- CN106320183A CN106320183A CN201610857759.0A CN201610857759A CN106320183A CN 106320183 A CN106320183 A CN 106320183A CN 201610857759 A CN201610857759 A CN 201610857759A CN 106320183 A CN106320183 A CN 106320183A
- Authority
- CN
- China
- Prior art keywords
- template
- formworks
- fence
- trusses
- capping beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The invention discloses an assembly type bent cap formwork system, and belongs to the field of expressway bridge engineering. The system comprises two groups of side formworks, two groups of end formworks, two bottom formworks, multiple bottom crossbeams arranged at the bottoms of the bottom formworks and two groups of primary trusses arranged on the periphery of a formwork; the side formworks, the end formworks and the bottom formworks are matched to form a bent cap; the primary trusses comprise multiple C-shaped trusses, B-shaped trusses and A-shaped trusses, and the primary trusses are provided with operating platforms, ladder stands and fences; the bottom formworks are provided with cavities matched with bridge pier columns, the bottom crossbeams arranged at the bottoms of the bottom formworks are put up on the primary trusses, upper opposite-pull rods are arranged on the upper portions of the bottom formworks, and lower opposite-pull rods are arranged at the bottoms of the bottom formworks; the lower ends of the primary trusses are fastened to the bridge pier columns through embedded bolts and cone nuts. According to the bent cap formwork system, the construction efficiency of bent cap formwork installation is greatly improved, the working environments of the processes of formwork installation, on-site steel bar binding and concrete pouring are improved, and the safety guarantee capacity is improved.
Description
Technical field
The present invention relates to a kind of assembled capping beam template system, belong to expressway bridge engineering field.
Background technology
In expressway bridge engineering is constructed, for cast-in-place concrete bent cap, traditional form technology typically uses steel
Anchor ear is connected with pier stud concrete, then disposes section longitudinal beam on anchor ear, lays crossbeam, crossbeam is laid at the end on longeron
Mould, then lay side form and end mould successively.
Under the conditions of one of major defect of traditional handicraft is work high above the ground, when anchor ear, installation longitudinal and cross beam are installed, lack
, there is bigger potential safety hazard in necessary safety prevention measure;The two of shortcoming are that model sheetinstallat efficiency of construction is low, it is generally required to
2 work talentes complete a set of model sheetinstallat.
Summary of the invention
The problem existed for above-mentioned prior art, the present invention provides a kind of assembled capping beam template system, can improve and execute
Work working environment, improves the protective capacities to operator.
To achieve these goals, the present invention use a kind of assembled capping beam template system, including two groups of side templates, two
Organize Side Template, two panels end template, be arranged on the some cross members bottom end template and be arranged on two groups of main trusses that template is peripheral
Frame, described side template, Side Template and end template coordinate molding bent cap;
Described main couple includes some c-type truss, Type B truss and A type truss, and described main couple is provided with operating platform, cat ladder
And fence, described fence includes the upper strata fence being arranged on cat ladder and is arranged on the lower floor's fence above operating platform, described
Upper strata fence is arranged on inside the upper end of lower floor's fence, and described operating platform surface is covered with expanded metal lath;
Having the cavity coordinated with pier column on described end template, the cross member bottom end template rides on main couple, cross member
Using 2 × 16# channel-section steel, and cross member two ends arrange lifting bolt, pull bar, bottom are provided with by being arranged over of described end template
Under to pull bar, described on pull bar is arranged on the upper end of side template, the lower lower end that pull bar is arranged on side template;
The lower end of described main couple is fastened with pier column by pre-embedded bolt, round platform nut.
As improvement, the surface of described end template and the upper surface flush of pier column.
As improvement, described operating platform surface is covered with multilamellar δ 3mm expanded metal lath.
As improvement, described operating platform is provided with some support crossbeams and indulges, and crossbeam indulges employing 80 × 6 square tube.
As improvement, the top opening of described side template and base opening are respectively provided with four road Screw arbor with nut at both-ends.
As improvement, it is bolted between described two Side Templates and end template.
As improvement, described side template uses space truss structure, and side template is located at end template both sides, and side template plate face is used
Shaped steel and Plate Welding form, and outside arranges two-layer horizontal truss, and the chord member of horizontal truss and web member are respectively adopted 60 × 5 and 50
× 4 square tubes.
Compared with prior art, the invention has the beneficial effects as follows:
1) present invention uses pre-embedded bolt to coordinate truncated cone-shaped nut, replaces anchor ear and takes root with pier column concrete, can avoid mixed
Occur when solidifying soil vibrates loosening and sliding phenomenon, improve reliability.
2) replace type steel support to consolidate template with truss, bigger rigidity can be obtained, and reduce rolled steel dosage.
3) side form uses space truss structure, improves the integral rigidity of template, split bolt negligible amounts, improves peace
Dress efficiency.
4) main couple and operating platform one, and it is provided with protective fence, improve the construction operation of model sheetinstallat process
Environment, improves safety assurance ability.
This capping beam template system is greatly improved the efficiency of construction that capping beam template is installed, and improves model sheetinstallat, reinforcing bar
On-the-spot colligation, the working environment of each operation of concreting, improve safety assurance ability.
Accompanying drawing explanation
Fig. 1 is the structural representation of the present invention;
Fig. 2 is that the A-A of the present invention is to structural representation;
Fig. 3 is that the B-B of the present invention is to structural representation;
Fig. 4 is that the C-C of the present invention is to structural representation;
Fig. 5 is pier column interconnection structure schematic diagram in the present invention;
In figure: 1, operating platform, 2, c-type truss, 3, side template, 4, cat ladder, 5, Type B truss, 6, Side Template, 7, pier column, 8,
Upper strata fence, 9, lower floor's fence, 10, end template, 11, cross member, 12, lifting bolt, 13, A type truss, 14, on to pull bar,
15, lower to pull bar, 16, pre-embedded bolt, 17, round platform nut.
Detailed description of the invention
For making the object, technical solutions and advantages of the present invention of greater clarity, below by drawings and Examples, to this
Invention is further elaborated.However, it should be understood that specific embodiment described herein is only in order to explain the present invention,
It is not limited to the scope of the present invention.
Unless otherwise defined, all of technical term used herein and scientific terminology are led with the technology belonging to the present invention
The implication that the technical staff in territory is generally understood that is identical, and the term used the most in the description of the invention is intended merely to retouch
State the purpose of specific embodiment, it is not intended that in limiting the present invention.
As it is shown in figure 1, a kind of assembled capping beam template system, including two groups of side templates 3, two groups of Side Templates 6, two panels bed dies
Plate 10, it is arranged on the some cross members 11 bottom end template 10 and is arranged on two groups of main couples that template is peripheral, described side template
3, Side Template 6 and end template 10 coordinate molding bent cap;
Described main couple includes some c-type truss 2, Type B truss 5 and A type truss 13, described main couple be provided with operating platform 1,
Cat ladder 4 and fence, described fence includes the upper strata fence 8 being arranged on cat ladder 4 and is arranged on the lower floor above operating platform 1
Fence 9, described upper strata fence 8 is arranged on inside the upper end of lower floor's fence 9, and described operating platform 1 surface is covered with expanded metal lath;
As shown in Figure 2, Figure 3 and Figure 4, described end template 10 has the cavity coordinated with pier column 7, the end bottom end template 10
Crossbeam 11 rides on main couple, and cross member 11 uses 2 × 16# channel-section steel, and cross member 11 two ends arrange lifting bolt 12, the described end
Pull bar 14, bottom are provided with lower to pull bar 15 by being arranged over of template 10, described on pull bar 14 is arranged on the upper of side template 3
End, the lower lower end that pull bar 15 is arranged on side template 3;
As it is shown in figure 5, the lower end of described main couple is fastened with pier column 7 by pre-embedded bolt 16, round platform nut 17.
As the improvement of embodiment, the surface of described end template 10 and the upper surface flush of pier column 7, it is ensured that prefabricated bent cap
Fit closely with pier column 7.
As the improvement of embodiment, described operating platform 1 surface is covered with multilamellar δ 3mm expanded metal lath, and structural soundness is high, changes
It is apt to the construction operation environment of model sheetinstallat process, improves safety assurance ability.
As the improvement of embodiment, described operating platform 1 is provided with some support crossbeams and indulges, and crossbeam indulges employing 80 × 6
Square tube.Cost of material is low, easy to install, and structural soundness is high, is effectively increased working security.
As the improvement of embodiment, the top opening of described side template 3 and base opening are respectively provided with four road Screw arbor with nut at both-ends, it is ensured that template
Between laminating closely, it is ensured that the prefabricated quality of bent cap.
As the improvement of embodiment, being bolted between described two Side Templates 6 and end template 10, dismounting is simple, uses
Convenient.
As the improvement of embodiment, described side template 3 uses space truss structure, side template 3 to be located at end template 10 both sides,
Side template 3 plate face shaped steel and Plate Welding form, and outside arranges two-layer horizontal truss, and the chord member of horizontal truss and web member are respectively
Use 60 × 5 and 50 × 4 square tubes.Side form uses space truss structure, improves the integral rigidity of template, and split bolt quantity is relatively
Few, improve installation effectiveness.
During model sheetinstallat, lift main couple the most respectively, with bridge pier built-in fitting (pre-embedded bolt 16, round platform nut 17) even
Connect, cross member 11, end template 10, Side Template 6 are installed the most successively, both sides side form is finally installed;During form removable, first remove side
Template 3, removes Side Template 6, end template 10 the most successively, after end template 10 is removed, rotates the lifting bolt on cross member 11
12, make cross member 11 reduce, then pull out cross member 11, then removed end template 10 by both sides respectively, finally remove main couple.
This capping beam template system is greatly improved the efficiency of construction that capping beam template is installed, and improves model sheetinstallat, reinforcing bar
On-the-spot colligation, the working environment of each operation of concreting, improve safety assurance ability.
The foregoing is only presently preferred embodiments of the present invention, not in order to limit the present invention, all essences in the present invention
Any amendment, equivalent or the improvement etc. made within god and principle, should be included within the scope of the present invention.
Claims (7)
1. an assembled capping beam template system, it is characterised in that include two groups of side templates (3), two groups of Side Templates (6), two panels
End template (10), it is arranged on some cross members (11) of end template (10) bottom and is arranged on two groups of main couples that template is peripheral,
Described side template (3), Side Template (6) and end template (10) coordinate molding bent cap;
Described main couple includes some c-type truss (2), Type B truss (5) and A type truss (13), and described main couple is provided with operation
Platform (1), cat ladder (4) and fence, described fence includes the upper strata fence (8) being arranged on cat ladder (4) and to be arranged on operation flat
Lower floor's fence (9) of platform (1) top, described upper strata fence (8) is arranged on inside the upper end of lower floor's fence (9), and described operation is put down
Platform (1) surface is covered with expanded metal lath;
Having the cavity coordinated with pier column (7) on described end template (10), the cross member (11) of end template (10) bottom rides over
On main couple, cross member (11) uses 2 × 16# channel-section steel, and cross member (11) two ends arrange lifting bolt (12), described end template
(10) pull bar (14), bottom are provided with lower to pull bar (15) by be arranged over, described on pull bar (14) is arranged on side template
(3) upper end, the lower lower end that pull bar (15) is arranged on side template (3);
The lower end of described main couple is fastened with pier column (7) by pre-embedded bolt (16), round platform nut (17).
A kind of assembled capping beam template system the most according to claim 1, it is characterised in that the table of described end template (10)
Face and the upper surface flush of pier column (7).
A kind of assembled capping beam template system the most according to claim 1, it is characterised in that described operating platform (1) table
Face is covered with multilamellar δ 3mm expanded metal lath.
