CN101845821B - Obliquity control method for basic cushion iron of large tilting equipment - Google Patents

Obliquity control method for basic cushion iron of large tilting equipment Download PDF

Info

Publication number
CN101845821B
CN101845821B CN2009100480953A CN200910048095A CN101845821B CN 101845821 B CN101845821 B CN 101845821B CN 2009100480953 A CN2009100480953 A CN 2009100480953A CN 200910048095 A CN200910048095 A CN 200910048095A CN 101845821 B CN101845821 B CN 101845821B
Authority
CN
China
Prior art keywords
equipment
iron
backing plate
seat slurry
control method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2009100480953A
Other languages
Chinese (zh)
Other versions
CN101845821A (en
Inventor
程建刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN2009100480953A priority Critical patent/CN101845821B/en
Publication of CN101845821A publication Critical patent/CN101845821A/en
Application granted granted Critical
Publication of CN101845821B publication Critical patent/CN101845821B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relates to equipment installation, particularly to an installation method for large tilting equipment, i.e. an obliquity control method for basic cushion iron of large tilting equipment, which comprises cushion plates and an cushion iron and is characterized by mainly comprising the following steps of: a preparation step mainly comprising the determination of the number and the positions of seat slurry piers, the determination of the depth of the seat slurry piers and the preparation of fittings; a cushion plate manufacturing step; an equipment positioning step; and a once grouting step: each cushion plate is cast and cured by adopting a self-leveling grouting material. On the premise of ensuring the good contact of the cushion plates and the pedestal of the equipment, the manpower is reduced, and the time is shortened.

Description

Obliquity control method for basic cushion iron of large tilting equipment
Technical field
The equipment that the present invention relates to is installed, and relates in particular to the large tilting equipment installation method.
Background technology
In the large tilting equipment installation process, Traditional use seat slurry method, this method need spend a large amount of manpowers, time, can't guarantee that backing plate contacts with the good of plant bottom case lower plane simultaneously.
Summary of the invention
The present invention is intended to solve the defective that said conventional bevel equipment seat basis seat slurry method is installed, and a kind of obliquity control method for basic cushion iron of large tilting equipment is provided.The present invention guarantees that backing plate is prerequisite with good contact of base of equipment, reduces manpower, shortening time.
The present invention is achieved in that obliquity control method for basic cushion iron of large tilting equipment comprises backing plate and parallels, and this method mainly comprises the following steps:
Preparation process comprises that mainly definite the and accessory definite, the seat slurry pier degree of depth of a slurry pier quantity, position is prepared;
The backing plate making step;
Equipment step in place; With
Once grouting step: adopt from levelling grouting material each backing plate is poured into a mould and maintenance.
Described obliquity control method for basic cushion iron of large tilting equipment, said preparation process comprises:
Before equipment is in place, confirm the quantity and the position of good seat slurry pier according to the equipment load situation;
The Fundamentals of Measurement absolute altitude is confirmed the height of back-grouting layer between basis and plant bottom case;
The processing batten, the batten width deducts taper liner iron thickness in groups for the back-grouting layer height;
On Equipment Foundations, eject the position of seat slurry pier upper surface backing plate and dig out seat slurry hole with the line of ink marker.
Said obliquity control method for basic cushion iron of large tilting equipment, said backing plate are made and also comprised: batten is fixed into mould with iron nail, and the outside one end wouldn't be adjusted in order to backing plate in shutoff, locatees with the slit between pea gravel concreten shutoff wooden frame and base surface and with wooden frame.
Described obliquity control method for basic cushion iron of large tilting equipment, said equipment is in place to be the adjustment screw that carries through equipment or several temporary supports are set temporarily put the center of preliminary centering equipment, absolute altitude, level and require to reach once grouting.
Described obliquity control method for basic cushion iron of large tilting equipment, when carrying out the equipment once grouting, taper liner iron is installed on the seat slurry plastic sheet and is regulated the adjustment screw taper liner plate is contacted with the equipment bottom surface fully in groups.
The present invention's tradition construction advantage relatively has:
Use the gravitational grouting material to compare traditional pea gravel concreten and shorten the initial setting time;
Pouring reduced input manpower, facility after use grouting material watered and compares tradition stirring pea gravel concreten, shortened Production Time, and the pollution of reduction environment reduces to make the place;
After in pouring once, carrying out backing plate pouring and comparing tradition and carry out the equipment initial adjustment behind the construction seat slurry pier earlier once pouring shorten the set-up time;
Utilize the gradient of equipment baseplane to guarantee the gradient of every cushion block and contact fully after the equipment initial adjustment, inclination, the abatement apparatus manufacture deviation of seat slurry plastic sheet cause factors such as equipment bottom surface and backing plate loose contact when comparing tradition construction seat slurry pier having solved concrete setting earlier.
Description of drawings:
Fig. 1 is said backing plate sketch map.
Fig. 2 arranges sketch map for mould on the basis.
The specific embodiment
Obliquity control method for basic cushion iron of large tilting equipment of the present invention comprises:
One, prepares
Before equipment is in place, confirm the quantity and the position of good seat slurry pier according to the equipment load situation; (with reference to Fig. 2)
The Fundamentals of Measurement absolute altitude is confirmed the height of back-grouting layer between basis and plant bottom case;
The processing batten, the batten width deducts taper liner iron thickness in groups for the back-grouting layer height;
On Equipment Foundations, eject the position of seat slurry pier upper surface backing plate and dig out seat slurry hole with the line of ink marker;
Prepare two cover adjustment screws according to each slurry pier of quantity of seat slurry pier;
Two, implement
1, batten is shaped with iron nail is fixing, the outside one end wouldn't be adjusted in order to backing plate in shutoff, locatees with the slit between pea gravel concreten shutoff wooden frame and base surface and with wooden frame; (see figure 1)
2, equipment is in place, center, absolute altitude, the level of the preliminary centering equipment of the adjustment screw (or several temporary support points are set temporarily) that carries through equipment reach the once grouting requirement;
3, when carrying out the equipment once grouting, taper liner iron is installed on the seat slurry plastic sheet 2 and is regulated adjustment screw 1 the taper liner plate is contacted with the equipment bottom surface fully in groups, and uses the gravitational grouting material that every block pulpboard is watered;
Three, finish
1, treat that a slurry pier intensity reaches requirement after, remove wooden frame and dispose foreign material such as wood chip.

