CN106381810A - Beam-and-column type bracket and method for casting-in-place cantilever perfusion beam with beam-and-column type bracket - Google Patents

Beam-and-column type bracket and method for casting-in-place cantilever perfusion beam with beam-and-column type bracket Download PDF

Info

Publication number
CN106381810A
CN106381810A CN201610782465.6A CN201610782465A CN106381810A CN 106381810 A CN106381810 A CN 106381810A CN 201610782465 A CN201610782465 A CN 201610782465A CN 106381810 A CN106381810 A CN 106381810A
Authority
CN
China
Prior art keywords
column type
steel
type bracket
steel buttress
strip footing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610782465.6A
Other languages
Chinese (zh)
Other versions
CN106381810B (en
Inventor
李树敬
王剑
李涛
明茂刚
靳国柱
王广川
赵传新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tiezheng Testing Technology Co ltd
Fourth Engineering Co Ltd of China Railway 14th Bureau Co Ltd
Original Assignee
Fourth Engineering Co Ltd of China Railway 14th Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Engineering Co Ltd of China Railway 14th Bureau Co Ltd filed Critical Fourth Engineering Co Ltd of China Railway 14th Bureau Co Ltd
Priority to CN201610782465.6A priority Critical patent/CN106381810B/en
Publication of CN106381810A publication Critical patent/CN106381810A/en
Application granted granted Critical
Publication of CN106381810B publication Critical patent/CN106381810B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Abstract

The invention discloses a beam-and-column type bracket and a method for casting-in-place cantilever perfusion beam with the beam-and-column type bracket, and belongs to the technical field of cantilever perfusion beam construction. The structure of the beam-and-column type bracket comprises a plurality of strip foundations, steel supporting piers, bearing beams, main beams, cross beams, elevation adjusting brackets and spreader beams, wherein a plurality of steel supporting piers are arranged on each strip foundation; each of the horizontal bearing beams is arranged on the corresponding steel supporting pier; a plurality of longitudinal main beams are arranged on each of the bearing beams; a plurality of cross beams are arranged on each of the main beams; the elevation adjusting brackets are arranged on each of the cross beams; the spreader beams are arranged on each of the elevation adjusting brackets; each of the spreader beams comprises a horizontal spreader beam and a longitudinal spreader beam; a mould is arranged on each of the longitudinal spreader beams; and each elevation adjusting bracket comprises a scaffold, a bottom support and a top support, wherein rotating nuts are respectively arranged at the top and the bottom of each scaffold. The beam-and-column type bracket disclosed by the invention has the characteristics of being convenient to mount, and the cantilever perfusion beam construction can be completed rapidly, so that the influence on residents at surrounding areas is reduced.

