CN103741963A - Industrial plant foundation strengthening method - Google Patents
Industrial plant foundation strengthening method Download PDFInfo
- Publication number
- CN103741963A CN103741963A CN201410007504.6A CN201410007504A CN103741963A CN 103741963 A CN103741963 A CN 103741963A CN 201410007504 A CN201410007504 A CN 201410007504A CN 103741963 A CN103741963 A CN 103741963A
- Authority
- CN
- China
- Prior art keywords
- newly
- increased
- steel pipe
- pipe pile
- platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410007504.6A CN103741963B (en) | 2014-01-06 | 2014-01-06 | A kind of workshop foundation reinforcement means |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410007504.6A CN103741963B (en) | 2014-01-06 | 2014-01-06 | A kind of workshop foundation reinforcement means |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103741963A true CN103741963A (en) | 2014-04-23 |
CN103741963B CN103741963B (en) | 2015-09-09 |
Family
ID=50499020
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410007504.6A Active CN103741963B (en) | 2014-01-06 | 2014-01-06 | A kind of workshop foundation reinforcement means |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103741963B (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105113387A (en) * | 2015-08-27 | 2015-12-02 | 苏州同尚工程设计咨询有限公司 | Reconstruction structure and construction method of bridge bearing platform |
CN105350559A (en) * | 2015-11-27 | 2016-02-24 | 中国一冶集团有限公司 | Construction method suitable for emery structural ground of large factory building |
CN106884443A (en) * | 2017-03-11 | 2017-06-23 | 中国二十二冶集团有限公司 | The construction method for grouting reinforcement that foundation bottom is come to nothing |
CN108193721A (en) * | 2017-12-25 | 2018-06-22 | 佛山科学技术学院 | It is a kind of constructed for pile framing after to the method for pile test |
CN109162210A (en) * | 2018-09-04 | 2019-01-08 | 广东和立土木工程有限公司 | For Bridge repair and reinforcement or widen the newly-increased pile base construction method of enlarging |
CN109469087A (en) * | 2018-12-24 | 2019-03-15 | 南京科技职业学院 | Cesspool strengthening of foundation system and its construction method in a kind of industrial premises room |
CN110273441A (en) * | 2019-06-17 | 2019-09-24 | 北京筑福建筑科学研究院有限责任公司 | A kind of old factory building foundation uses the structural strengthening and construction method of newly-increased steel-pipe pile and newly-increased concrete bearing platform |
CN112921962A (en) * | 2021-01-25 | 2021-06-08 | 浙江鼎固建筑技术有限公司 | Pile foundation reinforcing method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005155139A (en) * | 2003-11-25 | 2005-06-16 | Oriental Construction Co Ltd | Seismic reinforcing external frame construction method of existing building |
JP2006002428A (en) * | 2004-06-17 | 2006-01-05 | Shimizu Corp | Reinforcing method of existing floor and base isolation method of existing building |
CN101476338A (en) * | 2009-01-20 | 2009-07-08 | 淮海工学院 | Construction process for miniature steel pipe pile reinforced sedimentation base |
CN101532296A (en) * | 2008-03-12 | 2009-09-16 | 贵阳铝镁设计研究院 | Reinforcement treatment method for pile foundation |
CN101550705A (en) * | 2008-03-31 | 2009-10-07 | 贵阳铝镁设计研究院 | Reinforcement processing method of pile foundation |
CN103397667A (en) * | 2013-07-09 | 2013-11-20 | 北京筑福国际工程技术有限责任公司 | Existing building direct storey-adding foundation structure and construction method thereof |
-
2014
- 2014-01-06 CN CN201410007504.6A patent/CN103741963B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005155139A (en) * | 2003-11-25 | 2005-06-16 | Oriental Construction Co Ltd | Seismic reinforcing external frame construction method of existing building |
JP2006002428A (en) * | 2004-06-17 | 2006-01-05 | Shimizu Corp | Reinforcing method of existing floor and base isolation method of existing building |
CN101532296A (en) * | 2008-03-12 | 2009-09-16 | 贵阳铝镁设计研究院 | Reinforcement treatment method for pile foundation |
CN101550705A (en) * | 2008-03-31 | 2009-10-07 | 贵阳铝镁设计研究院 | Reinforcement processing method of pile foundation |
CN101476338A (en) * | 2009-01-20 | 2009-07-08 | 淮海工学院 | Construction process for miniature steel pipe pile reinforced sedimentation base |
CN103397667A (en) * | 2013-07-09 | 2013-11-20 | 北京筑福国际工程技术有限责任公司 | Existing building direct storey-adding foundation structure and construction method thereof |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105113387A (en) * | 2015-08-27 | 2015-12-02 | 苏州同尚工程设计咨询有限公司 | Reconstruction structure and construction method of bridge bearing platform |
CN105350559A (en) * | 2015-11-27 | 2016-02-24 | 中国一冶集团有限公司 | Construction method suitable for emery structural ground of large factory building |
CN105350559B (en) * | 2015-11-27 | 2017-12-15 | 中国一冶集团有限公司 | A kind of construction method of diamond dust structural floor suitable for large-sized workshop |
CN106884443A (en) * | 2017-03-11 | 2017-06-23 | 中国二十二冶集团有限公司 | The construction method for grouting reinforcement that foundation bottom is come to nothing |
CN106884443B (en) * | 2017-03-11 | 2019-01-18 | 中国二十二冶集团有限公司 | The construction method for grouting reinforcement that foundation bottom is come to nothing |
CN108193721A (en) * | 2017-12-25 | 2018-06-22 | 佛山科学技术学院 | It is a kind of constructed for pile framing after to the method for pile test |
CN109162210A (en) * | 2018-09-04 | 2019-01-08 | 广东和立土木工程有限公司 | For Bridge repair and reinforcement or widen the newly-increased pile base construction method of enlarging |
CN109469087A (en) * | 2018-12-24 | 2019-03-15 | 南京科技职业学院 | Cesspool strengthening of foundation system and its construction method in a kind of industrial premises room |
CN110273441A (en) * | 2019-06-17 | 2019-09-24 | 北京筑福建筑科学研究院有限责任公司 | A kind of old factory building foundation uses the structural strengthening and construction method of newly-increased steel-pipe pile and newly-increased concrete bearing platform |
CN112921962A (en) * | 2021-01-25 | 2021-06-08 | 浙江鼎固建筑技术有限公司 | Pile foundation reinforcing method |
Also Published As
Publication number | Publication date |
---|---|
CN103741963B (en) | 2015-09-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103741963B (en) | A kind of workshop foundation reinforcement means | |
CN102277867B (en) | Construction method for collapsible loess foundation | |
CN103147442B (en) | Ultra-deep foundation pit press-grouting pile and prestressed anchor combined supporting construction method | |
CN109026064B (en) | Construction method for large-span multi-arch tunnel with semi-bright and semi-dark | |
CN102080373A (en) | Construction method for jointly treating collapsibility of loess foundation by using DDC (Downhole Dynamic Compaction) pile and pile foundation | |
CN109763483B (en) | Up-going type sectional grouting process for thick fourth-system deep-buried mining cave-in broken stratum | |
CN101280568A (en) | Station pit construction method forming protection for neighboring operated subway interval tunnel | |
CN103806464B (en) | Large-scale high ferro station and subway cross top-down construction method up and down | |
CN103669365A (en) | External diagonal-pulling and internal diagonal-bracing herringbone foundation pit supporting pile and construction method thereof | |
CN110566223B (en) | Deep-buried PBA subway station section design method | |
CN106436788A (en) | Foundation reinforcement and inclination correction method for friction piles of high-rise building | |
CN106812153A (en) | Beam and slab type construction elevator foundation construction engineering method in a kind of backfill | |
CN110273441A (en) | A kind of old factory building foundation uses the structural strengthening and construction method of newly-increased steel-pipe pile and newly-increased concrete bearing platform | |
CN103174132A (en) | Construction method of minor diameter pile inside city underground construction underground excavation pilot tunnel | |
CN107675704A (en) | A kind of artificial digging pile assembled retaining wall and its construction technology | |
CN111691397A (en) | Karst tunnel bottom filling bead string type karst cave steel pipe pile grouting hole forming method | |
CN106988305A (en) | A kind of pile-column pier construction method of underground integrated molding | |
CN109944244A (en) | A kind of anti-float anchor rod and its construction method | |
CN113605377A (en) | Rock stratum ultra-deep steel pipe column and uplift pile combined construction process | |
CN202814388U (en) | Device for tunnel pipe shed support deformation testing | |
CN209891202U (en) | Anti-floating anchor rod | |
CN104712341A (en) | Shallow burial soil area shield driving stratum strengthening system and construction method thereof | |
CN110924404A (en) | Construction method for deep backfill filling wall foundation | |
CN110344395A (en) | A kind of supporting leg type underground continuous wall construction method | |
CN110258606A (en) | Projecting wall encloses well construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20171229 Address after: 102600, room 2, building 2212, pop Center, Xinghua street, Beijing, Daxing District Patentee after: BEIJING YONGBO TECHNOLOGY CO.,LTD. Address before: 100043 Shijingshan District, Yang Yang Street, No. 69, No. 1, building an international Park, Fu International Patentee before: BEIJING AEIDO ENGINEERING TECHNOLOGY Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20190604 Address after: 202172 Room 1260, No. 495 Yuejin South Road, Xinhai Town, Chongming District, Shanghai (Guangming Rice Industry Economic Park) Patentee after: Advocating Creation (Shanghai) Consulting Management Firm Address before: 102600 room 2212, building 2, Pope center, Xinghua street, Daxing District, Beijing. Patentee before: BEIJING YONGBO TECHNOLOGY CO.,LTD. |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20230808 Address after: Room 289, No. 333 Jiufo Jianshe Road, Zhongxin Guangzhou Knowledge City, Guangzhou, Guangdong Province, 510700 (self declared) Patentee after: China Construction Eighth Engineering Bureau South China Construction Co.,Ltd. Address before: Room 1260, building 5, No. 495, Yuejin South Road, Xinhai Town, Chongming District, Shanghai 202172 Patentee before: Advocating Creation (Shanghai) Consulting Management Firm |
|