Claims (2)

1. an obliquity control method for basic cushion iron of large tilting equipment comprises backing plate and parallels, it is characterized in that, this method mainly comprises the following steps:
Preparation process comprises that mainly definite the and accessory definite, the seat slurry pier degree of depth of a slurry pier quantity, position is prepared;
The backing plate making step; Batten is fixed into mould with iron nail, and the outside one end wouldn't be adjusted in order to backing plate in shutoff, locatees with the slit between pea gravel concreten shutoff wooden frame and base surface and with wooden frame;
Equipment step in place; The center of the preliminary centering equipment of adjustment screw that carries through equipment, absolute altitude, level are to reach the once grouting requirement; With
Once grouting step: adopt from levelling grouting material each backing plate is poured into a mould and maintenance, simultaneously, taper liner iron is installed on the seat slurry plastic sheet and is regulated the adjustment screw taper liner iron is contacted with the equipment bottom surface fully in groups.
2. obliquity control method for basic cushion iron of large tilting equipment according to claim 1 is characterized in that, said preparation process comprises:
Before equipment is in place, confirm the quantity and the position of good seat slurry pier according to the equipment load situation;
The Fundamentals of Measurement absolute altitude is confirmed the height of back-grouting layer between basis and plant bottom case;
The processing batten, the batten width deducts taper liner iron thickness in groups for the back-grouting layer height;
On Equipment Foundations, eject the position of seat slurry pier upper surface backing plate and dig out seat slurry hole with the line of ink marker.
CN2009100480953A 2009-03-24 2009-03-24 Obliquity control method for basic cushion iron of large tilting equipment Active CN101845821B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100480953A CN101845821B (en) 2009-03-24 2009-03-24 Obliquity control method for basic cushion iron of large tilting equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100480953A CN101845821B (en) 2009-03-24 2009-03-24 Obliquity control method for basic cushion iron of large tilting equipment

Publications (2)

Publication Number Publication Date
CN101845821A CN101845821A (en) 2010-09-29
CN101845821B true CN101845821B (en) 2012-05-23

Family

ID=42770621

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100480953A Active CN101845821B (en) 2009-03-24 2009-03-24 Obliquity control method for basic cushion iron of large tilting equipment

Country Status (1)

Country Link
CN (1) CN101845821B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103243913B (en) * 2013-05-17 2015-09-09 中国建筑东北设计研究院有限公司 The method for blocking of fabricated shear wall architectural lower floor junction grout blanket
CN103510536A (en) * 2013-05-29 2014-01-15 洛阳天信矿山机械制造有限公司 Method for mounting and adjusting hammer crusher
CN114960737A (en) * 2022-04-29 2022-08-30 中国华冶科工集团有限公司 Sizing device and method for mounting sizing block of equipment

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1073655C (en) * 1996-09-26 2001-10-24 周振华 Continuous bed mortar soleplate method
JP2007327626A (en) * 2006-06-09 2007-12-20 Suehiro System Kk Anchor integrated type liner, and equipment installation method
CN101307605A (en) * 2008-06-06 2008-11-19 中冶天工上海十三冶建设有限公司 High precision apparatus foundation mounting method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1073655C (en) * 1996-09-26 2001-10-24 周振华 Continuous bed mortar soleplate method
JP2007327626A (en) * 2006-06-09 2007-12-20 Suehiro System Kk Anchor integrated type liner, and equipment installation method
CN101307605A (en) * 2008-06-06 2008-11-19 中冶天工上海十三冶建设有限公司 High precision apparatus foundation mounting method

Also Published As

Publication number Publication date
CN101845821A (en) 2010-09-29

Similar Documents

Publication Publication Date Title
CN101881031B (en) Installation method of adjustable grouting material base plate device
CN101871265B (en) Flat shim plate-adjustable grouting installation method
CN101413249B (en) Method for positioning and mounting large-scale bridge support
CN101343879B (en) Secondary grouting construction method of machine setting
CN102758445A (en) Foundation leveling device, foundation assembly and foundation forming method for wind driven generator tower
CN205676785U (en) Leveling block formwork for placing device at the bottom of a kind of Bridge Support Replacement beam
CN204780983U (en) Whole pre -buried major diameter bolt crowd structure of raft board basis high accuracy
CN101397799B (en) Flowing grouting method installed on apparatus foundation
CN101845821B (en) Obliquity control method for basic cushion iron of large tilting equipment
CN203452266U (en) Fixing and leveling structure of H section steel column
CN102286988A (en) Grouting shim plate construction method
CN109323087A (en) A kind of centering leveling structure and its construction method for equipment installation
CN204266225U (en) A kind of standard device installs parallels pre-embedded device
CN104213708A (en) Integral construction method of anchor bolt-free fireproof wall
CN202187285U (en) Basin type rubber support of cast-in-situ bridge
CN102650135A (en) Method for leveling embedded parts at bottom of vertical column in sintered ring cooling machine
CN112095825A (en) Vibration isolation structure of high-speed rail of underpass terminal building and construction method thereof
CN207959249U (en) Cushion cap and its foundation pit cushion construction structure
CN110863652A (en) Precise positioning and mounting method for prefabricated and assembled double-section stand column
CN208138090U (en) A kind of wind power generating set concrete tower
CN102943484B (en) Tapered-iron pulp-bedding rapid leveling method for large-size and middle-size equipment installation
CN113293790B (en) Pre-leveling tower foundation and leveling construction method thereof
CN103132538A (en) Auxiliary device for alignment and leveling of slope foundation sand mound with mat iron and mat iron placing method
CN110374130A (en) A kind of heavy hydraulic press is basic and its installs manufacture craft
CN215330504U (en) Concrete support

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant