CN104234385B - Construction method of installation after a kind of terrace heavy steel plate built-in fitting - Google Patents
Construction method of installation after a kind of terrace heavy steel plate built-in fitting Download PDFInfo
- Publication number
- CN104234385B CN104234385B CN201410417780.XA CN201410417780A CN104234385B CN 104234385 B CN104234385 B CN 104234385B CN 201410417780 A CN201410417780 A CN 201410417780A CN 104234385 B CN104234385 B CN 104234385B
- Authority
- CN
- China
- Prior art keywords
- construction
- installation
- steel slab
- steel plate
- fitting
- Prior art date
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 77
- 239000010959 steel Substances 0.000 title claims abstract description 77
- 238000010276 construction Methods 0.000 title claims abstract description 27
- 238000009434 installation Methods 0.000 title claims abstract description 22
- 239000000463 materials Substances 0.000 claims abstract description 16
- 239000000686 essences Substances 0.000 claims abstract description 15
- 238000003466 welding Methods 0.000 claims abstract description 11
- 206010018987 Haemorrhages Diseases 0.000 claims abstract description 6
- 230000000740 bleeding Effects 0.000 claims abstract description 6
- 231100000319 bleeding Toxicity 0.000 claims abstract description 6
- 238000007569 slipcasting Methods 0.000 claims abstract description 6
- 210000000078 Claw Anatomy 0.000 claims description 5
- 238000004873 anchoring Methods 0.000 claims description 5
- 238000005266 casting Methods 0.000 claims description 5
- 239000010410 layers Substances 0.000 claims description 4
- 210000002381 Plasma Anatomy 0.000 claims description 3
- 230000000875 corresponding Effects 0.000 claims description 3
- 238000000034 methods Methods 0.000 claims description 3
- 239000002994 raw materials Substances 0.000 claims description 3
- 238000010008 shearing Methods 0.000 claims description 3
- 239000002956 ash Substances 0.000 abstract description 3
- 239000011901 water Substances 0.000 abstract description 3
- 239000011440 grout Substances 0.000 abstract description 2
- 230000005484 gravity Effects 0.000 abstract 1
- 238000004519 manufacturing process Methods 0.000 abstract 1
- 230000002787 reinforcement Effects 0.000 abstract 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering processes Methods 0.000 description 1
- 238000005755 formation reactions Methods 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 239000002699 waste materials Substances 0.000 description 1
Abstract
Description
Technical field
The present invention relates to a kind of construction techniques, in particular, relate to construction method of installation after a kind of terrace heavy steel plate built-in fitting.
Background technology
The construction method that in building engineering construction, pre-embedded steel slab is conventional is first welding embedded element fixed mount, relocates the fixing embedded part of installation, last casting concrete molding.Industrial Plant Ground large area pre-embedded steel slab embedded part adopts this method construction, it may appear that in concreting process, blanking has some setbacks, and reduces efficiency of construction;Vibrating in construction insufficient, concrete water bleeding shrinks all can cause pre-embedded steel slab large area hollowing;Lower ash hole offer, repair welding time pre-embedded steel slab can be caused to deform, readjust and need to waste time and energy;Embedded part steel plate off normal can be caused in casting process to adjust difficulty, and revising or doing over again needs to expend a large amount of manpower and materials, and quality is difficult to ensure.
Summary of the invention
The present invention is directed to the deficiencies in the prior art, and provide concreting convenience, vibration compacting, raising efficiency of construction, avoid embedded part large area hollowing to occur a kind of terrace heavy steel plate built-in fitting after construction method of installation.
Construction method of installation after a kind of terrace heavy steel plate built-in fitting of the present invention, comprises the steps:
A, according to drawing requirement installing bottom layer reinforced mesh, use angle steel vertically to anchor into below terrace, anchor into the degree of depth not less than 500mm, be welded and fixed support;
B, according to the specification of pre-embedded steel slab and steel plate raw material measure, four corners of pre-embedded steel slab offer hole, location, and the centrage both sides of pre-embedded steel slab length direction respectively offer that an injected hole, described pre-embedded steel slab and anchoring claw are fixing to be connected;
C, according to pre-embedded steel slab position of center line measurement and positioning, the essence whole bolt of Heibei provincial opera and adjusting nut are installed in the position corresponding with hole, location at independent fixed support, adjusting pre-embedded steel slab essence to put down, after passed examination, casting concrete is to higher than adjusting nut upper end 2-4mm vibration compacting;
Complete the installation of pre-embedded steel slab before D, concrete initial set, and adjust absolute altitude, flatness, after passed examination, whole for essence Heibei provincial opera bolt is fixed with location hole spot welding, then pre-embedded steel slab periphery concrete floor filling-in and be compacted receive light and maintenance;
E, slip casting funnel fill grouting material is installed at injected hole, fills compensating concrete bleeding by the grouting material that flows automatically with grouting material, utilizes from close performance and shrink gap, it is to avoid embedded part large area hollowing occurs;
Described fixed support is independent rack.4 hoisting rings are installed on described pre-embedded steel slab.Perfusion for the shrinkage-free grouting material of high intensity in described injected hole.Described pre-embedded steel slab blanking uses mechanical shearing or plasma cutting, it is to avoid hot-working produces steel plate deformed.The centrage of said two injected hole distance pre-embedded steel slab length direction is all 500mm.A diameter of 30 mm of described injected hole 4.Described location bore dia is 20mm.
The invention has the beneficial effects as follows: (1) concreting is convenient, vibration compacting can improve efficiency of construction;(2) deviation is found after pre-embedded steel slab is installed, can be flat with adjusting bolt essence in time, it is ensured that construction flatness;(3) irrigating high strength grout by injected hole, by flowing automatically with grouting material, utilizing, grouting material shrinks gap from close performance compensation concrete water bleeding, and embedded part large area hollowing can be avoided to occur;(4) pre-embedded steel slab is not required to offer, ash vibrates hole under repair welding, it is to avoid Plate Welding temperature distortion;(5) pre-embedded steel slab integral installation improves bearing capacity, it is ensured that quality, cost-effective.
Accompanying drawing explanation
Fig. 1 is the structural representation of the present invention;
In figure: pre-embedded steel slab 1, anchoring claw 2, hole 3, location, injected hole 4, slip casting funnel 5, hoisting ring 6, the essence whole bolt of Heibei provincial opera 7, fixed support 8.
Detailed description of the invention
The invention will be further described below in conjunction with the accompanying drawings.
Construction method of installation after a kind of terrace heavy steel plate built-in fitting of the present invention, comprises the steps:
A, according to drawing requirement installing bottom layer reinforced mesh, use angle steel vertically to anchor into below terrace, anchor into the degree of depth not less than 500mm, be welded and fixed support 8, fixed support 8 is independent rack;
B, according to the specification of pre-embedded steel slab 1 and steel plate raw material measure, pre-embedded steel slab 1 blanking uses mechanical shearing or plasma cutting, hot-working is avoided to produce steel plate deformed, four corners of pre-embedded steel slab 1 offer the hole, location 3 of a diameter of 20mm, the injected hole 4 of a diameter 30mm is respectively offered on the centrage both sides of pre-embedded steel slab 1 length direction, injected hole 4 is 500mm apart from the centrage of pre-embedded steel slab 1 length direction, described pre-embedded steel slab 1 and the fixing connection of anchoring claw 2, install 4 hoisting rings 6 after pre-embedded steel slab 1 completes;
C, according to pre-embedded steel slab 1 position of center line measurement and positioning, the essence whole bolt of Heibei provincial opera 7 and adjusting nut are installed in the position corresponding with hole 3, location at independent fixed support 8, adjusting pre-embedded steel slab 1 essence flat, after passed examination, casting concrete 9 is to higher than adjusting nut upper end about 3mm vibration compacting;
Complete the installation of pre-embedded steel slab 1 before D, concrete 9 initial set, and adjust absolute altitude, flatness, after passed examination, whole for essence Heibei provincial opera bolt 7 is fixed with location hole 3 spot welding, then pre-embedded steel slab 1 periphery concrete 9 terrace filling-in and be compacted receive light and maintenance;
E, slip casting funnel 5 fill the shrinkage-free grouting material of high intensity is installed at injected hole 4, fills compensating concrete bleeding by the grouting material that flows automatically with grouting material, utilizes from close performance and shrink gap, it is to avoid embedded part large area hollowing occurs.
Described step A is fixed independent rack and is used angle steel welding, and frame bottom anchors into formation independent system in the following soil layer of terrace, the cradle top welding scalable whole bolt of essence Heibei provincial opera 7, and puts down whole for essence Heibei provincial opera bolt 7 essence to pre-embedded steel slab 1 bottom position.
Described step B pre-embedded steel slab can carry out blanking according to embedded part size or convenient size of installing, and stagger reinforced mesh position welding embedded element anchoring claw 2, offers hole 3, location and injected hole 4.
Described step C, D pour terrace concrete, complete pre-embedded steel slab and install after abundant vibration compacting before concrete initial set, and carry out checking to the flatness of pre-embedded steel slab 1, horizontal level and adjust, qualified after adjustments bolt is fixed with positioning hole spot welding.
Described step E installs slip casting funnel 5 on pre-embedded steel slab 1 injected hole 4, and fills high intensity contraction-free grouting concrete.
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410417780.XA CN104234385B (en) | 2014-08-25 | 2014-08-25 | Construction method of installation after a kind of terrace heavy steel plate built-in fitting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410417780.XA CN104234385B (en) | 2014-08-25 | 2014-08-25 | Construction method of installation after a kind of terrace heavy steel plate built-in fitting |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104234385A CN104234385A (en) | 2014-12-24 |
CN104234385B true CN104234385B (en) | 2016-08-10 |
Family
ID=52223209
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410417780.XA CN104234385B (en) | 2014-08-25 | 2014-08-25 | Construction method of installation after a kind of terrace heavy steel plate built-in fitting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104234385B (en) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104831731B (en) * | 2015-04-15 | 2017-04-05 | 广东省建筑工程集团有限公司 | A kind of substrate bottom concrete casting method |
CN105040982B (en) * | 2015-07-05 | 2017-04-12 | 宜昌三峡送变电工程有限责任公司 | Reserve embedded postposition construction method of switch gear room of transformer substation |
CN105040826B (en) * | 2015-08-05 | 2018-03-13 | 中国电建集团贵阳勘测设计研究院有限公司 | A kind of standardization fastener inserts and its construction method for structural concrete construction |
CN105908944A (en) * | 2016-04-20 | 2016-08-31 | 湖北永益金属地板有限公司 | Construction method of metal floor product |
CN105926899A (en) * | 2016-05-13 | 2016-09-07 | 陕西柴油机重工有限公司 | Preparation technique for steel plate terrace of industrial workshop |
CN108005349A (en) * | 2017-11-30 | 2018-05-08 | 中建六局第三建筑工程有限公司 | Leveling method for super large ultra-flat terrace built-in fitting |
CN108193702B (en) * | 2017-12-28 | 2020-07-10 | 中国核工业二四建设有限公司 | Combined construction method of grouting material and concrete at bottom of embedded part |
CN109441111A (en) * | 2018-12-20 | 2019-03-08 | 北京首钢建设集团有限公司 | A kind of superduty embedded part mounting and fixing support method of conticaster |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2625956A1 (en) * | 1976-06-10 | 1977-12-15 | Fraunhofer Ges Forschung | Welding tubes into tube plastes by explosion plating - using steel plug to prevent bulging of the tube near the tube plate |
CN101307605A (en) * | 2008-06-06 | 2008-11-19 | 中冶天工上海十三冶建设有限公司 | High precision apparatus foundation mounting method |
CN201560432U (en) * | 2009-11-17 | 2010-08-25 | 武汉一冶钢结构有限责任公司 | Elevation and levelness adjusting device of pre-embedded steel sheet |
CN202194289U (en) * | 2011-07-29 | 2012-04-18 | 沈阳远大铝业工程有限公司 | Flat embedded part |
CN102619235A (en) * | 2012-04-17 | 2012-08-01 | 中国建筑第五工程局有限公司 | Concrete foundation embedded bolt bracket and embedding method for concrete foundation embedded bolts |
CN103790377A (en) * | 2012-10-29 | 2014-05-14 | 五冶集团上海有限公司 | Heavy embedded part ultrahigh mounting precision control method |
CN103835308A (en) * | 2012-11-23 | 2014-06-04 | 江西昌河航空工业有限公司 | Method for installing embedded base plate of machine tool |
-
2014
- 2014-08-25 CN CN201410417780.XA patent/CN104234385B/en active IP Right Grant
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2625956A1 (en) * | 1976-06-10 | 1977-12-15 | Fraunhofer Ges Forschung | Welding tubes into tube plastes by explosion plating - using steel plug to prevent bulging of the tube near the tube plate |
CN101307605A (en) * | 2008-06-06 | 2008-11-19 | 中冶天工上海十三冶建设有限公司 | High precision apparatus foundation mounting method |
CN201560432U (en) * | 2009-11-17 | 2010-08-25 | 武汉一冶钢结构有限责任公司 | Elevation and levelness adjusting device of pre-embedded steel sheet |
CN202194289U (en) * | 2011-07-29 | 2012-04-18 | 沈阳远大铝业工程有限公司 | Flat embedded part |
CN102619235A (en) * | 2012-04-17 | 2012-08-01 | 中国建筑第五工程局有限公司 | Concrete foundation embedded bolt bracket and embedding method for concrete foundation embedded bolts |
CN103790377A (en) * | 2012-10-29 | 2014-05-14 | 五冶集团上海有限公司 | Heavy embedded part ultrahigh mounting precision control method |
CN103835308A (en) * | 2012-11-23 | 2014-06-04 | 江西昌河航空工业有限公司 | Method for installing embedded base plate of machine tool |
Also Published As
Publication number | Publication date |
---|---|
CN104234385A (en) | 2014-12-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101871265B (en) | Flat shim plate-adjustable grouting installation method | |
CN104120647B (en) | It is suitable for section assembling concrete frame bridge pier system and the construction method of rapid construction | |
JP2007527971A (en) | How to set up a tower | |
CN103526770B (en) | A kind of construction method of high antiseepage anti-floating pile raft structure | |
CN104499504B (en) | A kind of road inspection well and construction method thereof | |
CN102758445B (en) | Foundation forming method for wind driven generator tower | |
CN204040056U (en) | A kind of location and installation support of pre-embedded anchoring bolts | |
CN104314314A (en) | Grouting connection construction method | |
DK2488338T3 (en) | Process for the preparation of tower segment-concrete finished parts of a wind power installation tower and formwork unit for production of concrete finished parts | |
CN105386778A (en) | Tunnel underground excavation and lining construction trolley and tunnel underground excavation and lining construction method | |
CN202194244U (en) | Positioning support for embedding of ultra-high steel-work pedestals | |
CN103205979B (en) | Method for constructing large raft foundation under high temperature | |
CN201826325U (en) | Foundation structure of tower crane | |
CN203755334U (en) | Single-pipe tower prefabricated spiral steel pipe pile foundation | |
CN201896365U (en) | Installing and fixing device for flat plate pre-embedded piece on surface of concrete | |
CN205000256U (en) | Cast -in -place case roof beam of high mound of bridge construction support system | |
CN102864795B (en) | Light steel factory post foundation suitable for sedimentation of filled-in ground and construction method | |
CN102383628B (en) | Construction device and construction method for post construction of depressing cone of silo structure | |
CN107119917B (en) | Increase the construction method of basement structure behind strip footing house | |
CN204054323U (en) | Steel construction assembled beam making bench | |
CN107059920B (en) | Loess formation piping lane construction technology | |
CN203809870U (en) | Supporting and fixing tool for level pump pipe on concrete floor | |
CN105937274B (en) | The prefabricated horizontal piece channel steel of shear wall is welded to connect device and connection method | |
CN203080430U (en) | Assembly and cast-in-place combined type reinforced concrete pipe type culvert | |
CN207616844U (en) | Foundation platform precast concrete side form and molding machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |