Prior art keywords
head plate
anchor bolts
chemical anchor
seal head
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520898968.0U
Other languages
Chinese (zh)
Inventor
顾小强
台登红
曾海霞
王诚
刘建明
张子琪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Co Ltd of China Construction Third Engineering Division
Original Assignee
Third Construction Co Ltd of China Construction Third Engineering Division
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Co Ltd of China Construction Third Engineering Division filed Critical Third Construction Co Ltd of China Construction Third Engineering Division
Priority to CN201520898968.0U priority Critical patent/CN205276286U/en
Application granted granted Critical
Publication of CN205276286U publication Critical patent/CN205276286U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a chemical anchor bolts steel bearing structure of automatic servo stress system of neighbour's subway deep basal pit, including pre -buried seal head plate in the underground continuous wall side, seal head plate adopts the chemical anchor bolts anchor in the underground continuous wall side, chemical anchor bolts are provided with the sealing cement waterproof layer with seal head plate's junction, seal head plate's lower part is fixed with outwardly directed horizontal floor, last a pair of curb plate and the front panel of setting up of horizontal floor, seal head plate, a pair of curb plate and hoarding synthesis in front uncovered formula just is used for placing the control box of jack, horizontal floor's upper surface is provided with the jacking bracket, horizontal floor's bottom is provided with the enhancement supporting leg of being connected with seal head plate, strengthen carrying out the anchor through perforation plug welding mode between supporting leg and seal head plate and the horizontal floor. The utility model discloses a chemical anchor bolts satisfy pulling force load and vertical shear stress that seal head plate connects the steel shotcrete with seal head plate anchor to underground continuous wall, guarantee underground continuous wall's waterproof performance.

Description

The chemical anchor bolts Steel Support Structure of adjacent Metro Deep Excavation automatic servo stress system
Technical field
The utility model relates to adjacent Metro Deep Excavation automatic servo stress system field, in particular to the chemical anchor bolts Steel Support Structure of a kind of adjacent Metro Deep Excavation automatic servo stress system.
Background technology
In bracing of foundation pit construction process, bracing of foundation pit unit is not when underground diaphragm wall pre-embedded steel slab, it is easy to cause underground diaphragm wall to seep water, and can not meet pulling force load and the vertical shearing stress of head plate connection bracing members.
Practical novel content
The purpose of this utility model is the above-mentioned deficiency for prior art and defect, the chemical anchor bolts Steel Support Structure of a kind of adjacent Metro Deep Excavation automatic servo stress system is provided, this chemical anchor bolts Steel Support Structure meets pulling force load and the vertical shearing stress that head plate connects bracing members, and can prevent underground diaphragm wall from seeping water, it is possible to solve the problem.
The technical problem that the utility model solves can realize by the following technical solutions:
The chemical anchor bolts Steel Support Structure of adjacent Metro Deep Excavation automatic servo stress system, it is characterized in that, comprise the head plate being embedded in underground diaphragm wall side, described head plate adopts chemical anchor bolts to be anchored at described underground diaphragm wall side, the junction of described chemical anchor bolts and described head plate is provided with sealing ointment waterproof layer, the bottom of described head plate is fixed with the horizonal base plate outwards stretched out, described horizonal base plate arranges pair of side plates and front panel, described head plate, pair of side plates and front panel enclose an opened type and the controlling box in order to place screw block, the upper surface of described horizonal base plate is provided with screw block bearing, the bottom of described horizonal base plate is provided with the reinforcement being connected with described head plate and supports leg, described reinforcement supports and carries out anchoring by perforation plug welding mode between leg and described head plate and described horizonal base plate.
In a preferred embodiment of the present utility model, described pair of side plates is H profile steel, and the outer side of described H profile steel is provided with stiffening plate.
Owing to have employed technical scheme as above, the beneficial effects of the utility model are:
1, adopt chemical anchor bolts that head plate is anchored to underground diaphragm wall, choose pulling force load and vertical shearing stress that suitable chemical anchor bolts specification meets head plate and connects bracing members, chemical anchor bolts technique is reliably safer compared to mode of connection such as other forms of welding, acid and alkali-resistance, ageing-resistant, resistance toheat is good, and in wet environment, long-term load is stable, and anti-weldering, flame retardant properties are good;
2, the junction of chemical anchor bolts and head plate is provided with sealing ointment waterproof layer, ensures the water resistance of underground diaphragm wall;
3, the bottom of horizonal base plate is provided with the reinforcement being connected with head plate and supports leg, strengthen supporting plug welding mode of boring a hole between leg and head plate and horizonal base plate and carry out anchoring, not only strengthen the intensity of controlling box, and ensure strength of joint further by perforation plug welding mode.
4, solving the problem not installing built-in fitting in construction on ground-connecting-wall, ensure that bracing members is installed effectively can be connected with ground-connecting-wall, and construction technology efficiency height, can not affect the duration, and installation operation is convenient, and after installation, energy consolidation rapidly, has higher bearing capacity.
Accompanying drawing explanation
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, it is briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only embodiments more of the present utility model, for those of ordinary skill in the art, under the prerequisite not paying creative work, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the front view of a kind of embodiment of the utility model.
Fig. 2 is the A-A sectional view of Fig. 1.
Fig. 3 is the use procedure schematic diagram of chemical anchor bolts of the present utility model.
Embodiment
In order to the utility model is realized technique means, creation characteristic, reach object and effect is easy to understand, set forth the utility model below further.
See the chemical anchor bolts Steel Support Structure of the adjacent Metro Deep Excavation automatic servo stress system shown in Fig. 1 and Fig. 2, comprise the head plate 200 being embedded in underground diaphragm wall 100 side, head plate 200 adopts chemical anchor bolts 300 to be anchored at underground diaphragm wall 100 side, head plate 200 is 20mm Plate Steel, adopt chemical anchor bolts 300 that head plate 200 is anchored to underground diaphragm wall 100, meet pulling force load and vertical shearing stress that head plate connects bracing members, chemical anchor bolts technique is reliably safer compared to mode of connection such as other forms of welding, acid and alkali-resistance, ageing-resistant, resistance toheat is good, in wet environment, long-term load is stablized, anti-weldering, flame retardant properties is good. in order to ensure the water resistance of underground diaphragm wall, chemical anchor bolts 300 are provided with sealing ointment waterproof layer (not shown) with the junction of head plate 200.
The bottom of head plate 200 is fixed with the horizonal base plate 400 outwards stretched out, horizonal base plate 400 arranges pair of side plates 500 and front panel 600, head plate 200, pair of side plates 500 and front panel 600 enclose an opened type and the controlling box 1000 in order to place screw block 900, and front panel 600 is connected with bracing members 800. The upper surface of horizonal base plate 400 is provided with screw block bearing 410. In order to strengthen the intensity of controlling box 1000, the pair of side plates 500 in the present embodiment is H profile steel, and the outer side of H profile steel is provided with stiffening plate 510.
The bottom of horizonal base plate 400 is provided with the reinforcement being connected with head plate 200 and supports leg 700, strengthen supporting plug welding mode of boring a hole between leg 700 and head plate 200 and horizonal base plate 400 and carry out anchoring, not only strengthen the intensity of controlling box 1000, and ensure strength of joint further by perforation plug welding mode.
Construction process of the present utility model is as follows:
1, surveying setting-out:
The feature of incorporation engineering, by the height of survey grid rank and specifically in the application of engineering different sites, engineering surveying control network arranges plane/elevation one-level SURVEYING CONTROL NETWORK and two grades of SURVEYING CONTROL NETWORK.
2, shown in composition graphs 3, the technical process of chemical anchor bolts and key points for operation:
