CN2858086Y (en) * 2005-12-01 2007-01-17 马鞍山钢铁股份有限公司 Rolling guide and protective base capable of off-line adjusting
CN101275400A (en) * 2007-03-27 2008-10-01 鞍钢建设集团有限公司 Method for mounting large-sized rolling mills
CN101391267A (en) * 2008-11-04 2009-03-25 北京首钢建设集团有限公司 On-line assembling entirety on-position assembling method of edge mill
CN105080976A (en) * 2015-08-28 2015-11-25 中国一冶集团有限公司 Installation method and device for backing plates of vertical rolling mill

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109441063A (en) * 2018-12-14 2019-03-08 上海市建筑装饰工程集团有限公司 The snap-type steel skirting of bright bolt decoration
CN112547801A (en) * 2020-11-17 2021-03-26 十四冶建设集团云南安装工程有限公司 High-precision ultrathin aluminum foil mill unit mounting method
CN112658035A (en) * 2020-11-30 2021-04-16 中国十九冶集团有限公司 Positioning and aligning method for rolling mill base plate and frame
CN112620353A (en) * 2020-12-12 2021-04-09 中冶天工集团有限公司 Vertical rolling mill stand foundation embedded part mounting device and mounting adjustment method

Also Published As

Publication number Publication date
CN107282641B (en) 2019-07-30

Similar Documents

Publication Publication Date Title
CN107282641A (en) A kind of parallels construction method of Bar Wire Product vertical mill base
CN101537564B (en) Pairing method of H-section steel for super-large crane beams
CN105220769A (en) Large area bolt-ball net frame integral top lifting construction method
CN101831917A (en) Mounting construction method of liner plates during mounting large-scale precision equipment
CN105158064A (en) Counterforce loading frame for multifunctional self-balancing type continuous beam test
CN102518312A (en) Synchronous jacking accurate in-place installation process for large equipment
CN205676785U (en) Leveling block formwork for placing device at the bottom of a kind of Bridge Support Replacement beam
CN102950464B (en) Non-orientation silicon steel tinuous production installation method
CN103862251B (en) A kind of hanging method of the main equipment by restricted by three-dimensional space
CN109323087A (en) A kind of centering leveling structure and its construction method for equipment installation
CN105438403A (en) Mounting method for roll-on and roll-off movable automobile deck
CN109322323B (en) Installation method of large-angle inclined equipment bottom plate
CN106272952B (en) Construction method is adjusted to the dual-direction pre-tensioning system prestressed track plate formwork camber of III types of CRTS
CN103669149B (en) The Special Road precasting board manufacturing method in Tire testing field stimulation ice face
KR20070017127A (en) Method for the insertion of machine units into a production line
CN103967048A (en) Wind turbine foundation ring leveling method
CN104422125B (en) Benzene hydrogenation engineering organic heat carrier gas-fired heater installation method
CN207749421U (en) A kind of regulating device for controlling prefabricated stand column installation verticality
CN100383454C (en) Water-force dynamometer auxiliary adjustable device and method
CN102350523B (en) Method for eliminating twist deformation of rolling mill heavy parts
CN205436613U (en) Parallels connection structure of vertical rolling mill base of stick wire rod
CN204689525U (en) A kind of equipment jacking apparatus being convenient to measure
CN210413272U (en) Precast concrete component production line mould platform welding frock
CN113622458A (en) Construction method for carrying out high-speed steam turbine modular installation by utilizing jackscrew
CN203594264U (en) Clamp special for angle steel iron tower rectification and tool for angle steel iron tower rectification

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant