CN103741963A CN201410007504.6A CN201410007504A CN103741963A CN 103741963 A CN103741963 A CN 103741963A CN 201410007504 A CN201410007504 A CN 201410007504A CN 103741963 A CN103741963 A CN 103741963A
Authority
CN
China
Prior art keywords
newly
increased
steel pipe
pipe pile
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410007504.6A
Other languages
Chinese (zh)
Other versions
CN103741963B (en
Inventor
董有
万兆
潘沂华
杨娜茵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Bureau South China Co Ltd
Original Assignee
BEIJING AEIDO INTERNATIONAL ENGINEERING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING AEIDO INTERNATIONAL ENGINEERING TECHNOLOGY Co Ltd filed Critical BEIJING AEIDO INTERNATIONAL ENGINEERING TECHNOLOGY Co Ltd
Priority to CN201410007504.6A priority Critical patent/CN103741963B/en
Publication of CN103741963A publication Critical patent/CN103741963A/en
Application granted granted Critical
Publication of CN103741963B publication Critical patent/CN103741963B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention relates to an industrial plant foundation strengthening method, belongs to the field of earthquake-proof strengthening technologies and discloses a foundation processing method. The method comprises the steps of using a newly-increased steel pipe pile and an upper newly-increased concrete bearing platform, fixedly connecting the newly-increased steel pipe pile and the upper newly-increased concrete bearing platform with a primary foundation bearing platform through steel bar anchors, and commonly bearing a newly-added layer structure, so that steadiness and safety of an added layer improving engineering are ensured; and the problems of personnel and property losses caused due to earthquake which is caused due to poor anti-seismic property of original houses in improvement of old plants are solved fundamentally.

Description

A kind of workshop foundation reinforcement means
Technical field
The present invention relates to a kind of reinforcement means, particularly a kind of workshop foundation reinforcement means, belongs to seismic hardening technical field.
Background technology
As everyone knows, building interior adds layer owing to not taking new soil, reduces investment outlay, and can make full use of existing building structure, especially in old old factory rehabilitation, is used widely.But increasing under superstructure load situation, easily cause foundation bearing capacity deficiency or uneven subsidence, need to reinforce factory building foundation.Use newly-increased steel pipe castinplace pile and concrete bearing platform and former foundation platform anchor connection shared, can obtain good consolidation effect, and construction quality is more easy to control, technical economic benefit is higher, but how to reinforce and how to construct, not seeing in prior art, is technical problem urgently to be resolved hurrily in prior art.
Summary of the invention
Based on above-mentioned defect, the present invention proposes a kind of workshop foundation reinforcement means, after the newly-increased concrete bearing platform of the newly-increased steel pipe pile of its use and top is connected by Bar Anchorage with former foundation platform, the based process of the new adding storey structure of shared, has fundamentally solved the technical problem of or differential settlement poor at old factory building storey-adding reconstruction Central Plains foundation bearing capacity.
To achieve these goals, the present invention has taked following technical scheme:
A kind of workshop foundation reinforcement means, comprises original structure grade beam, former foundation platform and former tube-sinking cast-in-situ pile, and described original structure grade beam is arranged on former foundation platform, and described former tube-sinking cast-in-situ pile is anchored in former foundation platform two bottom sides; Also comprise newly-increased concrete bearing platform, newly-increased steel pipe pile and newly-increased anchor bar; Bearing stratum is goed deep in described newly-increased steel pipe pile bottom, described newly-increased concrete bearing platform is set up in newly-increased steel pipe pile top, and described newly-increased concrete bearing platform and newly-increased steel pipe pile are arranged on former foundation platform both sides simultaneously, the described newly-increased concrete bearing platform of both sides and former foundation platform anchor connection, wherein, in described newly-increased concrete bearing platform, be provided with newly-increased anchor bar, horizontally disposed newly-increased anchor bar insert in former foundation platform and with former foundation platform anchor connection, specifically reinforce step as follows:
Step 1: add a layer position according to the old industrial premises standard width of a room in an old-style house, depth, floor height size and inside, determine that industrial premises original structure foundation bearing capacity is not enough or occur differential settlement position, and draw reinforcing drawing;
Step 2: take measurements with the invar tape degree of accuracy according to drawing and determine the position that increases steel pipe pile newly;
Step 3: according to the position of newly-increased steel pipe pile of determining at surface drilling;
Step 4: at the newly-increased steel pipe pile of floor manufacture;
Step 5: vertically lay above-mentioned newly-increased steel pipe pile in surface drilling;
Step 6: adopt φ 30PVC hard plastic tube as Grouting Pipe, once transfer to newly-increased steel pipe pile bottom, and throw in the rubble coarse aggregate that particle diameter is 2-3cm in newly-increased steel pipe pile;
Step 7: by Grouting Pipe slip casting maintenance in newly-increased steel pipe pile;
Step 8: along the former tube-sinking cast-in-situ pile outside excavation heatable adobe sleeping platform of former foundation platform bottom under original structure grade beam, after the former foundation platform sidewall exposing is cleaned up, by design size, make the position of anchor hole and carry out mark, by designing requirement, bored anchor hole and cleaned out with electric percussion drill;
Step 9: will increase anchor bar newly and insert former foundation platform and bore in anchor hole, and pour into macromolecule resin cementing agent, and make newly-increased anchor bar and former foundation platform anchoring solid;
Step 10: by former foundation platform sidewall dabbing and clean up;
Step 11: the design attitude assembling reinforcement of newly-increased concrete bearing platform in former foundation platform both sides, formwork after-pouring forms newly-increased concrete bearing platform.
Preferably, in described step 3, pore-forming facility adopt XJ-100 type geological drilling rig, aperture φ 168mm; During perforate, adopt the in advance premium mud retaining wall of preparation, through after back-up sand layer, adopt natural mud off, enter middle decomposed rock 0.5m, and get whole hole after rock core, adjust mud property, sediment at the bottom of cleaning hole.
Preferably, in described step 4, newly-increased steel pipe pile adopts GB I level Q235B shape steel tube, saves long 6m, and the steel pipe on newly-increased steel pipe pile overflows slurry hole at floor manufacture, and it performs mark, gas cutting pore-forming with invar tape location.
Preferably, in described step 5, newly-increased steel pipe pile bottom interface adopts the φ 159mm seamless steel pipe of overcoat one joint long 25cm, thick 5mm, and upper lower ring hole full weld, and steel pipe is down to after at the bottom of hole, hits reality with weight, passes through sediment and loosened soil at the bottom of hole.
Preferably, in described step 8, the wide x of the long x of the size of described heatable adobe sleeping platform is high=1000mmx1200mmx1500mm.
Preferably, in described step 9, described newly-increased anchor bar is five, and length is 680mm, and diameter is φ 16mm.
Preferably, in described step 9, the anchorage length of described newly-increased anchor bar in former foundation platform is 200mm.
Preferably, in described step 11, the wide x of the long x of described newly-increased concrete bearing platform size is high=500mmx750mmx800mm.
Preferably, in described step 11, the concrete grade of described newly-increased concrete bearing platform is not less than C25.
Preferably, between described newly-increased concrete bearing platform and newly-increased steel pipe pile, be provided with the reinforcing bar running through up and down, its two ends are stretched into respectively in newly-increased concrete bearing platform and newly-increased steel pipe pile.
Based on technique scheme, technique effect of the present invention is: first, the present invention, by newly-increased steel pipe pile and newly-increased concrete bearing platform, has made up the defect of former foundation bearing capacity deficiency; Secondly, in former foundation platform both sides, by anchor measure, new and old cushion cap is closely connected, under extend rock stratum newly-increased steel pipe pile foundation guaranteed that structure can not continue sedimentation; Simultaneously, under the acting in conjunction of newly-increased concrete bearing platform and former foundation platform (being new and old cushion cap), guaranteed the requirement of factory building follow-up adding storey structure in top to bearing capacity of foundation soil, for further utilizing industrial premises space that good reinforcement measure and effect is provided.
Underpin method of the present invention, simple in structure, power transmission is clear and definite, does not destroy the globality of original structure, and construction period do not affect the use function of original structure, with less cost, realize larger economic benefit.
Accompanying drawing explanation
Fig. 1 is that new and old cushion cap connects floor map;
Fig. 2 is that new and old cushion cap connects generalized section.
Reference numeral: 1: original structure grade beam; 2: former foundation platform; 3: former tube-sinking cast-in-situ pile; 4: newly-increased concrete bearing platform; 5: newly-increased steel pipe pile; 6: newly-increased anchor bar.
The specific embodiment
For making object of the present invention, technical scheme and beneficial effect more cheer and bright, below in conjunction with accompanying drawing, embodiments of the invention are described, it should be noted that, in the situation that not conflicting, the feature in embodiment and embodiment in the application can be combined mutually.
As shown in Figure 1-2, a kind of workshop foundation reinforcement means, comprise original structure grade beam 1, former foundation platform 2 and former tube-sinking cast-in-situ pile 3, original structure grade beam 1 is arranged on former foundation platform 2, former tube-sinking cast-in-situ pile 3 is anchored in former foundation platform 2 two bottom sides, and it also comprises newly-increased concrete bearing platform 4, newly-increased steel pipe pile 5 and newly-increased anchor bar 6.Bearing stratum is goed deep in newly-increased steel pipe pile 5 bottoms, newly-increased concrete bearing platform 4 is set up in newly-increased steel pipe pile 5 tops, and newly-increased concrete bearing platform 4 and newly-increased steel pipe pile 5 are arranged on former foundation platform 2 both sides simultaneously, newly-increased concrete bearing platform 4 and former foundation platform 2 anchor connections of both sides, wherein, in described newly-increased concrete bearing platform 4, be provided with newly-increased anchor bar 6, horizontally disposed newly-increased anchor bar 6 insert in former foundation platform 2 and with former foundation platform 2 anchor connections.
Its concrete following steps that adopt are implemented:
Step 1: add a layer position according to the old industrial premises standard width of a room in an old-style house, depth, floor height size and inside, determine that industrial premises original structure foundation bearing capacity is not enough or occur differential settlement position, and draw reinforcing drawing.
Step 2: take measurements with the invar tape degree of accuracy according to drawing and determine the position that increases steel pipe pile 5 newly.
Step 3: according to the position of newly-increased steel pipe pile 5 of determining at surface drilling.Pore-forming facility adopt XJ-100 type geological drilling rig, aperture φ 168mm; During perforate, adopt the in advance premium mud retaining wall of preparation, through after back-up sand layer, adopt natural mud off, enter middle decomposed rock 0.5m, and get whole hole after rock core, adjust mud property, sediment at the bottom of cleaning hole.
Step 4: at the newly-increased steel pipe pile 5 of floor manufacture.Newly-increased steel pipe pile 5 adopts GB I level Q235B shape steel tube, saves long 6m, and the steel pipe on newly-increased steel pipe pile 5 overflows slurry hole at floor manufacture, and it performs mark, gas cutting pore-forming with invar tape location.
Step 5: vertically lay above-mentioned newly-increased steel pipe pile 5 in surface drilling.Newly-increased steel pipe pile 5 bottom interface adopt the φ 159mm seamless steel pipe of overcoats one joint long 25cm, thick 5mm, and upper lower ring hole full weld, and steel pipe is down to after at the bottom of hole, hit reality with weight, pass through sediment and loosened soil at the bottom of hole.
Step 6: adopt φ 30PVC hard plastic tube as Grouting Pipe, once transfer to newly-increased steel pipe pile 5 bottoms, and the rubble coarse aggregate that is 2-3cm at the newly-increased interior input particle diameter of steel pipe pile 5.
Step 7: by Grouting Pipe in the interior slip casting of newly-increased steel pipe pile 5 maintenance.
Step 8: along the former tube-sinking cast-in-situ pile 3 outside excavation heatable adobe sleeping platforms of 1 time former foundation platform 2 bottom of original structure grade beam, the wide x height of the long x of size is 1000mmx1200mmx1500mm; After former foundation platform 2 sidewalls that expose are cleaned up, by design size, make the position of anchor hole and carry out mark, by designing requirement, bored anchor hole and cleaned out with electric percussion drill.
Step 9: the newly-increased anchor bar 6 of five long 680mm diameter phi 16mm is inserted to former foundation platform 2 according to construction requirement and bore in anchor hole, and pour into macromolecule resin cementing agent, and the anchorage length of newly-increased anchor bar 6 in former foundation platform 2 is 200mm, make newly-increased anchor bar 6 solid with former foundation platform 2 anchorings;
Step 10: by former foundation platform 2 sidewall dabbings and clean up.
Step 11: the design attitude assembling reinforcement of newly-increased concrete bearing platform 4 in former foundation platform 2 both sides, formwork after-pouring C25 concrete forms newly-increased concrete bearing platform 4, and the newly-increased wide x height of the long x of concrete bearing platform 4 size is 500mmx750mmx800mm.
Although disclosed embodiment as above, the embodiment that its content just adopts for the ease of understanding technical scheme of the present invention, is not intended to limit the present invention.Technician in any the technical field of the invention; do not departing under the prerequisite of disclosed core technology scheme; can in the form of implementing and details, make any modification and variation; but the protection domain that invention limits, the scope that still must limit with appending claims is as the criterion.

Claims (10)

1. a workshop foundation reinforcement means, comprise original structure grade beam (1), former foundation platform (2) and former tube-sinking cast-in-situ pile (3), it is upper that described original structure grade beam (1) is arranged at former foundation platform (2), and described former tube-sinking cast-in-situ pile (3) is anchored in former foundation platform (2) two bottom sides, also comprise newly-increased concrete bearing platform (4), newly-increased steel pipe pile (5) and newly-increased anchor bar (6), bearing stratum is goed deep in described newly-increased steel pipe pile (5) bottom, described newly-increased concrete bearing platform (4) is set up in newly-increased steel pipe pile (5) top, and described newly-increased concrete bearing platform (4) and newly-increased steel pipe pile (5) are arranged on former foundation platform (2) both sides simultaneously, the described newly-increased concrete bearing platform (4) of both sides and former foundation platform (2) anchor connection, wherein, in described newly-increased concrete bearing platform (4), be provided with newly-increased anchor bar (6), horizontally disposed newly-increased anchor bar (6) insert in former foundation platform (2) and with former foundation platform (2) anchor connection,
It is characterized in that: it is as follows specifically to reinforce step:
Step 1: add a layer position according to the old industrial premises standard width of a room in an old-style house, depth, floor height size and inside, determine that industrial premises original structure foundation bearing capacity is not enough or occur differential settlement position, and draw reinforcing drawing;
Step 2: take measurements with the invar tape degree of accuracy according to drawing and determine the position that increases steel pipe pile (5) newly;
Step 3: according to the position of newly-increased steel pipe pile (5) of determining at surface drilling;
Step 4: at the newly-increased steel pipe pile (5) of floor manufacture;
Step 5: vertically lay above-mentioned newly-increased steel pipe pile (5) in surface drilling;
Step 6: adopt φ 30PVC hard plastic tube as Grouting Pipe, once transfer to newly-increased steel pipe pile (5) bottom, and throw in the rubble coarse aggregate that particle diameter is 2-3cm in newly-increased steel pipe pile (5);
Step 7: by Grouting Pipe slip casting maintenance in newly-increased steel pipe pile (5);
Step 8: along former tube-sinking cast-in-situ pile (3) the outside excavation heatable adobe sleeping platform of the lower former foundation platform (2) of original structure grade beam (1) bottom, after former foundation platform (2) sidewall exposing is cleaned up, by design size, make the position of anchor hole and carry out mark, by designing requirement, bored anchor hole and cleaned out with electric percussion drill;
Step 9: will increase anchor bar (6) newly and insert former foundation platform (2) and bore in anchor hole, and pour into macromolecule resin cementing agent, and make newly-increased anchor bar (6) solid with former foundation platform (2) anchoring;
Step 10: by former foundation platform (2) sidewall dabbing and clean up;
Step 11: the design attitude assembling reinforcement of newly-increased concrete bearing platform (4) in former foundation platform (2) both sides, formwork after-pouring forms newly-increased concrete bearing platform (4).
2. the method for claim 1, is characterized in that: in described step 3, pore-forming facility adopt XJ-100 type geological drilling rig, aperture φ 168mm; During perforate, adopt the in advance premium mud retaining wall of preparation, through after back-up sand layer, adopt natural mud off, enter middle decomposed rock 0.5m, and get whole hole after rock core, adjust mud property, sediment at the bottom of cleaning hole.
3. the method for claim 1, it is characterized in that: in described step 4, newly-increased steel pipe pile (5) adopts GB I level Q235B shape steel tube, save long 6m, steel pipe on newly-increased steel pipe pile (5) overflows slurry hole at floor manufacture, it performs mark, gas cutting pore-forming with invar tape location.
4. the method for claim 1, it is characterized in that: in described step 5, newly-increased steel pipe pile (5) bottom interface adopts the φ 1.59mm seamless steel pipe of overcoat one joint long 25cm, thick 5mm, and upper lower ring hole full weld, steel pipe is down to after at the bottom of hole, hit reality with weight, pass through sediment and loosened soil at the bottom of hole.
5. the method for claim 1, is characterized in that: in described step 8, the wide x of the long x of the size of described heatable adobe sleeping platform is high=and 1000mmx1200mmx1500mm.
6. the method for claim 1, is characterized in that: in described step 9, described newly-increased anchor bar (6) is five, and length is 680mm, and diameter is φ 16mm.
7. the method for claim 1, is characterized in that: in described step 9, the anchorage length of described newly-increased anchor bar (6) in former foundation platform (2) is 200mm.
8. the method for claim 1, is characterized in that: in described step 11, the wide x of the long x of described newly-increased concrete bearing platform (4) size is high=and 500mmx750mmx800mm.
9. the method for claim 1, is characterized in that: in described step 11, the concrete grade of described newly-increased concrete bearing platform (4) is not less than C25.
10. the method for claim 1, it is characterized in that: between described newly-increased concrete bearing platform (4) and newly-increased steel pipe pile (5), be provided with the reinforcing bar running through up and down, its two ends are stretched into respectively in newly-increased concrete bearing platform (4) and newly-increased steel pipe pile (5).
CN201410007504.6A 2014-01-06 2014-01-06 A kind of workshop foundation reinforcement means Active CN103741963B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410007504.6A CN103741963B (en) 2014-01-06 2014-01-06 A kind of workshop foundation reinforcement means

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410007504.6A CN103741963B (en) 2014-01-06 2014-01-06 A kind of workshop foundation reinforcement means

Publications (2)

Publication Number Publication Date
CN103741963A true CN103741963A (en) 2014-04-23
CN103741963B CN103741963B (en) 2015-09-09

Family

ID=50499020

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410007504.6A Active CN103741963B (en) 2014-01-06 2014-01-06 A kind of workshop foundation reinforcement means

Country Status (1)

Country Link
CN (1) CN103741963B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105113387A (en) * 2015-08-27 2015-12-02 苏州同尚工程设计咨询有限公司 Reconstruction structure and construction method of bridge bearing platform
CN105350559A (en) * 2015-11-27 2016-02-24 中国一冶集团有限公司 Construction method suitable for emery structural ground of large factory building
CN106884443A (en) * 2017-03-11 2017-06-23 中国二十二冶集团有限公司 The construction method for grouting reinforcement that foundation bottom is come to nothing
CN108193721A (en) * 2017-12-25 2018-06-22 佛山科学技术学院 It is a kind of constructed for pile framing after to the method for pile test
CN109162210A (en) * 2018-09-04 2019-01-08 广东和立土木工程有限公司 For Bridge repair and reinforcement or widen the newly-increased pile base construction method of enlarging
CN109469087A (en) * 2018-12-24 2019-03-15 南京科技职业学院 Cesspool strengthening of foundation system and its construction method in a kind of industrial premises room
CN110273441A (en) * 2019-06-17 2019-09-24 北京筑福建筑科学研究院有限责任公司 A kind of old factory building foundation uses the structural strengthening and construction method of newly-increased steel-pipe pile and newly-increased concrete bearing platform
CN112921962A (en) * 2021-01-25 2021-06-08 浙江鼎固建筑技术有限公司 Pile foundation reinforcing method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005155139A (en) * 2003-11-25 2005-06-16 Oriental Construction Co Ltd Seismic reinforcing external frame construction method of existing building
JP2006002428A (en) * 2004-06-17 2006-01-05 Shimizu Corp Reinforcing method of existing floor and base isolation method of existing building
CN101476338A (en) * 2009-01-20 2009-07-08 淮海工学院 Construction process for miniature steel pipe pile reinforced sedimentation base
CN101532296A (en) * 2008-03-12 2009-09-16 贵阳铝镁设计研究院 Reinforcement treatment method for pile foundation
CN101550705A (en) * 2008-03-31 2009-10-07 贵阳铝镁设计研究院 Reinforcement processing method of pile foundation
CN103397667A (en) * 2013-07-09 2013-11-20 北京筑福国际工程技术有限责任公司 Existing building direct storey-adding foundation structure and construction method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005155139A (en) * 2003-11-25 2005-06-16 Oriental Construction Co Ltd Seismic reinforcing external frame construction method of existing building
JP2006002428A (en) * 2004-06-17 2006-01-05 Shimizu Corp Reinforcing method of existing floor and base isolation method of existing building
CN101532296A (en) * 2008-03-12 2009-09-16 贵阳铝镁设计研究院 Reinforcement treatment method for pile foundation
CN101550705A (en) * 2008-03-31 2009-10-07 贵阳铝镁设计研究院 Reinforcement processing method of pile foundation
CN101476338A (en) * 2009-01-20 2009-07-08 淮海工学院 Construction process for miniature steel pipe pile reinforced sedimentation base
CN103397667A (en) * 2013-07-09 2013-11-20 北京筑福国际工程技术有限责任公司 Existing building direct storey-adding foundation structure and construction method thereof

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105113387A (en) * 2015-08-27 2015-12-02 苏州同尚工程设计咨询有限公司 Reconstruction structure and construction method of bridge bearing platform
CN105350559A (en) * 2015-11-27 2016-02-24 中国一冶集团有限公司 Construction method suitable for emery structural ground of large factory building
CN105350559B (en) * 2015-11-27 2017-12-15 中国一冶集团有限公司 A kind of construction method of diamond dust structural floor suitable for large-sized workshop
CN106884443A (en) * 2017-03-11 2017-06-23 中国二十二冶集团有限公司 The construction method for grouting reinforcement that foundation bottom is come to nothing
CN106884443B (en) * 2017-03-11 2019-01-18 中国二十二冶集团有限公司 The construction method for grouting reinforcement that foundation bottom is come to nothing
CN108193721A (en) * 2017-12-25 2018-06-22 佛山科学技术学院 It is a kind of constructed for pile framing after to the method for pile test
CN109162210A (en) * 2018-09-04 2019-01-08 广东和立土木工程有限公司 For Bridge repair and reinforcement or widen the newly-increased pile base construction method of enlarging
CN109469087A (en) * 2018-12-24 2019-03-15 南京科技职业学院 Cesspool strengthening of foundation system and its construction method in a kind of industrial premises room
CN110273441A (en) * 2019-06-17 2019-09-24 北京筑福建筑科学研究院有限责任公司 A kind of old factory building foundation uses the structural strengthening and construction method of newly-increased steel-pipe pile and newly-increased concrete bearing platform
CN112921962A (en) * 2021-01-25 2021-06-08 浙江鼎固建筑技术有限公司 Pile foundation reinforcing method

Also Published As

Publication number Publication date
CN103741963B (en) 2015-09-09

Similar Documents

Publication Publication Date Title
CN103741963B (en) A kind of workshop foundation reinforcement means
CN102277867B (en) Construction method for collapsible loess foundation
CN103147442B (en) Ultra-deep foundation pit press-grouting pile and prestressed anchor combined supporting construction method
CN109026064B (en) Construction method for large-span multi-arch tunnel with semi-bright and semi-dark
CN102080373A (en) Construction method for jointly treating collapsibility of loess foundation by using DDC (Downhole Dynamic Compaction) pile and pile foundation
CN109763483B (en) Up-going type sectional grouting process for thick fourth-system deep-buried mining cave-in broken stratum
CN101280568A (en) Station pit construction method forming protection for neighboring operated subway interval tunnel
CN103806464B (en) Large-scale high ferro station and subway cross top-down construction method up and down
CN103669365A (en) External diagonal-pulling and internal diagonal-bracing herringbone foundation pit supporting pile and construction method thereof
CN110566223B (en) Deep-buried PBA subway station section design method
CN106436788A (en) Foundation reinforcement and inclination correction method for friction piles of high-rise building
CN106812153A (en) Beam and slab type construction elevator foundation construction engineering method in a kind of backfill
CN110273441A (en) A kind of old factory building foundation uses the structural strengthening and construction method of newly-increased steel-pipe pile and newly-increased concrete bearing platform
CN103174132A (en) Construction method of minor diameter pile inside city underground construction underground excavation pilot tunnel
CN107675704A (en) A kind of artificial digging pile assembled retaining wall and its construction technology
CN111691397A (en) Karst tunnel bottom filling bead string type karst cave steel pipe pile grouting hole forming method
CN106988305A (en) A kind of pile-column pier construction method of underground integrated molding
CN109944244A (en) A kind of anti-float anchor rod and its construction method
CN113605377A (en) Rock stratum ultra-deep steel pipe column and uplift pile combined construction process
CN202814388U (en) Device for tunnel pipe shed support deformation testing
CN209891202U (en) Anti-floating anchor rod
CN104712341A (en) Shallow burial soil area shield driving stratum strengthening system and construction method thereof
CN110924404A (en) Construction method for deep backfill filling wall foundation
CN110344395A (en) A kind of supporting leg type underground continuous wall construction method
CN110258606A (en) Projecting wall encloses well construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20171229

Address after: 102600, room 2, building 2212, pop Center, Xinghua street, Beijing, Daxing District

Patentee after: BEIJING YONGBO TECHNOLOGY CO.,LTD.

Address before: 100043 Shijingshan District, Yang Yang Street, No. 69, No. 1, building an international Park, Fu International

Patentee before: BEIJING AEIDO ENGINEERING TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190604

Address after: 202172 Room 1260, No. 495 Yuejin South Road, Xinhai Town, Chongming District, Shanghai (Guangming Rice Industry Economic Park)

Patentee after: Advocating Creation (Shanghai) Consulting Management Firm

Address before: 102600 room 2212, building 2, Pope center, Xinghua street, Daxing District, Beijing.

Patentee before: BEIJING YONGBO TECHNOLOGY CO.,LTD.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230808

Address after: Room 289, No. 333 Jiufo Jianshe Road, Zhongxin Guangzhou Knowledge City, Guangzhou, Guangdong Province, 510700 (self declared)

Patentee after: China Construction Eighth Engineering Bureau South China Construction Co.,Ltd.

Address before: Room 1260, building 5, No. 495, Yuejin South Road, Xinhai Town, Chongming District, Shanghai 202172

Patentee before: Advocating Creation (Shanghai) Consulting Management Firm

TR01 Transfer of patent right