(1) technical process:
Boring �� clear hole �� insert medicament pipe �� bore into bolt �� gelation process �� process of setting �� fixed object.
(2) key points for operation:
1. hole:
First according to design requirements, position is reserved by drawing spacing (distance between adjacent crab-bolt axis), back gauge (crab-bolt axis is to the distance at the free edge of component), base material is holed, by design bolt model, installation parameter table according to bolt determines aperture, hole depth, determines the drilling depth needed by crab-bolt type and size. The selection of screw rod model to be met the requirement of anchoring thickness, and anchoring thickness equals by the thickness of anchoring object.
2. clear hole:
Use air pressure blowpipe, floating dust in hole is removed, clean in retaining hole.
3. medicament pipe is inserted:
In hole clean for the insertion of medicament pipe, during insertion, will ensure that resin can flow when hand temperature as honey, can make with medicament pipe.
4. bore into bolt:
] a. electric drill screws in screw rod, till medicament flows out.
B. electric drill uses the supporting electric drill (possess boring and screw in the dual-use function of screw rod) that producer provides, and drilling speed is 750n/min.
C. bolt screws in, and medicament pipe is broken, resin. Solidifying agent and quartz particles mixing, and fill the hole between crab-bolt and hole wall.
During the wet hole that d. insertion of medicament pipe is clean, in hole, water must discharge boring, but the waiting time of gelation process and process of setting must double.
5. gelation process:
Setting tool is kept not move. Chemical time is not less than specification and wants seeking time.
6. process of setting:
Take off setting tool and wait for medicament hardening quietly.
7. fixed object:
After medicament hardens completely, add upper gasket and hex-nut fixed object.
3, pull-out test:
Install to reach after design strength requires until chemical anchor bolts and carry out pull-out test by specialty detection unit according to anchorage depth, anchoring thickness and ultimate bearing capacity, sampling group number is chosen by the higher value of 1/1000 and 3, and on-the-spot selection three place's head plate chemical anchor bolts carry out pull-out test. Pull-out test flow process:
(1) from instrument container, take out instrument, connect screw block and anchor pole drawing instrument;
(2) first opening force value display instrument, reset, and click peak value button, close oil-closing valve, empty load pressurization, it is determined that instrument uses normal, then opens oil valve, makes screw block reinstatement;
(3) for the specification of reinforcing bar or crab-bolt, corresponding ground tackle is chosen, (if crab-bolt, corresponding crab-bolt joint should be chosen and screw);
(4) screw block is inserted in crab-bolt to be checked, closes oil-closing valve, with the tight reinforcing bar of ground tackle anchor, slowly pressurize, until there is no space (having slight firmly sense on hand) between screw block and metope, at this moment, pressurization should be stopped, and clicking clearing button and reset;
(5) uniform load force value, meets and exceeds design force value, and stopping pressurization, clicks peak value button, and the force value that record loads waits 2 minutes, and then records force value now;
4, WATER REPELLENT:
Adopt sealing ointment that head plate and ground-connecting-wall junction are carried out waterproof construction.
(1) service tool base cleaning instrument: spade, broom, wire brush, metal bucket, iron spoon, iron pot, waddy, three conjunction scraper plate or plastic scrapers, scrapers etc.
(2) basic level requirement construction surface must be dry, it is desired to base face water ratio is not more than 9%, and with the logical brush of wire brush, thoroughly removes floating ash.
(3) liquefaction cream is endured: waterproofing unction belongs to heat construction water-proof material. Will product external packaging remove after be positioned in iron pot, slowly heat up, limit heating edge constantly stirs, careful anti-burn caking and become waste product, it is warming up to 100 DEG C-110 DEG C, when product surface black becomes clear, fully dissolves, constant temperature can be constructed, and will affect cohesive strength when material is below 80 DEG C. (when enduring liquefaction cream, forbid emitting in pot tobacco, after stopping work every time, be bonded in the ointment defective material endured on pot processed and answer scraped clean, in order to avoid affecting quality when dissolving ointment next time).
(4) panel seam is filled out: before the cementation of fissures, should clean out in seam, first embed in seam with fiber crops muscle, then painting is repeatedly scraped with a small amount of ointment scraper, scraper-trough conveyer on slot both sides, again ointment being divided to fill out for twice is embedded in seam, itself and parietal suture are cohered firmly, presses densification real, prevent ointment from leaving space with seam wall or entraining into air.
(5) ointment construction: waterproofing unction selects single painting, falls ointment on construction basic unit face when list is coated with, uses scraper plate brushing, strike off its thickness, and its thickness should meet design requirements.
5, perforation plug welding:
Strengthen supporting plug welding mode of boring a hole between leg and head plate and horizonal base plate and carry out anchoring.
When the bracing members assembled stage, part workmen can carry out strengthening supporting the work of leg erecting and welding, and the workmen strengthening supporting leg welding all needs to take appointment with certificate. First with slate pencil, built-in fitting is drawn pre-welding to strengthen supporting leg position, leave mark, and check level with water level gauge. Again reinforcement support 200mm place, leg short limit and built-in fitting being carried out completely soldered connecing, weld bead height must meet design requirement. 300mm place, long limit level bar is measured, it is ensured that strengthens supporting leg and is horizontal, to improve stationarity, the fixing of bracing members. While when excavating the first layer earthwork, the groove below built-in fitting is also together outputed, generally it is excavated to lower about 1.0 meters of built-in fitting.
6, the installation of bracing members:
After head plate and reinforcement support leg install, get final product the bracing members of erection stress make-up system, screw block is lifted in controlling box, connect oil pipe and data transmission line, subsequent construction work can be carried out.
More than show and describe ultimate principle of the present utility model and main characteristic sum advantage of the present utility model. The technician of the industry should understand; the utility model is not restricted to the described embodiments; what describe in above-described embodiment and specification sheets just illustrates principle of the present utility model; under the prerequisite not departing from the utility model spirit and scope; the utility model also has various changes and modifications, and these changes and improvements all fall within the scope of claimed the utility model. The claimed scope of the utility model is defined by appending claims and equivalent thereof.

Claims (2)

1. the chemical anchor bolts Steel Support Structure of adjacent Metro Deep Excavation automatic servo stress system, it is characterized in that, comprise the head plate being embedded in underground diaphragm wall side, described head plate adopts chemical anchor bolts to be anchored at described underground diaphragm wall side, the junction of described chemical anchor bolts and described head plate is provided with sealing ointment waterproof layer, the bottom of described head plate is fixed with the horizonal base plate outwards stretched out, described horizonal base plate arranges pair of side plates and front panel, described head plate, pair of side plates and front panel enclose an opened type and the controlling box in order to place screw block, the upper surface of described horizonal base plate is provided with screw block bearing, the bottom of described horizonal base plate is provided with the reinforcement being connected with described head plate and supports leg, described reinforcement supports and carries out anchoring by perforation plug welding mode between leg and described head plate and described horizonal base plate.
2. the chemical anchor bolts Steel Support Structure of adjacent Metro Deep Excavation automatic servo stress system as claimed in claim 1, it is characterised in that, described pair of side plates is H profile steel, and the outer side of described H profile steel is provided with stiffening plate.
CN201520898968.0U 2015-11-12 2015-11-12 Chemical anchor bolts steel bearing structure of automatic servo stress system of neighbour's subway deep basal pit Active CN205276286U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520898968.0U CN205276286U (en) 2015-11-12 2015-11-12 Chemical anchor bolts steel bearing structure of automatic servo stress system of neighbour's subway deep basal pit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520898968.0U CN205276286U (en) 2015-11-12 2015-11-12 Chemical anchor bolts steel bearing structure of automatic servo stress system of neighbour's subway deep basal pit

Publications (1)

Publication Number Publication Date
CN205276286U true CN205276286U (en) 2016-06-01

Family

ID=56060870

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520898968.0U Active CN205276286U (en) 2015-11-12 2015-11-12 Chemical anchor bolts steel bearing structure of automatic servo stress system of neighbour's subway deep basal pit

Country Status (1)

Country Link
CN (1) CN205276286U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106869135A (en) * 2016-12-20 2017-06-20 杭州江润科技有限公司 Ground-connecting-wall goes along with sb. to guard him the construction method of foundation ditch steel pipe support structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106869135A (en) * 2016-12-20 2017-06-20 杭州江润科技有限公司 Ground-connecting-wall goes along with sb. to guard him the construction method of foundation ditch steel pipe support structure

Similar Documents

Publication Publication Date Title
CN104594348B (en) Enlarged footing bellows anchor pole and construction method thereof
CN102767180A (en) Construction method for strengthening base of static-pressure anchor rod pile
CN102852290A (en) Roof parapet flashing place structure and construction method thereof
CN113882375A (en) Anti-floating anchor rod construction process
CN103741963A (en) Industrial plant foundation strengthening method
CN109629845A (en) Concrete structure seam areas leakage treatment device and its construction method
CN102220762A (en) Method and device for disposing underwater pouring concrete pile breaking accident
CN105386610A (en) Protective construction method for natural-foundation ancient architectures at top of asymmetric deep foundation pit
CN205276286U (en) Chemical anchor bolts steel bearing structure of automatic servo stress system of neighbour's subway deep basal pit
CN105970955A (en) Self-drilling type nail and pipe combined double-liquid grouting soil nail construction process
CN202401561U (en) Multifunctional environment-friendly movable water channel
CN102425228A (en) Multifunctional environment-friendly movable water tank
CN109339118A (en) A kind of basement bottom board leakage-resistant device and construction method
CN111501855A (en) Ground anchor anti-floating structure and construction method thereof
CN208379803U (en) A kind of fine fitment kitchen and toilet waterproof construction modular system
CN208380137U (en) A kind of kitchen and toilet percolating water repairerment system
CN111733894A (en) Anti-floating system of deep foundation pit underground structure and construction process
CN204533836U (en) Pipeline through-flooring leakage-resistant device
CN211816675U (en) Downpipe waterproof casing structure for kitchen and bathroom
CN115596241A (en) Visual concrete crack repairing, sealing and grouting device and using method
CN114808923A (en) Cave grouting construction processing method
CN109537926B (en) Waterproof and leaking stoppage construction method for building area
CN208329204U (en) A kind of reinforced waterproof leakage-proof structure of toilet base
CN112942432A (en) Construction method of anti-leakage brick inspection well
CN217399700U (en) Well sealing structure of deep foundation pit steel pipe dewatering well

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant