CN101413249B - Method for positioning and mounting large-scale bridge support - Google Patents

Method for positioning and mounting large-scale bridge support Download PDF

Info

Publication number
CN101413249B
CN101413249B CN2008101801425A CN200810180142A CN101413249B CN 101413249 B CN101413249 B CN 101413249B CN 2008101801425 A CN2008101801425 A CN 2008101801425A CN 200810180142 A CN200810180142 A CN 200810180142A CN 101413249 B CN101413249 B CN 101413249B
Authority
CN
China
Prior art keywords
concrete
pinner
venthole
steel
steel baseplate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2008101801425A
Other languages
Chinese (zh)
Other versions
CN101413249A (en
Inventor
秦顺全
宋伟俊
文武松
潘军
于祥君
连泽平
张耀军
董广文
龚国锋
张爱民
赵顺涛
沈涛
章德春
朱丹彤
吴杰良
张君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
Original Assignee
China Railway Major Bridge Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Co Ltd filed Critical China Railway Major Bridge Engineering Co Ltd
Priority to CN2008101801425A priority Critical patent/CN101413249B/en
Publication of CN101413249A publication Critical patent/CN101413249A/en
Application granted granted Critical
Publication of CN101413249B publication Critical patent/CN101413249B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention provides a method for positioning and installing large-sized bridge supports, which relates to large-sized bridge construction. The method concretely comprises the following: 1. a step of manufacturing a steel baseplate; 2. a step of accurately positioning the steel baseplate of a support; 3. a step of grouting an anchor bolt hole; 4. pouring cushion stone concrete; and 5. maintaining pressure and blocking a vent hole. The method for positioning and installing large-sized bridge supports can ensure that gas is smoothly discharged when the cushion stone concrete is poured, ensurethe close contact between the steel baseplate of the support and a cushion stone, and improve integral stress property.

Description

A kind of location of large-scale bridge support and mounting method
Technical field
The present invention relates to large bridge and build, specifically a kind of location of large-scale bridge support and mounting method.
Background technology
Traditional bridge pad is reserved anchor hole when pinner is constructed, bearing is installed the post-grouting anchoring, and the anchor hole of reserving when only needing accurate location pinner just can make the bearing location, by anchor hole grouting anchoring crab-bolt, gets final product fixed bearing.But, now general large-scale bridge support is the orthotropic plate steel work, from as subregion independence enclosed construction, the steel baseplate of bearing is with synchronous anchoring construction of pinner and positioning accuracy request height, gas was difficult to discharge when this just caused pinner concreting, accumulate in the pinner end face and form a large amount of bubbles, the steel baseplate that makes bearing is with producing the gap between the pinner, and influence is whole stressed.
Summary of the invention
At the defective that exists in the prior art, the object of the present invention is to provide a kind of location and mounting method of large-scale bridge support, gas is discharged smoothly in the time of can guaranteeing pinner concreting, and the steel baseplate of guaranteeing bearing improves whole stressed property with closely contact between the pinner.
For reaching above purpose, the technical scheme that the present invention takes is:
A kind of location of large-scale bridge support and mounting method is characterized in that: its concrete steps are:
Step 1, making steel baseplate: said steel baseplate is divided into 9 independent closed area structures by 3 * 3, Φ 300mm blanking hole 1 is reserved at the end face middle part of every independent closed area, every independent closed area around apart from the uniform some ventholes 3 in edge 5cm place, coarse aggregate size is adaptive in the size of venthole 3 and the concrete, to guarantee that venthole 3 can not stop up in concreting, also be provided with some crab-bolts 2 on the every independent closed area;
The steel baseplate of step 2, accurate positioning support: utilize the locating rack structural framing 21 that constitutes by level, vertical adjustable locating support, the steel baseplate 24 of bearing is accurately located, said level, vertical adjustable locating support are adjusted bolt 22 by some screw rods and plane or are vertically adjusted bolt 23 and cooperate, be anchored on the pre-embedded steel slab of pier top pedestal, utilize the spinning in and out of bolt, adjust spiro rod length, be arranged on the plan-position and the elevation of the steel baseplate 24 of the bearing above the locating rack structural framing 21 with adjustment, make crab-bolt 2 stretch in the anchor hole 34 of pier top pedestal;
Step 3, be in the milk at the anchor hole place: the grouting hose 32 of grout filler loading head 31 is stretched in the anchor hole 34 of pier top pedestal, with crab-bolt 2 and anchor hole 34 fixed be one, crab-bolt 2 is cemented on the pedestal of pier top;
Step 4, build the pinner concrete: pinner template 43 is placed in around the steel baseplate 24, adopt C50 not have contraction, microdilatancy, self-leveling concrete then and build pinner, pinner is built in the process concrete is slightly vibrated, and is beneficial to the closely knit of position, pinner corner; Slow down when building and build, building the back that finishes and inserting by the bamboo chip level and smashes, gas is discharged by venthole apart from the about 10cm of end face;
Step 5, pressurize and shutoff venthole: pressurize that height 1m diameter is at least 30cm is set with steel pipe 41 building the concrete feed opening of pinner place, pressurize is carried out pressurize by the concrete discrepancy in elevation to steel baseplate 24 interior concrete with filling concrete in the steel pipe 41; Because the pressure effect, venthole 3 can pulps, and shutoff is carried out to venthole 3 in the pulp for the treatment of venthole 3 back that meets the requirements.
On the basis of technique scheme, the spacing of two adjacent ventholes 3 is 10cm~20cm, and the diameter of venthole 3 is Φ 25mm.
On the basis of technique scheme, the front end of said bamboo chip and middle part at an angle, middle part and rear end are level.
The location of large-scale bridge support of the present invention and mounting method, gas is discharged smoothly in the time of can guaranteeing pinner concreting, and the steel baseplate of guaranteeing bearing improves whole stressed property with closely contact between the pinner.Therefore, the method that the present invention provides has the following advantages: bridge pad is active controllable in accurate location, installation process, and the pinner concrete is built with the steel baseplate of bearing and is integral, and the closely connected no gap of its contact surface; The steel baseplate of bearing is adjusted convenient reliably in the work progress, and the pinner concreting method is simple.
Description of drawings
The present invention has following accompanying drawing:
Fig. 1 steel baseplate structural representation
Fig. 2 steel baseplate locating rack schematic diagram
Fig. 3 bearing anchor hole grouting schematic diagram
Fig. 4 builds pinner concrete and pressurize schematic diagram