A kind of assembled capping beam template system the most according to claim 3, it is characterised in that on described operating platform (1)
Being provided with some support crossbeams to indulge, crossbeam indulges employing 80 × 6 square tube.
A kind of assembled capping beam template system the most according to claim 1, it is characterised in that the top of described side template (3)
Mouth and base opening are respectively provided with four road Screw arbor with nut at both-ends.
A kind of assembled capping beam template system the most according to claim 1, it is characterised in that described two Side Templates (6) with
End template is bolted between (10).
A kind of assembled capping beam template system the most according to claim 1, it is characterised in that described side template (3) uses
Space truss structure, side template (3) is located at end template (10) both sides, and side template (3) plate face shaped steel and Plate Welding form, outward
Side arranges two-layer horizontal truss, and the chord member of horizontal truss and web member are respectively adopted 60 × 5 and 50 × 4 square tubes.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610857759.0A CN106320183A (en) | 2016-09-28 | 2016-09-28 | Assembly type bent cap formwork system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610857759.0A CN106320183A (en) | 2016-09-28 | 2016-09-28 | Assembly type bent cap formwork system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106320183A true CN106320183A (en) | 2017-01-11 |
Family
ID=57820156
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610857759.0A Pending CN106320183A (en) | 2016-09-28 | 2016-09-28 | Assembly type bent cap formwork system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106320183A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107443549A (en) * | 2017-08-31 | 2017-12-08 | 上海公路投资建设发展有限公司 | Multipurpose lighting integral cap girder steel formwork |
CN107587708A (en) * | 2017-09-22 | 2018-01-16 | 宁夏桥多美路桥钢模板科技有限公司 | Foldable high-altitude construction platform and high-altitude construction method |
CN109371822A (en) * | 2018-12-19 | 2019-02-22 | 中交二航局第三工程有限公司 | The motor-driven template of linear type rectangular pier and construction method |
US11479929B2 (en) | 2020-08-07 | 2022-10-25 | Peri Se | Formwork system and method |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100547591B1 (en) * | 2002-11-04 | 2006-01-31 | 지에스건설 주식회사 | Pier coping part pre-assembly method |
KR20070107250A (en) * | 2006-05-02 | 2007-11-07 | 한성산업(주) | Coping form system and method for constructing bridge pier using thereof |
KR20090128114A (en) * | 2008-06-10 | 2009-12-15 | 지에스건설 주식회사 | Concrete sheeting system for a bridge pier |
CN202359506U (en) * | 2011-12-15 | 2012-08-01 | 中交四航局第一工程有限公司 | Double hoop supporting system for pier column capping beam |
CN103556823A (en) * | 2013-10-28 | 2014-02-05 | 山西省第二建筑工程公司 | Construction method with silo sliding formwork operating platform as top cover plate formwork supporting system |
CN203923914U (en) * | 2014-05-20 | 2014-11-05 | 中交四公局第三工程有限公司 | Solely stub bent cap support |
CN204023422U (en) * | 2014-09-05 | 2014-12-17 | 中铁二十四局集团安徽工程有限公司 | A kind of assembling Coping Construction operating platform |
CN204825652U (en) * | 2015-06-16 | 2015-12-02 | 中国十七冶集团有限公司 | Bridge pier stud bent cap formwork support device |
-
2016
- 2016-09-28 CN CN201610857759.0A patent/CN106320183A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100547591B1 (en) * | 2002-11-04 | 2006-01-31 | 지에스건설 주식회사 | Pier coping part pre-assembly method |
KR20070107250A (en) * | 2006-05-02 | 2007-11-07 | 한성산업(주) | Coping form system and method for constructing bridge pier using thereof |
KR20090128114A (en) * | 2008-06-10 | 2009-12-15 | 지에스건설 주식회사 | Concrete sheeting system for a bridge pier |
CN202359506U (en) * | 2011-12-15 | 2012-08-01 | 中交四航局第一工程有限公司 | Double hoop supporting system for pier column capping beam |
CN103556823A (en) * | 2013-10-28 | 2014-02-05 | 山西省第二建筑工程公司 | Construction method with silo sliding formwork operating platform as top cover plate formwork supporting system |
CN203923914U (en) * | 2014-05-20 | 2014-11-05 | 中交四公局第三工程有限公司 | Solely stub bent cap support |
CN204023422U (en) * | 2014-09-05 | 2014-12-17 | 中铁二十四局集团安徽工程有限公司 | A kind of assembling Coping Construction operating platform |
CN204825652U (en) * | 2015-06-16 | 2015-12-02 | 中国十七冶集团有限公司 | Bridge pier stud bent cap formwork support device |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107443549A (en) * | 2017-08-31 | 2017-12-08 | 上海公路投资建设发展有限公司 | Multipurpose lighting integral cap girder steel formwork |
CN107587708A (en) * | 2017-09-22 | 2018-01-16 | 宁夏桥多美路桥钢模板科技有限公司 | Foldable high-altitude construction platform and high-altitude construction method |
CN107587708B (en) * | 2017-09-22 | 2023-12-22 | 昌吉城建市政工程建设有限公司 | Foldable high-altitude construction platform and high-altitude construction method |
CN109371822A (en) * | 2018-12-19 | 2019-02-22 | 中交二航局第三工程有限公司 | The motor-driven template of linear type rectangular pier and construction method |
US11479929B2 (en) | 2020-08-07 | 2022-10-25 | Peri Se | Formwork system and method |
US11885083B2 (en) | 2020-08-07 | 2024-01-30 | Peri Se | Formwork system and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102535845A (en) | Construction method of bearing frame of corridor structure | |
CN109914244B (en) | Weak bracket system suitable for high-tower reinforced concrete combined beam steel structure installation and bottom and top plate concrete pouring and operation method thereof | |
CN107989447A (en) | A kind of large-scale earthing concrete tank dome steel support structure and installation method | |
CN110878522B (en) | Main tower lower cross beam construction system and construction method | |
CN106320183A (en) | Assembly type bent cap formwork system | |
CN103362069B (en) | Steel and concrete combined box girder concrete wing plate formwork and construction method | |
CN110409624B (en) | Reverse calculation and construction method for large equipment installation and main body structure | |
CN103452350A (en) | Fabricated electronic workshop and construction method thereof | |
CN106351445A (en) | Bracing reinforcement system and installation construction method of steel reinforced concrete inclined shear wall form assembly | |
CN105780922B (en) | Large span steel reinforced concrete transfer truss segmental hoisting formwork system construction method | |
CN104831639A (en) | Consolidation and release construction method for 0# blocks of ultra-wide non-uniform continuous beam | |
CN207974601U (en) | A kind of large size earthing concrete tank dome steel support structure | |
CN110863563B (en) | Ultra-long cantilever and pull rod combined structure and construction method | |
CN112726411A (en) | Integral dragging construction method for single-hole large cantilever steel truss girder | |
CN203475310U (en) | Formwork for concrete slabs of composite steel-concrete box girders | |
CN112160247B (en) | Construction method of asynchronous hydraulic creeping formwork for hollow high pier of limited space pier group | |
CN206902913U (en) | A kind of high-altitude long-span overhung structure | |
CN204780635U (en) | Super wide nonprismatic continuous beam 0# piece concreties and relieves construction structures | |
CN111424948A (en) | Construction method and construction platform for cantilever structure layer of high-rise building | |
CN106381810A (en) | Beam-and-column type bracket and method for casting-in-place cantilever perfusion beam with beam-and-column type bracket | |
CN114277672B (en) | Large-span prestressed concrete bent cap structure and construction method thereof | |
CN110792282B (en) | Transformation method of frame column without support underpinning | |
CN212224301U (en) | Anti structure of splitting of infilled wall combination | |
CN210621475U (en) | Cast-in-situ bent cap assembled steel pipe support | |
CN208201663U (en) | Overlapped beam of continuous rigid frame bridge box girder 0# block corbel-free cast-in-place support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170111 |