Description

A kind of beam-column type bracket and the method with the cast-in-place outstanding filling beam of beam-column type bracket
Technical field
Fill beam technical field of construction the present invention relates to a kind of outstanding, especially a kind of beam-column type bracket and existing with beam-column type bracket Pour the outstanding method filling beam.
Background technology
Increasing with China's intercity track railway construction, when urban road crossed over by intercity track railway, adopt more With the outstanding bridge structure filling beam;For example Pearl River Delta fringe tabernaemontanus bulrush depth inter-city passenger rail, through the bustling urban district in Guangzhou, Dongguan and Shenzhen, is crossed over Urban road is just many using the outstanding filling beam of the little span structure forms such as (30+45+30) m, (30+50+30) m and (35+60+35) m Reach at 51.The outstanding beam that fills is constructed paragraph by paragraph using Hanging Basket equipment, and such as (35+60+35) m hangs filling beam and is divided into 10 segmental constructions, each section In at least 12 days section design and construction cycle, construction period is longer, for a long time to nearby residents life office, urban transportation and city Management interferes.
Content of the invention
The technical assignment of the present invention is for a kind of beam-column type bracket of above-mentioned not enough offer of the prior art and to use beam column Formula support cast-in-place hangs the method filling beam, and a kind of this beam-column type bracket and the method with the cast-in-place outstanding filling beam of beam-column type bracket have installation Convenient, can efficiently complete the outstanding beam that fills and construct to reduce the feature of the impact to surrounding resident.
The technical solution adopted for the present invention to solve the technical problems is:
A kind of beam-column type bracket, it includes strip footing, steel buttress, bearing beam, girder, crossbeam, absolute altitude adjusting bracket and divides Cloth beam, described strip footing includes multiple, and along pontic longitudinal arrangement, the top of each strip footing is provided with multiple steel and props up Pier, the top of each steel buttress is respectively arranged with horizontal bearing beam, and the top of bearing beam is provided with longitudinal girder, described girder Including multiple, it is uniformly arranged along bearing beam horizontal direction, the top of described girder is provided with multiple uniform along girder longitudinal direction The crossbeam of setting, the top of described crossbeam is provided with absolute altitude adjusting bracket, and the top of described absolute altitude adjusting bracket is provided with Spreader beam, described spreader beam includes cross direction profiles beam and genesis analysis beam, and described cross direction profiles beam is arranged on absolute altitude and adjusts The top of support, the bottom of genesis analysis beam, the top of described genesis analysis beam is mould, described absolute altitude adjusting bracket bag Include scaffold, collet and jacking, described collet is arranged on the bottom of scaffold, jacking is arranged on the top of scaffold, described The top of scaffold and bottom be respectively arranged with rotation nut, one end of described collet and jacking inserts in scaffold respectively Interior, and be connected with rotation nut thread.
The bottom of each described strip footing is respectively arranged with multiple prestressed concrete pipe piles, under each steel buttress Portion corresponds to a prestressed concrete pipe pile, and the centrage of steel buttress corresponding up and down and prestressed concrete pipe pile overlaps.
Connecting plate is provided with each described circumferencial direction of steel buttress, is provided between two adjacent steel buttresses Tranverse connecting rod and diagonal control arm, are connected by connecting plate between described tranverse connecting rod and diagonal control arm and steel buttress.
By thickness, the steel plate for 10mm rolls and forms each described steel buttress, and is made up of more piece, including the long standard of 4m Section and the adjustment section of 0.5m, 1m, 2m.
Often the upper and lower of section steel buttress is respectively arranged with ring flange, and ring flange is provided with bolt hole, and adjacent two Pass through the bolt hole on ring flange to be connected between section steel buttress by bolt.
The thickness of described ring flange is 16mm, a diameter of 24mm of the bolt hole on ring flange, and ring is away from for 100mm.
The width of described strip footing is 1m, and highly for 0.5m, length is 10m.
Described bearing beam adopts Two bors d's oeuveres I-steel.
With the cast-in-place outstanding method filling beam of above-mentioned beam-column type bracket, comprise the following steps:Set pre- using strip footing ground Prestressed concrete pile tube, after construction reaches design requirement, the unification of prestressed concrete pipe pile top is cut flat with, carries out strip footing Construction, pour strip footing, in strip footing, join compression-resistant structure reinforcing bar, pour pre-embedded anchoring bolts during strip footing, for The connection of steel buttress;
Steel buttress is connected with strip footing by foundation bolt, often section steel buttress bottom and the equal welding flange in top, and two It is bolted between section steel buttress, steel buttress connecting plate provided circumferentially about, being connected with each other it is ensured that it is whole for steel buttress Body stability;
The steel connecting props up socle and arranges multiple horizontal bearing beams;
Multiple longitudinal girders are set on bearing beam top, load is sequentially delivered to bearing beam, steel buttress and bar shaped base by girder Plinth;
On girder top, multiple crossbeams being uniformly arranged along girder longitudinal direction are set;
On crossbeam top, absolute altitude adjusting bracket is set;
Absolute altitude adjusting bracket top sets gradually cross direction profiles beam and genesis analysis beam;
Mould is placed on the top of genesis analysis beam, then carries out the outstanding primary concreting filling beam.
A kind of beam-column type bracket of the present invention and with beam-column type bracket cast-in-place outstanding fill beam method compared to the prior art, tool There is beneficial effect following outstanding:Can one-time-concreting molding, easy for installation, stability is strong, accelerates the outstanding engineering filling beam construction Progress, improves labor productivity, decreases nearby residents life office, urban transportation and city management are caused long-time The features such as interference.
Brief description
Accompanying drawing 1 is a kind of main structure diagram of beam-column type bracket;
Accompanying drawing 2 is steel buttress overlooking the structure diagram;
Accompanying drawing 3 is a kind of left view structural representation of beam-column type bracket;
Accompanying drawing 4 is steel buttress connection diagram;
Accompanying drawing 5 is the partial enlarged drawing shown in Fig. 1;
Description of reference numerals:1st, strip footing, 2, prestressed concrete pipe pile, 3, steel buttress, 31, connecting plate, 32, flange Disk, 4, tranverse connecting rod, 5, diagonal control arm, 6, bearing beam, 7, girder, 8, crossbeam, 9, absolute altitude adjusting bracket, 91, scaffold, 92, collet, 93rd, jacking, 94, rotation nut, 10, cross direction profiles beam, 11, genesis analysis beam, 12, mould.
Specific embodiment
With reference to Figure of description 1 to accompanying drawing 5 to a kind of beam-column type bracket of the present invention and with the cast-in-place outstanding filling of beam-column type bracket The method of beam is described in detail below.
A kind of beam-column type bracket of the present invention, its structure include strip footing 1, steel buttress 3, bearing beam 6, girder 7, crossbeam 8, Absolute altitude adjusting bracket 9 and spreader beam, described strip footing 1 include multiple, along pontic longitudinal arrangement, each strip footing 1 Top is provided with multiple steel buttresses 3, and the top of each steel buttress 3 is respectively arranged with horizontal bearing beam 6, the top setting of bearing beam 6 There is longitudinal girder 7, described girder 7 includes multiple, is uniformly arranged along bearing beam 6 horizontal direction, the top of described girder 7 sets It is equipped with multiple crossbeams 8 being uniformly arranged along girder 7 longitudinal direction, the top of described crossbeam 8 is provided with absolute altitude adjusting bracket 9, The top of described absolute altitude adjusting bracket 9 is provided with spreader beam, and described spreader beam includes cross direction profiles beam 10 and genesis analysis Beam 11, described cross direction profiles beam 10 is arranged on the top of absolute altitude adjusting bracket 9, the bottom of genesis analysis beam 11, and described is vertical It is mould to the top of spreader beam 11, described absolute altitude adjusting bracket 9 includes scaffold 91, collet 92 and jacking 93, described Collet 92 is arranged on the bottom of scaffold 91, and jacking 93 is arranged on the top of scaffold 91, the described top of scaffold 91 and Bottom is respectively arranged with rotation nut 94, and one end of described collet 92 and jacking 93 inserts in scaffold 91 respectively, and with rotation Turn nut 94 is threaded.
The bottom of each described strip footing 1 is respectively arranged with multiple prestressed concrete pipe piles 2, each steel buttress 3 Bottom correspond to a prestressed concrete pipe pile 2, the center of steel buttress 3 corresponding up and down and prestressed concrete pipe pile 2 Line overlaps.
Connecting plate 31 is provided with each described circumferencial direction of steel buttress 3, sets between two adjacent steel buttresses 3 It is equipped with tranverse connecting rod 4 and diagonal control arm 5, is connected by connecting plate 31 between described tranverse connecting rod 4 and diagonal control arm 5 and steel buttress 3, connect The thickness of plate 31 is 15mm, is connected with each other it is ensured that its stability in the large for adjacent steel buttress 3.
By thickness, the steel plate for 10mm rolls and forms each described steel buttress 3, and is made up of more piece, including the long standard of 4m Section and the adjustment section of 0.5m, 1m, 2m.
Often the upper and lower of section steel buttress 3 is respectively arranged with ring flange 32, and ring flange 32 is provided with bolt hole, adjacent Two section steel buttresses 3 between by bolt pass through ring flange 32 on bolt hole be connected.
The thickness of described ring flange 32 be 16mm, a diameter of 24mm of the bolt hole on ring flange 32, ring away from for 100mm.
The width of described strip footing 1 is 1m, and highly for 0.5m, length is 10m.
Described bearing beam 6 adopts Two bors d's oeuveres I-steel.
With the cast-in-place outstanding method filling beam of above-mentioned beam-column type bracket, comprise the following steps:Set pre- using strip footing 1 ground Prestressed concrete pile tube 2, after construction reaches design requirement, the unification of prestressed concrete pipe pile 2 top is cut flat with, carries out bar shaped base Plinth 1 is constructed, and pours strip footing 1, joins compression-resistant structure reinforcing bar in strip footing 1, pours pre-embedded anchoring bolts during strip footing 1, For the connection with steel buttress 3;
Steel buttress 3 is connected with strip footing 1 by foundation bolt, often section steel buttress 3 bottom and the equal welding flange in top 32, it is bolted between two section steel buttresses 3, steel buttress 3 connecting plate 31 provided circumferentially about, for the mutually interconnection of steel buttress 3 Connect it is ensured that its stability in the large;
Steel buttress 3 top connecting arranges multiple horizontal bearing beams 6;Bearing beam 6 is connected using U-shaped card with steel buttress 3;
Multiple longitudinal girders 7 are set on bearing beam 6 top, load is sequentially delivered to bearing beam 6, steel buttress 3 and bar by girder 7 Shape basis 1;Girder 7 adopts Bailey beam, and girder 7 is connected using U-shaped card with bearing beam 6;
On girder 7 top, multiple crossbeams 8 being uniformly arranged along girder 7 longitudinal direction are set;Crossbeam 8 adopts I-steel, cloth Put spacing 60cm, girder 7 is connected using U-shaped card with crossbeam 8;
On crossbeam 8 top, absolute altitude adjusting bracket 9 is set;Using jacking 93 and collet 92, absolute altitude is adjusted to designed elevation, Horizontal and vertical spacing is 60cm;
Absolute altitude adjusting bracket 9 top sets gradually cross direction profiles beam 10 and genesis analysis beam 11;Cross direction profiles beam 10 adopts I-steel, spacing 60cm, genesis analysis beam 11 adopts 10cm × 10cm lumps of wood, spacing 20cm;
Mould 12 is placed on the top of genesis analysis beam 11, then carries out the outstanding primary concreting filling beam.
Illustrative embodiments listed above for understanding that the present invention is used, are only not to technical scheme described in the invention Restriction, about the those of ordinary skill in field, on the basis of technical scheme described in claim, multiple changes can also be made Change or deform, all equivalent changes or deformation all should be covered within the claims of the present invention.The present invention is not In place of detailed description, it is the known technology of those skilled in the art of the present technique.

Claims (9)

1. a kind of beam-column type bracket, is characterized in that:Including strip footing, steel buttress, bearing beam, girder, crossbeam, absolute altitude adjusting bracket And spreader beam, described strip footing includes multiple, and along pontic longitudinal arrangement, the top of each strip footing is provided with multiple steel Buttress, the top of each steel buttress is respectively arranged with horizontal bearing beam, and the top of bearing beam is provided with longitudinal girder, described master Beam includes multiple, is uniformly arranged along bearing beam horizontal direction, and the top of described girder is provided with multiple equal along girder longitudinal direction The crossbeam of even setting, the top of described crossbeam is provided with absolute altitude adjusting bracket, and the top of described absolute altitude adjusting bracket is arranged It is distributed beam, described spreader beam includes cross direction profiles beam and genesis analysis beam, described cross direction profiles beam is arranged on absolute altitude and adjusts The section top of support, the bottom of genesis analysis beam, the top of described genesis analysis beam is mould, described absolute altitude adjusting bracket Including scaffold, collet and jacking, described collet is arranged on the bottom of scaffold, and jacking is arranged on the top of scaffold, institute The top of the scaffold stated and bottom are respectively arranged with rotation nut, and one end of described collet and jacking inserts in scaffold respectively Interior, and be connected with rotation nut thread.
2. a kind of beam-column type bracket according to claim 1, is characterized in that:The bottom of each described strip footing is respectively It is provided with multiple prestressed concrete pipe piles, the bottom of each steel buttress corresponds to a prestressed concrete pipe pile, up and down relatively The steel buttress answered and the centrage of prestressed concrete pipe pile overlap.
3. a kind of beam-column type bracket according to claim 1, is characterized in that:On each described circumferencial direction of steel buttress It is provided with connecting plate, between two adjacent steel buttresses, be provided with tranverse connecting rod and diagonal control arm, described tranverse connecting rod and diagonal control arm It is connected by connecting plate between steel buttress.
4. a kind of beam-column type bracket according to claim 1, is characterized in that:Each described steel buttress is 10mm by thickness Steel plate roll and form, and be made up of more piece, including the adjustment section of the long standard knot of 4m and 0.5m, 1m, 2m.
5. a kind of beam-column type bracket according to claim 4, is characterized in that:Often the upper and lower of section steel buttress sets respectively It is equipped with ring flange, ring flange is provided with bolt hole, between two adjacent section steel buttresses, pass through the spiral shell on ring flange by bolt Keyhole is connected.
6. a kind of beam-column type bracket according to claim 5, is characterized in that:The thickness of described ring flange is 16mm, method A diameter of 24mm of the bolt hole on blue disk, ring is away from for 100mm.
7. a kind of beam-column type bracket according to claim 1, is characterized in that:The width of described strip footing is 1m, high Spend for 0.5m, length is 10m.
8. a kind of beam-column type bracket according to claim 1, is characterized in that:Described bearing beam adopts Two bors d's oeuveres I-steel.
9., with the cast-in-place outstanding method filling beam of above-mentioned beam-column type bracket, it is characterized in that:Comprise the following steps:
Prestressed concrete pipe pile is set using strip footing ground, after construction reaches design requirement, by prestressed concrete pipe The unification of stake top portion cuts flat with, and carries out strip footing construction, pours strip footing, joins compression-resistant structure reinforcing bar, pour bar in strip footing Pre-embedded anchoring bolts during shape basis, for the connection with steel buttress;
Steel buttress is connected with strip footing by foundation bolt, often section steel buttress bottom and the equal welding flange in top, two section steel It is bolted between buttress, steel buttress connecting plate provided circumferentially about, for being connected with each other of steel buttress;
The steel connecting props up socle and arranges multiple horizontal bearing beams;
Multiple longitudinal girders are set on bearing beam top, load is sequentially delivered to bearing beam, steel buttress and strip footing by girder;
On girder top, multiple crossbeams being uniformly arranged along girder longitudinal direction are set;
On crossbeam top, absolute altitude adjusting bracket is set;
Absolute altitude adjusting bracket top sets gradually cross direction profiles beam and genesis analysis beam;
Mould is placed on the top of genesis analysis beam, then carries out the outstanding primary concreting filling beam.
CN201610782465.6A 2016-08-31 2016-08-31 With the cast-in-place outstanding method for filling beam of beam-column type bracket Active CN106381810B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610782465.6A CN106381810B (en) 2016-08-31 2016-08-31 With the cast-in-place outstanding method for filling beam of beam-column type bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610782465.6A CN106381810B (en) 2016-08-31 2016-08-31 With the cast-in-place outstanding method for filling beam of beam-column type bracket

Publications (2)

Publication Number Publication Date
CN106381810A true CN106381810A (en) 2017-02-08
CN106381810B CN106381810B (en) 2018-01-30

Family

ID=57939609

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610782465.6A Active CN106381810B (en) 2016-08-31 2016-08-31 With the cast-in-place outstanding method for filling beam of beam-column type bracket

Country Status (1)

Country Link
CN (1) CN106381810B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109056545A (en) * 2018-09-07 2018-12-21 中铁四局集团有限公司 A kind of cast-in-place simply supported beam removes tooling and installation method
CN109750607A (en) * 2019-03-13 2019-05-14 秦山伟业建设集团有限公司 A kind of pile for prestressed pipe and Bailey beam combined bridge bracket erection construction method
CN109778715A (en) * 2019-03-25 2019-05-21 中冶建工集团有限公司 Assembled support platform and its installation and removal method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008106569A (en) * 2006-10-27 2008-05-08 Kajima Corp Rope type repairing scaffold and floating body type repairing scaffold
CN203487467U (en) * 2013-09-30 2014-03-19 上海建工七建集团有限公司 Multifunctional bracket for simply supported change continuous box beam construction
CN103669226A (en) * 2013-12-25 2014-03-26 中建六局土木工程有限公司 River-crossing prestressed concrete continuous beam bridge box girder 0# block support construction method
CN205000256U (en) * 2015-09-15 2016-01-27 中交四航局第一工程有限公司 Cast -in -place case roof beam of high mound of bridge construction support system
CN205296792U (en) * 2016-01-11 2016-06-08 中建五局工业设备安装有限公司 Raise scaffold
CN206052565U (en) * 2016-08-31 2017-03-29 中铁十四局集团第四工程有限公司 A kind of beam-column type bracket

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008106569A (en) * 2006-10-27 2008-05-08 Kajima Corp Rope type repairing scaffold and floating body type repairing scaffold
CN203487467U (en) * 2013-09-30 2014-03-19 上海建工七建集团有限公司 Multifunctional bracket for simply supported change continuous box beam construction
CN103669226A (en) * 2013-12-25 2014-03-26 中建六局土木工程有限公司 River-crossing prestressed concrete continuous beam bridge box girder 0# block support construction method
CN205000256U (en) * 2015-09-15 2016-01-27 中交四航局第一工程有限公司 Cast -in -place case roof beam of high mound of bridge construction support system
CN205296792U (en) * 2016-01-11 2016-06-08 中建五局工业设备安装有限公司 Raise scaffold
CN206052565U (en) * 2016-08-31 2017-03-29 中铁十四局集团第四工程有限公司 A kind of beam-column type bracket

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109056545A (en) * 2018-09-07 2018-12-21 中铁四局集团有限公司 A kind of cast-in-place simply supported beam removes tooling and installation method
CN109750607A (en) * 2019-03-13 2019-05-14 秦山伟业建设集团有限公司 A kind of pile for prestressed pipe and Bailey beam combined bridge bracket erection construction method
CN109778715A (en) * 2019-03-25 2019-05-21 中冶建工集团有限公司 Assembled support platform and its installation and removal method

Also Published As

Publication number Publication date
CN106381810B (en) 2018-01-30

Similar Documents

Publication Publication Date Title
CN101824800B (en) Method for construction of bridge cast-in-situ pre-stressed concrete continuous beam
CN112982181B (en) Construction method for steel-concrete combined section of through-type steel box continuous arch bridge
CN107841953B (en) High-altitude oblique crossing Liang Doupo side span cast-in-situ section construction support and construction method
CN102383628A (en) Construction device and construction method for post construction of depressing cone of silo structure
CN112411391A (en) Single-column capping beam steel pipe column Bailey beam construction supporting system and construction method thereof
CN208072415U (en) Deep foundation pit reinforced concrete support part changes structure
CN106381810B (en) With the cast-in-place outstanding method for filling beam of beam-column type bracket
CN104831639A (en) Consolidation and release construction method for 0# blocks of ultra-wide non-uniform continuous beam
CN102733307B (en) Method for constructing cast-in-place beam falsework
CN208534068U (en) A kind of traction sliding system that the prefabricated crane girder in power plant building is set up
CN206052565U (en) A kind of beam-column type bracket
CN106320183A (en) Assembly type bent cap formwork system
CN113958112A (en) Comprehensive scaffold construction method
CN103233426A (en) Bailey beam support free of buttress in soft foundation and supporting method thereof
CN204780635U (en) Super wide nonprismatic continuous beam 0# piece concreties and relieves construction structures
CN111424948A (en) Construction method and construction platform for cantilever structure layer of high-rise building
CN107227688B (en) Pier hangs bottom technique
CN207244633U (en) Brick retaining wall steel bar girder hardened system on foundation pit enclosure top beam
CN114277672B (en) Large-span prestressed concrete bent cap structure and construction method thereof
CN108755701A (en) The construction method of the support construction of deep basal pit
CN211772868U (en) Pier temporary consolidation device in large-span continuous beam
CN210712576U (en) Multi-hoop truss supporting bailey bracket for cast-in-situ large-span box girder
CN211873014U (en) System for bailey truss protects cable
CN108951643B (en) Super high-rise deep foundation pit basement core tube large-span large-area support changing construction method
CN207714150U (en) Assemble holder in adhesion type high-altitude

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20231225

Address after: No.267, yingyingshan Road, Shizhong District, Jinan City, Shandong Province

Patentee after: CHINA RAILWAY 14TH BUREAU GROUP 4TH ENGINEERING Co.,Ltd.

Patentee after: TIEZHENG TESTING TECHNOLOGY Co.,Ltd.

Address before: 250002 267 heroes Hill Road, Shizhong District, Ji'nan, Shandong

Patentee before: CHINA RAILWAY 14TH BUREAU GROUP 4TH ENGINEERING Co.,Ltd.

TR01 Transfer of patent right