Reference numeral:
1 blanking hole, 2 anchors are fastened, 3 ventholes, 21 locating rack structural framings, bolt is adjusted on 22 planes, 23 vertical bolt, 24 steel baseplates, 31 grout filler loading heads, 32 grouting hoses, 34 anchor hole, 41 pressurize steel pipes, the 43 pinner templates adjusted.
The specific embodiment
Below in conjunction with accompanying drawing the present invention is described in further detail.
The invention provides a kind of location and mounting method of large-scale bridge support, its concrete steps are:
Step 1, making steel baseplate (referring to Fig. 1): said steel baseplate is divided into 9 independent closed area structures by 3 * 3, Φ 300mm blanking hole 1 is reserved at the end face middle part of every independent closed area, every independent closed area around apart from the uniform some ventholes 3 in edge 5cm place, coarse aggregate size is adaptive in the size of venthole 3 and the concrete, to guarantee that venthole 3 can not stop up in concreting, also be provided with some crab-bolts 2 on the every independent closed area;
Step 2, the steel baseplate (referring to Fig. 2) of accurate positioning support: utilize by level, the locating rack structural framing 21 that vertical adjustable locating support constitutes, the steel baseplate 24 of bearing is accurately located, said level, vertical adjustable locating support is adjusted bolt 22 by some screw rods and plane or is vertically adjusted bolt 23 and cooperates, be anchored on the pre-embedded steel slab of pier top pedestal, utilize the spinning in and out of bolt, adjust spiro rod length, be arranged on the plan-position and the elevation of the steel baseplate 24 of the bearing above the locating rack structural framing 21 with adjustment, make crab-bolt 2 stretch in the anchor hole 34 of pier top pedestal; To the plan-position of steel baseplate 24 and the adjusting of elevation, also can adopt existing techniques in realizing;
Step 3, be in the milk (referring to Fig. 3) at the anchor hole place: the grouting hose 32 of grout filler loading head 31 is stretched in the anchor hole 34 of pier top pedestal, with crab-bolt 2 and anchor hole 34 fixed be one, crab-bolt 2 is cemented on the pedestal of pier top;
Step 4, build pinner concrete (referring to Fig. 4): pinner template 43 is placed in around the steel baseplate 24, adopt C50 not have contraction, microdilatancy, self-leveling concrete then and build pinner, pinner is built in the process concrete is slightly vibrated, and is beneficial to the closely knit of position, pinner corner; Slow down when building and build, building the back that finishes and inserting by the bamboo chip level and smashes, gas is discharged by venthole apart from the about 10cm of end face;
Step 5, pressurize and shutoff venthole (referring to Fig. 4): pressurize that height 1m diameter is at least 30cm is set with steel pipe 41 building the concrete feed opening of pinner place, pressurize is carried out pressurize by the concrete discrepancy in elevation to the concrete in the steel baseplate 24 with filling concrete in the steel pipe 41; Because the pressure effect, venthole 3 can pulps, and shutoff is carried out to venthole 3 in the pulp for the treatment of venthole 3 back that meets the requirements.
On the basis of technique scheme, the spacing of two adjacent ventholes 3 is 10cm~20cm, the diameter of venthole 3 is Φ 25mm, and for example, spacing can be 10cm, 11cm, 12cm, 13cm, 14cm, 15cm, 16cm, 17cm, 18cm, 19cm or 20cm.
On the basis of technique scheme, said bamboo chip is the bamboo chip of band certain angle.Said certain angle is meant the front end of bamboo chip and middle part at an angle, and middle part and rear end are level, and the angle at front end and middle part can be guaranteed to insert and smashes fully like this, and gas is discharged by venthole as far as possible.
Find that through actual tests the concrete test piece end face and the steel baseplate that adopt said method to build are closely connected, test block end face bubble accounts for 8% of top surface area, and outward appearance do not have defectives such as voids and pits, and inside concrete is closely knit, meets the pinner force request.Steel baseplate setting accuracy height in actual the use, the pinner concrete compaction is seamless, satisfies the instructions for use of bearing pad stone.Therefore, the steel baseplate of method employing anchor hole of the present invention grouting, bearing is left pore, the self-leveling concrete technology matches, realized bridge pad active controllable in accurate location, installation process, the pinner concrete is built with the steel baseplate of bearing and is integral, the closely connected no gap of its contact surface.And the steel baseplate adjustment of bearing is convenient reliable in work progress, and to steel baseplate position control accuracy height, the pinner concreting method is simple, builds the back concrete compaction, and does not have the gap between steel baseplate.Method of the present invention can be carried out according to following step when reality is implemented: colligation pinner reinforcing bar → installation steel baseplate (containing anchor pole) → installing and locating support → adjust the formal bearing of steel baseplate and fixing → bolthole grouting → installation pinner template → inspection steel baseplate position → build pinner concrete → install by locating support.

Claims (3)

1. the location of a large-scale bridge support and mounting method, it is characterized in that: its concrete steps are:
Step 1, making steel baseplate: said steel baseplate is divided into 9 independent closed area structures by 3 * 3, Φ 300mm blanking hole (1) is reserved at the end face middle part of every independent closed area, every independent closed area around apart from the uniform some ventholes in edge 5cm place (3), coarse aggregate size is adaptive in the size of venthole (3) and the concrete, to guarantee that venthole (3) can not stop up, and also is provided with some crab-bolts (2) on the every independent closed area in concreting;
Step 2, the steel baseplate of accurate positioning support: utilize by level, the locating rack structural framing (21) that vertical adjustable locating support constitutes, the steel baseplate (24) of bearing is accurately located, said level, vertical adjustable locating support is adjusted bolt (22) or is vertically adjusted bolt (23) by some screw rods and plane and cooperates, be anchored on the pre-embedded steel slab of pier top pedestal, utilize the spinning in and out of bolt, adjust spiro rod length, be arranged on the plan-position and the elevation of the steel baseplate (24) of the bearing above the locating rack structural framing (21) with adjustment, make crab-bolt (2) stretch in the anchor hole (34) of pier top pedestal;
Step 3, be in the milk at the anchor hole place: the grouting hose (32) of grout filler loading head (31) is stretched in the anchor hole (34) of pier top pedestal, with crab-bolt (2) and anchor hole (34) fixed be one, crab-bolt (2) is cemented on the pedestal of pier top;
Step 4, build the pinner concrete: pinner template (43) is placed in steel baseplate (24) all around, adopt C50 not have contraction, microdilatancy, self-leveling concrete then and build pinner, pinner is built in the process concrete is slightly vibrated, and is beneficial to the closely knit of position, pinner corner; Slow down when building and build, building the back that finishes and inserting by the bamboo chip level and smashes, gas is discharged by venthole apart from the about 10cm of end face;
Step 5, pressurize and shutoff venthole: pressurize that height 1m diameter is at least 30cm is set with steel pipe (41) building the concrete feed opening of pinner place, pressurize is carried out pressurize by the concrete discrepancy in elevation to the concrete in the steel baseplate (24) with filling concrete in the steel pipe (41); Because the pressure effect, venthole (3) can pulp, and shutoff is carried out to venthole (3) in the pulp for the treatment of venthole (3) back that meets the requirements.
2. the location of large-scale bridge support as claimed in claim 1 and mounting method, it is characterized in that: the spacing of two adjacent ventholes (3) is 10cm~20cm, the diameter of venthole (3) is Φ 25mm.
3. the location of large-scale bridge support as claimed in claim 1 and mounting method is characterized in that: the front end of said bamboo chip and middle part at an angle, middle part and rear end are level.
CN2008101801425A 2008-12-01 2008-12-01 Method for positioning and mounting large-scale bridge support Active CN101413249B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008101801425A CN101413249B (en) 2008-12-01 2008-12-01 Method for positioning and mounting large-scale bridge support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008101801425A CN101413249B (en) 2008-12-01 2008-12-01 Method for positioning and mounting large-scale bridge support

Publications (2)

Publication Number Publication Date
CN101413249A CN101413249A (en) 2009-04-22
CN101413249B true CN101413249B (en) 2010-09-15

Family

ID=40593967

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008101801425A Active CN101413249B (en) 2008-12-01 2008-12-01 Method for positioning and mounting large-scale bridge support

Country Status (1)

Country Link
CN (1) CN101413249B (en)

Families Citing this family (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101922141B (en) * 2010-07-16 2012-05-23 中交第一公路工程局有限公司 Structure and construction method of bearing pad stone
CN101985824B (en) * 2010-08-23 2016-03-30 重庆城建控股(集团)有限责任公司 For the embedded part installation device of bridge pad
CN102286926A (en) * 2011-08-25 2011-12-21 重庆新科建设工程有限公司 Mounting process of cast-in-place bridge pot rubber bearing
CN102392540B (en) * 2011-10-24 2013-10-16 上海城建市政工程(集团)有限公司 High-precision method and structure for positioning high-precision precast beam
CN103161123A (en) * 2013-03-11 2013-06-19 浙江海天建设集团有限公司 Installation structures of piled layer rubber support and flat plate sliding support
CN103174234A (en) * 2013-03-11 2013-06-26 浙江海天建设集团有限公司 Construction method of construction damping device
CN104179191B (en) * 2013-05-28 2016-08-10 中广核工程有限公司 Nuclear power plant's main equipment basement construction method
CN103485539B (en) * 2013-09-23 2015-08-19 中国五冶集团有限公司 The construction control method of large-scale direct burial steel anchor fluke built-in fitting
CN104712061B (en) * 2015-01-22 2017-03-15 中交第二航务工程局有限公司 A kind of installation method of large-tonnage spherical bearing
CN105200915B (en) * 2015-07-14 2017-05-17 中铁大桥勘测设计院集团有限公司 Bridge deck or rail non-lifting longitudinal movable spherical support for railway bridge and construction method thereof
CN105386531A (en) * 2015-12-01 2016-03-09 中国建筑第八工程局有限公司 Locating device used between buttress and vibration insulation support and construction method thereof
CN107642035A (en) * 2017-10-31 2018-01-30 中铁第四勘察设计院集团有限公司 A kind of bearing embedded board for large-tonnage support grouting
CN107858926B (en) * 2017-10-31 2020-07-24 中铁第四勘察设计院集团有限公司 Large-tonnage support positioning grouting method
CN108755395B (en) * 2018-02-12 2019-09-20 浙江大学城市学院 A kind of spherical bearing installation method
CN110230259B (en) * 2018-08-21 2021-05-28 中铁十八局集团有限公司 Bridge cantilever casting pier top beam section and rapid construction method thereof
CN110485284A (en) * 2019-08-29 2019-11-22 苏州交通工程集团有限公司 A kind of novel base for supporting installation method
CN114108447A (en) * 2021-11-05 2022-03-01 中国一冶集团有限公司 Vase pier ball steel support embedded bolt framework and construction method
CN114319092A (en) * 2022-01-14 2022-04-12 中国铁建大桥工程局集团有限公司 Connecting device, bridge and mounting method of connecting device

Also Published As

Publication number Publication date
CN101413249A (en) 2009-04-22

Similar Documents

Publication Publication Date Title
CN101413249B (en) Method for positioning and mounting large-scale bridge support
CN204040056U (en) A kind of location and installation support of pre-embedded anchoring bolts
CN108004855B (en) Pressing limiting device and method for plate-type ballastless track structure
CN201896365U (en) Installing and fixing device for flat plate pre-embedded piece on surface of concrete
CN205443946U (en) Connected system of bridge prefabrication roof beam and pier
CN103306208A (en) Formwork creeping method for novel 1.6 parabola-shaped four-column type hollow variable section high pier
CN204849798U (en) Rag bolt fixed bolster
CN203530837U (en) Circular laminated rubber bearing mounting structure
CN112127637A (en) Construction method for pre-buried vertical component steel bars of foundation layer of fabricated building
CN201933370U (en) Compressing device for construction of ballastless track plate
CN109722956B (en) Grouting lifting method and grouting material for high-speed railway
CN102518046A (en) Method for eliminating secondary internal force of sinking of support saddle of continuous beam during cantilever construction
CN103572774A (en) Leveling ruler flat underboarding mortar bedding method
CN105804291A (en) Bare concrete sloping core interlayer through connection system and construction method thereof
CN206015523U (en) The built-in steel anchor beam accurate positioning device of free-standing Sarasota
CN206753059U (en) A kind of construction pours suspension leveling unit
CN105952002B (en) A kind of terrace heavy steel plate pre-embedded device and construction method
CN113832842B (en) Spherical support mounting and leveling method
CN101845821B (en) Obliquity control method for basic cushion iron of large tilting equipment
CN105002926B (en) Parabasal plate alignment method for mounting large equipment
CN106499156A (en) The reinforcement tools and its reinforcement means of template in cast-in-place ground surface layer
CN206986896U (en) A kind of concrete is received storehouse and wiped one's face sample rack
CN107165288A (en) The lower margin reinforced liner of construction in a kind of steel reinforced concrete structure cushion cap
CN207878943U (en) A kind of foundation ground flatness and elevation control device
CN102943484B (en) Tapered-iron pulp-bedding rapid leveling method for large-size and middle-size equipment installation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GROUP CO., LTD., ZHONGTIE DAQIAO BUREAU

Free format text: FORMER OWNER: CHINA ZHONGTIE MAJOR BRIDGE ENGINEERING CO., LTD.

Effective date: 20150212

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150212

Address after: 430050 Hanyang Road, Hanyang District, Hubei, No. 38, No.

Patentee after: Group Co., Ltd., Zhongtie Daqiao Bureau

Address before: 430050 Hanyang Road, Hanyang District, Hubei, No. 38, No.

Patentee before: China Zhongtie Major Bridge Engineering Co., Ltd.