CN105908944A - Construction method of metal floor product - Google Patents

Construction method of metal floor product Download PDF

Info

Publication number
CN105908944A
CN105908944A CN201610245739.8A CN201610245739A CN105908944A CN 105908944 A CN105908944 A CN 105908944A CN 201610245739 A CN201610245739 A CN 201610245739A CN 105908944 A CN105908944 A CN 105908944A
Authority
CN
China
Prior art keywords
metal floor
construction method
metal
formation level
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610245739.8A
Other languages
Chinese (zh)
Inventor
李明信
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUBEI YONGYI METAL FLOOR CO Ltd
Original Assignee
HUBEI YONGYI METAL FLOOR CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUBEI YONGYI METAL FLOOR CO Ltd filed Critical HUBEI YONGYI METAL FLOOR CO Ltd
Priority to CN201610245739.8A priority Critical patent/CN105908944A/en
Publication of CN105908944A publication Critical patent/CN105908944A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/02Flooring or floor layers composed of a number of similar elements
    • E04F15/06Flooring or floor layers composed of a number of similar elements of metal, whether or not in combination with other material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/02Flooring or floor layers composed of a number of similar elements
    • E04F15/0215Flooring or floor layers composed of a number of similar elements specially adapted for being adhesively fixed to an underlayer; Fastening means therefor; Fixing by means of plastics materials hardening after application
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/02Flooring or floor layers composed of a number of similar elements
    • E04F15/02044Separate elements for fastening to an underlayer
    • E04F2015/02105Separate elements for fastening to an underlayer without load-supporting elongated furring elements between the flooring elements and the underlayer
    • E04F2015/02111Separate elements for fastening to an underlayer without load-supporting elongated furring elements between the flooring elements and the underlayer not adjustable

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Floor Finish (AREA)

Abstract

The invention relates to a construction method of a metal floor product. The construction method comprises the steps that before construction, a cement base surface free of structural defects is selected as a construction base surface, and the levelness deviation, the flatness and the strength of the cement base surface reach the engineering standard; checking is conducted, the longitudinal laying angle and the transverse laying angle of the metal floor are set, and the metal floor is spliced tentatively; expansion screw holes are sequentially drilled in the metal floor spliced tentatively one by one; dust falling on the metal floor base surface is removed thoroughly; epoxy resin, a curing agent, a filling agent and a thinning agent are weighed according to standard measurement, stirred sufficiently and uniformly, and used up before curing; the metal floor is laid, and the effect that the horizontal lines are located on the same line is guaranteed; and expansion bolts are installed in the expansion screw holes in the laid metal floor and screwed. According to the construction method, the design is reasonable, the operation process is simple, the construction efficiency is high, the construction quality is high, the service life of the metal floor can be effectively prolonged, and the construction method is suitable for application and popularization.

Description

A kind of construction method of metal floor product
Metal field
The present invention relates to floor construction metal field, particularly relate to the construction method of a kind of metal floor product.
Background technology
Traditional industrial plant cement flooring badly broken, the steel plate about usually 10mm thickness is directly layered on mill floor, stamps straight hole screw locking in surface layer one fixed point, and not only efficiency of construction is on the low side, and construction quality is the highest, and also has the disadvantages that
1. heavy goods vehicles walks back and forth and is easily generated bigger empty sound sound;
2. time one long steel plate can be protruding, and steel plate cost is the highest;
3. screw is vertical-type, uses a period of time easily to loosen, shortens the service life of steel plate.
Summary of the invention
For problem above, the present invention proposes that a kind of reasonable idea, operating process are simple, and efficiency of construction is high, quality is high, can be effectively improved the construction method of the metal floor product in floor service life.
Technical scheme is as follows:
The construction method of above-mentioned metal floor product, it comprises the following steps: (1) selects formation level, and before i.e. selecting construction, levelness deviation, flatness, strength grade require to reach the cement basal plane of engineering specification and non-structure defect as formation level;(2) metal floor is spelled in examination, i.e. checks and approves and set the angle that longitudinally, laterally metal floor is laid, and metal floor is spelled in examination;(3) brill is beaten on expansion screw, i.e. metal floor after examination is spelled, and arranges in order, and brill is beaten and expanded screw one by one, until completing and taking out the metal floor that examination is spelled in order;(4) clean dust, i.e. clean up the dust on metal floor basal plane that falls after expansion screw beaten by brill, dust is not fallen in expansion screw;(5) metal special-purpose adhesive is scraped in preparation painting, i.e. weighs the epoxy resin of 30 ~ 50 parts, the curing agent of 8 ~ 14 parts, the filler of 60 ~ 100 parts, the diluent of 1 ~ 3 part by standard metering respectively and stirs, using complete before curing;(6) laying metal floor, the requirement one piece piece when i.e. spelling according to examination is laid metal floor and guarantees that horizontal line is point-blank;(7) load expansion bolt in dress expansion bolt, i.e. expansion screw on the metal floor laid and tighten, having twisted rear scrub and entered back into down examination spelling metal floor operation together.
The construction method of described metal floor product, wherein: before described step (1) construction, formation level must not have down cold water or seeping phenomenon, formation level flatness requirement is measured with 2 meters of guiding rulers and allows space to be less than 5mm, formation level strength grade requires to reach more than c20, formation level should firm, solid, do not flake, do not play ash, must not there be crackle, pit, play husky, greasy dirt and former epoxies floor coatings layer defects, pre-treatment of constructing must be carried out, till up to standard if any any of the above-described defect.
The construction method of described metal floor product, wherein: described step (2) repairs the degree of depth more than more than 10mm for formation level, area, more than more than 1/4th of metal floor single-block area, must mark on metal floor plate face respectively, in case the expansion screw drilling deeper;Markd place is done in metal floor plate face by described step (3) need to be with longer drill bit, and the length of the bit should be added formation level and repair the degree of depth;Described step (7) mixes lengthening expansion bolt, to guarantee that formation level, metal special-purpose adhesive, metal floor are connected with each other firmly at the hole expanding screw done on markd metal floor.
The construction method of described metal floor product, wherein: the dust fallen into when cleaning in expansion screw need to be cleaned up by described step (4).
The construction method of described metal floor product, wherein: described step (5) is coated with when scraping described metal special-purpose adhesive, uniformly need to be coated with toothed scraper plate scrapes on the formation level holed, the most all expansion screw holes need to fill up this adhesive material, whole formation level require to be coated with scrape the most closely knit.
The construction method of described metal floor product, wherein: described step (6) is operating personnel's not operation or walk about, in case polluting metal floor plate face on plate face when laying.
Beneficial effect:
The construction method reasonable idea of metal floor product of the present invention, operating process is simple, have employed a certain amount of metal special 3mm thickness adhesive and can pour in expansion screw, allow adhesive and expansion bolt, the expansion screw hole of metal floor basal plane tightly connects together and does not loosens, it is coated with again to scrape and metal floor and formation level closely can be linked to be entirety on whole basal plane, it is big that expansion bolt defines again little bottom, top after tightly twisting, also be cannot be loosened after by large impact power again on metal floor basal plane, efficiency of construction is high, quality is high, substantially increase the service life of metal floor.
Detailed description of the invention
The construction method of metal floor product of the present invention, specifically includes following steps:
S010, selection formation level
Before selecting construction, cement basal plane levelness deviation need to reach the relevant standard-required of building ground engineering, the most flashing or seeping phenomenon, and flatness requirement is measured with 2 meters of guiding rulers and allows space to be less than 5mm, and strength grade requires to reach more than c20;Formation level should firm, solid, do not flake, do not play ash, must not have crackle, pit, play the defects such as husky, greasy dirt and original epoxies floor coatings layer, must carry out, if any any of the above-described defect, pre-treatment of constructing, till up to standard.‘
Metal floor is spelled in S020, examination
Check and approve and set the angle that longitudinally, laterally floor is laid, the degree of depth is repaired for formation level and is more than more than 1/4th of metal floor single-block area more than more than 10mm and area, need to mark respectively on plate face, in case the expansion screw drilling deeper.
Expansion screw beaten by S030, brill
On metal floor after examination is spelled, arranging in order, bore one by one and beat expansion screw, metal floor plate face is done the longer drill bit in markd place, the length of the bit should be added formation level and repair the degree of depth, until completing and taking out the metal floor that examination is spelled in order.
S040, cleaning dust
Try not to sweep dust when cleaning and fall in expansion screw hole, to falling into the dust expanded in screw hole, washing with specific purpose tool and take, otherwise metal adhesive cannot fall in hole, finally affecting its using effect, whole metal floor basal plane must clean up.
Metal special-purpose adhesive is scraped in S050, preparation painting
Weigh the epoxy resin of 30 ~ 50 parts, the curing agent of 8 ~ 14 parts, the filler of 60 ~ 100 parts, the diluent of 1 ~ 3 part by standard metering respectively and stir, use complete (generally in 30 minutes before curing, can solidify more than 30 minutes special-purpose adhesives, using effect is not good enough);When this metal special-purpose adhesive is scraped in painting, need to uniformly be coated with toothed scraper plate and scrape on the formation level holed, the most all expansion screw holes need to fill up this adhesive material, whole formation level require to be coated with scrape the most closely knit.
S060, laying metal floor
In process of deployment, requirement when must spell according to examination is gone the laying of a piece a piece and guarantees that horizontal line is point-blank;Wherein, operating personnel's not operation or walk about, in case polluting metal floor plate face on metal floor plate face during laying.
S070, dress expansion bolt
The floor marked on plate face, its hole should mix lengthening expansion bolt, it is ensured that formation level, metal special-purpose adhesive, metal floor are connected with each other firmly;Other expand the most critical stubborn expansion bolt of hole of screw and check one by one, twist expansion bolt with leakproof, enter back into down examination together with clean useless cloth scrub and spell metal floor operation after all having twisted.
The construction method reasonable idea of metal floor product of the present invention, operating process are simple, and efficiency of construction is high, and construction quality is high, can be effectively improved floor service life, be suitable to popularization and application.

Claims (6)

1. the construction method of a metal floor product, it is characterised in that comprise the following steps:
(1) formation level is selected
Before selecting construction, levelness deviation, flatness, strength grade require to reach the cement basal plane of engineering specification and non-structure defect as formation level;
(2) metal floor is spelled in examination
Checking and approving and set the angle that longitudinally, laterally metal floor is laid, metal floor is spelled in examination;
(3) expansion screw beaten by brill
On metal floor after examination is spelled, arrange in order, bore one by one and beat expansion screw, until completing and taking out the metal floor that examination is spelled in order;
(4) dust is cleaned
Clean up the dust on metal floor basal plane that falls after expansion screw beaten by brill, dust is not fallen in expansion screw;
(5) metal special-purpose adhesive is scraped in preparation painting
Weigh the epoxy resin of 30 ~ 50 parts, the curing agent of 8 ~ 14 parts, the filler of 60 ~ 100 parts, the diluent of 1 ~ 3 part by standard metering respectively and stir, using complete before curing;
(6) metal floor is laid
Requirement one piece one piece when spelling according to examination is laid metal floor and guarantees that horizontal line is point-blank;
(7) dress expansion bolt
Load expansion bolt in expansion screw on the metal floor laid and tighten, having twisted rear scrub and entered back into down examination spelling metal floor operation together.
2. the construction method of metal floor product as claimed in claim 1, it is characterized in that: before described step (1) construction, formation level must not have down cold water or seeping phenomenon, formation level flatness requirement is measured with 2 meters of guiding rulers and allows space to be less than 5mm, formation level strength grade requires to reach more than c20, formation level should firm, solid, do not flake, do not play ash, must not there be crackle, pit, play husky, greasy dirt and former epoxies floor coatings layer defects, pre-treatment of constructing must be carried out, till up to standard if any any of the above-described defect.
3. the construction method of metal floor product as claimed in claim 1, it is characterized in that: described step (2) repairs the degree of depth more than more than 10mm for formation level, area is more than more than 1/4th of metal floor single-block area, must mark respectively on metal floor plate face, in case the expansion screw drilling deeper;
Markd place is done in metal floor plate face by described step (3) need to be with longer drill bit, and the length of the bit should be added formation level and repair the degree of depth;
Described step (7) mixes lengthening expansion bolt, to guarantee that formation level, metal special-purpose adhesive, metal floor are connected with each other firmly at the hole expanding screw done on markd metal floor.
4. the construction method of metal floor product as claimed in claim 1, it is characterised in that: the dust fallen into when cleaning in expansion screw need to be cleaned up by described step (4).
5. the construction method of metal floor product as claimed in claim 1, it is characterized in that: described step (5) is coated with when scraping described metal special-purpose adhesive, uniformly need to be coated with toothed scraper plate scrapes on the formation level holed, the most all expansion screw holes need to fill up this adhesive material, whole formation level require to be coated with scrape the most closely knit.
6. the construction method of metal floor product as claimed in claim 1, it is characterised in that: described step (6) is operating personnel's not operation or walk about, in case polluting metal floor plate face on plate face when laying.
CN201610245739.8A 2016-04-20 2016-04-20 Construction method of metal floor product Pending CN105908944A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610245739.8A CN105908944A (en) 2016-04-20 2016-04-20 Construction method of metal floor product

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610245739.8A CN105908944A (en) 2016-04-20 2016-04-20 Construction method of metal floor product

Publications (1)

Publication Number Publication Date
CN105908944A true CN105908944A (en) 2016-08-31

Family

ID=56746551

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610245739.8A Pending CN105908944A (en) 2016-04-20 2016-04-20 Construction method of metal floor product

Country Status (1)

Country Link
CN (1) CN105908944A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114108995A (en) * 2020-08-26 2022-03-01 江苏鑫达建设工程有限公司 High-flatness stainless steel ground construction process

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1037432A (en) * 1996-07-26 1998-02-10 Toyo Exterior Co Ltd Imitation stone of outdoor structure, or tile bonding fixing device, and its bonding fixing method
CN2334821Y (en) * 1998-04-06 1999-08-25 陈耀宗 Sandwich type over mounted floor structure
CN2422370Y (en) * 1999-11-26 2001-03-07 李富安 Metal split decorative surface veneer
CN2685435Y (en) * 2004-02-05 2005-03-16 杭州金星铜工程有限总公司 Metal wall and floor board
CN103628650A (en) * 2013-11-28 2014-03-12 中国五冶集团有限公司 Metal floor and formation method
CN104234385A (en) * 2014-08-25 2014-12-24 中国十七冶集团有限公司 Mounting and construction method for terrace large-size steel plate embedded part
CN204510732U (en) * 2015-02-05 2015-07-29 湖北永益金属地板有限公司 A kind of convex-type metal floor

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1037432A (en) * 1996-07-26 1998-02-10 Toyo Exterior Co Ltd Imitation stone of outdoor structure, or tile bonding fixing device, and its bonding fixing method
CN2334821Y (en) * 1998-04-06 1999-08-25 陈耀宗 Sandwich type over mounted floor structure
CN2422370Y (en) * 1999-11-26 2001-03-07 李富安 Metal split decorative surface veneer
CN2685435Y (en) * 2004-02-05 2005-03-16 杭州金星铜工程有限总公司 Metal wall and floor board
CN103628650A (en) * 2013-11-28 2014-03-12 中国五冶集团有限公司 Metal floor and formation method
CN104234385A (en) * 2014-08-25 2014-12-24 中国十七冶集团有限公司 Mounting and construction method for terrace large-size steel plate embedded part
CN204510732U (en) * 2015-02-05 2015-07-29 湖北永益金属地板有限公司 A kind of convex-type metal floor

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
孙敬宇: "《施工员一本通》", 30 June 2013 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114108995A (en) * 2020-08-26 2022-03-01 江苏鑫达建设工程有限公司 High-flatness stainless steel ground construction process

Similar Documents

Publication Publication Date Title
CN103669871A (en) Method for comprehensively preventing and treating indirect cracks in premixed concrete construction periods
CN109978378B (en) Post-construction evaluation method for new construction to pass through existing road facilities
CN105421254A (en) In-situ repairing method of upper pinner of rail transit bridge support and pinner formwork
CN105908944A (en) Construction method of metal floor product
Sinenko et al. Construction machines requirement for the building site
CN106120835A (en) A kind of circular concrete structures toe board panel guide rail and levelling construction thereof
Luchko et al. Degradating concrete and reinforced concrete building structures and long-term structures
CN204252572U (en) A kind of ruggedized construction of outer side bar concrete structure
CN104675138B (en) A kind of slab balcony reinforcement means for sound insulation and noise reducing transformation
CN106192701B (en) Construction method for repaving asphalt coat after the lower concrete road surface punishment of high and cold heavy duty
CN214925717U (en) Stirring roller for preparing grouting material
CN211973156U (en) Comprehensive reinforcing structure for top plate void of steel-concrete combined section of steel-concrete combined beam bridge
CN104929379A (en) Reinforcing method for reinforced concrete beam board
Chennareddy Retrofit of Corroded Metal Culverts Using GFRP Slip-Liner
CN106479299A (en) A kind of new concrete accelerated surface renovation agent and construction method
CN206428716U (en) A kind of circular concrete structures toe board panel guide rail
CN103663135B (en) Composite stick steel repairing and reinforcing technology of concrete rail-bearing beam of crane
CN205276286U (en) Chemical anchor bolts steel bearing structure of automatic servo stress system of neighbour's subway deep basal pit
CN109595008A (en) A kind of restorative procedure of Tunnel Second Lining concrete dew muscle
CN113152311B (en) Steel bridge deck pavement maintenance method and performance evaluation method after maintenance
CN215574435U (en) Measuring device for use amount of asphalt pavement broken stone seal
CN117026753A (en) Old cement pavement disease treatment construction process and drilling device
Enshassi et al. Material wastage on construction sites in the Gaza strip
CN108484856B (en) Holding vessel bottom restorative procedure
ADEBIYI¹ et al. PROMOTING SUSTAINABLE WASTE MANAGEMENT ON CONSTRUCTION SITES IN NIGERIA

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160831