CN106192701B - Construction method for repaving asphalt coat after the lower concrete road surface punishment of high and cold heavy duty - Google Patents

Construction method for repaving asphalt coat after the lower concrete road surface punishment of high and cold heavy duty Download PDF

Info

Publication number
CN106192701B
CN106192701B CN201610700564.5A CN201610700564A CN106192701B CN 106192701 B CN106192701 B CN 106192701B CN 201610700564 A CN201610700564 A CN 201610700564A CN 106192701 B CN106192701 B CN 106192701B
Authority
CN
China
Prior art keywords
plate
deflection value
construction method
repairing
pitch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610700564.5A
Other languages
Chinese (zh)
Other versions
CN106192701A (en
Inventor
田明有
李强
朱磊
王永维
凌晨
刘伟
张生贵
杨志鹏
白卿
李桂琴
花红桂
党生成
熊文涛
卢健
汪珍昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qinghai Toll Road Management Office
JSTI Group Co Ltd
Original Assignee
Qinghai Toll Road Management Office
JSTI Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qinghai Toll Road Management Office, JSTI Group Co Ltd filed Critical Qinghai Toll Road Management Office
Priority to CN201610700564.5A priority Critical patent/CN106192701B/en
Publication of CN106192701A publication Critical patent/CN106192701A/en
Application granted granted Critical
Publication of CN106192701B publication Critical patent/CN106192701B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/06Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)
  • Road Repair (AREA)

Abstract

The invention discloses the construction methods for repaving asphalt coat after the lower concrete road surface punishment of high and cold heavy duty, including:Step S1, old pavement performance detection and repairing:Crack of the deflection value less than 20 (0.01mm) is repaired with casting glue, and the crack of deflection value 20 45 (0.01mm) is repaired with cement mud-jack, and plate of the deflection value more than 45 (0.01mm) carries out changing plate;Step S2 is rechecked after repairing:It is qualification that deflection value, which is less than 20 (0.01mm) just,;Step S3, road surface cleaning;Step S4, seam are strengthened;Seam crossing both sides overlap glass fiber grid;Step S5 overlays bituminous macadam:Bituminous macadam is overlayed using pitch synchronous breakstone technology;Step S6, voltage stabilizing:When bituminous macadam temperature is reduced to steel roller not glue rubble, voltage stabilizing is carried out using steel roller;Step S7, health:Bituminous macadam making carries out health after completing;Step S8, surface construction:Layer asphalt in making face after health.

Description

Construction method for repaving asphalt coat after the lower concrete road surface punishment of high and cold heavy duty
Technical field
The invention belongs to building fields, are related to a kind of construction method of cement concrete repaving asphalt coat, and in particular to To a kind of construction method suitable for repaving asphalt coat after cover at cement concrete pavement table under the heavy duty of High aititude mountain area.
Background technology
On cement concrete pavement Laying Asphalt Surface Course be commonly called as it is white change black, the pavement structure of this form can absorb two kinds of materials The advantages of material, on the one hand original cement concrete pavement, which can provide, stablizes solid base, and asphaltum concrete cover-layer can be provided and be rubbed It is high to hinder coefficient, the good superficial layer of flatness substantially improves the performance on road surface.But from the point of view of actual using effect, instead The passage of crack and corner is penetrated than more serious.Research shows that:Effective bonding between original road surface and bitumen layer be it is white change it is black Transformation is successfully crucial, and it is mostly due to the tensile strength at layer bottom and anti-shearing strong often to change the reason of black road surface generates disease in vain Spend it is low caused by.
Some northwest regions such as Qinghai, Tibet, since height above sea level is higher, climatic environment is complicated, and especially mountain road is more, Bend and zig zag are more, are more cement concrete pavements in early stage Pavement Design in order to avoid the erosion of Moisture Damage, As the volume of traffic and heavy-duty vehicle are more and more, road surface running vehicle comfort is increasingly paid close attention to, it is contemplated that cost reason, using compared with More modes is to control the pitch micro-surface area of cement concrete pavement progress 1cm to restore the comfortable sexual function in road surface, but investigate hair Existing, thin overlay micro-surface area contains higher bitumen aggregate ratio, although thin overlay can improve original road surface performance and Road-ability, but it is not particularly suited for the more location of High aititude mountain area loaded vehicle, practice result shows can only using such mode Delay the time of origin of disease, the durability wretched insufficiency on road surface that early disease, especially bend shortly have occurred after being open to traffic The passage at place and reflection crack etc. not only bring great economic loss to owner's unit, but also affect normal road surface Performance.
Invention content
For overcome the deficiencies in the prior art, the purpose of the present invention is to provide one kind for water under the heavy duty of High aititude mountain area At the table of cement concrete road surface after cover repaving asphalt coat construction method, suitable in the coagulating cement that pitch micro-surface area is controlled Bitumen layer is laid on soil surface, to reduce passage and the reflection crack disease of corner.
The above-mentioned purpose of the present invention is achieved by following technical solution:
A kind of construction method suitable for repaving asphalt coat after cover at the lower cement concrete pavement table of high and cold heavy duty, including Following operating procedure:
Step S1, old pavement performance detection and repairing:Old pavement to carrying out pitch micro-surface area carries out deflection value detection, And crack repairing and plate replacement are carried out to old pavement according to deflection value size;The pit slot light to disease and ravelled spot carry out pitch Micro-surface area changes fill out after be compacted;
Step S2 is rechecked after repairing:It is qualification that the deflection value of all slits and plate, which is less than 20 (0.01mm) just,;
Step S3, road surface cleaning:Particle, soil, sundries on the qualified old pavement of repairing is cleaned up;
Step S4, seam are strengthened;Seam crossing both sides overlap glass fiber grid;
Step S5 overlays bituminous macadam:Bituminous macadam is overlayed using pitch synchronous breakstone technology;
Step S6, voltage stabilizing:When bituminous macadam temperature is reduced to steel roller not glue rubble, road is pressed using steel wheel One or more bout of machine progress voltage stabilizing, makes rubble go deep into the micro-surface area layer of old pavement;
Step S7, health:Bituminous macadam making carries out health after completing, and centre must not open to traffic;
Step S8, surface construction:Layer asphalt in making face after health.
Preferably, the crack repairing and plate, which are replaced, includes:To crack of the deflection value less than 20 (0.01mm) using filling Sealing is repaired, and is repaired using cement mud-jack in the crack of 20-45 (0.01mm) to deflection value;45 are more than to deflection value The plate of (0.01mm) carries out changing plate.
Preferably, plates of the step S1 to deflection value more than 45 (0.01mm) change the specific method of plate and is:Before changing plate Relief of traffic changes plate after cement concrete slab intensity is formed, as other plate faces, cover pitch micro-surface area layer.
Preferably, the thickness of cover pitch micro-surface area layer is 1cm.
Preferably, step S4 seams both sides respectively overlap 1m glass fiber grids.
Preferably, step S5 pitches select 90# bi tumenf orr oads.
Preferably, the spread quantity of pitch is 0.6-1.5kg/m2
Preferably, step S5 rubbles select hard quality, cleaning, the particle without weathering, grain size 4.75mm-9.5mm The full paving rate of rubble is not less than 70%.
Preferably, step S1 casting glues are cold mixing water-base epoxy pitch.
Preferably, include early strength agent, swelling agent and flyash in step S1 cement mud-jacks material.
Advantages of the present invention:
1, construction method provided by the invention does not carry out milling to the pitch micro-surface area layer on old pavement, but first basis Deflection value size handles different diseases respectively, then carries out regeneration, and not only saving cost, (asphalt content reduces 5%), and higher shearing force can be provided, to effectively solve passage and the reflection crack disease of corner.
2, construction method provided by the invention first respectively overlaps 1m or so before overlaying bituminous macadam in seam crossing or so Glass fiber grid, reflection crack can be effectively prevent;In addition pitch synchronous breakstone technique is selected, using rubble by former road surface Pitch micro-surface area layer combines with having with new black top layer strength, is firmly bonded, anti-passage performance is more preferable, road surface overall structure It is more durable.
Specific implementation mode
The essentiality content further illustrated the present invention with reference to embodiment, but present invention protection model is not limited with this It encloses.Although being explained in detail to the present invention with reference to preferred embodiment, it will be understood by those of ordinary skill in the art that, it can be right Technical scheme of the present invention is modified or replaced equivalently, without departing from the spirit and scope of technical solution of the present invention.
Embodiment 1:A kind of construction suitable for repaving asphalt coat after cover at the lower cement concrete pavement table of high and cold heavy duty Method
Including following operating procedure:
Step S1, old pavement performance detection and repairing:Using drop hammer deflection meter (or backman beam method) to carrying out The old pavement of pitch micro-surface area carries out deflection value detection, and around several points, weight should be surveyed for the disease that emphasis is exposed more Joint slab ability and deflection value at point abutment joint are detected, and the crack to deflection value less than 20 (0.01mm) utilizes embedding Glue is repaired, and is repaired using cement mud-jack in the crack of 20-45 (0.01mm) to deflection value, is more than 45 to deflection value The plate of (0.01mm) carries out changing plate (carrying out changing plate using C35 plain concretes), need to pay close attention to change plate after between each seam Effective connection, ensure the transmission of load;The light pit slot of disease and ravelled spot progress pitch micro-surface area are changed and are filled out, using small-sized pressure road Machine or plate compactor compacting;Wherein, it needs the road surface for changing plate health to carry out health measure and traffic dredging organization work, waits for that cement is mixed After concrete board intensity is formed, as other plate faces, the micro-surface area layer of cover 1cm, and ensure effective connection between each seam, Ensure the transmission of load;Wherein, casting glue is cold mixing water-base epoxy pitch, and the mass ratio of aqueous epoxy resins and emulsified asphalt is 1:10, the solid content of emulsified asphalt otherwise be less than 50%;Wherein, include early strength agent, swelling agent and fine coal in cement mud-jack material Ash, the ratio of mud 0.5, quality compare cement:Early strength agent:Swelling agent:Flyash=1:0.006:0.15:1;
Step S2 is rechecked after repairing:Disease Processing carries out deflection value reinspection after completing, it is necessary to assure deflection value is in technology Within it is required that, it is qualification that the deflection value of all slits and plate, which is less than 20 (0.01mm) just, and weight is carried out for underproof plate New repairing requires to reach qualified until meeting technology;
Step S3, road surface cleaning:Particle, soil, sundries on the qualified old pavement of repairing is cleaned up;
Step S4, seam are strengthened;Seam crossing both sides overlap glass fiber grid;
Step S5 overlays bituminous macadam:Using the high bitumen aggregate ratio of original thin layer micro-surface area layer, interlaminar bonding layer is being carried out Bituminous macadam is overlayed using pitch synchronous breakstone technology when processing;Rubble selects hard quality, cleaning, without weathering Grain, specification 4.75mm-9.5mm, completely paving rate are not less than 75%;Pitch selection 90# bi tumenf orr oads, spread quantity parameter are 1.0kg/m2
Step S6, voltage stabilizing:When bituminous macadam temperature is reduced to steel roller not glue rubble, road is pressed using steel wheel Machine carries out voltage stabilizing one bout, and rubble is made to go deep into the micro-surface area layer of old pavement;
Step S7, health:Bituminous macadam making carries out health after completing, and centre must not open to traffic;
Step S8, surface construction:Until after the assay was approved, making face layer asphalt, in strict accordance with bituminous concrete Making technique complete each Paving Techniques, ensure the flatness and compactness on road surface;When pavement temperature is reduced to 50 DEG C or less Ability open to traffic, and coring is required according to coring, its shearing strength between layers is tested, checks whether to meet technology requirement.
Embodiment 2:A kind of construction suitable for repaving asphalt coat after cover at the lower cement concrete pavement table of high and cold heavy duty Method
Including following operating procedure:
Step S1, old pavement performance detection and repairing:Using drop hammer deflection meter (or backman beam method) to carrying out The old pavement of pitch micro-surface area carries out deflection value detection, and around several points, weight should be surveyed for the disease that emphasis is exposed more Joint slab ability and deflection value at point abutment joint are detected, and the crack to deflection value less than 20 (0.01mm) utilizes embedding Glue is repaired, and is repaired using cement mud-jack in the crack of 20-45 (0.01mm) to deflection value, is more than 45 to deflection value The plate of (0.01mm) carries out changing plate (carrying out changing plate using C35 plain concretes), need to pay close attention to change plate after between each seam Effective connection, ensure the transmission of load;The light pit slot of disease and ravelled spot progress pitch micro-surface area are changed and are filled out, using small-sized pressure road Machine or plate compactor compacting;Wherein, it needs the road surface for changing plate health to carry out health measure and traffic dredging organization work, waits for that cement is mixed After concrete board intensity is formed, as other plate faces, the micro-surface area layer of cover 1cm, and ensure effective connection between each seam, Ensure the transmission of load;Wherein, casting glue is cold mixing water-base epoxy pitch, and the mass ratio of aqueous epoxy resins and emulsified asphalt is 1:7.5, the solid content of emulsified asphalt otherwise be less than 50%;Wherein, include early strength agent, swelling agent and fine coal in cement mud-jack material Ash, the ratio of mud 0.5, quality compare cement:Early strength agent:Swelling agent:Flyash=1:0.007:0.16:1;
Step S2 is rechecked after repairing:Disease Processing carries out deflection value reinspection after completing, it is necessary to assure deflection value is in technology Within it is required that, it is qualification that the deflection value of all slits and plate, which is less than 20 (0.01mm) just, and weight is carried out for underproof plate New repairing requires to reach qualified until meeting technology;
Step S3, road surface cleaning:Particle, soil, sundries on the qualified old pavement of repairing is cleaned up;
Step S4, seam are strengthened;Seam crossing both sides overlap glass fiber grid;
Step S5 overlays bituminous macadam:Using the high bitumen aggregate ratio of original thin layer micro-surface area layer, interlaminar bonding layer is being carried out Bituminous macadam is overlayed using pitch synchronous breakstone technology when processing;Rubble selects hard quality, cleaning, without weathering Grain, specification 4.75mm-9.5mm, completely paving rate are not less than 70%;Pitch selection 90# bi tumenf orr oads, spread quantity parameter are 1.5kg/m2
Step S6, voltage stabilizing:When bituminous macadam temperature is reduced to steel roller not glue rubble, road is pressed using steel wheel Machine carries out voltage stabilizing one bout, and rubble is made to go deep into the micro-surface area layer of old pavement;
Step S7, health:Bituminous macadam making carries out health after completing, and centre must not open to traffic;
Step S8, surface construction:Until after the assay was approved, making face layer asphalt, in strict accordance with bituminous concrete Making technique complete each Paving Techniques, ensure the flatness and compactness on road surface;When pavement temperature is reduced to 50 DEG C or less Ability open to traffic, and coring is required according to coring, its shearing strength between layers is tested, checks whether to meet technology requirement.
Embodiment 3:A kind of construction suitable for repaving asphalt coat after cover at the lower cement concrete pavement table of high and cold heavy duty Method
Including following operating procedure:
Step S1, old pavement performance detection and repairing:Using drop hammer deflection meter (or backman beam method) to carrying out The old pavement of pitch micro-surface area carries out deflection value detection, and around several points, weight should be surveyed for the disease that emphasis is exposed more Joint slab ability and deflection value at point abutment joint are detected, and the crack to deflection value less than 20 (0.01mm) utilizes embedding Glue is repaired, and is repaired using cement mud-jack in the crack of 20-45 (0.01mm) to deflection value, is more than 45 to deflection value The plate of (0.01mm) carries out changing plate (carrying out changing plate using C35 plain concretes), need to pay close attention to change plate after between each seam Effective connection, ensure the transmission of load;The light pit slot of disease and ravelled spot progress pitch micro-surface area are changed and are filled out, using small-sized pressure road Machine or plate compactor compacting;Wherein, it needs the road surface for changing plate health to carry out health measure and traffic dredging organization work, waits for that cement is mixed After concrete board intensity is formed, as other plate faces, the micro-surface area layer of cover 1cm, and ensure effective connection between each seam, Ensure the transmission of load;Wherein, casting glue is cold mixing water-base epoxy pitch, and the mass ratio of aqueous epoxy resins and emulsified asphalt is 1:12.5, the solid content of emulsified asphalt otherwise be less than 50%;Wherein, include early strength agent, swelling agent and powder in cement mud-jack material Coal ash, the ratio of mud 0.5, quality compare cement:Early strength agent:Swelling agent:Flyash=1:0.008:0.17:1;
Step S2 is rechecked after repairing:Disease Processing carries out deflection value reinspection after completing, it is necessary to assure deflection value is in technology Within it is required that, it is qualification that the deflection value of all slits and plate, which is less than 20 (0.01mm) just, and weight is carried out for underproof plate New repairing requires to reach qualified until meeting technology;
Step S3, road surface cleaning:Particle, soil, sundries on the qualified old pavement of repairing is cleaned up;
Step S4, seam are strengthened;Seam crossing both sides overlap glass fiber grid;
Step S5 overlays bituminous macadam:Using the high bitumen aggregate ratio of original thin layer micro-surface area layer, interlaminar bonding layer is being carried out Bituminous macadam is overlayed using pitch synchronous breakstone technology when processing;Rubble selects hard quality, cleaning, without weathering Grain, specification 4.75mm-9.5mm, completely paving rate are not less than 80%;Pitch selection 90# bi tumenf orr oads, spread quantity parameter are 1.2kg/m2
Step S6, voltage stabilizing:When bituminous macadam temperature is reduced to steel roller not glue rubble, road is pressed using steel wheel Machine carries out voltage stabilizing one bout, and rubble is made to go deep into the micro-surface area layer of old pavement;
Step S7, health:Bituminous macadam making carries out health after completing, and centre must not open to traffic;
Step S8, surface construction:Until after the assay was approved, making face layer asphalt, in strict accordance with bituminous concrete Making technique complete each Paving Techniques, ensure the flatness and compactness on road surface;When pavement temperature is reduced to 50 DEG C or less Ability open to traffic, and coring is required according to coring, its shearing strength between layers is tested, checks whether to meet technology requirement.
Embodiment 4:Comparative example is compared with embodiment 1, and milling is carried out to old pavement micro-surface area layer:
Step S1, old pavement performance detection and repairing:The micro-surface area cover of cement concrete pavement is carried out first complete Milling is handled, and then carries out deflection value detection to the old pavement after milling using drop hammer deflection meter (or backman beam method), The disease that emphasis is exposed around should survey several points more, the joint slab ability and deflection value at emphasis abutment joint into Row detection, the crack to deflection value less than 20 (0.01mm) is repaired using casting glue, to deflection value at 20-45 (0.01mm) Crack repaired using cement mud-jack, the plate to deflection value more than 45 (0.01mm) change plate and (utilizes C35 element coagulations Soil carries out changing plate), it needs to pay close attention to effective connection between each seam after changing plate, ensures the transmission of load;Wherein, it needs to change Health measure and traffic dredging organization work are carried out in the road surface of plate health, and ensure effective connection between each seam, ensure to carry The transmission of lotus;Wherein, casting glue is cold mixing water-base epoxy pitch, and the mass ratio of aqueous epoxy resins and emulsified asphalt is 1:10, The solid content of emulsified asphalt however be less than 50%;Wherein, include early strength agent, swelling agent and flyash, water in cement mud-jack material Gray scale is 0.5, and quality compares cement:Early strength agent:Swelling agent:Flyash=1:0.006:0.15:1;
Step S2 is rechecked after repairing:Disease Processing carries out deflection value reinspection after completing, it is necessary to assure deflection value is in technology Within it is required that, it is qualification that the deflection value of all slits and plate, which is less than 20 (0.01mm) just, and weight is carried out for underproof plate New repairing requires to reach qualified until meeting technology;
Step S3, road surface cleaning:Particle, soil, sundries on the qualified old pavement of repairing is cleaned up;
Step S4, seam are strengthened;Seam crossing both sides overlap glass fiber grid;
Step S5 overlays bituminous macadam:Bituminous macadam is overlayed using pitch synchronous breakstone technology;Rubble selects quality Hard, cleaning, the particle without weathering, specification 4.75mm-9.5mm, completely paving rate are not less than 75%;Pitch selects 90# roads Asphalt, spread quantity parameter are 1.0kg/m2
Step S6, voltage stabilizing:When bituminous macadam temperature is reduced to steel roller not glue rubble, road is pressed using steel wheel Machine carries out voltage stabilizing one bout, and rubble is made to go deep into old pavement;
Step S7, health:Bituminous macadam making carries out health after completing, and centre must not open to traffic;
Step S8, surface construction:Until after the assay was approved, making face layer asphalt, in strict accordance with bituminous concrete Making technique complete each Paving Techniques, ensure the flatness and compactness on road surface;When pavement temperature is reduced to 50 DEG C or less Ability open to traffic, and coring is required according to coring, its shearing strength between layers is tested, checks whether to meet technology requirement.
Embodiment 5:Effect example
Coring is required according to coring, tests its shearing strength between layers, checks whether to meet technology requirement.Test result such as following table It is shown.
Embodiment 1 Embodiment 2 Embodiment 3 Embodiment 4
Shearing strength (MPa) 2.4 2.2 2.3 1.5
The comparison of embodiment 1 and embodiment 4 is as can be seen that construction method of the present invention is not required to the micro- table of pitch on old pavement Locate layer and carry out milling, but first different diseases are handled respectively according to deflection value size, then carry out regeneration, not only saves Cost (asphalt content reduces by 5%) has been saved, and higher shearing force can be provided compared with the method for milling, to effectively solve The passage of corner and reflection crack disease.
The effect of above-described embodiment indicates that the essentiality content of the present invention, but the protection of the present invention is not limited with this Range.It will be understood by those of ordinary skill in the art that technical scheme of the present invention can be modified or replaced equivalently, Without departing from the essence and protection domain of technical solution of the present invention.

Claims (8)

1. a kind of construction method suitable for repaving asphalt coat after cover at the lower cement concrete pavement table of high and cold heavy duty, feature It is, including following operating procedure:
Step S1, old pavement performance detection and repairing:Old pavement to carrying out pitch micro-surface area carries out deflection value detection, and root Crack repairing is carried out to old pavement according to deflection value size and plate is replaced;The pit slot light to disease and ravelled spot carry out the micro- table of pitch Place changes fill out after be compacted;
Step S2 is rechecked after repairing:It is qualification that the deflection value of all slits and plate, which is less than 20 sides,;
Step S3, road surface cleaning:Particle, soil, sundries on the qualified old pavement of repairing is cleaned up;
Step S4, seam are strengthened;Seam crossing both sides overlap glass fiber grid;
Step S5 overlays bituminous macadam:Bituminous macadam is overlayed using pitch synchronous breakstone technology;
Step S6, voltage stabilizing:When bituminous macadam temperature is reduced to steel roller not glue rubble, using steel roller into One or more bout of row voltage stabilizing makes rubble go deep into the micro-surface area layer of old pavement;
Step S7, health:Bituminous macadam making carries out health after completing, and centre must not open to traffic;
Step S8, surface construction:Layer asphalt in making face after health.
2. construction method according to claim 1, which is characterized in that the crack repairing and plate replacement include:To curved Heavy crack of the value less than 20 is repaired using casting glue, is repaired using cement mud-jack in the crack of 20-45 to deflection value; Plate to deflection value more than 45 carries out changing plate.
3. construction method according to claim 2, which is characterized in that the plate to deflection value more than 45 change the tool of plate Body method is:Relief of traffic before plate is changed, changes plate after cement concrete slab intensity is formed, as other plate faces, cover pitch Micro-surface area layer.
4. construction method according to claim 3, it is characterised in that:The thickness of cover pitch micro-surface area layer is 1cm.
5. construction method according to claim 1, which is characterized in that step S4 seams both sides respectively overlap 1m glass fiber grids.
6. construction method according to claim 1, which is characterized in that step S5 pitches select 90# bi tumenf orr oads.
7. construction method according to claim 6, which is characterized in that the spread quantity of pitch is 0.6-1.5kg/m2
8. construction method according to claim 1, which is characterized in that step S5 rubbles selection quality is hard, cleans, is free of The particle of weathering, grain size 4.75mm-9.5mm;The full paving rate of rubble is not less than 70%.
CN201610700564.5A 2016-08-22 2016-08-22 Construction method for repaving asphalt coat after the lower concrete road surface punishment of high and cold heavy duty Expired - Fee Related CN106192701B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610700564.5A CN106192701B (en) 2016-08-22 2016-08-22 Construction method for repaving asphalt coat after the lower concrete road surface punishment of high and cold heavy duty

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610700564.5A CN106192701B (en) 2016-08-22 2016-08-22 Construction method for repaving asphalt coat after the lower concrete road surface punishment of high and cold heavy duty

Publications (2)

Publication Number Publication Date
CN106192701A CN106192701A (en) 2016-12-07
CN106192701B true CN106192701B (en) 2018-07-24

Family

ID=57523720

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610700564.5A Expired - Fee Related CN106192701B (en) 2016-08-22 2016-08-22 Construction method for repaving asphalt coat after the lower concrete road surface punishment of high and cold heavy duty

Country Status (1)

Country Link
CN (1) CN106192701B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107288003A (en) * 2017-07-19 2017-10-24 广东金长成桥梁隧道科技有限公司 A kind of road surface or preventive maintenance of deck structure and its construction method
CN115450086B (en) * 2022-09-08 2023-10-13 广西北投交通养护科技集团有限公司 Old cement concrete pavement reconstruction structure suitable for non-extra-heavy traffic grade and design method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101603286A (en) * 2009-07-03 2009-12-16 江西赣粤高速公路股份有限公司 Old road asphalt stabilized macadam overlay reforming method and structure thereof
CN101691736A (en) * 2009-09-23 2010-04-07 中交二公局第六工程有限公司 Construction method for reconstructing old concrete pavement by paving asphalt-concrete surface layer
CN105256686A (en) * 2015-10-10 2016-01-20 青海正平公路养护工程有限公司 High-grade highway high and cold road surface micro-surfacing preventive maintenance construction method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100476132B1 (en) * 1999-12-17 2005-03-15 미쓰이 가가쿠 가부시키가이샤 Road reinforcing sheet, structure of asphalt reinforced pavement and method for paving road

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101603286A (en) * 2009-07-03 2009-12-16 江西赣粤高速公路股份有限公司 Old road asphalt stabilized macadam overlay reforming method and structure thereof
CN101691736A (en) * 2009-09-23 2010-04-07 中交二公局第六工程有限公司 Construction method for reconstructing old concrete pavement by paving asphalt-concrete surface layer
CN105256686A (en) * 2015-10-10 2016-01-20 青海正平公路养护工程有限公司 High-grade highway high and cold road surface micro-surfacing preventive maintenance construction method

Also Published As

Publication number Publication date
CN106192701A (en) 2016-12-07

Similar Documents

Publication Publication Date Title
CN104762863B (en) Bituminous mixture used for thin layer overlay of cement concrete pavement and preparation and construction methods of bituminous mixture
US20100316445A1 (en) Method for continuous on-site repaving of an asphalt mixture layer of paved road pavement and a motor-driven vehicle system therefor
KR101845242B1 (en) Guss asphalt mixture with reflection Cracking and plastic deformation resistance
CN206736657U (en) A kind of cracking resistance rubber asphalt composite seal coat
Kumar et al. Case studies on failure of bituminous pavements
CN104294732A (en) High-elasto-viscosity stress absorbing layer and top facing construction process thereof
Moreno-Navarro et al. Structural analysis of polymer modified bituminous materials in the rehabilitation of light-medium traffic volume roads
CN106192701B (en) Construction method for repaving asphalt coat after the lower concrete road surface punishment of high and cold heavy duty
CN104846714B (en) Anti-rut pavement structure of Heat reflection fog sealing layer material for high temperature heavy duty conditions
Ali et al. Asphalt surface treatment practice in southeastern United States.
Sha et al. Pavement structure and materials design for sea-crossing bridges and tunnel: Case study of the Hong Kong–Zhuhai–Macau Bridge
Ogundipe Mechanical behaviour of stress absorbing membrane interlayers
Hanson Construction and performance of an ultrathin bonded hot-mix asphalt wearing course
CN108914757A (en) A kind of technique that cement concrete pavement solves reflective crack
Orr Pavement Maintenance
Taghipoor et al. Improving the resistance of asphalt pavements against cracking with an Interlayer: A comprehensive review
Moses Mechanical behaviour of stress absorbing membrane interlayers
CN113152311B (en) Steel bridge deck pavement maintenance method and performance evaluation method after maintenance
Bischoff Evaluation of strata® reflective crack relief system
CN110374017A (en) A kind of blackened remodeling method of cement bridge floor
Brotman et al. Roller compacted concrete pavement: Properties, design, and construction
Lim et al. Feasibility of 9.5-mm Stone Matrix Asphalt for Thin Lift Overlays in Washington State
Abate Concrete paving blocks: an overview
Jamieson Stone Mastic Asphalt for Australian Airport Pavements
Alghamdi Dynamic Cone Penetrometer (DCP) Based Evaluation of Sustainable Low Volume Road Rehabilitation Techniques

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180724